Drawbridge Operation Regulation; North Landing River, Chesapeake, VA, 20529-20530 [2016-08017]
Download as PDF
Federal Register / Vol. 81, No. 68 / Friday, April 8, 2016 / Rules and Regulations
CFR 431.154 to clarify that the test
procedures at appendixes J1 and J2 must
be used to determine compliance with
the CCW energy conservation standards
at redesignated 10 CFR 431.156(a) and
(b), respectively.
conservation standards at § 431.156(a).
The test procedures for clothes washers
in appendix J2 to subpart B of part 430
of this chapter must be used to
determine compliance with the energy
conservation standards at § 431.156(b).
Procedural Issues and Regulatory
Review
The regulatory reviews conducted for
this rulemaking are those set forth in the
December 3, 2014 final rule that
originally codified amendments to
DOE’s test procedures for commercial
clothes washers. 79 FR 71624. The
amendments from that final rule became
effective January 2, 2015. Id.
Pursuant to the Administrative
Procedure Act, 5 U.S.C. 553(b), DOE has
determined that notice and prior
opportunity for comment on this rule
are unnecessary and contrary to the
public interest. The amended CCW
standards codified at 10 CFR 431.156(c)
correspond to the ‘‘amended standards
based on appendix J2 efficiency metrics
published after December 3, 2014’’
referenced in 10 CFR 431.154. This
correction is needed to ensure clarity
regarding the amended CCW standards
for which the appendix J2 test
procedure must be used. This final rule
also removes obsolete regulatory
provisions.
§ 431.156
List of Subjects in 10 CFR Part 431
Administrative practice and
procedure, Energy conservation,
Household appliances.
Issued in Washington, DC, on March 28,
2016.
Kathleen Hogan,
Deputy Assistant Secretary, Energy Efficiency
and Renewable Energy.
For the reasons stated in the
preamble, DOE amends part 431 of
chapter II, subchapter D, of title 10 of
the Code of Federal Regulations, by
making the following correcting
amendments:
PART 431—ENERGY EFFICIENCY
PROGRAM FOR CERTAIN
COMMERCIAL AND INDUSTRIAL
EQUIPMENT
1. The authority citation for part 431
continues to read as follows:
■
asabaliauskas on DSK3SPTVN1PROD with RULES
Authority: 42 U.S.C. 6291–6317.
2. Section 431.154 is revised to read
as follows:
■
§ 431.154
Test procedures.
The test procedures for clothes
washers in appendix J1 to subpart B of
part 430 of this chapter must be used to
test commercial clothes washers to
determine compliance with the energy
VerDate Sep<11>2014
17:15 Apr 07, 2016
Jkt 238001
[Amended]
3. Section 431.156 is amended by
removing paragraph (a) and
redesignating paragraphs (b) and (c) as
paragraphs (a) and (b), respectively.
■
[FR Doc. 2016–08120 Filed 4–7–16; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2016–0275]
Drawbridge Operation Regulation;
Annisquam River and Blynman Canal,
Gloucester, MA
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Blynman
(SR127) Bridge across the Annisquam
River and Blynman Canal at mile 0.0 at
Gloucester, MA. This deviation is
necessary to facilitate public safety
during a public event, the annual Saint
Peter’s Fiesta 5K Road Race. This
deviation allows the bridge to remain
closed for thirty minutes to facilitate
public safety.
DATES: This deviation is effective from
6:15 p.m. to 6:45 p.m. on June 23, 2016.
ADDRESSES: The docket for this
deviation, [USCG–2016–0275] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH’’.
Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Mr. Jim
Rousseau, First Coast Guard District
Bridge Branch, Coast Guard; telephone
617–223–8619, email
James.L.Rousseau2@uscg.mil.
SUPPLEMENTARY INFORMATION: The
Blynman (SR 127) Bridge across the
Annisquam River and Blynman Canal,
mile 0.0, at Gloucester, Massachusetts,
has a vertical clearance in the closed
position of 8.2 feet at mean high water
and 16 feet at mean low water. The
SUMMARY:
PO 00000
Frm 00007
Fmt 4700
Sfmt 4700
20529
existing bridge operating regulations are
found at 33 CFR 117.586.
The owner of the bridge,
Massachusetts Department of
Transportation, requested a temporary
deviation from the normal operating
schedule to facilitate a public event, the
Annual Saint Peter’s Fiesta 5K Road
Race.
