National Emission Standards for Hazardous Air Pollutants From Coal- and Oil-Fired Electric Utility Steam Generating Units and Standards of Performance for Fossil-Fuel-Fired Electric Utility, Industrial-Commercial-Institutional, and Small Industrial-Commercial-Institutional Steam Generating Units; Technical Correction, 20171-20207 [2016-06563]
Download as PDF
Vol. 81
Wednesday,
No. 66
April 6, 2016
Part IV
Environmental Protection Agency
srobinson on DSK5SPTVN1PROD with RULES4
40 CFR Parts 60 and 63
National Emission Standards for Hazardous Air Pollutants From Coal- and
Oil-Fired Electric Utility Steam Generating Units and Standards of
Performance for Fossil-Fuel-Fired Electric Utility, Industrial-CommercialInstitutional, and Small Industrial-Commercial-Institutional Steam Generating
Units; Technical Correction; Final Rule
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
PO 00000
Frm 00001
Fmt 4717
Sfmt 4717
E:\FR\FM\06APR4.SGM
06APR4
20172
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
ENVIRONMENTAL PROTECTION
AGENCY
40 CFR Parts 60 and 63
[EPA–HQ–OAR–2009–0234 and EPA–HQ–
OAR–2011–0044; FRL–9942–28–OAR]
RIN 2060–AS41
National Emission Standards for
Hazardous Air Pollutants From Coaland Oil-Fired Electric Utility Steam
Generating Units and Standards of
Performance for Fossil-Fuel-Fired
Electric Utility, Industrial-CommercialInstitutional, and Small IndustrialCommercial-Institutional Steam
Generating Units; Technical Correction
Environmental Protection
Agency (EPA).
ACTION: Final rule; technical corrections.
AGENCY:
This action finalizes the
technical corrections that the
Environmental Protection Agency (EPA)
proposed on February 17, 2015, to
correct and clarify certain text of the
EPA’s regulations regarding ‘‘National
Emission Standards for Hazardous Air
Pollutants from Coal- and Oil-fired
Electric Utility Steam Generating Units
and Standards of Performance for
Fossil-Fuel-Fired Electric Utility,
Industrial-Commercial-Institutional, and
Small Industrial-CommercialInstitutional Steam Generating Units’’.
We are also taking final action to
remove the rule provision establishing
an affirmative defense for malfunction.
DATES: The effective date of this rule is
April 6, 2016.
ADDRESSES: Docket. The EPA has
established two dockets for this action:
Docket ID No. EPA–HQ–OAR–2011–
0044 (new source performance
standards (NSPS) action) and Docket ID
No. EPA–HQ–OAR–2009–0234
(Mercury and Air Toxics Standards
(MATS) action). All documents in the
dockets are listed in the https://
www.regulations.gov index. Although
listed in the index, some information is
not publicly available (e.g., confidential
business information or other
information whose disclosure is
restricted by statute). Certain other
material, such as copyrighted material,
will be publicly available only in hard
copy form. Publicly available docket
srobinson on DSK5SPTVN1PROD with RULES4
SUMMARY:
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
materials are available either
electronically in https://
www.regulations.gov or in hard copy at
the EPA Docket Center, Room 3334,
EPA WJC West Building, 1301
Constitution Avenue NW., Washington,
DC 20004. The Public Reading Room is
open from 8:30 a.m. to 4:30 p.m.,
Monday through Friday, excluding legal
holidays. The telephone number for the
Public Reading Room is (202) 566–1744,
and the telephone number for the Air
Docket is (202) 566–1742.
FOR FURTHER INFORMATION CONTACT: For
questions about the MATS action: Mr.
Jim Eddinger, Energy Strategies Group,
Sector Policies and Programs Division
(D243–01), Office of Air Quality
Planning and Standards, U.S.
Environmental Protection Agency,
Research Triangle Park, North Carolina
27711; telephone number: (919) 541–
5426; fax number (919) 541–5450; email
address: eddinger.jim@epa.gov. For
questions about the NSPS action: Mr.
