Drawbridge Operation Regulation; Annisquam River and Blynman Canal, Gloucester, MA, 20529 [2016-08126]
Download as PDF
Federal Register / Vol. 81, No. 68 / Friday, April 8, 2016 / Rules and Regulations
CFR 431.154 to clarify that the test
procedures at appendixes J1 and J2 must
be used to determine compliance with
the CCW energy conservation standards
at redesignated 10 CFR 431.156(a) and
(b), respectively.
conservation standards at § 431.156(a).
The test procedures for clothes washers
in appendix J2 to subpart B of part 430
of this chapter must be used to
determine compliance with the energy
conservation standards at § 431.156(b).
Procedural Issues and Regulatory
Review
The regulatory reviews conducted for
this rulemaking are those set forth in the
December 3, 2014 final rule that
originally codified amendments to
DOE’s test procedures for commercial
clothes washers. 79 FR 71624. The
amendments from that final rule became
effective January 2, 2015. Id.
Pursuant to the Administrative
Procedure Act, 5 U.S.C. 553(b), DOE has
determined that notice and prior
opportunity for comment on this rule
are unnecessary and contrary to the
public interest. The amended CCW
standards codified at 10 CFR 431.156(c)
correspond to the ‘‘amended standards
based on appendix J2 efficiency metrics
published after December 3, 2014’’
referenced in 10 CFR 431.154. This
correction is needed to ensure clarity
regarding the amended CCW standards
for which the appendix J2 test
procedure must be used. This final rule
also removes obsolete regulatory
provisions.
§ 431.156
List of Subjects in 10 CFR Part 431
Administrative practice and
procedure, Energy conservation,
Household appliances.
Issued in Washington, DC, on March 28,
2016.
Kathleen Hogan,
Deputy Assistant Secretary, Energy Efficiency
and Renewable Energy.
For the reasons stated in the
preamble, DOE amends part 431 of
chapter II, subchapter D, of title 10 of
the Code of Federal Regulations, by
making the following correcting
amendments:
PART 431—ENERGY EFFICIENCY
PROGRAM FOR CERTAIN
COMMERCIAL AND INDUSTRIAL
EQUIPMENT
1. The authority citation for part 431
continues to read as follows:
■
asabaliauskas on DSK3SPTVN1PROD with RULES
Authority: 42 U.S.C. 6291–6317.
2. Section 431.154 is revised to read
as follows:
■
§ 431.154
Test procedures.
The test procedures for clothes
washers in appendix J1 to subpart B of
part 430 of this chapter must be used to
test commercial clothes washers to
determine compliance with the energy
VerDate Sep<11>2014
17:15 Apr 07, 2016
Jkt 238001
[Amended]
3. Section 431.156 is amended by
removing paragraph (a) and
redesignating paragraphs (b) and (c) as
paragraphs (a) and (b), respectively.
■
[FR Doc. 2016–08120 Filed 4–7–16; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2016–0275]
Drawbridge Operation Regulation;
Annisquam River and Blynman Canal,
Gloucester, MA
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Blynman
(SR127) Bridge across the Annisquam
River and Blynman Canal at mile 0.0 at
Gloucester, MA. This deviation is
necessary to facilitate public safety
during a public event, the annual Saint
Peter’s Fiesta 5K Road Race. This
deviation allows the bridge to remain
closed for thirty minutes to facilitate
public safety.
DATES: This deviation is effective from
6:15 p.m. to 6:45 p.m. on June 23, 2016.
ADDRESSES: The docket for this
deviation, [USCG–2016–0275] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH’’.
Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Mr. Jim
Rousseau, First Coast Guard District
Bridge Branch, Coast Guard; telephone
617–223–8619, email
James.L.Rousseau2@uscg.mil.
SUPPLEMENTARY INFORMATION: The
Blynman (SR 127) Bridge across the
Annisquam River and Blynman Canal,
mile 0.0, at Gloucester, Massachusetts,
has a vertical clearance in the closed
position of 8.2 feet at mean high water
and 16 feet at mean low water. The
SUMMARY:
PO 00000
Frm 00007
Fmt 4700
Sfmt 4700
20529
existing bridge operating regulations are
found at 33 CFR 117.586.
