(NFPA) Standard 805 (NFPA 805),
‘‘Performance-Based Standard for Fire
Protection for Light Water Reactor
Electric Generating Plants,’’ 2001
Edition. Copies of NFPA 805 may be
purchased from the NFPA Customer
Service Department, 1 Batterymarch
Park, P.O. Box 9101, Quincy,
Massachusetts 02269–9101 and in PDF
format through the NFPA Online
Catalog (https://www.nfpa.org) or by
calling 1–800–344–3555 or 617–770–
3000. Copies are also available for
inspection at the NRC Library, Two
White Flint North, 11545 Rockville
Pike, Rockville, Maryland 20852–2738,
and at the NRC PDR, One White Flint
North, Room O1–F15, 11555 Rockville
Pike, Rockville, Maryland 20852–2738.
Date of issuance: March 31, 2016.
Effective date: As of the date of
issuance and shall be implemented as
described in the transition license
conditions.
Amendment Nos.: 231 and 181. A
publicly-available version is in ADAMS
under Accession No. ML15344A346;
documents related to these amendments
are listed in the Safety Evaluation
enclosed with the amendments.
Renewed Facility Operating License
Nos. DPR–67 and NPF–16: Amendments
revised the Renewed Facility Operating
Licenses and Technical Specifications.
Date of initial notice in Federal
Register: December 26, 2013 (78 FR
78407). The supplemental letters dated
February 24, March 25, April 25, July
14, August 27, September 10, and
October 10, 2014; and March 10, April
1, April 20, May 12, August 21, and
October 22, 2015, provided additional
information that clarified the
application, did not expand the scope of
the application as originally noticed,
and did not change the staff’s original
proposed no significant hazards
consideration determination as
published in the Federal Register.
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated March 31, 2016.
No significant hazards consideration
comments received: No.
mstockstill on DSK4VPTVN1PROD with NOTICES
Omaha Public Power District, Docket
No. 50–285, Fort Calhoun Station, Unit
No. 1, Washington County, Nebraska
Date of amendment request: July 24,
2015.
Brief description of amendment: The
amendment revised the Technical
Specification (TS) Surveillance
Requirements (SRs), which currently
require operation of ventilation systems
with charcoal filters for a 10-hour
period at a monthly frequency. The SRs
are revised to require operation of the
VerDate Sep<11>2014
22:08 Apr 25, 2016
Jkt 238001
systems for 15 continuous minutes at a
monthly frequency.
Date of issuance: April 5, 2016.
Effective date: As of the date of
issuance and shall be implemented
within 90 days from the date of
issuance.
Amendment No.: 287. A publiclyavailable version is in ADAMS under
Accession No. ML16084A755;
documents related to this amendment
are listed in the Safety Evaluation
enclosed with the amendment.
Renewed Facility Operating License
No. DPR–40: The amendment revised
the License and Technical
Specifications.
Date of initial notice in Federal
Register: October 13, 2015 (80 FR
61485).
The Commission’s related evaluation
of the amendment is contained in a
Safety Evaluation dated April 5, 2016.
No significant hazards consideration
comments received: No.
PSEG Nuclear LLC and Exelon
Generation Company, LLC, Docket Nos.
50–272 and 50–311, Salem Nuclear
Generating Station (Salem), Unit Nos. 1
and 2, Salem County, New Jersey
Date of amendment request: March
27, 2015, as supplemented by letter
dated February 3, 2016.
Brief description of amendments: The
amendments revised certain Technical
Specification (TS) 3/4.3.1, ‘‘Reactor Trip
System Instrumentation,’’ actions.
Specifically, TS Table 3.3–1, Action 2,
is revised to allow one power range (PR)
channel to be bypassed for up to 4 hours
for surveillance testing, and two new
action notes are established for the PR
nuclear instrumentation in TS Table
4.3–1. The changes support the
installation and use of bypass test
capability for the PR nuclear
instrumentation.
Date of issuance: March 28, 2016.