Christian Fellner, Energy Strategies
Group, Sector Policies and Programs
Division (D243–01), Office of Air
Quality Planning and Standards, U.S.
Environmental Protection Agency,
Research Triangle Park, North Carolina
27711; telephone number: (919) 541–
4003; fax number (919) 541–5450; email
address: fellner.christian@epa.gov.
SUPPLEMENTARY INFORMATION:
A. How can I get copies of this
document and other related
information?
This Federal Register document and
the document titled ‘‘Summary of
Public Comments and Responses:
MATS and Utility NSPS Technical
Corrections’’ (TC RTC) are available in
the dockets the EPA established under
Docket ID No. EPA–HQ–OAR–2009–
0234 and Docket ID No. EPA–HQ–OAR–
2011–0044. The TC RTC is available in
both the MATS and Utility NSPS
dockets by conducting a search of the
title ‘‘Summary of Public Comments and
Responses: MATS and Utility NSPS
Technical Corrections.’’ In addition to
being available in the docket, electronic
copies of these documents are available
on the www.regulations.gov Web site.
This Federal Register document and the
TC RTC can also be found on the EPA’s
Technology Transfer Network (TTN)
PO 00000
Frm 00002
Fmt 4701
Sfmt 4700
Web site at https://www.epa.gov/ttn/atw/
utility/utilitypg.html.
B. Judicial Review
Under CAA section 307(b)(1), judicial
review of this final rule is available only
by filing a petition for review in the U.S.
Court of Appeals for the District of
Columbia Circuit by June 6, 2016. Under
CAA section 307(d)(7)(B), only an
objection to this final rule that was
raised with reasonable specificity
during the period for public comment
can be raised during judicial review.
Note, under CAA section 307(b)(2), the
requirements established by this final
rule may not be challenged separately in
any civil or criminal proceedings
brought by the EPA to enforce these
requirements.
I. Background
The final Clean Air Act (CAA) rules
published in the Federal Register on
February 16, 2012 (77 FR 9303),
establish national emission standards
for hazardous air pollutants (NESHAP)
from coal- and oil-fired electric utility
steam generating units (EGUs), referred
to as ‘‘MATS,’’ and NSPS for fossil-fuelfired electric utility, industrialcommercial-institutional, and small
industrial-commercial-institutional
steam generating units, referred to as the
‘‘Utility NSPS’’.
In the February 17, 2015, Federal
Register (80 FR 8442), the EPA
proposed to correct certain regulatory
text. The proposed corrections were
categorized generally as follows: (a)
Resolution of conflicts between
preamble and regulatory text, (b)
corrections that were inadvertently not
made that the EPA stated it would make
in response to comments, and (c)
clarification of language in regulatory
text. In the proposed rule, the EPA
identified each proposed technical
correction to the regulatory text as
found in the Code of Federal
Regulations (i.e., 40 CFR). Table 1 of this
preamble lists the proposed revisions to
the regulatory text that the EPA is
finalizing. In Table 2 below, the EPA
lists additional changes that the Agency
determined were necessary to conform
to changes the Agency included in the
proposed rule.
E:\FR\FM\06APR4.SGM
06APR4
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
20173
TABLE 1—SUMMARY OF PROPOSED TECHNICAL CORRECTIONS AND CLARIFICATIONS BEING FINALIZED
Section of subpart Da
(40 CFR part 60)
Description of correction
(40 CFR part 60)
40 CFR 60.48Da(f) ..............................................
Revise procedures for calculating compliance with the NSPS daily average particulate matter
(PM) emission limit using PM continuous emission monitoring system (CEMS).
Section of subpart UUUUU
(40 CFR part 63)
Description of correction
(40 CFR part 63)
40 CFR 63.9983(a) .............................................
Revise to clarify that MATS does not apply to either major or area source combustion turbines, except for integrated gasification combined cycle (IGCC) units.
Revise consistent with the definitional changes in 40 CFR 63.10042.