Under this temporary deviation, the
Blynman (SR 127) Bridge may remain in
the closed position for thirty minutes
between 6:15 p.m. and 6:45 p.m. on
Thursday June 23, 2016.
The waterways are transited by
commercial and seasonal recreational
vessels of various sizes. There is an
alternate route for vessel traffic around
Cape Ann. Also, vessels that can pass
under the closed draws during this
closure may do so at all times.
The Coast Guard will inform the users
of the waterways through our Local and
Broadcast Notice to Mariners of the
change in operating schedule for the
bridge so that vessels can arrange their
transits to minimize any impact caused
by the temporary deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: April 5, 2016.
C.J. Bisignano,
Supervisory Bridge Management Specialist,
First Coast Guard District.
[FR Doc. 2016–08126 Filed 4–7–16; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2016–0181]
Drawbridge Operation Regulation;
North Landing River, Chesapeake, VA
Coast Guard, DHS.
Notice of temporary deviation
from drawbridge regulations;
modification.
AGENCY:
ACTION:
The Coast Guard has modified
a temporary deviation from the
operating schedule that governs the
S165 (North Landing Road) Bridge
across the North Landing River, mile
20.2, at Chesapeake, VA. This modified
deviation is necessary to perform
emergency bridge repairs and provide
for safe navigation. This modified
SUMMARY:
E:\FR\FM\08APR1.SGM
08APR1
asabaliauskas on DSK3SPTVN1PROD with RULES
20530
Federal Register / Vol. 81, No. 68 / Friday, April 8, 2016 / Rules and Regulations
deviation allows the bridge to remain in
the closed-to-navigation position.
DATES: This modified deviation is
effective without actual notice from
April 8, 2016 through 6 p.m. on June 30,
2016. For the purposes of enforcement,
actual notice will be used from April 4,
2016, until April 8, 2016.
ADDRESSES: The docket for this
deviation, [USCG–2016–0181] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH’’.
Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this modified
temporary deviation, call or email Mr.
Hal R. Pitts, Bridge Administration
Branch Fifth District, Coast Guard,
telephone 757–398–6222, email
Hal.R.Pitts@uscg.mil.
SUPPLEMENTARY INFORMATION: On March
11, 2016, the Coast Guard published a
temporary deviation entitled
‘‘Drawbridge Operation Regulation;
North Landing River, Chesapeake, VA’’
in the Federal Register (81 FR 12824).
Under that temporary deviation, the
north span of the bridge opened-tonavigation on the hour and half hour,
upon request, from 6 a.m. to 7 p.m., and
on demand from 7 p.m. to 6 a.m.
Additionally under that deviation, the
north and south spans of the bridge
would open to navigation concurrently,
with the south span only opening
partially due to damage, upon request,
for scheduled openings at 10 a.m., noon
and 2 p.m., Monday through Friday.
The United States Army Corps of
Engineers, Norfolk District Office, who
owns and operates the S165 (North
Landing Road) Bridge, has requested a
modified temporary deviation from the
currently published deviation to
perform additional repairs to the south
swing span of the bridge due to damage
sustained as a result of a vessel allision
with the bridge.
Under this modified temporary
deviation, the north span of the bridge
will open-to-navigation on the hour and
half hour, upon request, from 6 a.m. to
7 p.m., and on demand from 7 p.m. to
6 a.m. The north and south spans of the
bridge will open to navigation
concurrently, with the south span only
opening partially due to damage, upon
request, for: (1) Scheduled openings at
9:30 a.m. for vessels transiting
southeast, (2) 10:30 a.m. for vessels
transiting northwest, and (3) at noon
and 2 p.m. for two-way vessel traffic
through the bridge, Monday through
Friday. The horizontal clearance of the
bridge with the south span closed-tonavigation is 38 feet and the horizontal
VerDate Sep<11>2014
17:15 Apr 07, 2016
Jkt 238001
clearance of the bridge with the south
span partially open-to-navigation is 70
feet. The modified temporary deviation
is necessary to relieve vessel congestion
and provide for safe navigation on the
waterway. The bridge is a double swing
draw bridge and has a vertical clearance
in the closed position of 6 feet above
mean high water.
