Combined Notice of Filings, 23478-23479 [2016-09255]
Download as PDF
jstallworth on DSK7TPTVN1PROD with NOTICES
23478
Federal Register / Vol. 81, No. 77 / Thursday, April 21, 2016 / Notices
filed in the above referenced docket an
application pursuant to sections 7(c) of
the Natural Gas Act (NGA), and Part 157
of the Commission’s regulations
requesting authorization to construct
and operate its Fields Point Liquefaction
Project (Project) located in Providence,
RI, all as more fully set forth in the
application which is on file with the
Commission and open to public
inspection. The filing is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site web at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions concerning this
application may be directed to Andrea
Wolfman, Alston & Bird LLP, 950 F
Street NW., Washington, DC 20004; by
calling (202) 239–3943; by faxing (202)
239–3943; or by emailing
andrea.wolfman@alston.com.
Specifically, NGLNG proposes to
construct and operate one (1) new 20
million cubic feet per day (MMcf/d) gas
pretreatment and liquefaction system to
convert natural gas delivered by
pipeline into liquefied natural gas
(LNG). The liquefaction facility is
designed to enable NGLNG to provide
up to 20,600 dekatherms per day (Dth/
day) liquefaction service at its existing
LNG storage facility. NGLNG estimates
the total cost of the liquefaction Project
to be $180 million. Additionally,
NGLNG intends to undertake another
project on its existing plant site at the
same time. A storage tank containment
enhancement project, called the Bund
Wall Project, is planned to add a
reinforced concrete bund wall around
the existing tank. Both of these projects
will be reviewed by the Commission in
a single environment review process
which has been underway per the
Notice of Intent to Prepare an
Environmental Document issued in
Docket No. PF15–28–000 on September
25, 2015.
On July 2, 2015 the Commission
granted NGLNG’s request to utilize the
Pre-Filing Process and assigned Docket
No. PF15–28–000 to staff activities
involved in the Project. Now, as of the
filing of the April 1, 2016 application,
the Pre-Filing Process for this Project
has ended. From this time forward, this
proceeding will be conducted in Docket
No. CP16–121–000 as noted in the
caption of this Notice.
Pursuant to section 157.9 of the
Commission’s rules (18 CFR 157.9),
VerDate Sep<11>2014
13:27 Apr 20, 2016
Jkt 238001
within 90 days of this Notice, the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
seven copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 7 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern
Time on May 6, 2016.
Dated: April 15, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–09226 Filed 4–20–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP16–834–000.
Applicants: Sabine Pipe Line LLC.
Description: § 4(d) Rate Filing: Sabine
Clean-up Filing 4–12–16 to be effective
4/1/2016.
Filed Date: 4/12/16.
Accession Number: 20160412–5114.
Comments Due: 5 p.m. ET 4/25/16.
Docket Numbers: RP16–835–000.
Applicants: Kinetica Energy Express,
LLC.
Description: Compliance filing
Compliance Filing for Order Nos 587–W
and 809 Revised Sheet 119 to be
effective 4/1/2016.
Filed Date: 4/12/16.
Accession Number: 20160412–5292.
E:\FR\FM\21APN1.SGM
21APN1
Federal Register / Vol. 81, No. 77 / Thursday, April 21, 2016 / Notices
Comments Due: 5 p.m. ET 4/25/16.
Docket Numbers: RP16–836–000.
Applicants: Northern Natural Gas
Company.
Description: § 4(d) Rate Filing:
20160412 Negotiated Rate to be effective
4/13/2016.
Filed Date: 4/12/16.
Accession Number: 20160412–5294.
Comments Due: 5 p.m. ET 4/25/16.
Docket Numbers: RP16–837–000.
Applicants: Black Marlin Pipeline
Company.
Description: Black Marlin Pipeline
Company’s 2016 Cash-Out Report.
Filed Date: 4/12/16.
Accession Number: 20160412–5310.
Comments Due: 5 p.m. ET 4/25/16.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
jstallworth on DSK7TPTVN1PROD with NOTICES
Filings in Existing Proceedings
Docket Numbers: RP16–474–001.
Applicants: ANR Storage Company.
Description: Compliance filing
Compliance to RP16–474–000 to be
effective 4/1/2016.
Filed Date: 4/12/16.
Accession Number: 20160412–5079.
Comments Due: 5 p.m. ET 4/25/16.
Docket Numbers: RP16–481–001.
