Completion Date of Cyber Security Plan Implementation Milestone 8; Tennessee Valley Authority; Watts Bar Nuclear Plant, Unit 1, 23011-23016 [2016-09042]
Download as PDF
Federal Register / Vol. 81, No. 75 / Tuesday, April 19, 2016 / Notices
mstockstill on DSK4VPTVN1PROD with NOTICES
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
ADAMS accession number for each
document referenced (if that document
is available in ADAMS) is provided the
first time that a document is referenced.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT:
William Allen, Office of Nuclear
Material Safety and Safeguards, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001; telephone:
301–415–6877, email: William.Allen@
nrc.gov.
SUPPLEMENTARY INFORMATION: By letter
dated September 16, 2015 (ADAMS
Accession No. ML15259A590), as
supplemented January 27, 2016
(ADAMS Accession No. ML16027A357),
PG&E submitted a license amendment
request (LAR) to the NRC in accordance
with section 72.56 of title 10 of the Code
of Federal Regulations (10 CFR). The
LAR requested that the TS of Materials
License No. SNM–2511 be amended by
(a) removing references to preferential
loading from the TS, and (b) making
editorial corrections to the TS, to
improve their readability and human
factors usage. The NRC staff (staff)
docketed the application, and in
accordance with 10 CFR 72.46(b)(1), a
Notice of Proposed Action and a Notice
of Opportunity for Hearing was
published in the Federal Register on
October 30, 2015 (80 FR 66938). No
requests for a hearing or leave to
intervene were submitted.
The staff has completed its review of
the September, 2015 LAR, and has
determined that it complies with the
standards and requirements of the
Atomic Energy Act of 1954, as amended
(the Act), as well as the NRC’s rules and
regulations. As required by the Act and
the NRC’s rules and regulations in 10
CFR Chapter 1, the staff made the
appropriate findings which are
contained in a Safety Evaluation Report
(ADAMS Accession No. ML16048A478).
The NRC has thus granted the LAR and
has accordingly issued Amendment No.
5 to Materials License No. SNM–2511.
Environmental Consideration
The staff’s environmental review of
the proposed action is set forth in the
Safety Evaluation Report. The staff
found that the LAR met the categorical
exclusion criteria in 10 CFR
51.22(c)(11). Specifically, the staff
determined that granting the LAR (i)
VerDate Sep<11>2014
18:02 Apr 18, 2016
Jkt 238001
does not produce a significant change in
either the type or amount of effluents
released to the environment; (ii) does
not produce a significant increase in
occupational radiation exposure; (iii)
does not have significant construction
impacts; and (iv) does not produce a
significant increase in the potential for
or consequences from radiological
accidents. Accordingly, pursuant to 10
CFR 51.22(b), neither an environmental
assessment nor an environmental
impact statement was required for this
proposed action. This amendment was
effective upon issuance.
Dated at Rockville, Maryland, this 7th day
of April, 2016.
For the Nuclear Regulatory Commission.
Steve Ruffin,
Acting Chief, Spent Fuel Licensing Branch,
Division of Spent Fuel Management, Office
of Nuclear Material Safety and Safeguards.
[FR Doc. 2016–09041 Filed 4–18–16; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–390; NRC–2016–0076]
Completion Date of Cyber Security
Plan Implementation Milestone 8;
Tennessee Valley Authority; Watts Bar
Nuclear Plant, Unit 1
23011
this document describes a different
method for submitting comments on a
specific subject):
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2016–0076. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–415–3463;
email: Carol.Gallagher@nrc.gov. For
technical questions, contact the
individual listed in the FOR FURTHER
INFORMATION CONTACT section of this
document.
• Mail comments to: Cindy Bladey,
Office of Administration, Mail Stop:
OWFN–12–H08, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001.
For additional direction on obtaining
information and submitting comments,
see ‘‘Obtaining Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
FOR FURTHER INFORMATION CONTACT:
Robert Schaaf, Office of Nuclear Reactor
Regulation, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001; telephone: 301–415–6020, email:
Robert.Schaaf@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and
Submitting Comments
AGENCY:
A. Obtaining Information
The U.S. Nuclear Regulatory
Commission (NRC) is considering
issuance of an amendment to Facility
Operating License No. NPF–90, issued
to the Tennessee Valley Authority, for
operation of the Watts Bar Nuclear Plant
(WBN), Unit 1. The proposed
amendment would revise the WBN,
Unit 1, Cyber Security Plan (CSP)
implementation schedule for Milestone
8 and would revise the associated
license condition in the Facility
Operating License. The amendment
request contains sensitive unclassified
non-safeguards information (SUNSI).
DATES: Submit comments by May 19,
2016. Requests for a hearing or petition
for leave to intervene must be filed by
June 20, 2016. Any potential party as
defined in § 2.4 of title 10 of the Code
of Federal Regulations (10 CFR), who
believes access to SUNSI is necessary to
respond to this notice must request
document access by April 29, 2016.
ADDRESSES: You may submit comments
by any of the following methods (unless
Please refer to Docket ID NRC–2016–
0076 when contacting the NRC about
the availability of information for this
action. You may obtain publiclyavailable information related to this
action by any of the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2016–0076.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may obtain publiclyavailable documents online in the
ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/
adams.html. To begin the search, select
‘‘ADAMS Public Documents’’ and then
select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. The
License Amendment Request (WBN–
TS–16–04) to Change the Completion
Date of Cyber Security Plan
Implementation Milestone 8 is available
in ADAMS under Accession No.
ML16064A488.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
Nuclear Regulatory
Commission.
ACTION: License amendment application;
opportunity to comment, request a
hearing, and petition for leave to
intervene; order.
SUMMARY:
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
E:\FR\FM\19APN1.SGM
19APN1
23012
Federal Register / Vol. 81, No. 75 / Tuesday, April 19, 2016 / Notices
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
mstockstill on DSK4VPTVN1PROD with NOTICES
B. Submitting Comments
Please include Docket ID NRC–2016–
0076 and ‘‘Watts Bar Nuclear Plant, Unit
1, application dated March 4, 2016,
license amendment request to change
the completion date of Cyber Security
Plan Implementation Milestone 8,’’ in
your comment submission.
The NRC cautions you not to include
identifying or contact information that
you do not want to be publicly
disclosed in your comment submission.
The NRC will post all comment
submissions at https://
www.regulations.gov as well as enter the
comment submissions into ADAMS.
The NRC does not routinely edit
comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information that
they do not want to be publicly
disclosed in their comment submission.
Your request should state that the NRC
does not routinely edit comment
submissions to remove such information
before making the comment
submissions available to the public or
entering the comment into ADAMS.
II. Introduction
The NRC is considering issuance of an
amendment to Facility Operating
License No. NPF–90, issued to the
Tennessee Valley Authority, for
operation of the WBN, Unit 1, located in
Rhea County, Tennessee.
The proposed amendment would
revise the WBN, Unit 1, CSP
implementation schedule for Milestone
8 and would revise the associated
license condition in the Facility
Operating License.
Before any issuance of the proposed
license amendment, the NRC will need
to make the findings required by the
Atomic Energy Act of 1954, as amended
(the Act), and NRC’s regulations.
