Energy Resources USA Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 22588-22589 [2016-08860]
Download as PDF
22588
Federal Register / Vol. 81, No. 74 / Monday, April 18, 2016 / Notices
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, .211, and .214. In determining
the appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST,’’ ‘‘MOTION
TO INTERVENE,’’ ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’
‘‘PRELIMINARY TERMS AND
CONDITIONS,’’ or ‘‘PRELIMINARY
FISHWAY PRESCRIPTIONS;’’ (2) set
forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, recommendations, terms
and conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
o. Procedural Schedule:
The application will be processed
according to the following revised
Hydro Licensing Schedule. Revisions to
the schedule may be made as
appropriate.
Milestone
Target date
Filing of recommendations, preliminary terms and conditions, and preliminary fishway prescriptions ...........................................
Commission Issues Draft EA ............................................................................................................................................................
Comments on Draft EA ....................................................................................................................................................................
Modified Terms and Conditions ........................................................................................................................................................
Commission Issues Final EA ............................................................................................................................................................
June 2016.
December 2016.
January 2017.
March 2017.
June 2017.
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
q. A license applicant must file no
later than 60 days following the date of
issuance of the notice of acceptance and
ready for environmental analysis
provided for in 5.22: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Dated: April 6, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–08858 Filed 4–15–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
mstockstill on DSK4VPTVN1PROD with NOTICES
[Project No. 14758–000]
Energy Resources USA Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On February 19, 2016, Energy
Resources USA Inc. filed an application
VerDate Sep<11>2014
17:54 Apr 15, 2016
Jkt 238001
for a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Bosher Dam Hydroelectric Project
(Bosher Project or project) to be located
at the existing Bosher Dam on the James
River, about 2 miles southwest of
Tuckahoe, in Henrico County, Virginia.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist of
the following: (1) An existing 12-foothigh dam; (2) an 1,000-acre-size
impoundment with a storage capacity of
2,100-acre-foot and drainage area of
6,753 square miles; (3) a new 700-footlong, 180-foot-wide intake; (4) a new
300-foot-long, 180-foot-wide tailrace; (5)
four new 2-megawatt (MW) turbines; (6)
a new 65-foot-long, 197-foot-wide
powerhouse; (7) a new 60-foot-long, 50foot-wide substation; (8) a new 528-footlong, 69-kilovolt transmission line; and
(9) appurtenant facilities. The estimated
annual generation of the Bosher Project
would be 68,500 megawatt-hours.
Applicant Contact: Mr. Ander
Gonzalez, Energy Resources USA Inc.,
350 Lincoln Road, 2nd Floor, Miami
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
Beach, FL 33139; phone: (954) 248–
5425.
FERC Contact: Woohee Choi; phone:
(202) 502–6336.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14758–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
E:\FR\FM\18APN1.SGM
18APN1
Federal Register / Vol. 81, No. 74 / Monday, April 18, 2016 / Notices
ready for environmental analysis,
requesting comments,
recommendations, terms and
conditions, or prescriptions.
For further information, contact Alan
Mitchnick at (202) 502–6074.
Dated: April 6, 2016.
Kimberly D. Bose,
Secretary.
Dated: April 6, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–08860 Filed 4–15–16; 8:45 am]
[FR Doc. 2016–08857 Filed 4–15–16; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Project No. 2246–065]
[Project No. 5891–009]
Yuba County Water Agency; Notice
Soliciting Comments on Final
Technical Memoranda
mstockstill on DSK4VPTVN1PROD with NOTICES
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14758) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Deschutes Valley Water District; Notice
of Availability of Environmental
Assessment
On March 31, 2016, Yuba County
Water Agency, licensee for the Yuba
River Project, filed Technical
Memoranda 7–11 and 7–11a, Fish
Behavior and Hydraulics near Narrows
2 Powerhouse and Radio Telemetry of
Spring- and Fall-Run Chinook Migratory
Behavior Downstream of Narrows 2
Powerhouse.1 The memoranda were
required by studies approved by the
Commission on September 30, 2011
(modified on December 28, 2011; April
12, 2012; and March 29, 2013) (Study
11) and August 22, 2013 (Study 11a).
The Commission is soliciting
comments on these memoranda. Any
comments should be filed within 30
days from the date of this notice. The
Commission strongly encourages
electronic filing. Please file all
documents using the Commission’s
eFiling system at https://www.ferc.gov/
docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov. In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first
page of any filing should include docket
number P–2246–065.