Add to clarify applicability to units meeting the definition of a natural gas-fired EGU in MATS,
and, because they combust greater than 10 percent biomass, also meet the definition of a
biomass-fired boiler in the Industrial Boiler NESHAP (subpart DDDDD).
Revise to clarify the conditions that are required in order to use the alternate sulfur dioxide
(SO2) limit.
Revise to clarify the provisions of units designated as being low emitting EGUs (LEE) when an
acid gas scrubber and a bypass stack are present.
Add to allow EGUs the ability to seek LEE status if their bypass stacks that are able to measure emissions and to allow EGUs with LEE status the ability to bypass emissions control
devices during emergency periods.
Revise to state that EGU choosing to use quarterly testing and parametric monitoring for hydrogen fluoride (HF) or hydrogen chloride (HCl) compliance must include the continuous
monitoring systems (CMS) in their site-specific monitoring plans.
Add to clarify that EGUs choosing to meet the work practice standards contained in paragraph
(2) of the definition of startup may verify, instead of certify, monitoring systems used to meet
the work practice standards.
Revise to remove the affirmative defense provisions.
Revise to clarify that different compliance demonstrations may require different and additional
types of data collection and to clarify the date by which compliance must be demonstrated
for existing EGUs.
Revise to clarify the date by which compliance must be demonstrated for EGUs using CMS or
sorbent trap monitoring systems.
Revise to clarify applicability of the provision to both the 30- and 90-boiler operating day performance testing requirements.
Add to clarify the date EGUs must begin conducting required stack tests when stack test data
collected prior to the applicable compliance date are submitted to satisfy initial performance
test.
Revise to more clearly state when compliance must be demonstrated.
Revise to clarify when sources must complete the initial tune-up after the compliance date,
and the timing for subsequent tune-ups when the initial tune-up is conducted prior to the
compliance date.
Revise to clarify that the alternate 30- and 90-day averaging provisions are both applicable to
mercury (Hg) emission limits.
Revise to delete paragraphs (iii) and (iv). The identified test methods are not for determining
fuel moisture content, as required in the provision.
Revise to specify EGU operational status with respect to performance testing; the requirements if the performance testing schedule is missed; and intervals between performance
tests.
Revise to clarify that the 90-boiler operating day averaging period is an option for Hg emissions from non-low rank virgin coal-fired EGUs.
Revise to clarify group eligibility equations 1a and 1b.
Revise to correct the term ‘‘gross electric output’’ to ‘‘gross output’’ which is the term defined
in 40 CFR 63.10042.
Revise to clarify the conditions for determining the ability of the emissions averaging group to
meet the emissions limit and to clarify use of the alternate Hg emission limit.
Revise to add requirement to route exhaust gases that bypass emissions control devices
through stacks that contain monitoring so that emissions can be measured and to clarify
that hours that a bypass stack is in use are to be counted as hours of deviation from monitoring requirements.
Revise to clarify that 30-boiler operating day rolling averages are based only on valid hourly
SO2 emission rates.
Revise to clarify that data collected during certain periods are not to be included in compliance
assessments but such periods are to be included in annual deviation reports.
Revise to replace the incorrect reference to § 63.7(e) with the correct reference to § 63.8(d)(2).
Revise to clarify that EGU owners or operators who choose to meet the work practice standards contained in paragraph (2) of the definition of startup may verify, instead of certify,
monitoring systems used.
Revise to remove the incorrect reference to Table 4 and to replace the incorrect reference to
Table 7 with the correct reference to Table 6.