The NRC has made a proposed
determination that the license
amendment request involves no
significant hazards consideration. Under
the NRC’s regulations in 10 CFR 50.92,
this means that operation of the facility
in accordance with the proposed
amendment would not (1) involve a
significant increase in the probability or
consequences of an accident previously
evaluated; or (2) create the possibility of
a new or different kind of accident from
any accident previously evaluated; or
(3) involve a significant reduction in a
margin of safety. As required by 10 CFR
VerDate Sep<11>2014
18:02 Apr 18, 2016
Jkt 238001
50.91(a), the licensee has provided its
analysis of the issue of no significant
hazards consideration, which is
presented below:
1. Does the proposed change involve a
significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed change revises the CSP
Milestone 8 implementation date. This
change does not alter accident analysis
assumptions, add any initiators, or affect the
function of plant systems or the manner in
which systems are operated, maintained,
modified, tested, or inspected. The proposed
change is an extension to the completion date
of implementation Milestone 8, that in itself
does not require any plant modifications
which affect the performance capability of
the structures, systems, and components
relied upon to mitigate the consequences of
postulated accidents and have no impact on
the probability or consequences of an
accident previously evaluated.
Therefore, the proposed change does not
involve a significant increase in the
probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the
possibility of a new or different kind of
accident from any accident previously
evaluated?
Response: No.
The proposed change revises the CSP
Implementation Schedule. This proposed
change to extend the completion date of
implementation Milestone 8 does not alter
accident analysis assumptions, add any
initiators, or affect the function of plant
systems or the manner in which systems are
operated, maintained, modified, tested, or
inspected. The proposed change does not
require any plant modifications which affect
the performance capability of the structures,
systems and components relied upon to
mitigate the consequences of postulated
accidents. This change also does not create
the possibility of a new or different kind of
accident from any accident previously
evaluated.
Therefore, the proposed change does not
create the possibility of a new or different
kind of accident from any accident
previously evaluated.
3. Does the proposed change involve a
significant reduction in a margin of safety?
Response: No.
Plant safety margins are established
through limiting conditions for operation,
limiting safety system settings, and safety
limits specified in the technical
specifications. The proposed change extends
the CSP Implementation Schedule. Because
there is no change to these established safety
margins as result of this change, the proposed
change does not involve a significant
reduction in a margin of safety.
Therefore, the proposed change does not
involve a significant reduction in a margin of
safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
PO 00000
Frm 00049
Fmt 4703
Sfmt 4703
satisfied. Therefore, the NRC staff
proposes to determine that the license
amendment request involves a No
Significant Hazards Consideration.
The NRC is seeking public comments
on this proposed determination that the
license amendment request involves no
significant hazards consideration. Any
comments received within 30 days after
the date of publication of this notice
will be considered in making any final
determination.
Normally, the Commission will not
issue the amendment until the
expiration of 60 days after the date of
publication of this notice. The
Commission may issue the license
amendment before expiration of the 60day notice period if the Commission
concludes the amendment involves no
significant hazards consideration. In
addition, the Commission may issue the
amendment prior to the expiration of
the 30-day comment period should
circumstances change during the 30-day
comment period such that failure to act
in a timely way would result, for
example, in derating or shutdown of the
facility. Should the Commission take
action prior to the expiration of either
the comment period or the notice
period, it will publish in the Federal
Register a notice of issuance. Should the
Commission make a final No Significant
Hazards Consideration Determination,
any hearing will take place after
issuance. The Commission expects that
the need to take this action will occur
very infrequently.
III. Opportunity To Request a Hearing
and Petition for Leave To Intervene
Within 60 days after the date of
publication of this notice, any person(s)
whose interest may be affected by this
action may file a request for a hearing
and a petition to intervene with respect
to issuance of the amendment to the
subject facility operating license or
combined license. Requests for a
hearing and a petition for leave to
intervene shall be filed in accordance
with the Commission’s ‘‘Agency Rules
of Practice and Procedure’’ in 10 CFR
part 2. Interested person(s) should
consult a current copy of 10 CFR 2.309,
which is available at the NRC’s PDR,
located at One White Flint North, Room
O1–F21, 11555 Rockville Pike (first
floor), Rockville, Maryland 20852. The
NRC’s regulations are accessible
electronically from the NRC Library on
the NRC’s Web site at https://
www.nrc.gov/reading-rm/doccollections/cfr/. If a request for a hearing
or petition for leave to intervene is filed
within 60 days, the Commission or a
presiding officer designated by the
Commission or by the Chief
E:\FR\FM\19APN1.SGM
19APN1
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 81, No. 75 / Tuesday, April 19, 2016 / Notices
Administrative Judge of the Atomic
Safety and Licensing Board Panel, will
rule on the request and/or petition; and
the Secretary or the Chief
Administrative Judge of the Atomic
Safety and Licensing Board will issue a
notice of a hearing or an appropriate
order.
As required by 10 CFR 2.309, a
petition for leave to intervene shall set
forth with particularity the interest of
the petitioner in the proceeding, and
how that interest may be affected by the
results of the proceeding. The petition
should specifically explain the reasons
why intervention should be permitted
with particular reference to the
following general requirements: (1) The
name, address, and telephone number of
the requestor or petitioner; (2) the
nature of the requestor’s/petitioner’s
right under the Act to be made a party
to the proceeding; (3) the nature and
extent of the requestor’s/petitioner’s
property, financial, or other interest in
the proceeding; and (4) the possible
effect of any decision or order which
may be entered in the proceeding on the
requestor’s/petitioner’s interest. The
petition must also set forth the specific
contentions which the requestor/
petitioner seeks to have litigated at the
proceeding.
Each contention must consist of a
specific statement of the issue of law or
fact to be raised or controverted. In
addition, the requestor/petitioner shall
provide a brief explanation of the bases
for the contention and a concise
statement of the alleged facts or expert
opinion which support the contention
and on which the requestor/petitioner
intends to rely in proving the contention
at the hearing. The requestor/petitioner
must also provide references to those
specific sources and documents of
which the petitioner is aware and on
which the requestor/petitioner intends
to rely to establish those facts or expert
opinion. The petition must include
sufficient information to show that a
genuine dispute exists with the
applicant on a material issue of law or
fact. Contentions shall be limited to
matters within the scope of the
amendment under consideration. The
contention must be one which, if
proven, would entitle the requestor/
petitioner to relief. A requestor/
petitioner who fails to satisfy these
requirements with respect to at least one
contention will not be permitted to
participate as a party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene, and have the opportunity to
participate fully in the conduct of the
hearing with respect to resolution of
VerDate Sep<11>2014
18:02 Apr 18, 2016
Jkt 238001
that person’s admitted contentions,
including the opportunity to present
evidence and to submit a crossexamination plan for cross-examination
of witnesses, consistent with NRC
regulations, policies and procedures.
Petitions for leave to intervene must
be filed no later than 60 days from the
date of publication of this notice.
Requests for hearing, petitions for leave
to intervene, and motions for leave to
file new or amended contentions that
are filed after the 60-day deadline will
not be entertained absent a
determination by the presiding officer
that the filing demonstrates good cause
by satisfying the three factors in 10 CFR
2.309(c)(1)(i)–(iii).
If a hearing is requested, and the
Commission has not made a final
determination on the issue of no
significant hazards consideration, the
Commission will make a final
determination on the issue of no
significant hazards consideration. The
final determination will serve to decide
when the hearing is held. If the final
determination is that the amendment
request involves no significant hazards
consideration, the Commission may
issue the amendment and make it
immediately effective, notwithstanding
the request for a hearing. Any hearing
held would take place after issuance of
the amendment. If the final
determination is that the amendment
request involves a significant hazards
consideration, then any hearing held
would take place before the issuance of
any amendment unless the Commission
finds an imminent danger to the health
or safety of the public, in which case it
will issue an appropriate order or rule
under 10 CFR part 2.
A State, local governmental body,
Federally-recognized Indian Tribe, or
agency thereof, may submit a petition to
the Commission to participate as a party
under 10 CFR 2.309(h)(1). The petition
should state the nature and extent of the
petitioner’s interest in the proceeding.
