City of Loveland, Co; Notice of Authorization for Continued Project Operation, 21858 [2016-08476]

Download as PDF 21858 Federal Register / Vol. 81, No. 71 / Wednesday, April 13, 2016 / Notices 22 letters have been sent to FERC Commissioners and staff under this docket number. letters have been sent to FERC Commissioners and staff under this docket number. Charles E. Schumer and Kirsten Gillibrand. 5 Telephone Communication Record from March 22, 2016 call with U.S. Congressman Pedro Pierluisi. 36 4 Senators Dated: April 5, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise.1 If the project is not subject to section 15 of the FPA, notice is hereby given that the licensee, City of Loveland, Colorado, is authorized to continue operation of the Loveland Hydroelectric Project, until such time as the Commission acts on its application to surrender its license. [FR Doc. 2016–08414 Filed 4–12–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2829–000] asabaliauskas on DSK3SPTVN1PROD with NOTICES City of Loveland, Co; Notice of Authorization for Continued Project Operation Dated: April 7, 2016. Kimberly D. Bose, Secretary. The Loveland Hydroelectric Project is located in Larimer County, Colorado on the Big Thompson River. The license for Project No. 2829 was issued for a period ending March 8, 2016. Section 15(a) (1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 2829 is issued to the licensee for a period effective March 9, 2016 through March 8, 2017 or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before March 8, 2017, notice is hereby given that, pursuant to 18 CFR [FR Doc. 2016–08476 Filed 4–12–16; 8:45 am] VerDate Sep<11>2014 17:41 Apr 12, 2016 Jkt 238001 BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–1763–002; ER10–1765–002; ER10–1766–002; ER10–1769–002; ER10–1767–002; ER10–1532–002; ER10–1541–003; ER10–1642–004; ER10–1529–003; ER13–2349–001; ER13–2350–001. Applicants: Entergy Arkansas, Inc., Entergy Louisiana, LLC, Entergy Mississippi, Inc., Entergy New Orleans, Inc., Entergy Texas, Inc., Entergy Nuclear Palisades, LLC, Entergy Power, LLC, EWO Marketing, LLC, Northern Iowa Windpower, LLC, EAM Nelson Holding, LLC, RS Cogen, LLC. Description: Notice of Change in Status of the Entergy Central MBR Utilities. Filed Date: 4/1/16. Accession Number: 20160401–5475. Comments Due: 5 p.m. ET 4/22/16. Docket Numbers: ER15–746–004. Applicants: RC Cape May Holdings, LLC. Description: Compliance filing: RC Cape May 90-day Informational Filing to be effective 3/1/2016. Filed Date: 3/3/16. Accession Number: 20160303–5110. 1 On November 12, 2014, City of Loveland, Colorado filed an application to surrender its license due to severe damage to the powerhouse and other project features as a result of flooding in September of 2013. The surrender application is currently pending. PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 Comments Due: 5 p.m. ET 4/19/16. Docket Numbers: ER16–1342–000. Applicants: Arizona Public Service Company. Description: Notice of Cancellation, Request for Approval of Accounting and Rate Treatment, and Request for Expedited Action and Shortened Comment Period of Arizona Public Service Company. Filed Date: 4/1/16. Accession Number: 20160401–5485. Comments Due: 5 p.m. ET 4/11/16. Docket Numbers: ER16–1344–000. Applicants: Seward Generation, LLC. Description: Baseline eTariff Filing: Notice of Sucession to be effective 4/4/ 2016. Filed Date: 4/4/16. Accession Number: 20160404–5260. Comments Due: 5 p.m. ET 4/25/16. Docket Numbers: ER16–1345–000. Applicants: Virginia Electric and Power Company, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: VEPCO submits 3 Wholesale Distribution Service Agreements Nos. 4433, 4434, 4435 to be effective 12/26/ 2015. Filed Date: 4/5/16. Accession Number: 20160405–5047. Comments Due: 5 p.m. ET 4/26/16. Docket Numbers: ER16–1346–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2016–04–05_SA 2911 LEPA–MISO eNRIS (J373) to be effective 4/6/2016. Filed Date: 4/5/16. Accession Number: 20160405–5063. Comments Due: 5 p.m. ET 4/26/16. Docket Numbers: ER16–1347–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to WMPA SA No. 3636, Queue No. X1–085 per Assignment to be effective 8/12/2013. Filed Date: 4/5/16. Accession Number: 20160405–5098. Comments Due: 5 p.m. ET 4/26/16. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern E:\FR\FM\13APN1.SGM 13APN1

Agencies

[Federal Register Volume 81, Number 71 (Wednesday, April 13, 2016)]
[Notices]
[Page 21858]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-08476]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2829-000]


City of Loveland, Co; Notice of Authorization for Continued 
Project Operation

    The Loveland Hydroelectric Project is located in Larimer County, 
Colorado on the Big Thompson River.
    The license for Project No. 2829 was issued for a period ending 
March 8, 2016. Section 15(a) (1) of the FPA, 16 U.S.C. 808(a)(1), 
requires the Commission, at the expiration of a license term, to issue 
from year-to-year an annual license to the then licensee under the 
terms and conditions of the prior license until a new license is 
issued, or the project is otherwise disposed of as provided in section 
15 or any other applicable section of the FPA. If the project's prior 
license waived the applicability of section 15 of the FPA, then, based 
on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), 
and as set forth at 18 CFR 16.21(a), if the licensee of such project 
has filed an application for a subsequent license, the licensee may 
continue to operate the project in accordance with the terms and 
conditions of the license after the minor or minor part license 
expires, until the Commission acts on its application. If the licensee 
of such a project has not filed an application for a subsequent 
license, then it may be required, pursuant to 18 CFR 16.21(b), to 
continue project operations until the Commission issues someone else a 
license for the project or otherwise orders disposition of the project.
    If the project is subject to section 15 of the FPA, notice is 
hereby given that an annual license for Project No. 2829 is issued to 
the licensee for a period effective March 9, 2016 through March 8, 2017 
or until the issuance of a new license for the project or other 
disposition under the FPA, whichever comes first. If issuance of a new 
license (or other disposition) does not take place on or before March 
8, 2017, notice is hereby given that, pursuant to 18 CFR 16.18(c), an 
annual license under section 15(a)(1) of the FPA is renewed 
automatically without further order or notice by the Commission, unless 
the Commission orders otherwise.\1\
---------------------------------------------------------------------------

    \1\ On November 12, 2014, City of Loveland, Colorado filed an 
application to surrender its license due to severe damage to the 
powerhouse and other project features as a result of flooding in 
September of 2013. The surrender application is currently pending.
---------------------------------------------------------------------------

    If the project is not subject to section 15 of the FPA, notice is 
hereby given that the licensee, City of Loveland, Colorado, is 
authorized to continue operation of the Loveland Hydroelectric Project, 
until such time as the Commission acts on its application to surrender 
its license.

    Dated: April 7, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016-08476 Filed 4-12-16; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.