The North Landing River is used by
a variety of vessels including small U.S.
government and public vessels, small
commercial vessels, tug and barge, and
recreational vessels. The Coast Guard
has carefully considered the nature and
volume of vessel traffic on the waterway
in publishing this temporary deviation.
During the closure times there will be
limited opportunity for vessels which
are able to safely pass through the
bridge in the closed position to do so.
Vessels able to safely pass through the
bridge in the closed position may do so,
after receiving confirmation from the
bridge tender that it is safe to transit
through the bridge. The north span of
the bridge will be able to open for
emergencies. The Coast Guard will also
inform the users of the waterways
through our Local and Broadcast
Notices to Mariners of the change in
operating schedule for the bridge so that
vessel operators can arrange their transit
to minimize any impact caused by the
temporary deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: April 4, 2016.
Hal R. Pitts,
Bridge Program Manager, Fifth Coast Guard
District.
[FR Doc. 2016–08017 Filed 4–7–16; 8:45 am]
BILLING CODE 9110–04–P
POSTAL REGULATORY COMMISSION
39 CFR Part 3020
[Docket Nos. MC2010–21 and CP2010–36]
Update to Product Lists
Postal Regulatory Commission.
Final rule.
AGENCY:
ACTION:
The Commission is updating
the product lists. This action reflects a
publication policy adopted by
Commission order. The referenced
policy assumes periodic updates. The
updates are identified in the body of
this document. The product lists, which
is re-published in its entirety, includes
these updates.
SUMMARY:
PO 00000
Frm 00008
Fmt 4700
Sfmt 4700
Effective Date: April 8, 2016.
Applicability Dates: January 5, 2016,
Priority Mail Contract 171 (MC2016–48
and CP2016–63); January 5, 2016,
Priority Mail Contract 170 (MC2016–47
and CP2016–62); January 6, 2016,
Priority Mail Contract 176 (MC2016–54
and CP2016–69); January 6, 2016,
Priority Mail Express Contract 31
(MC2016–61 and CP2016–76); January
6, 2016, Priority Mail Express, Priority
Mail & First-Class Package Service
Contract 7 (MC2016–55 and CP2016–
70); January 6, 2016, Priority Mail
Contract 177 (MC2016–57 and CP2016–
72); January 6, 2016, Priority Mail &
First-Class Package Service Contract 11
(MC2016–62 and CP2016–77); January
6, 2016, Priority Mail Contract 179
(MC2016–63 and CP2016–78); January
6, 2016, Priority Mail Contract 180
(MC2016–64 and CP2016–79); January
6, 2016, Priority Mail Contract 183
(MC2016–67 and CP2016–82); January
6, 2016, Priority Mail & First-Class
Package Service Contract 10 (MC2016–
58 and CP2016–73); January 6, 2016,
Priority Mail Express & Priority Mail
Contract 26 (MC2016–56 and CP2016–
71); January 6, 2016, Priority Mail
Contract 175 (MC2016–53 and CP2016–
68); January 6, 2016, Priority Mail
Contract 181 (MC2016–65 and CP2016–
80); January 6, 2016, Priority Mail
Contract 178 (MC2016–60 and CP2016–
75); January 6, 2016, Priority Mail
Express & Priority Mail Contract 27
(MC2016–59 and CP2016–74); January
6, 2016, Priority Mail Contract 184
(MC2016–66 and CP2016–81); January
7, 2016, Priority Mail Express, Priority
Mail & First-Class Package Service
Contract 8 (MC2016–72 and CP2016–
87); January 7, 2016, Priority Mail &
First-Class Package Service Contract 12
(MC2016–70 and CP2016–85); January
7, 2016, Priority Mail Contract 185
(MC2016–69 and CP2016–84); January
7, 2016, Priority Mail Contract 186
(MC2016–71 and CP2016–86); January
7, 2016, First-Class Package Service
Contract 41 (MC2016–73 and CP2016–
88); January 7, 2016, Priority Mail
Contract 182 (MC2016–68 and CP2016–
83); January 8, 2016, Priority Mail
Contract 172 (MC2016–49 and CP2016–
64); January 8, 2016, First-Class Package
Service Contract 40 (MC2016–51 and
CP2016–66); January 8, 2016, Priority
Mail Contract 173 (MC2016–50 and
CP2016–65); January 12, 2016, FirstClass Package Service Contract 42
(MC2016–74 and CP2016–91); January
12, 2016, Parcel Select Contract 13
(MC2016–75 and CP2016–93); February
10, 2016, Priority Mail & First-Class
Package Service Contract 13 (MC2016–
76 and CP2016–98); February 12, 2016,
DATES:
E:\FR\FM\08APR1.SGM
08APR1
Agencies
[Federal Register Volume 81, Number 68 (Friday, April 8, 2016)]
[Rules and Regulations]
[Pages 20529-20530]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-08017]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2016-0181]
Drawbridge Operation Regulation; North Landing River, Chesapeake,
VA
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from drawbridge regulations;
modification.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has modified a temporary deviation from the
operating schedule that governs the S165 (North Landing Road) Bridge
across the North Landing River, mile 20.2, at Chesapeake, VA. This
modified deviation is necessary to perform emergency bridge repairs and
provide for safe navigation. This modified
[[Page 20530]]
deviation allows the bridge to remain in the closed-to-navigation
position.