The petition should be submitted to the
Commission by June 20, 2016. The
petition must be filed in accordance
with the filing instructions in the
‘‘Electronic Submissions (E-Filing)’’
section of this document, and should
meet the requirements for petitions for
leave to intervene set forth in this
section, except that under § 2.309(h)(2)
a State, local governmental body, or
Federally-recognized Indian Tribe, or
agency thereof does not need to address
the standing requirements in 10 CFR
2.309(d) if the facility is located within
its boundaries. A State, local
governmental body, Federallyrecognized Indian Tribe, or agency
PO 00000
Frm 00050
Fmt 4703
Sfmt 4703
23013
thereof may also have the opportunity to
participate under 10 CFR 2.315(c).
If a hearing is granted, any person
who does not wish, or is not qualified,
to become a party to the proceeding
may, in the discretion of the presiding
officer, be permitted to make a limited
appearance pursuant to the provisions
of 10 CFR 2.315(a). A person making a
limited appearance may make an oral or
written statement of position on the
issues, but may not otherwise
participate in the proceeding. A limited
appearance may be made at any session
of the hearing or at any prehearing
conference, subject to the limits and
conditions as may be imposed by the
presiding officer. Persons desiring to
make a limited appearance are
requested to inform the Secretary of the
Commission by June 20, 2016.
IV. Electronic Submissions (E-Filing)
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing, a petition for leave
to intervene, any motion or other
document filed in the proceeding prior
to the submission of a request for
hearing or petition to intervene, and
documents filed by interested
governmental entities participating
under 10 CFR 2.315(c), must be filed in
accordance with the NRC’s E-Filing rule
(72 FR 49139; August 28, 2007). The EFiling process requires participants to
submit and serve all adjudicatory
documents over the internet, or in some
cases to mail copies on electronic
storage media. Participants may not
submit paper copies of their filings
unless they seek an exemption in
accordance with the procedures
described below.
To comply with the procedural
requirements of E-Filing, at least 10
days prior to the filing deadline, the
participant should contact the Office of
the Secretary by email at
hearing.docket@nrc.gov, or by telephone
at 301–415–1677, to request (1) a digital
identification (ID) certificate, which
allows the participant (or its counsel or
representative) to digitally sign
documents and access the E-Submittal
server for any proceeding in which it is
participating; and (2) advise the
Secretary that the participant will be
submitting a request or petition for
hearing (even in instances in which the
participant, or its counsel or
representative, already holds an NRCissued digital ID certificate). Based upon
this information, the Secretary will
establish an electronic docket for the
hearing in this proceeding if the
Secretary has not already established an
electronic docket.
E:\FR\FM\19APN1.SGM
19APN1
mstockstill on DSK4VPTVN1PROD with NOTICES
23014
Federal Register / Vol. 81, No. 75 / Tuesday, April 19, 2016 / Notices
Information about applying for a
digital ID certificate is available on the
NRC’s public Web site at https://
www.nrc.gov/site-help/e-submittals/
getting-started.html. System
requirements for accessing the ESubmittal server are detailed in the
NRC’s ‘‘Guidance for Electronic
Submission,’’ which is available on the
agency’s public Web site at https://
www.nrc.gov/site-help/esubmittals.html. Participants may
attempt to use other software not listed
on the Web site, but should note that the
NRC’s E-Filing system does not support
unlisted software, and the NRC Meta
System Help Desk will not be able to
offer assistance in using unlisted
software.
If a participant is electronically
submitting a document to the NRC in
accordance with the E-Filing rule, the
participant must file the document
using the NRC’s online, Web-based
submission form. In order to serve
documents through the Electronic
Information Exchange System, users
will be required to install a Web
browser plug-in from the NRC’s Web
site. Further information on the Webbased submission form, including the
installation of the Web browser plug-in,
is available on the NRC’s public Web
site at https://www.nrc.gov/site-help/esubmittals.html.
Once a participant has obtained a
digital ID certificate and a docket has
been created, the participant can then
submit a request for hearing or petition
for leave to intervene. Submissions
should be in Portable Document Format
(PDF) in accordance with NRC guidance
available on the NRC’s public Web site
at https://www.nrc.gov/site-help/esubmittals.html. A filing is considered
complete at the time the documents are
submitted through the NRC’s E-Filing
system. To be timely, an electronic
filing must be submitted to the E-Filing
system no later than 11:59 p.m. Eastern
Time on the due date. Upon receipt of
a transmission, the E-Filing system
time-stamps the document and sends
the submitter an email notice
confirming receipt of the document. The
E-Filing system also distributes an email
notice that provides access to the
document to the NRC’s Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the documents on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before a hearing request/
petition to intervene is filed so that they
VerDate Sep<11>2014
18:02 Apr 18, 2016
Jkt 238001
can obtain access to the document via
the E-Filing system.
A person filing electronically using
the NRC’s adjudicatory E-Filing system
may seek assistance by contacting the
NRC Meta System Help Desk through
the ‘‘Contact Us’’ link located on the
NRC’s public Web site at https://
www.nrc.gov/site-help/esubmittals.html, by email to
MSHD.Resource@nrc.gov, or by a tollfree call at 1–866–672–7640. The NRC
Meta System Help Desk is available
between 8 a.m. and 8 p.m., Eastern
Time, Monday through Friday,
excluding government holidays.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing requesting authorization to
continue to submit documents in paper
format. Such filings must be submitted
by: (1) First class mail addressed to the
Office of the Secretary of the
Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, Attention: Rulemaking and
Adjudications Staff; or (2) courier,
express mail, or expedited delivery
service to the Office of the Secretary,
Sixteenth Floor, One White Flint North,
11555 Rockville Pike, Rockville,
Maryland 20852, Attention: Rulemaking
and Adjudications Staff. Participants
filing a document in this manner are
responsible for serving the document on
all other participants. Filing is
considered complete by first-class mail
as of the time of deposit in the mail, or
by courier, express mail, or expedited
delivery service upon depositing the
document with the provider of the
service. A presiding officer, having
granted an exemption request from
using E-Filing, may require a participant
or party to use E-Filing if the presiding
officer subsequently determines that the
reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory
proceedings will appear in the NRC’s
electronic hearing docket which is
available to the public at https://
ehd1.nrc.gov/ehd/, unless excluded
pursuant to an order of the Commission,
or the presiding officer. Participants are
requested not to include personal
privacy information, such as social
security numbers, home addresses, or
home phone numbers in their filings,
unless an NRC regulation or other law
requires submission of such
information. However, in some
instances, a request to intervene will
require including information on local
residence in order to demonstrate a
proximity assertion of interest in the
PO 00000
Frm 00051
Fmt 4703
Sfmt 4703
proceeding. With respect to copyrighted
works, except for limited excerpts that
serve the purpose of the adjudicatory
filings and would constitute a Fair Use
application, participants are requested
not to include copyrighted materials in
their submission.
For further details with respect to this
action, see the application for license
amendment dated March 4, 2016.
Attorney for licensee: Ms. Sherry A.
Quirk, Executive Vice President and
General Counsel, Tennessee Valley
Authority, 400 West Summit Hill Drive,
Knoxville, Tennessee 37902.
NRC Branch Chief: Benjamin Beasley.
Order Imposing Procedures for Access
to Sensitive Unclassified NonSafeguards Information for Contention
Preparation
Tennessee Valley Authority, Docket No.
50–390, Watts Bar Nuclear Plant, Unit
1, Rhea County, Tennessee
A. This Order contains instructions
regarding how potential parties to this
proceeding may request access to
documents containing SUNSI.