The owner of the bridge,
Massachusetts Department of
Transportation, requested a temporary
deviation from the normal operating
schedule to facilitate a public event, the
Annual Saint Peter’s Fiesta 5K Road
Race.
Under this temporary deviation, the
Blynman (SR 127) Bridge may remain in
the closed position for thirty minutes
between 6:15 p.m. and 6:45 p.m. on
Thursday June 23, 2016.
The waterways are transited by
commercial and seasonal recreational
vessels of various sizes. There is an
alternate route for vessel traffic around
Cape Ann. Also, vessels that can pass
under the closed draws during this
closure may do so at all times.
The Coast Guard will inform the users
of the waterways through our Local and
Broadcast Notice to Mariners of the
change in operating schedule for the
bridge so that vessels can arrange their
transits to minimize any impact caused
by the temporary deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: April 5, 2016.
C.J. Bisignano,
Supervisory Bridge Management Specialist,
First Coast Guard District.
[FR Doc. 2016–08126 Filed 4–7–16; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2016–0181]
Drawbridge Operation Regulation;
North Landing River, Chesapeake, VA
Coast Guard, DHS.
Notice of temporary deviation
from drawbridge regulations;
modification.
AGENCY:
ACTION:
The Coast Guard has modified
a temporary deviation from the
operating schedule that governs the
S165 (North Landing Road) Bridge
across the North Landing River, mile
20.2, at Chesapeake, VA. This modified
deviation is necessary to perform
emergency bridge repairs and provide
for safe navigation. This modified
SUMMARY:
E:\FR\FM\08APR1.SGM
08APR1
Agencies
[Federal Register Volume 81, Number 68 (Friday, April 8, 2016)]
[Rules and Regulations]
[Page 20529]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-08126]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2016-0275]
Drawbridge Operation Regulation; Annisquam River and Blynman
Canal, Gloucester, MA
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Blynman (SR127) Bridge across the
Annisquam River and Blynman Canal at mile 0.0 at Gloucester, MA. This
deviation is necessary to facilitate public safety during a public
event, the annual Saint Peter's Fiesta 5K Road Race. This deviation
allows the bridge to remain closed for thirty minutes to facilitate
public safety.
DATES: This deviation is effective from 6:15 p.m. to 6:45 p.m. on June
23, 2016.
ADDRESSES: The docket for this deviation, [USCG-2016-0275] is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH''. Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Mr. Jim Rousseau, First Coast Guard
District Bridge Branch, Coast Guard; telephone 617-223-8619, email
James.L.Rousseau2@uscg.mil.
SUPPLEMENTARY INFORMATION: The Blynman (SR 127) Bridge across the
Annisquam River and Blynman Canal, mile 0.0, at Gloucester,
Massachusetts, has a vertical clearance in the closed position of 8.2
feet at mean high water and 16 feet at mean low water. The existing
bridge operating regulations are found at 33 CFR 117.586.
The owner of the bridge, Massachusetts Department of
Transportation, requested a temporary deviation from the normal
operating schedule to facilitate a public event, the Annual Saint
Peter's Fiesta 5K Road Race.
Under this temporary deviation, the Blynman (SR 127) Bridge may
remain in the closed position for thirty minutes between 6:15 p.m. and
6:45 p.m. on Thursday June 23, 2016.
The waterways are transited by commercial and seasonal recreational
vessels of various sizes. There is an alternate route for vessel
traffic around Cape Ann. Also, vessels that can pass under the closed
draws during this closure may do so at all times.
The Coast Guard will inform the users of the waterways through our
Local and Broadcast Notice to Mariners of the change in operating
schedule for the bridge so that vessels can arrange their transits to
minimize any impact caused by the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: April 5, 2016.
C.J. Bisignano,
Supervisory Bridge Management Specialist, First Coast Guard District.
[FR Doc. 2016-08126 Filed 4-7-16; 8:45 am]
BILLING CODE 9110-04-P