Applicants: Bison Pipeline LLC.
Description: Compliance filing
Compliance to RP16–481–000 to be
effective 4/1/2016.
Filed Date: 4/12/16.
Accession Number: 20160412–5080.
Comments Due: 5 p.m. ET 4/25/16.
Docket Numbers: RP16–485–001.
Applicants: Blue Lake Gas Storage
Company.
Description: Compliance filing
Compliance to RP16–485–000 to be
effective 4/1/2016.
Filed Date: 4/12/16.
Accession Number: 20160412–5077.
Comments Due: 5 p.m. ET 4/25/16.
Docket Numbers: RP16–563–001.
Applicants: Pine Needle LNG
Company, LLC.
Description: Compliance filing Pine
Needle Order No. 587–W (NAESB
Version 3.0) Second Compliance to be
effective 4/1/2016.
Filed Date: 4/12/16.
Accession Number: 20160412–5278.
Comments Due: 5 p.m. ET 4/25/16.
Docket Numbers: RP16–565–001.
Applicants: Transcontinental Gas
Pipe Line Company,
VerDate Sep<11>2014
13:27 Apr 20, 2016
Jkt 238001
Description: Compliance filing Order
No. 587–W (NAESB Version 3.0) Second
Compliance to be effective 4/1/2016.
Filed Date: 4/12/16.
Accession Number: 20160412–5291.
Comments Due: 5 p.m. ET 4/25/16.
Docket Numbers: RP16–571–001.
Applicants: Enable Mississippi River
Transmission, L.
Description: Compliance filing
NAESB 3.0 Compliance Filing to be
effective 4/1/2016.
Filed Date: 4/12/16.
Accession Number: 20160412–5130.
Comments Due: 5 p.m. ET 4/25/16.
Any person desiring to protest in any
of the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 13, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–09255 Filed 4–20–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER16–1427–000.
Applicants: Public Service Company
of Colorado.
Description: Tariff Cancellation:
2016–4–15_PSCo Cancel Tariff ID to be
effective 4/15/2016.
Filed Date: 4/15/16.
Accession Number: 20160415–5152.
Comments Due: 5 p.m. ET 5/6/16.
Docket Numbers: ER16–1428–000.
Applicants: Public Service Company
of Colorado.
Description: Compliance filing: Rebaseline to be effective 4/16/2016.
Filed Date: 4/15/16.
Accession Number: 20160415–5157.
Comments Due: 5 p.m. ET 5/6/16.
Docket Numbers: ER16–1429–000.
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
23479
Applicants: Northern States Power
Company, a Minnesota corporation.
Description: Compliance filing: Rebaseline to be effective 4/16/2016.
Filed Date: 4/15/16.
Accession Number: 20160415–5167.
Comments Due: 5 p.m. ET 5/6/16.
Docket Numbers: ER16–1430–000.
Applicants: Northern States Power
Company, a Wisconsin corporation.
Description: Compliance filing: Rebaseline to be effective 4/16/2016.
Filed Date: 4/15/16.
Accession Number: 20160415–5168.
Comments Due: 5 p.m. ET 5/6/16.
Docket Numbers: ER16–1431–000.
Applicants: Southwestern Public
Service Company.
Description: Compliance filing: Rebaseline to be effective 4/16/2016.
Filed Date: 4/15/16.
Accession Number: 20160415–5177.
Comments Due: 5 p.m. ET 5/6/16.
Docket Numbers: ER16–1432–000.
Applicants: Southwestern Public
Service Company.
Description: Tariff Cancellation: 4–
15–16 SPS Tariff ID1000 NOC to be
effective 4/15/2016.
Filed Date: 4/15/16.
Accession Number: 20160415–5181.
Comments Due: 5 p.m. ET 5/6/16.
Docket Numbers: ER16–1433–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing: 2016
Revised Added Facilities Rate under
WDAT—Filing No. 6 to be effective 1/
1/2016.
Filed Date: 4/15/16.
Accession Number: 20160415–5182.
Comments Due: 5 p.m. ET 5/6/16.
Docket Numbers: ER16–1434–000.
Applicants: ISO New England Inc.,
New England Power Pool Participants
Committee.
Description: Compliance filing: Zonal
Demand Curves 206 Filing to be
effective 6/15/2016.
Filed Date: 4/15/16.
Accession Number: 20160415–5202.
Comments Due: 5 p.m. ET 5/6/16.