B. Within 10 days after publication of
this notice of hearing and opportunity to
petition for leave to intervene, any
potential party who believes access to
SUNSI is necessary to respond to this
notice may request such access. A
‘‘potential party’’ is any person who
intends to participate as a party by
demonstrating standing and filing an
admissible contention under 10 CFR
2.309. Requests for access to SUNSI
submitted later than 10 days after
publication of this notice will not be
considered absent a showing of good
cause for the late filing, addressing why
the request could not have been filed
earlier.
C. The requester shall submit a letter
requesting permission to access SUNSI
to the Office of the Secretary, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemakings and Adjudications Staff,
and provide a copy to the Associate
General Counsel for Hearings,
Enforcement and Administration, Office
of the General Counsel, Washington, DC
20555–0001. The expedited delivery or
courier mail address for both offices is:
U.S. Nuclear Regulatory Commission,
11555 Rockville Pike, Rockville,
Maryland 20852. The email address for
the Office of the Secretary and the
Office of the General Counsel are
Hearing.Docket@nrc.gov and
OGCmailcenter@nrc.gov, respectively.1
1 While a request for hearing or petition to
intervene in this proceeding must comply with the
filing requirements of the NRC’s ‘‘E-Filing Rule,’’
the initial request to access SUNSI under these
E:\FR\FM\19APN1.SGM
19APN1
Federal Register / Vol. 81, No. 75 / Tuesday, April 19, 2016 / Notices
The request must include the following
information:
(1) A description of the licensing
action with a citation to this Federal
Register notice;
(2) The name and address of the
potential party and a description of the
potential party’s particularized interest
that could be harmed by the action
identified in C.(1); and
(3) The identity of the individual or
entity requesting access to SUNSI and
the requester’s basis for the need for the
information in order to meaningfully
participate in this adjudicatory
proceeding. In particular, the request
must explain why publicly-available
versions of the information requested
would not be sufficient to provide the
basis and specificity for a proffered
contention.
D. Based on an evaluation of the
information submitted under paragraph
C.(3) the NRC staff will determine
within 10 days of receipt of the request
whether:
(1) There is a reasonable basis to
believe the petitioner is likely to
establish standing to participate in this
NRC proceeding; and
(2) The requestor has established a
legitimate need for access to SUNSI.
E. If the NRC staff determines that the
requestor satisfies both D.(1) and D.(2)
above, the NRC staff will notify the
requestor in writing that access to
SUNSI has been granted. The written
notification will contain instructions on
how the requestor may obtain copies of
the requested documents, and any other
conditions that may apply to access to
those documents. These conditions may
include, but are not limited to, the
signing of a Non-Disclosure Agreement
or Affidavit, or Protective Order 2 setting
forth terms and conditions to prevent
the unauthorized or inadvertent
disclosure of SUNSI by each individual
who will be granted access to SUNSI.
F. Filing of Contentions. Any
contentions in these proceedings that
are based upon the information received
as a result of the request made for
SUNSI must be filed by the requestor no
later than 25 days after the requestor is
granted access to that information.
However, if more than 25 days remain
between the dates the petitioner is
granted access to the information and
the deadline for filing all other
contentions (as established in the notice
of hearing or opportunity for hearing),
the petitioner may file its SUNSI
contentions by that later deadline. This
provision does not extend the time for
filing a request for a hearing and
petition to intervene, which must
comply with the requirements of 10 CFR
2.309.
G. Review of Denials of Access.
(1) If the request for access to SUNSI
is denied by the NRC staff after a
determination on standing and need for
access, the NRC staff shall immediately
notify the requestor in writing, briefly
stating the reason or reasons for the
denial.
(2) The requester may challenge the
NRC staff’s adverse determination by
filing a challenge within 5 days of
receipt of that determination with: (a)
The presiding officer designated in this
proceeding; (b) if no presiding officer
has been appointed, the Chief
Administrative Judge, or if he or she is
unavailable, another administrative
judge, or an administrative law judge
with jurisdiction pursuant to 10 CFR
2.318(a); or (c) officer if that officer has
23015
been designated to rule on information
access issues.
H. Review of Grants of Access. A
party other than the requester may
challenge an NRC staff determination
granting access to SUNSI whose release
would harm that party’s interest
independent of the proceeding. Such a
challenge must be filed with the Chief
Administrative Judge within 5 days of
the notification by the NRC staff of its
grant of access.
If challenges to the NRC staff
determinations are filed, these
procedures give way to the normal
process for litigating disputes
concerning access to information. The
availability of interlocutory review by
the Commission of orders ruling on
such NRC staff determinations (whether
granting or denying access) is governed
by 10 CFR 2.311.3
I. The Commission expects that the
NRC staff and presiding officers (and
any other reviewing officers) will
consider and resolve requests for access
to SUNSI, and motions for protective
orders, in a timely fashion in order to
minimize any unnecessary delays in
identifying those petitioners who have
standing and who have propounded
contentions meeting the specificity and
basis requirements in 10 CFR part 2.
Attachment 1 to this Order summarizes
the general target schedule for
processing and resolving requests under
these procedures.
It is so ordered.
Dated at Rockville, Maryland, this 12th day
of April, 2016.
For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
ATTACHMENT 1—GENERAL TARGET SCHEDULE FOR PROCESSING AND RESOLVING REQUESTS FOR ACCESS TO SENSITIVE
UNCLASSIFIED NON-SAFEGUARDS INFORMATION IN THIS PROCEEDING
Day
Event/activity
0 .........................
Publication of Federal Register notice of hearing and opportunity to petition for leave to intervene, including order with instructions for access requests.
Deadline for submitting requests for access to Sensitive Unclassified Non-Safeguards Information (SUNSI) with information:
supporting the standing of a potential party identified by name and address; describing the need for the information in
order for the potential party to participate meaningfully in an adjudicatory proceeding.
Deadline for submitting petition for intervention containing: (i) Demonstration of standing; and (ii) all contentions whose formulation does not require access to SUNSI (+25 Answers to petition for intervention; +7 petitioner/requestor reply).
U.S. Nuclear Regulatory Commission (NRC) staff informs the requester of the staff’s determination whether the request for
access provides a reasonable basis to believe standing can be established and shows need for SUNSI. (NRC staff also informs any party to the proceeding whose interest independent of the proceeding would be harmed by the release of the information.) If NRC staff makes the finding of need for SUNSI and likelihood of standing, NRC staff begins document processing (preparation of redactions or review of redacted documents).
10 .......................
60 .......................
mstockstill on DSK4VPTVN1PROD with NOTICES
20 .......................
procedures should be submitted as described in this
paragraph.
2 Any motion for Protective Order or draft NonDisclosure Affidavit or Agreement for SUNSI must
be filed with the presiding officer or the Chief
VerDate Sep<11>2014
18:02 Apr 18, 2016
Jkt 238001
Administrative Judge if the presiding officer has not
yet been designated, within 30 days of the deadline
for the receipt of the written access request.
3 Requesters should note that the filing
requirements of the NRC’s E-Filing Rule (72 FR
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
49139; August 28, 2007) apply to appeals of NRC
staff determinations (because they must be served
on a presiding officer or the Commission, as
applicable), but not to the initial SUNSI request
submitted to the NRC staff under these procedures.
E:\FR\FM\19APN1.SGM
19APN1
23016
Federal Register / Vol. 81, No. 75 / Tuesday, April 19, 2016 / Notices
ATTACHMENT 1—GENERAL TARGET SCHEDULE FOR PROCESSING AND RESOLVING REQUESTS FOR ACCESS TO SENSITIVE
UNCLASSIFIED NON-SAFEGUARDS INFORMATION IN THIS PROCEEDING—Continued
Day
Event/activity
25 .......................