40 CFR 63.9983(b) and (c) .................................
40 CFR 63.9983(e) .............................................
40 CFR 63.9991(c)(1) and (2) ............................
40 CFR 63.10000(c)(1)(i)(A) and 63.10005(h) ...
40 CFR 63.10000(c)(1)(i)(C) ...............................
40 CFR 63.10000(c)(2)(iii) ..................................
40 CFR 63.10000(m) ..........................................
40 CFR 63.10001 ................................................
40 CFR 63.10005(a) ...........................................
40 CFR 63.10005(a)(2) .......................................
40 CFR 63.10005(a)(2)(i) ....................................
40 CFR 63.10005(b)(6) .......................................
40 CFR 63.10005(d)(3) and (d)(4)(i) ...................
40 CFR 63.10005(f) ............................................
40 CFR 63.10005(h)(3) .......................................
40 CFR 63.10005(i)(4) ........................................
40 CFR 63.10006(f) ............................................
40 CFR 63.10009(a)(2) and (a)(2)(i) ...................
40 CFR 63.10009(b)(1) .......................................
40 CFR 63.10009(b)(2), (b)(3), (f)(2), (g)(1),
(g)(2), and (j)(1)(ii).
40 CFR 63.10009(f) ............................................
40 CFR 63.10010(a)(4) .......................................
srobinson on DSK5SPTVN1PROD with RULES4
40 CFR 63.10010(f)(3) ........................................
40 CFR 63.10010(h)(6)(i) and (ii), (i)(5)(i)(A) and
(B), and (j)(4)(i)(A) and (B).
40 CFR 63.10010(j)(l)(i) ......................................
40 CFR 63.10010(l) and (l)(4) .............................
40 CFR 63.10011(b) ...........................................
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
PO 00000
Frm 00003
Fmt 4701
Sfmt 4700
E:\FR\FM\06APR4.SGM
06APR4
20174
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
TABLE 1—SUMMARY OF PROPOSED TECHNICAL CORRECTIONS AND CLARIFICATIONS BEING FINALIZED—Continued
Section of subpart UUUUU
(40 CFR part 63)
Description of correction
(40 CFR part 63)
40 CFR 63.10011(c)(1) and (2) ..........................
Revise to clarify the date by which compliance must be demonstrated by EGUs that use
CEMS or sorbent trap monitoring systems and to clarify in 40 CFR 63.10011(c)(1) that the
alternate Hg emission limit may be used.
Revise to replace ‘‘according to’’ with ‘‘in accordance with.’’
Revise to clarify our intent by changing ‘‘to the maximum extent possible’’ to ‘‘to the maximum
extent possible, taking into account boiler or control device integrity.’’
Revise to clarify that it applies only to EGU owners or operators who choose to meet the work
practice standards contained in paragraph (2) of the definition of startup. In addition, the undefined term ‘‘electrical load’’ has been replaced with the defined term ‘‘gross output’’ and
the incorrect terms ‘‘liquid to fuel ratio’’ and ‘‘the differential pressure of the liquid’’ have
been replaced with the correct terms ‘‘liquid to flue gas ratio’’ and ‘‘the pressure drop across
the scrubber.’’
Revise to clarify the type of monitoring that is to be used to demonstrate compliance.
Revise to clarify the condition that allows delay of burner inspections for initial tune-ups.
Revise to clarify the dates that tune-ups must be reported.
Revise to clarify that all EGUs using PM continuous parametric monitoring systems (CPMS)
for compliance purposes are to follow the same procedure for determining the operating
limit.
Revise to replace the phrase ‘‘identification of which subcategory the source is in’’ with ‘‘identification of the subcategory of the source.’’
Revise to delete and reserve since subsequent performance tests are not part of the Notification of Compliance Status.
Add to establish the procedures by which an EGU owner or operator may switch between
mass per heat input and mass per gross output emission limits.
Revise to clarify that it applies only to EGU owners or operators who choose to meet the work
practice standards contained in paragraph (2) of the definition of startup.
Revise to clarify that PM control device efficiencies and PM emission rates are those of periods other than startup and shutdown periods.
Revise to remove the requirement for use of an independent professional engineer.
Revise to add notification requirements for EGUs that move in and out of MATS applicability.
Revise to clarify the reporting requirements for EGU tune-ups.
Revise to clarify that it applies only to EGU owners or operators who choose to meet the work
practice standards contained in paragraph (2) of the definition of startup.
Revise to add emergency bypass reporting for EGUs with LEE status.