Effective date: As of the date of
issuance and shall be implemented at
Salem, Unit No. 1, prior to returning to
the MODE of applicability following
refueling outage 1R24, and at Salem,
Unit No. 2, prior to returning to the
MODE of applicability following
refueling outage 2R22.
Amendment Nos.: 312 (Unit No. 1)
and 293 (Unit No. 2). A publiclyavailable version is in ADAMS under
Accession No. ML16054A068;
documents related to these amendments
are listed in the Safety Evaluation
enclosed with the amendments.
Renewed Facility Operating License
Nos. DPR–70 and DPR–75: Amendments
revised the Renewed Facility Operating
Licenses and TSs.
PO 00000
Frm 00114
Fmt 4703
Sfmt 9990
24667
Date of initial notice in Federal
Register: July 7, 2015 (80 FR 38776).
The supplemental letter dated February
3, 2016, provided additional
information that clarified the
application, did not expand the scope of
the application as originally noticed,
and did not change the staff’s original
proposed no significant hazards
consideration determination as
published in the Federal Register.
The Commission’s related evaluation
of the amendments is contained in a
Safety Evaluation dated March 28, 2016.
No significant hazards consideration
comments received: No.
Dated at Rockville, Maryland, this 15th day
of April 2016.
For the Nuclear Regulatory Commission.
Anne T. Boland,
Director, Division of Operating Reactor
Licensing, Office of Nuclear Reactor
Regulation.
[FR Doc. 2016–09543 Filed 4–25–16; 8:45 am]
BILLING CODE 7590–01–P
POSTAL SERVICE
Product Change—Priority Mail
Negotiated Service Agreement
AGENCY:
ACTION:
Postal ServiceTM.
Notice.
The Postal Service gives
notice of filing a request with the Postal
Regulatory Commission to add a
domestic shipping services contract to
the list of Negotiated Service
Agreements in the Mail Classification
Schedule’s Competitive Products List.
SUMMARY:
DATES:
Effective date: April 26, 2016.
FOR FURTHER INFORMATION CONTACT:
Elizabeth A. Reed, 202–268–3179.
The
United States Postal Service® hereby
gives notice that, pursuant to 39 U.S.C.
3642 and 3632(b)(3), on April 20, 2016,
it filed with the Postal Regulatory
Commission a Request of the United
States Postal Service to Add Priority
Mail Contract 208 to Competitive
Product List. Documents are available at
www.prc.gov, Docket Nos. MC2016–123,
CP2016–156.
SUPPLEMENTARY INFORMATION:
Stanley F. Mires,
Attorney, Federal Compliance.
[FR Doc. 2016–09621 Filed 4–25–16; 8:45 am]
BILLING CODE 7710–12–P
E:\FR\FM\26APN1.SGM
26APN1
Agencies
[Federal Register Volume 81, Number 80 (Tuesday, April 26, 2016)]
[Notices]
[Page 24667]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-09621]
=======================================================================
-----------------------------------------------------------------------
POSTAL SERVICE
Product Change--Priority Mail Negotiated Service Agreement
AGENCY: Postal ServiceTM.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: The Postal Service gives notice of filing a request with the
Postal Regulatory Commission to add a domestic shipping services
contract to the list of Negotiated Service Agreements in the Mail
Classification Schedule's Competitive Products List.
DATES: Effective date: April 26, 2016.
FOR FURTHER INFORMATION CONTACT: Elizabeth A. Reed, 202-268-3179.
SUPPLEMENTARY INFORMATION: The United States Postal Service[supreg]
hereby gives notice that, pursuant to 39 U.S.C. 3642 and 3632(b)(3), on
April 20, 2016, it filed with the Postal Regulatory Commission a
Request of the United States Postal Service to Add Priority Mail
Contract 208 to Competitive Product List. Documents are available at
www.prc.gov, Docket Nos. MC2016-123, CP2016-156.
Stanley F. Mires,
Attorney, Federal Compliance.
[FR Doc. 2016-09621 Filed 4-25-16; 8:45 am]
BILLING CODE 7710-12-P