Download as PDF Federal Register / Vol. 81, No. 79 / Monday, April 25, 2016 / Notices 24087 37 letters have been sent to FERC Commissioners and staff under this docket number. letters have been sent to FERC Commissioners and staff under this docket number. letters have been sent to FERC Commissioners and staff under this docket number. 6 4 letters have been sent to FERC Commissioners and staff under this docket number. 7 2 letters have been sent to FERC Commissioners and staff under this docket number. 8 3 letters have been sent to FERC Commissioners and staff under this docket number. 9 Meeting Summary from April 6, 2016 conference call between FERC, Golden Pass LNG, and CH–IV. 47 52 Dated: April 19, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on May 9, 2016. [FR Doc. 2016–09476 Filed 4–22–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EL16–55–000QF11–204– 002QF11–205–002] asabaliauskas on DSK3SPTVN1PROD with NOTICES Interconnect Solar Development LLC; Notice of Petition for Enforcement Take notice that on April 18, 2016, pursuant to section 210 m of the Public Utility Regulatory Policies Act of 1978 (PURPA), 16 U.S.C. 824a–3(b), Interconnect Solar Development LLC filed a Petition for Enforcement alleging unlawful cancellation of QF Power Purchase Agreement and requesting the Federal Energy Regulatory Commission (Commission) to reincorporate previous FERC Docket Nos. EL13–51–000, Docket No. QF11–204–001 and QF11–205–001. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public VerDate Sep<11>2014 19:02 Apr 22, 2016 Jkt 238001 Dated: April 19, 2016. Kimberly D. Bose, Secretary. [FR Doc. 2016–09479 Filed 4–22–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 6057–004] James and Sharon Jans; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Proceeding: Surrender of Exemption. b. Project No.: 6057–004. c. Date Filed: August 3, 2015, and supplemented on April 14, 2016. d. Exemptee: James and Sharon Jans. e. Name of Project: Odell Creek Hydro Project. f. Location: The project is located at Odell Creek in Hood River County, Oregon. The project does not occupy federal lands. g. Filed Pursuant to: 18 CFR 4.102. h. Exemptee Contact: Mr. and Mrs. James and Sharon Jans, 4025 Summit Drive, Hood River, OR 97031, Telephone: (541) 806–2848, and Cindy Thieman, Hood River Soil and Water Conservation District (SWCD), 3007 Experiment Station Dr., Hood River, OR 97031, Telephone: (541) 386–6063. i. FERC Contact: Mr. Ashish Desai, (202) 502–8370, ashish.desai@ferc.gov. j. Deadline for filing comments, interventions and protests is 30 days from the issuance date of this notice by the Commission. The Commission PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 strongly encourages electronic filing. Please file motions to intervene, protests and comments using the Commission’s eFiling system at https://www.ferc.gov/ docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–6057–004. k. Description of Project Facilities: The project consists of: (1) A 12-foothigh diversion structure; (2) a 42-inchdiameter, 1,095-foot-long corrugated metal pipeline connected by a surge tank to a 34-inch-diameter, 418-footlong steel penstock; (3) a powerhouse containing three generating units with a total rated capacity of 225-kilowatts; (4) a 1,200-foot-long, 15-kilovolt transmission line; (5) intake fish screens; (6) a weir fish ladder on the right side of the diversion structure; and (7) appurtenant facilities. l. Description of Proceeding: On August 18, 2015, and supplemented on April 14, 2016, James and Sharon Jans, exemptee, filed an application stating that due to financial and regulatory challenges it would surrender and decommission the existing Odell Creek Hydroelectric Project. The exemptee proposes to remove the diversion structure, fish ladder, and portions of the penstock and to restore the stream channel. The generating and transmission facilities would also be removed; however, the exemptee would secure the powerhouse which would remain in place. m. Locations of the Application: This filing may be viewed on the Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via E:\FR\FM\25APN1.SGM 25APN1

Agencies

[Federal Register Volume 81, Number 79 (Monday, April 25, 2016)]
[Notices]
[Page 24087]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-09479]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. EL16-55-000QF11-204-002QF11-205-002]


Interconnect Solar Development LLC; Notice of Petition for 
Enforcement

    Take notice that on April 18, 2016, pursuant to section 210 m of 
the Public Utility Regulatory Policies Act of 1978 (PURPA), 16 U.S.C. 
824a-3(b), Interconnect Solar Development LLC filed a Petition for 
Enforcement alleging unlawful cancellation of QF Power Purchase 
Agreement and requesting the Federal Energy Regulatory Commission 
(Commission) to reincorporate previous FERC Docket Nos. EL13-51-000, 
Docket No. QF11-204-001 and QF11-205-001.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. On or 
before the comment date, it is not necessary to serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 5 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on May 9, 2016.

    Dated: April 19, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-09479 Filed 4-22-16; 8:45 am]