Revise to clarify that the requirements of § 63.10032(f)(1) apply only to those EGU owners or
operators who choose to meet the work practice standards contained in paragraph (1) of
the definition of startup, while the requirements of § 63.10032(f)(2) apply only to those EGU
owners or operators who choose to meet the work practice standards contained in paragraph (2) of the definition of startup.
The definitions of ‘‘Coal-fired electric utility steam generating unit,’’ ‘‘Coal refuse,’’ ‘‘Fossil fuelfired,’’ ‘‘Integrated gasification combined cycle electric utility steam generating unit or
IGCC,’’ ‘‘Limited-use liquid oil-fired subcategory,’’ ‘‘Natural gas-fired electric utility steam
generating unit,’’ and ‘‘Oil-fired electric utility steam generating unit’’ are revised to clarify the
period of time to be included in determining the source’s applicability to the MATS.
A definition of ‘‘neural network’’ is added because the term is used in 40 CFR 63.10005(f),
63.10006(i), and 63.10021(e) and Table 3 to subpart UUUUU of Part 63 but is not defined.
Revise to correct the term ‘‘gross electric output’’ to ‘‘gross output’’ which is the term defined
in 40 CFR 63.10042.
Revise to correct the term ‘‘gross electric output’’ to ‘‘gross output’’ which is the term defined
in 40 CFR 63.10042. Provision 1(c) (the Hg limit for EGUs in the subcategory ‘‘unit designed for coal ≥8,300 Btu/lb’’) is also revised to clarify the applicability of the alternate 90boiler operating day compliance option.
Revise as described earlier to clarify the term ‘‘maximum extent possible.’’.
Revise to clarify that existing as well as new EGUs using PM CPMS share the same procedures for developing operating limits.
Revise to clarify that when using Method 29, the metals matrix spike and recovery levels are
to be reported.
Revise to clarify that existing, as well as new, EGUs using PM CPMS share the same procedures for developing operating limits.
Revise to clarify that compliance reports are to include information required by 40 CFR
63.10031(c)(5) and (6).
Revise to correct an inadvertent omission of 30-day notification requirements of 40 CFR 63.9.
Revise to adjust Hg CEMS language regarding converters.
40 CFR 63.10011(e) ...........................................
40 CFR 63.10011(g)(4)(v)(A) and Table 3 .........
40 CFR 63.10020(e) ...........................................
40
40
40
40
CFR
CFR
CFR
CFR
63.10021(d)(3) .......................................
63.10021(e) ...........................................
63.10021(e)(9) .......................................
63.10023(b) and Table 6 .......................
40 CFR 63.10030(e)(1) .......................................
40 CFR 63.10030(e)(7)(i) ....................................
40 CFR 63.10030(e)(7)(iii) ..................................
40 CFR 63.10030(e)(8)(i) ....................................
40
40
40
40
CFR
CFR
CFR
CFR
63.10030(e)(8)(ii) ...................................
63.10030(f) ............................................
63.10031(c)(4) .......................................
63.10031(c)(5) .......................................
40 CFR 63.10031(c)(6) .......................................
40 CFR 63.10032(f) ............................................
40 CFR 63.10042 ................................................
Table 1 to subpart UUUUU of part 63 ................
Table 2 to subpart UUUUU of part 63 ................
Table 3 to subpart UUUUU of part 63 ................
Table 4 to subpart UUUUU of part 63 ................
Table 5 to subpart UUUUU of part 63 ................
Table 6 to subpart UUUUU of part 63 ................
srobinson on DSK5SPTVN1PROD with RULES4
Table 8 to subpart UUUUU of part 63 ................
Table 9 to subpart UUUUU of part 63 ................
Paragraphs 4.1.1.3 and 5.1.2.3 and Tables A–1
and A–2 to appendix A.
Paragraph 7.1.2.5 to appendix A ........................
Paragraph 3.2.1.2.1 of appendix A .....................
Paragraphs 4.1.1.1, Table A–1, Table A–2,
5.1.2.1, and 4.1.1.3 of appendix A.
Paragraph 5.1.2.3 of appendix A ........................