If NRC staff finds no ‘‘need’’ or no likelihood of standing, the deadline for petitioner/requester to file a motion seeking a ruling
to reverse the NRC staff’s denial of access; NRC staff files copy of access determination with the presiding officer (or Chief
Administrative Judge or other designated officer, as appropriate). If NRC staff finds ‘‘need’’ for SUNSI, the deadline for any
party to the proceeding whose interest independent of the proceeding would be harmed by the release of the information
to file a motion seeking a ruling to reverse the NRC staff’s grant of access.
Deadline for NRC staff reply to motions to reverse NRC staff determination(s).
(Receipt +30) If NRC staff finds standing and need for SUNSI, deadline for NRC staff to complete information processing and
file motion for Protective Order and draft Non-Disclosure Affidavit. Deadline for applicant/licensee to file Non-Disclosure
Agreement for SUNSI.
If access granted: issuance of presiding officer or other designated officer decision on motion for protective order for access
to sensitive information (including schedule for providing access and submission of contentions) or decision reversing a
final adverse determination by the NRC staff.
Deadline for filing executed Non-Disclosure Affidavits. Access provided to SUNSI consistent with decision issuing the protective order.
Deadline for submission of contentions whose development depends upon access to SUNSI. However, if more than 25 days
remain between the petitioner’s receipt of (or access to) the information and the deadline for filing all other contentions (as
established in the notice of hearing or opportunity for hearing), the petitioner may file its SUNSI contentions by that later
deadline.
(Contention receipt +25) Answers to contentions whose development depends upon access to SUNSI.
(Answer receipt +7) Petitioner/Intervenor reply to answers.
Decision on contention admission.
30 .......................
40 .......................
A ........................
A + 3 ..................
A + 28 ................
A + 53 ................
A + 60 ................
>A + 60 ..............
[FR Doc. 2016–09042 Filed 4–18–16; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
Advisory Committee on Reactor
Safeguards (ACRS); Meeting of the
ACRS Subcommittee on Planning and
Procedures; Notice of Meeting
The ACRS Subcommittee on Planning
and Procedures will hold a meeting on
May 4, 2016, Room T–2B3, 11545
Rockville Pike, Rockville, Maryland.
The meeting will be open to public
attendance with the exception of a
portion that may be closed pursuant to
5 U.S.C. 552b(c)(2) and (6) to discuss
organizational and personnel matters
that relate solely to the internal
personnel rules and practices of the
ACRS, and information the release of
which would constitute a clearly
unwarranted invasion of personal
privacy.
The agenda for the subject meeting
shall be as follows:
mstockstill on DSK4VPTVN1PROD with NOTICES
Wednesday, May 4, 2016—12:00 p.m.
Until 1:00 p.m.
The Subcommittee will discuss
proposed ACRS activities and related
matters. The Subcommittee will gather
information, analyze relevant issues and
facts, and formulate proposed positions
and actions, as appropriate, for
deliberation by the Full Committee.
Members of the public desiring to
provide oral statements and/or written
comments should notify the Designated
Federal Official (DFO), Quynh Nguyen
VerDate Sep<11>2014
18:02 Apr 18, 2016
Jkt 238001
(Telephone 301–415–5844 or Email:
Quynh.Nguyen@nrc.gov) five days prior
to the meeting, if possible, so that
arrangements can be made. Thirty-five
hard copies of each presentation or
handout should be provided to the DFO
thirty minutes before the meeting. In
addition, one electronic copy of each
presentation should be emailed to the
DFO one day before the meeting. If an
electronic copy cannot be provided
within this timeframe, presenters
should provide the DFO with a CD
containing each presentation at least
thirty minutes before the meeting.
Electronic recordings will be permitted
only during those portions of the
meeting that are open to the public.
Detailed procedures for the conduct of
and participation in ACRS meetings
were published in the Federal Register
on October 21, 2015 (80 FR 63846).
Information regarding changes to the
agenda, whether the meeting has been
canceled or rescheduled, and the time
allotted to present oral statements can
be obtained by contacting the identified
DFO. Moreover, in view of the
possibility that the schedule for ACRS
meetings may be adjusted by the
Chairman as necessary to facilitate the
conduct of the meeting, persons
planning to attend should check with
the DFO if such rescheduling would
result in a major inconvenience.
If attending this meeting, please enter
through the One White Flint North
building, 11555 Rockville Pike,
Rockville, MD. After registering with
security, please contact Mr. Theron
Brown (240–888–9835) to be escorted to
the meeting room.
PO 00000
Frm 00053
Fmt 4703
Sfmt 4703
Dated: April 6, 2016.
Mark L. Banks,
Chief, Technical Support Branch, Advisory
Committee on Reactor Safeguards.
[FR Doc. 2016–09078 Filed 4–18–16; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2016–0001]
Sunshine Act Meeting
DATE:
April 18, 25, May 2, 9, 16, 23,
2016.
Commissioners’ Conference
Room, 11555 Rockville Pike, Rockville,
Maryland.
PLACE:
STATUS:
Public and Closed.
Week of April 18, 2016
Tuesday, April 19, 2016
9:30 a.m. Meeting with the
Organization of Agreement States
and the Conference of Radiation
Control Program Directors (Public
Meeting) (Contact: Paul Michalak:
301–415–5804)
This meeting will be webcast live at
the Web address—https://www.nrc.gov/.
Week of April 25, 2016—Tentative
There are no meetings scheduled for
the week of April 25, 2016.
Week of May 2, 2016—Tentative
There are no meetings scheduled for
the week of May 2, 2016.
E:\FR\FM\19APN1.SGM
19APN1
Agencies
[Federal Register Volume 81, Number 75 (Tuesday, April 19, 2016)]
[Notices]
[Pages 23011-23016]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-09042]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-390; NRC-2016-0076]
Completion Date of Cyber Security Plan Implementation Milestone
8; Tennessee Valley Authority; Watts Bar Nuclear Plant, Unit 1
AGENCY: Nuclear Regulatory Commission.
ACTION: License amendment application; opportunity to comment, request
a hearing, and petition for leave to intervene; order.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is considering
issuance of an amendment to Facility Operating License No. NPF-90,
issued to the Tennessee Valley Authority, for operation of the Watts
Bar Nuclear Plant (WBN), Unit 1. The proposed amendment would revise
the WBN, Unit 1, Cyber Security Plan (CSP) implementation schedule for
Milestone 8 and would revise the associated license condition in the
Facility Operating License. The amendment request contains sensitive
unclassified non-safeguards information (SUNSI).
DATES: Submit comments by May 19, 2016. Requests for a hearing or
petition for leave to intervene must be filed by June 20, 2016. Any
potential party as defined in Sec. 2.4 of title 10 of the Code of
Federal Regulations (10 CFR), who believes access to SUNSI is necessary
to respond to this notice must request document access by April 29,
2016.
ADDRESSES: You may submit comments by any of the following methods
(unless this document describes a different method for submitting
comments on a specific subject):
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2016-0076. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-415-
3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact
the individual listed in the FOR FURTHER INFORMATION CONTACT section of
this document.
Mail comments to: Cindy Bladey, Office of Administration,
Mail Stop: OWFN-12-H08, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001.
For additional direction on obtaining information and submitting
comments, see ``Obtaining Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Robert Schaaf, Office of Nuclear
Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001; telephone: 301-415-6020, email: Robert.Schaaf@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2016-0076 when contacting the NRC
about the availability of information for this action. You may obtain
publicly-available information related to this action by any of the
following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2016-0076.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may obtain publicly-available documents online in the
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS,
please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The
License Amendment Request (WBN-TS-16-04) to Change the Completion Date
of Cyber Security Plan Implementation Milestone 8 is available in ADAMS
under Accession No. ML16064A488.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One
[[Page 23012]]
White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC-2016-0076 and ``Watts Bar Nuclear
Plant, Unit 1, application dated March 4, 2016, license amendment
request to change the completion date of Cyber Security Plan
Implementation Milestone 8,'' in your comment submission.