DATES: This modified deviation is effective without actual notice from
April 8, 2016 through 6 p.m. on June 30, 2016. For the purposes of
enforcement, actual notice will be used from April 4, 2016, until April
8, 2016.
ADDRESSES: The docket for this deviation, [USCG-2016-0181] is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH''. Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If you have questions on this modified
temporary deviation, call or email Mr. Hal R. Pitts, Bridge
Administration Branch Fifth District, Coast Guard, telephone 757-398-
6222, email Hal.R.Pitts@uscg.mil.
SUPPLEMENTARY INFORMATION: On March 11, 2016, the Coast Guard published
a temporary deviation entitled ``Drawbridge Operation Regulation; North
Landing River, Chesapeake, VA'' in the Federal Register (81 FR 12824).
Under that temporary deviation, the north span of the bridge opened-to-
navigation on the hour and half hour, upon request, from 6 a.m. to 7
p.m., and on demand from 7 p.m. to 6 a.m. Additionally under that
deviation, the north and south spans of the bridge would open to
navigation concurrently, with the south span only opening partially due
to damage, upon request, for scheduled openings at 10 a.m., noon and 2
p.m., Monday through Friday.
The United States Army Corps of Engineers, Norfolk District Office,
who owns and operates the S165 (North Landing Road) Bridge, has
requested a modified temporary deviation from the currently published
deviation to perform additional repairs to the south swing span of the
bridge due to damage sustained as a result of a vessel allision with
the bridge.
Under this modified temporary deviation, the north span of the
bridge will open-to-navigation on the hour and half hour, upon request,
from 6 a.m. to 7 p.m., and on demand from 7 p.m. to 6 a.m. The north
and south spans of the bridge will open to navigation concurrently,
with the south span only opening partially due to damage, upon request,
for: (1) Scheduled openings at 9:30 a.m. for vessels transiting
southeast, (2) 10:30 a.m. for vessels transiting northwest, and (3) at
noon and 2 p.m. for two-way vessel traffic through the bridge, Monday
through Friday. The horizontal clearance of the bridge with the south
span closed-to-navigation is 38 feet and the horizontal clearance of
the bridge with the south span partially open-to-navigation is 70 feet.
The modified temporary deviation is necessary to relieve vessel
congestion and provide for safe navigation on the waterway. The bridge
is a double swing draw bridge and has a vertical clearance in the
closed position of 6 feet above mean high water.
The North Landing River is used by a variety of vessels including
small U.S. government and public vessels, small commercial vessels, tug
and barge, and recreational vessels. The Coast Guard has carefully
considered the nature and volume of vessel traffic on the waterway in
publishing this temporary deviation.
During the closure times there will be limited opportunity for
vessels which are able to safely pass through the bridge in the closed
position to do so. Vessels able to safely pass through the bridge in
the closed position may do so, after receiving confirmation from the
bridge tender that it is safe to transit through the bridge. The north
span of the bridge will be able to open for emergencies. The Coast
Guard will also inform the users of the waterways through our Local and
Broadcast Notices to Mariners of the change in operating schedule for
the bridge so that vessel operators can arrange their transit to
minimize any impact caused by the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: April 4, 2016.
Hal R. Pitts,
Bridge Program Manager, Fifth Coast Guard District.
[FR Doc. 2016-08017 Filed 4-7-16; 8:45 am]
BILLING CODE 9110-04-P