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
Add to require that owners or operators flag EGUs that are part of emission averaging groups.
Revise to specifically indicate that Hg gas generators and cylinders are allowed.
Revise to exclude use of oxidized Hg gas standards for daily calibration of Hg CEMS.
Revise to make the weekly single level system integrity check mandatory.
PO 00000
Frm 00004
Fmt 4701
Sfmt 4700
E:\FR\FM\06APR4.SGM
06APR4
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
20175
TABLE 1—SUMMARY OF PROPOSED TECHNICAL CORRECTIONS AND CLARIFICATIONS BEING FINALIZED—Continued
Section of subpart UUUUU
(40 CFR part 63)
Description of correction
(40 CFR part 63)
Paragraphs 4.1.1.5.2, Table A–1, Table A–2,
and 4.1.1.5 of appendix A.
Paragraph 5.2.1 of appendix A ...........................
Paragraph 6.2.2.3 of appendix A ........................
Revise to provide an alternative relative accuracy test audit (RATA) procedure for EGUs with
low emissions.
Revise to correct the number of days for sorbent trap use from 14 to 15.
Revise to clarify that the 90-day alternative Hg standard may be used and that electrical output is gross output.
Add to clarify that EGU owners or operators are to keep records of their EGUs that constitute
emissions averaging groups.
Revise to clarify that use of Performance Specification (PS) 18, when promulgated, will be allowed.
Add as part of the renumbering due to the addition of PS 18.
Revise to accommodate use of PS 18.
Revise as part of the renumbering due to the addition of PS 18.
Paragraph 7.1.2.6 of appendix A ........................
Paragraphs 2.1, 2.3, 2.3.1, 2.3.2, 3.1, 3.2, 3.3,
5, 5.1, 5.2, and 5.3 of appendix B.
Paragraph 5.4 of appendix B ..............................
Paragraph 8 of appendix B .................................
Paragraphs 10.1.8, 10.1.8.1, 10.1.8.1.1, and
10.1.8.1.2 of appendix B.
Paragraph 10.1.8.1.3 of appendix B ...................
Paragraphs
10.1.8.2,
10.1.8.1.2.1,
and
10.1.8.1.2.2 of appendix B.
Paragraph 11.4 of appendix B ............................
Paragraph 11.4.2 of appendix B .........................
Paragraph 11.4.3 of Appendix B .........................
Paragraph 11.4.4 of appendix B .........................
Paragraphs 11.4.4.1, 11.4.5, 11.4.5.1, 11.4.6,
11.4.6.1 of appendix B.
Paragraph 11.4.7 of appendix B .........................
Paragraphs 11.4.7.1 through 11.4.7.13 of appendix B.
Paragraph 11.5.3.4 of appendix B ......................
Most of the corrections and
clarifications remain the same as
presented in the proposed correction
document and those changes are being
finalized without further discussion.
However, the EPA has made some
changes in this final rule after
consideration of the public comments
received on the proposed correction
document. The changes are to clarify
applicability and implementation issues
associated with proposed changes, and
the significant changes are discussed
below in this preamble. A summary of
the comments received and our
responses thereto is contained in the
document ‘‘Summary of Public
Comments and Responses: MATS and
Utility NSPS Technical Corrections’’
located in the dockets for these
rulemakings.
srobinson on DSK5SPTVN1PROD with RULES4
II. Significant Changes Since Proposal
This section of the preamble
summarizes the significant changes
made to the proposed corrections and
clarifications.
1. Section 63.9984(f) is revised to add
‘‘or the EGU’s otherwise applicable
compliance date established by the EPA
or the state.’’ A commenter stated that
the EPA’s proposed revision, which was
adding ‘‘the date that compliance must
be demonstrated, as given’’ in § 63.9984,
to the initial compliance requirements
in § 63.10005(a) for existing EGUs, does
not effectively clarify the date that
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
Revise to clarify that records of relative accuracy audits (RAAs) are also required.