Once the Commission has determined
that it has sufficient information to
process the license application, it will
issue a notice that the application is
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380 (Order No.
486, 52 FR 47897), the Office of Energy
Projects has reviewed the Deschutes
Valley Water District’s (licensee)
application to amend the license in
order to construct and operate fish
passage facilities at the Opal Springs
Hydroelectric Project No. 5891. The
project is located on the Crooked River
in Jefferson County, Oregon. The project
occupies federal lands administered by
the U.S. Bureau of Land Management.
The application, filed with the
Commission on October 8, 2015,
contains an Environmental Analysis in
its Exhibit E. After independent review
of the licensee’s Exhibit E, Commission
staff has decided to adopt the licensee’s
Environmental Analysis and issue it as
staff’s Environmental Assessment (EA).
The EA analyzes the potential
environmental impacts of construction
and operation of fish passage facilities
plus the proposed mitigation measures
and concludes that granting the
proposed amendment would not
constitute a major federal action that
would significantly affect the quality of
the human environment.
A copy of the EA is on file with the
Commission and is available for public
inspection. The EA may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number (P–5891) in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or call
toll-free at 1–866–208–3676 or (202)
502–8659 (for TTY).
1 These technical memoranda can be viewed at
https://elibrary.ferc.gov/idmws/common/
OpenNat.asp?fileID=14186240.
VerDate Sep<11>2014
17:54 Apr 15, 2016
Jkt 238001
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
22589
A copy of the EA may also be
accessed using this link: https://
elibrary.ferc.gov/idmws/common/
OpenNat.asp?fileID=14010704.
You may also register online at https://
www.ferc.gov/docs-filing/
esubsription.asp to be notified via email
of new filings and issuances related to
this or other pending projects. For
assistance, contact FERC Online
Support.
All comments must be filed within 30
days of the date of this notice and
should reference Project No. 5891–009.
The Commission strongly encourages
electronic filing. Please file comments
using the Commission’s efiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support. In
lieu of electronic filing, please send a
paper copy to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426.
For further information, contact
Jennifer Ambler at (202) 502–8586 or
Jennifer.Ambler@ferc.gov.
Dated: April 6, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–08859 Filed 4–15–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1940–029]
Wisconsin Public Service Corporation;
Notice of Application Tendered for
Filing With the Commission and
Establishing Procedural Schedule for
Licensing and Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: P–1940–029.
c. Date filed: March 28, 2016.
d. Applicant: Wisconsin Public
Service Corporation.
e. Name of Project: Tomahawk
Hydroelectric Project.
f. Location: The existing project is
located on the Wisconsin River in
E:\FR\FM\18APN1.SGM
18APN1
Agencies
[Federal Register Volume 81, Number 74 (Monday, April 18, 2016)]
[Notices]
[Pages 22588-22589]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-08860]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14758-000]
Energy Resources USA Inc.; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On February 19, 2016, Energy Resources USA Inc. filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of the
Bosher Dam Hydroelectric Project (Bosher Project or project) to be
located at the existing Bosher Dam on the James River, about 2 miles
southwest of Tuckahoe, in Henrico County, Virginia. The sole purpose of
a preliminary permit, if issued, is to grant the permit holder priority
to file a license application during the permit term. A preliminary
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by
others without the owners' express permission.
The proposed project would consist of the following: (1) An
existing 12-foot-high dam; (2) an 1,000-acre-size impoundment with a
storage capacity of 2,100-acre-foot and drainage area of 6,753 square
miles; (3) a new 700-foot-long, 180-foot-wide intake; (4) a new 300-
foot-long, 180-foot-wide tailrace; (5) four new 2-megawatt (MW)
turbines; (6) a new 65-foot-long, 197-foot-wide powerhouse; (7) a new
60-foot-long, 50-foot-wide substation; (8) a new 528-foot-long, 69-
kilovolt transmission line; and (9) appurtenant facilities. The
estimated annual generation of the Bosher Project would be 68,500
megawatt-hours.
Applicant Contact: Mr. Ander Gonzalez, Energy Resources USA Inc.,
350 Lincoln Road, 2nd Floor, Miami Beach, FL 33139; phone: (954) 248-
5425.
FERC Contact: Woohee Choi; phone: (202) 502-6336.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14758-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary''
[[Page 22589]]
link of the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-14758) in the docket number
field to access the document. For assistance, contact FERC Online
Support.
Dated: April 6, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-08860 Filed 4-15-16; 8:45 am]
BILLING CODE 6717-01-P