Interconnect Solar Development LLC; Notice of Petition for Enforcement, 24087 [2016-09479]
Download as PDF
Federal Register / Vol. 81, No. 79 / Monday, April 25, 2016 / Notices
24087
37
letters have been sent to FERC Commissioners and staff under this docket number.
letters have been sent to FERC Commissioners and staff under this docket number.
letters have been sent to FERC Commissioners and staff under this docket number.
6 4 letters have been sent to FERC Commissioners and staff under this docket number.
7 2 letters have been sent to FERC Commissioners and staff under this docket number.
8 3 letters have been sent to FERC Commissioners and staff under this docket number.
9 Meeting Summary from April 6, 2016 conference call between FERC, Golden Pass LNG, and CH–IV.
47
52
Dated: April 19, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on May 9, 2016.
[FR Doc. 2016–09476 Filed 4–22–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. EL16–55–000QF11–204–
002QF11–205–002]
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Interconnect Solar Development LLC;
Notice of Petition for Enforcement
Take notice that on April 18, 2016,
pursuant to section 210 m of the Public
Utility Regulatory Policies Act of 1978
(PURPA), 16 U.S.C. 824a–3(b),
Interconnect Solar Development LLC
filed a Petition for Enforcement alleging
unlawful cancellation of QF Power
Purchase Agreement and requesting the
Federal Energy Regulatory Commission
(Commission) to reincorporate previous
FERC Docket Nos. EL13–51–000, Docket
No. QF11–204–001 and QF11–205–001.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
VerDate Sep<11>2014
19:02 Apr 22, 2016
Jkt 238001
Dated: April 19, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–09479 Filed 4–22–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6057–004]
James and Sharon Jans; Notice of
Application Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Proceeding: Surrender of
Exemption.
b. Project No.: 6057–004.
c. Date Filed: August 3, 2015, and
supplemented on April 14, 2016.
d. Exemptee: James and Sharon Jans.
e. Name of Project: Odell Creek Hydro
Project.
f. Location: The project is located at
Odell Creek in Hood River County,
Oregon. The project does not occupy
federal lands.
g. Filed Pursuant to: 18 CFR 4.102.
h. Exemptee Contact: Mr. and Mrs.
James and Sharon Jans, 4025 Summit
Drive, Hood River, OR 97031,
Telephone: (541) 806–2848, and Cindy
Thieman, Hood River Soil and Water
Conservation District (SWCD), 3007
Experiment Station Dr., Hood River, OR
97031, Telephone: (541) 386–6063.
i. FERC Contact: Mr. Ashish Desai,
(202) 502–8370, ashish.desai@ferc.gov.
j. Deadline for filing comments,
interventions and protests is 30 days
from the issuance date of this notice by
the Commission. The Commission
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
strongly encourages electronic filing.
Please file motions to intervene, protests
and comments using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–6057–004.
k. Description of Project Facilities:
The project consists of: (1) A 12-foothigh diversion structure; (2) a 42-inchdiameter, 1,095-foot-long corrugated
metal pipeline connected by a surge
tank to a 34-inch-diameter, 418-footlong steel penstock; (3) a powerhouse
containing three generating units with a
total rated capacity of 225-kilowatts; (4)
a 1,200-foot-long, 15-kilovolt
transmission line; (5) intake fish
screens; (6) a weir fish ladder on the
right side of the diversion structure; and
(7) appurtenant facilities.
l. Description of Proceeding: On
August 18, 2015, and supplemented on
April 14, 2016, James and Sharon Jans,
exemptee, filed an application stating
that due to financial and regulatory
challenges it would surrender and
decommission the existing Odell Creek
Hydroelectric Project. The exemptee
proposes to remove the diversion
structure, fish ladder, and portions of
the penstock and to restore the stream
channel. The generating and
transmission facilities would also be
removed; however, the exemptee would
secure the powerhouse which would
remain in place.
m. Locations of the Application: This
filing may be viewed on the
Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
E:\FR\FM\25APN1.SGM
25APN1
Agencies
[Federal Register Volume 81, Number 79 (Monday, April 25, 2016)]
[Notices]
[Page 24087]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-09479]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. EL16-55-000QF11-204-002QF11-205-002]
Interconnect Solar Development LLC; Notice of Petition for
Enforcement
Take notice that on April 18, 2016, pursuant to section 210 m of
the Public Utility Regulatory Policies Act of 1978 (PURPA), 16 U.S.C.
824a-3(b), Interconnect Solar Development LLC filed a Petition for
Enforcement alleging unlawful cancellation of QF Power Purchase
Agreement and requesting the Federal Energy Regulatory Commission
(Commission) to reincorporate previous FERC Docket Nos. EL13-51-000,
Docket No. QF11-204-001 and QF11-205-001.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date. On or
before the comment date, it is not necessary to serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on May 9, 2016.
Dated: April 19, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-09479 Filed 4-22-16; 8:45 am]
BILLING CODE 6717-01-P