Revise to clarify the quarterly gas audit recordkeeping requirements for PS 15 and the quarterly data accuracy assessments for PS 18 (which are reserved).
Revise to replace the incorrect abbreviation ‘‘i.e.’’ with ‘‘e.g.’’.
Revise to specify the requirements of the daily beam intensity checks for EGUs using PS 18.
Revise to reflect the reporting requirements for PS 15.
Revise to reserve the reporting requirements for quarterly parameter verification checks for PS
18.
Add to reserve the reporting requirements for quarterly gas audit information and for quarterly
dynamic spiking for PS 18.
Add to include reporting requirements for RAAs.
Add as part of the renumbering due to the addition of PS 18.
Revise to include reporting requirements for beam intensity checks for PS 18.
compliance must be demonstrated due
to its reference to § 63.9984 and
paragraph (f) of § 63.9984 because
§ 63.9984(b) specifies a compliance date
of April 16, 2015 for existing EGUs.
Also, § 63.9984(f), which states the dates
by which compliance must be
demonstrated, refers to § 63.9984(b).
Therefore, we revised § 63.9984(f)
because specifying a date for existing
EGUs to demonstrate compliance is
confusing for existing sources that have
been granted a compliance extension.
2. Section 63.10000(n) is added to
address comments that noted the
proposed technical corrections did not
address the permanent conversion to
natural gas or biomass consistent with
the proposals outlined in the February
17, 2015 preamble. In the preamble (see
80 FR 8447), we stated ‘‘The EPA is also
proposing that sources that permanently
convert to natural gas or biomass after
the compliance date are no longer
subject to MATS, notwithstanding the
coal or oil usage the previous 3 calendar
years.’’ However, we inadvertently did
not include the necessary language to
address permanent conversions in the
proposed regulatory text. For that
reason, we are revising paragraph (n) to
incorporate the proposed change as
outlined in the preamble to the
proposed rule.
3. The proposal to revise
§ 63.10005(b)(1) to change the time
period allowed for existing EGUs to use
PO 00000
Frm 00005
Fmt 4701
Sfmt 4700
stack test data collected prior to the
applicable compliance date has been
withdrawn. Several commenters did not
support the proposed revision to change
the window in which initial compliance
can be demonstrated, and said that
EGUs should be allowed to demonstrate
initial compliance using stack tests
conducted on or after April 16, 2014.
Commenters said the EPA’s proposed
change is unfair, renders investments in
stack testing useless, and requires
companies to perform new, unnecessary
initial compliance testing. For these
reasons, and because the Agency
believes earlier stack tests may be
representative under certain
circumstances, the EPA is not making
the proposed change.
4. Section 63.10006(f) is revised to: (1)
Correct the minimum time between
annual performance tests (from 370 to
320 calendar days); (2) clarify the
minimum time between annual sorbent
trap mercury testing for 30-boiler
operating day low emitting EGU (LEE)
retests (also 320 calendar days); and (3)
provide the minimum time between
annual sorbent trap mercury testing for
90-boiler operating day LEE retests (230
calendar days). Commenters correctly
stated that the 370-day interval for
annual tests was a typographical error,
as they would expect the interval to be
365 days or less. Commenters expressed
concerns that, while the proposed
revised § 63.10006(f) specified the time
E:\FR\FM\06APR4.SGM
06APR4
srobinson on DSK5SPTVN1PROD with RULES4
20176
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
periods between annual performance
tests, it did not specify the time periods
between annual sorbent trap mercury
testing for either the 30-boiler operating
day averaging periods or the 90-boiler
operating day averaging periods. The
three revisions, listed above, being made
to § 63.10006(f) address the
commenters’ concerns. In addition,
§ 63.10010(i)(2)(i) and (ii) is revised to
clarify the time periods between
quarterly, annual, and three year testing
for particulate matter continuous
emissions monitoring system (PM
CEMS) audits.