The NRC cautions you not to include identifying or contact
information that you do not want to be publicly disclosed in your
comment submission. The NRC will post all comment submissions at https://www.regulations.gov as well as enter the comment submissions into
ADAMS. The NRC does not routinely edit comment submissions to remove
identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information that they do not want to be
publicly disclosed in their comment submission. Your request should
state that the NRC does not routinely edit comment submissions to
remove such information before making the comment submissions available
to the public or entering the comment into ADAMS.
II. Introduction
The NRC is considering issuance of an amendment to Facility
Operating License No. NPF-90, issued to the Tennessee Valley Authority,
for operation of the WBN, Unit 1, located in Rhea County, Tennessee.
The proposed amendment would revise the WBN, Unit 1, CSP
implementation schedule for Milestone 8 and would revise the associated
license condition in the Facility Operating License.
Before any issuance of the proposed license amendment, the NRC will
need to make the findings required by the Atomic Energy Act of 1954, as
amended (the Act), and NRC's regulations.
The NRC has made a proposed determination that the license
amendment request involves no significant hazards consideration. Under
the NRC's regulations in 10 CFR 50.92, this means that operation of the
facility in accordance with the proposed amendment would not (1)
involve a significant increase in the probability or consequences of an
accident previously evaluated; or (2) create the possibility of a new
or different kind of accident from any accident previously evaluated;
or (3) involve a significant reduction in a margin of safety. As
required by 10 CFR 50.91(a), the licensee has provided its analysis of
the issue of no significant hazards consideration, which is presented
below:
1. Does the proposed change involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed change revises the CSP Milestone 8 implementation
date. This change does not alter accident analysis assumptions, add
any initiators, or affect the function of plant systems or the
manner in which systems are operated, maintained, modified, tested,
or inspected. The proposed change is an extension to the completion
date of implementation Milestone 8, that in itself does not require
any plant modifications which affect the performance capability of
the structures, systems, and components relied upon to mitigate the
consequences of postulated accidents and have no impact on the
probability or consequences of an accident previously evaluated.
Therefore, the proposed change does not involve a significant
increase in the probability or consequences of an accident
previously evaluated.
2. Does the proposed change create the possibility of a new or
different kind of accident from any accident previously evaluated?
Response: No.
The proposed change revises the CSP Implementation Schedule.
This proposed change to extend the completion date of implementation
Milestone 8 does not alter accident analysis assumptions, add any
initiators, or affect the function of plant systems or the manner in
which systems are operated, maintained, modified, tested, or
inspected. The proposed change does not require any plant
modifications which affect the performance capability of the
structures, systems and components relied upon to mitigate the
consequences of postulated accidents. This change also does not
create the possibility of a new or different kind of accident from
any accident previously evaluated.
Therefore, the proposed change does not create the possibility
of a new or different kind of accident from any accident previously
evaluated.
3. Does the proposed change involve a significant reduction in a
margin of safety?
Response: No.
Plant safety margins are established through limiting conditions
for operation, limiting safety system settings, and safety limits
specified in the technical specifications. The proposed change
extends the CSP Implementation Schedule. Because there is no change
to these established safety margins as result of this change, the
proposed change does not involve a significant reduction in a margin
of safety.
Therefore, the proposed change does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
license amendment request involves a No Significant Hazards
Consideration.
The NRC is seeking public comments on this proposed determination
that the license amendment request involves no significant hazards
consideration. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day notice period if the Commission concludes the amendment involves no
significant hazards consideration. In addition, the Commission may
issue the amendment prior to the expiration of the 30-day comment
period should circumstances change during the 30-day comment period
such that failure to act in a timely way would result, for example, in
derating or shutdown of the facility. Should the Commission take action
prior to the expiration of either the comment period or the notice
period, it will publish in the Federal Register a notice of issuance.
Should the Commission make a final No Significant Hazards Consideration
Determination, any hearing will take place after issuance. The
Commission expects that the need to take this action will occur very
infrequently.
III. Opportunity To Request a Hearing and Petition for Leave To
Intervene
Within 60 days after the date of publication of this notice, any
person(s) whose interest may be affected by this action may file a
request for a hearing and a petition to intervene with respect to
issuance of the amendment to the subject facility operating license or
combined license. Requests for a hearing and a petition for leave to
intervene shall be filed in accordance with the Commission's ``Agency
Rules of Practice and Procedure'' in 10 CFR part 2. Interested
person(s) should consult a current copy of 10 CFR 2.309, which is
available at the NRC's PDR, located at One White Flint North, Room O1-
F21, 11555 Rockville Pike (first floor), Rockville, Maryland 20852. The
NRC's regulations are accessible electronically from the NRC Library on
the NRC's Web site at https://www.nrc.gov/reading-rm/doc-collections/cfr/. If a request for a hearing or petition for leave to intervene is
filed within 60 days, the Commission or a presiding officer designated
by the Commission or by the Chief
[[Page 23013]]
Administrative Judge of the Atomic Safety and Licensing Board Panel,
will rule on the request and/or petition; and the Secretary or the
Chief Administrative Judge of the Atomic Safety and Licensing Board
will issue a notice of a hearing or an appropriate order.
As required by 10 CFR 2.309, a petition for leave to intervene
shall set forth with particularity the interest of the petitioner in
the proceeding, and how that interest may be affected by the results of
the proceeding. The petition should specifically explain the reasons
why intervention should be permitted with particular reference to the
following general requirements: (1) The name, address, and telephone
number of the requestor or petitioner; (2) the nature of the
requestor's/petitioner's right under the Act to be made a party to the
proceeding; (3) the nature and extent of the requestor's/petitioner's
property, financial, or other interest in the proceeding; and (4) the
possible effect of any decision or order which may be entered in the
proceeding on the requestor's/petitioner's interest. The petition must
also set forth the specific contentions which the requestor/petitioner
seeks to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue
of law or fact to be raised or controverted. In addition, the
requestor/petitioner shall provide a brief explanation of the bases for
the contention and a concise statement of the alleged facts or expert
opinion which support the contention and on which the requestor/
petitioner intends to rely in proving the contention at the hearing.
The requestor/petitioner must also provide references to those specific
sources and documents of which the petitioner is aware and on which the
requestor/petitioner intends to rely to establish those facts or expert
opinion. The petition must include sufficient information to show that
a genuine dispute exists with the applicant on a material issue of law
or fact. Contentions shall be limited to matters within the scope of
the amendment under consideration. The contention must be one which, if
proven, would entitle the requestor/petitioner to relief. A requestor/
petitioner who fails to satisfy these requirements with respect to at
least one contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing with respect to resolution of that person's admitted
contentions, including the opportunity to present evidence and to
submit a cross-examination plan for cross-examination of witnesses,
consistent with NRC regulations, policies and procedures.
Petitions for leave to intervene must be filed no later than 60
days from the date of publication of this notice. Requests for hearing,
petitions for leave to intervene, and motions for leave to file new or
amended contentions that are filed after the 60-day deadline will not
be entertained absent a determination by the presiding officer that the
filing demonstrates good cause by satisfying the three factors in 10
CFR 2.309(c)(1)(i)-(iii).