Docket Numbers: ER16–1435–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing: TriState Master Install, O&M Agmt for
Metering Equipment to be effective 6/
15/2016.
Filed Date: 4/15/16.
Accession Number: 20160415–5206.
Comments Due: 5 p.m. ET 5/6/16.
Docket Numbers: ER16–1436–000.
Applicants: Public Service Company
of Colorado.
Description: Tariff Cancellation:
20160415_PSCo Tariff Cancellation to
be effective 4/15/2016.
E:\FR\FM\21APN1.SGM
21APN1
Agencies
[Federal Register Volume 81, Number 77 (Thursday, April 21, 2016)]
[Notices]
[Pages 23478-23479]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-09255]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP16-834-000.
Applicants: Sabine Pipe Line LLC.
Description: Sec. 4(d) Rate Filing: Sabine Clean-up Filing 4-12-16
to be effective 4/1/2016.
Filed Date: 4/12/16.
Accession Number: 20160412-5114.
Comments Due: 5 p.m. ET 4/25/16.
Docket Numbers: RP16-835-000.
Applicants: Kinetica Energy Express, LLC.
Description: Compliance filing Compliance Filing for Order Nos 587-
W and 809 Revised Sheet 119 to be effective 4/1/2016.
Filed Date: 4/12/16.
Accession Number: 20160412-5292.
[[Page 23479]]
Comments Due: 5 p.m. ET 4/25/16.
Docket Numbers: RP16-836-000.
Applicants: Northern Natural Gas Company.
Description: Sec. 4(d) Rate Filing: 20160412 Negotiated Rate to be
effective 4/13/2016.
Filed Date: 4/12/16.
Accession Number: 20160412-5294.
Comments Due: 5 p.m. ET 4/25/16.
Docket Numbers: RP16-837-000.
Applicants: Black Marlin Pipeline Company.
Description: Black Marlin Pipeline Company's 2016 Cash-Out Report.
Filed Date: 4/12/16.
Accession Number: 20160412-5310.
Comments Due: 5 p.m. ET 4/25/16.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
Filings in Existing Proceedings
Docket Numbers: RP16-474-001.
Applicants: ANR Storage Company.
Description: Compliance filing Compliance to RP16-474-000 to be
effective 4/1/2016.
Filed Date: 4/12/16.
Accession Number: 20160412-5079.
Comments Due: 5 p.m. ET 4/25/16.
Docket Numbers: RP16-481-001.
Applicants: Bison Pipeline LLC.
Description: Compliance filing Compliance to RP16-481-000 to be
effective 4/1/2016.
Filed Date: 4/12/16.
Accession Number: 20160412-5080.
Comments Due: 5 p.m. ET 4/25/16.
Docket Numbers: RP16-485-001.
Applicants: Blue Lake Gas Storage Company.
Description: Compliance filing Compliance to RP16-485-000 to be
effective 4/1/2016.
Filed Date: 4/12/16.
Accession Number: 20160412-5077.
Comments Due: 5 p.m. ET 4/25/16.
Docket Numbers: RP16-563-001.
Applicants: Pine Needle LNG Company, LLC.
Description: Compliance filing Pine Needle Order No. 587-W (NAESB
Version 3.0) Second Compliance to be effective 4/1/2016.
Filed Date: 4/12/16.
Accession Number: 20160412-5278.
Comments Due: 5 p.m. ET 4/25/16.
Docket Numbers: RP16-565-001.
Applicants: Transcontinental Gas Pipe Line Company,
Description: Compliance filing Order No. 587-W (NAESB Version 3.0)
Second Compliance to be effective 4/1/2016.
Filed Date: 4/12/16.
Accession Number: 20160412-5291.
Comments Due: 5 p.m. ET 4/25/16.
Docket Numbers: RP16-571-001.
Applicants: Enable Mississippi River Transmission, L.
Description: Compliance filing NAESB 3.0 Compliance Filing to be
effective 4/1/2016.
Filed Date: 4/12/16.
Accession Number: 20160412-5130.
Comments Due: 5 p.m. ET 4/25/16.
Any person desiring to protest in any of the above proceedings must
file in accordance with Rule 211 of the Commission's Regulations (18
CFR 385.211) on or before 5:00 p.m. Eastern time on the specified
comment date.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: April 13, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-09255 Filed 4-20-16; 8:45 am]
BILLING CODE 6717-01-P