If a hearing is requested, and the Commission has not made a final
determination on the issue of no significant hazards consideration, the
Commission will make a final determination on the issue of no
significant hazards consideration. The final determination will serve
to decide when the hearing is held. If the final determination is that
the amendment request involves no significant hazards consideration,
the Commission may issue the amendment and make it immediately
effective, notwithstanding the request for a hearing. Any hearing held
would take place after issuance of the amendment. If the final
determination is that the amendment request involves a significant
hazards consideration, then any hearing held would take place before
the issuance of any amendment unless the Commission finds an imminent
danger to the health or safety of the public, in which case it will
issue an appropriate order or rule under 10 CFR part 2.
A State, local governmental body, Federally-recognized Indian
Tribe, or agency thereof, may submit a petition to the Commission to
participate as a party under 10 CFR 2.309(h)(1). The petition should
state the nature and extent of the petitioner's interest in the
proceeding. The petition should be submitted to the Commission by June
20, 2016. The petition must be filed in accordance with the filing
instructions in the ``Electronic Submissions (E-Filing)'' section of
this document, and should meet the requirements for petitions for leave
to intervene set forth in this section, except that under Sec.
2.309(h)(2) a State, local governmental body, or Federally-recognized
Indian Tribe, or agency thereof does not need to address the standing
requirements in 10 CFR 2.309(d) if the facility is located within its
boundaries. A State, local governmental body, Federally-recognized
Indian Tribe, or agency thereof may also have the opportunity to
participate under 10 CFR 2.315(c).
If a hearing is granted, any person who does not wish, or is not
qualified, to become a party to the proceeding may, in the discretion
of the presiding officer, be permitted to make a limited appearance
pursuant to the provisions of 10 CFR 2.315(a). A person making a
limited appearance may make an oral or written statement of position on
the issues, but may not otherwise participate in the proceeding. A
limited appearance may be made at any session of the hearing or at any
prehearing conference, subject to the limits and conditions as may be
imposed by the presiding officer. Persons desiring to make a limited
appearance are requested to inform the Secretary of the Commission by
June 20, 2016.
IV. Electronic Submissions (E-Filing)
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene, and documents filed by
interested governmental entities participating under 10 CFR 2.315(c),
must be filed in accordance with the NRC's E-Filing rule (72 FR 49139;
August 28, 2007). The E-Filing process requires participants to submit
and serve all adjudicatory documents over the internet, or in some
cases to mail copies on electronic storage media. Participants may not
submit paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least 10
days prior to the filing deadline, the participant should contact the
Office of the Secretary by email at hearing.docket@nrc.gov, or by
telephone at 301-415-1677, to request (1) a digital identification (ID)
certificate, which allows the participant (or its counsel or
representative) to digitally sign documents and access the E-Submittal
server for any proceeding in which it is participating; and (2) advise
the Secretary that the participant will be submitting a request or
petition for hearing (even in instances in which the participant, or
its counsel or representative, already holds an NRC-issued digital ID
certificate). Based upon this information, the Secretary will establish
an electronic docket for the hearing in this proceeding if the
Secretary has not already established an electronic docket.
[[Page 23014]]
Information about applying for a digital ID certificate is
available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/getting-started.html. System requirements for accessing
the E-Submittal server are detailed in the NRC's ``Guidance for
Electronic Submission,'' which is available on the agency's public Web
site at https://www.nrc.gov/site-help/e-submittals.html. Participants
may attempt to use other software not listed on the Web site, but
should note that the NRC's E-Filing system does not support unlisted
software, and the NRC Meta System Help Desk will not be able to offer
assistance in using unlisted software.
If a participant is electronically submitting a document to the NRC
in accordance with the E-Filing rule, the participant must file the
document using the NRC's online, Web-based submission form. In order to
serve documents through the Electronic Information Exchange System,
users will be required to install a Web browser plug-in from the NRC's
Web site. Further information on the Web-based submission form,
including the installation of the Web browser plug-in, is available on
the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals.html.
Once a participant has obtained a digital ID certificate and a
docket has been created, the participant can then submit a request for
hearing or petition for leave to intervene. Submissions should be in
Portable Document Format (PDF) in accordance with NRC guidance
available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the
documents are submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of
a transmission, the E-Filing system time-stamps the document and sends
the submitter an email notice confirming receipt of the document. The
E-Filing system also distributes an email notice that provides access
to the document to the NRC's Office of the General Counsel and any
others who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
documents on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before a hearing request/petition
to intervene is filed so that they can obtain access to the document
via the E-Filing system.
A person filing electronically using the NRC's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System
Help Desk through the ``Contact Us'' link located on the NRC's public
Web site at https://www.nrc.gov/site-help/e-submittals.html, by email to
MSHD.Resource@nrc.gov, or by a toll-free call at 1-866-672-7640. The
NRC Meta System Help Desk is available between 8 a.m. and 8 p.m.,
Eastern Time, Monday through Friday, excluding government holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North, 11555 Rockville Pike, Rockville, Maryland
20852, Attention: Rulemaking and Adjudications Staff. Participants
filing a document in this manner are responsible for serving the
document on all other participants. Filing is considered complete by
first-class mail as of the time of deposit in the mail, or by courier,
express mail, or expedited delivery service upon depositing the
document with the provider of the service. A presiding officer, having
granted an exemption request from using E-Filing, may require a
participant or party to use E-Filing if the presiding officer
subsequently determines that the reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory proceedings will appear in the
NRC's electronic hearing docket which is available to the public at
https://ehd1.nrc.gov/ehd/, unless excluded pursuant to an order of the
Commission, or the presiding officer. Participants are requested not to
include personal privacy information, such as social security numbers,
home addresses, or home phone numbers in their filings, unless an NRC
regulation or other law requires submission of such information.
However, in some instances, a request to intervene will require
including information on local residence in order to demonstrate a
proximity assertion of interest in the proceeding. With respect to
copyrighted works, except for limited excerpts that serve the purpose
of the adjudicatory filings and would constitute a Fair Use
application, participants are requested not to include copyrighted
materials in their submission.
For further details with respect to this action, see the
application for license amendment dated March 4, 2016.
Attorney for licensee: Ms. Sherry A. Quirk, Executive Vice
President and General Counsel, Tennessee Valley Authority, 400 West
Summit Hill Drive, Knoxville, Tennessee 37902.
NRC Branch Chief: Benjamin Beasley.
Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information for Contention Preparation
Tennessee Valley Authority, Docket No. 50-390, Watts Bar Nuclear Plant,
Unit 1, Rhea County, Tennessee
A. This Order contains instructions regarding how potential parties
to this proceeding may request access to documents containing SUNSI.
B. Within 10 days after publication of this notice of hearing and
opportunity to petition for leave to intervene, any potential party who
believes access to SUNSI is necessary to respond to this notice may
request such access. A ``potential party'' is any person who intends to
participate as a party by demonstrating standing and filing an
admissible contention under 10 CFR 2.309. Requests for access to SUNSI
submitted later than 10 days after publication of this notice will not
be considered absent a showing of good cause for the late filing,
addressing why the request could not have been filed earlier.
C. The requester shall submit a letter requesting permission to
access SUNSI to the Office of the Secretary, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, Attention: Rulemakings and
Adjudications Staff, and provide a copy to the Associate General
Counsel for Hearings, Enforcement and Administration, Office of the
General Counsel, Washington, DC 20555-0001. The expedited delivery or
courier mail address for both offices is: U.S. Nuclear Regulatory
Commission, 11555 Rockville Pike, Rockville, Maryland 20852. The email
address for the Office of the Secretary and the Office of the General
Counsel are Hearing.Docket@nrc.gov and OGCmailcenter@nrc.gov,
respectively.\1\
[[Page 23015]]
The request must include the following information:
---------------------------------------------------------------------------
\1\ While a request for hearing or petition to intervene in this
proceeding must comply with the filing requirements of the NRC's
``E-Filing Rule,'' the initial request to access SUNSI under these
procedures should be submitted as described in this paragraph.
---------------------------------------------------------------------------
(1) A description of the licensing action with a citation to this
Federal Register notice;
(2) The name and address of the potential party and a description
of the potential party's particularized interest that could be harmed
by the action identified in C.(1); and
(3) The identity of the individual or entity requesting access to
SUNSI and the requester's basis for the need for the information in
order to meaningfully participate in this adjudicatory proceeding. In
particular, the request must explain why publicly-available versions of
the information requested would not be sufficient to provide the basis
and specificity for a proffered contention.
D. Based on an evaluation of the information submitted under
paragraph C.(3) the NRC staff will determine within 10 days of receipt
of the request whether:
(1) There is a reasonable basis to believe the petitioner is likely
to establish standing to participate in this NRC proceeding; and
(2) The requestor has established a legitimate need for access to
SUNSI.
E. If the NRC staff determines that the requestor satisfies both
D.(1) and D.(2) above, the NRC staff will notify the requestor in
writing that access to SUNSI has been granted. The written notification
will contain instructions on how the requestor may obtain copies of the
requested documents, and any other conditions that may apply to access
to those documents. These conditions may include, but are not limited
to, the signing of a Non-Disclosure Agreement or Affidavit, or
Protective Order \2\ setting forth terms and conditions to prevent the
unauthorized or inadvertent disclosure of SUNSI by each individual who
will be granted access to SUNSI.
---------------------------------------------------------------------------
\2\ Any motion for Protective Order or draft Non-Disclosure
Affidavit or Agreement for SUNSI must be filed with the presiding
officer or the Chief Administrative Judge if the presiding officer
has not yet been designated, within 30 days of the deadline for the
receipt of the written access request.
---------------------------------------------------------------------------
F. Filing of Contentions. Any contentions in these proceedings that
are based upon the information received as a result of the request made
for SUNSI must be filed by the requestor no later than 25 days after
the requestor is granted access to that information. However, if more
than 25 days remain between the dates the petitioner is granted access
to the information and the deadline for filing all other contentions
(as established in the notice of hearing or opportunity for hearing),
the petitioner may file its SUNSI contentions by that later deadline.
This provision does not extend the time for filing a request for a
hearing and petition to intervene, which must comply with the
requirements of 10 CFR 2.309.
G. Review of Denials of Access.
(1) If the request for access to SUNSI is denied by the NRC staff
after a determination on standing and need for access, the NRC staff
shall immediately notify the requestor in writing, briefly stating the
reason or reasons for the denial.
(2) The requester may challenge the NRC staff's adverse
determination by filing a challenge within 5 days of receipt of that
determination with: (a) The presiding officer designated in this
proceeding; (b) if no presiding officer has been appointed, the Chief
Administrative Judge, or if he or she is unavailable, another
administrative judge, or an administrative law judge with jurisdiction
pursuant to 10 CFR 2.318(a); or (c) officer if that officer has been
designated to rule on information access issues.
H. Review of Grants of Access. A party other than the requester may
challenge an NRC staff determination granting access to SUNSI whose
release would harm that party's interest independent of the proceeding.
Such a challenge must be filed with the Chief Administrative Judge
within 5 days of the notification by the NRC staff of its grant of
access.
If challenges to the NRC staff determinations are filed, these
procedures give way to the normal process for litigating disputes
concerning access to information. The availability of interlocutory
review by the Commission of orders ruling on such NRC staff
determinations (whether granting or denying access) is governed by 10
CFR 2.311.\3\
---------------------------------------------------------------------------
\3\ Requesters should note that the filing requirements of the
NRC's E-Filing Rule (72 FR 49139; August 28, 2007) apply to appeals
of NRC staff determinations (because they must be served on a
presiding officer or the Commission, as applicable), but not to the
initial SUNSI request submitted to the NRC staff under these
procedures.
---------------------------------------------------------------------------
I. The Commission expects that the NRC staff and presiding officers
(and any other reviewing officers) will consider and resolve requests
for access to SUNSI, and motions for protective orders, in a timely
fashion in order to minimize any unnecessary delays in identifying
those petitioners who have standing and who have propounded contentions
meeting the specificity and basis requirements in 10 CFR part 2.
Attachment 1 to this Order summarizes the general target schedule for
processing and resolving requests under these procedures.
It is so ordered.
Dated at Rockville, Maryland, this 12th day of April, 2016.
For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
Attachment 1--General Target Schedule for Processing and Resolving
Requests for Access to Sensitive Unclassified Non-Safeguards Information
in This Proceeding
------------------------------------------------------------------------
Day Event/activity
------------------------------------------------------------------------
0............................. Publication of Federal Register notice
of hearing and opportunity to petition
for leave to intervene, including order
with instructions for access requests.
10............................ Deadline for submitting requests for
access to Sensitive Unclassified Non-
Safeguards Information (SUNSI) with
information: supporting the standing of
a potential party identified by name
and address; describing the need for
the information in order for the
potential party to participate
meaningfully in an adjudicatory
proceeding.
60............................ Deadline for submitting petition for
intervention containing: (i)
Demonstration of standing; and (ii) all
contentions whose formulation does not
require access to SUNSI (+25 Answers to
petition for intervention; +7
petitioner/requestor reply).
20............................ U.S. Nuclear Regulatory Commission (NRC)
staff informs the requester of the
staff's determination whether the
request for access provides a
reasonable basis to believe standing
can be established and shows need for
SUNSI. (NRC staff also informs any
party to the proceeding whose interest
independent of the proceeding would be
harmed by the release of the
information.) If NRC staff makes the
finding of need for SUNSI and
likelihood of standing, NRC staff
begins document processing (preparation
of redactions or review of redacted
documents).
[[Page 23016]]
25............................ If NRC staff finds no ``need'' or no
likelihood of standing, the deadline
for petitioner/requester to file a
motion seeking a ruling to reverse the
NRC staff's denial of access; NRC staff
files copy of access determination with
the presiding officer (or Chief
Administrative Judge or other
designated officer, as appropriate). If
NRC staff finds ``need'' for SUNSI, the
deadline for any party to the
proceeding whose interest independent
of the proceeding would be harmed by
the release of the information to file
a motion seeking a ruling to reverse
the NRC staff's grant of access.
30............................ Deadline for NRC staff reply to motions
to reverse NRC staff determination(s).
40............................ (Receipt +30) If NRC staff finds
standing and need for SUNSI, deadline
for NRC staff to complete information
processing and file motion for
Protective Order and draft Non-
Disclosure Affidavit. Deadline for
applicant/licensee to file Non-
Disclosure Agreement for SUNSI.
A............................. If access granted: issuance of presiding
officer or other designated officer
decision on motion for protective order
for access to sensitive information
(including schedule for providing
access and submission of contentions)
or decision reversing a final adverse
determination by the NRC staff.
A + 3......................... Deadline for filing executed Non-
Disclosure Affidavits. Access provided
to SUNSI consistent with decision
issuing the protective order.
A + 28........................ Deadline for submission of contentions
whose development depends upon access
to SUNSI. However, if more than 25 days
remain between the petitioner's receipt
of (or access to) the information and
the deadline for filing all other
contentions (as established in the
notice of hearing or opportunity for
hearing), the petitioner may file its
SUNSI contentions by that later
deadline.
A + 53........................ (Contention receipt +25) Answers to
contentions whose development depends
upon access to SUNSI.
A + 60........................ (Answer receipt +7) Petitioner/
Intervenor reply to answers.
>A + 60....................... Decision on contention admission.
------------------------------------------------------------------------
[FR Doc. 2016-09042 Filed 4-18-16; 8:45 am]