5. Section 63.10009(b)(1) is revised to
clarify group eligibility equations 1a and
1b. The purpose of the group eligibility
equations is to provide EGU owners or
operators a quick method for
demonstrating initial compliance with
the emission limits for all units
participating in the emission averaging
group using the maximum rated heat
input or gross output of each unit and
the results of the initial compliance
demonstrations. Commenters stated that
the EPA proposed to drop the double
summation in the denominator, which
is a correct step. However, the
commenters indicated they do not
understand what the Agency was
thinking with respect to adding the ‘‘qj’’
term in both the numerator and
denominator and that the EPA defined
‘‘qj’’ to be the hours in the averaging
period (720 for 30-day averages and
2,160 for 90-day averages) because the
term’s presence in both the numerator
and denominator cancels out and has no
effect. Commenters also stated that they
do not agree that the newly proposed
group averaging eligibility Equation 1a
is more useful than the original
equation. Commenters said both the
original equation and the newly
proposed equation are flawed and, thus,
produce incorrect results. Commenters
said corrections need to be made to
either equation that the EPA wants to
use. Commenters said the stack testing
components of the equation for each
unit that is tested need to be weighted
the same as units that use continuous
monitoring in order for any equation to
produce correct calculations.
Commenters said the original equation
works for the continuous monitoring
components, but is flawed because it
does not properly weight the stack
testing components, and the newly
proposed equation is flawed on both
fronts. Based on the commenters’
concerns, the equations have been
revised so that individual EGU
characteristics, whether from
continuous emission monitoring
systems (CEMS) or stack testing results,
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
are easier to input. We agree that the
added ‘‘qj’’ term and ‘‘rk’’ term have no
effect, and they have been deleted. We
are also deleting the ‘‘n’’ term since
Equations 1a and 1b are to demonstrate
initial compliance based on using the
initial compliance results and not
continuous compliance that is based on
an averaging period. We have revised
some of the terms’ descriptions to
clarify that the emission rates used are
those determined during the initial
compliance demonstration.
6. Section 63.10009(e), (g), and (j)(2)
are revised to require compliance with
the weighted average emissions rate at
all times following the date that
emissions averaging begins. A
commenter argued that the EPA must
also revise these sections to remove the
specifically identified dates (e.g., April
16, 2015 and February 16, 2015). We
agree that the dates within
§ 63.10009(e), (g), and (j)(2) should be
removed, and the dates have been
replaced with ‘‘the date that you begin
emission averaging.’’
7. Section 63.10010(h)(6)(i),
(i)(5)(i)(A), and (j)(4)(i)(A) and (B) are
revised to clarify when monitoring
system quality assurance or quality
control activities are to be reported.
Commenters said § 63.10010(h)(6)(i),
(i)(5)(i)(A), and (j)(4)(i)(A) and (B)
specify what data from particulate
matter (PM) continuous parameter
monitoring system (CPMS), PM CEMS,
and hazardous air pollutants (HAP)
metal CEMS must be excluded from
compliance determinations and that the
EPA proposed to separate the language
regarding deviation reporting that
currently appears at the end of these
provisions into a separate sentence to
‘‘ease readability.’’ The commenter
disagreed that the proposed revision
improves readability and said that, to
the contrary, by separating out the
sentence, the EPA implies that the
periods when data are not collected
because of monitoring system
malfunctions, repairs, required quality
assurance or quality control, as well as
periods when a monitoring system is
out of control, are deviations from
monitoring requirements, which they
are not. The commenter is incorrectly
interpreting the proposed change.
Periods when data are not collected
because of monitoring system
malfunctions are deviations. The
required quality assurance or quality
control activities that are deviations
from monitoring requirements are, as
stated in § 63.10010(h)(6)(i), (i)(5)(i)(A),
and (j)(4)(i)(A) and (B), those conducted
during monitoring systems
malfunctions.
PO 00000
Frm 00006
Fmt 4701
Sfmt 4700
8. Section 63.10011(g)(4)(v)(A) is
revised to change the proposed language
‘‘to the maximum extent practicable’’
back to the language ‘‘to the maximum
extent possible’’ as in the final rule.
Commenters said the requirement to use
clean fuels ‘‘to the maximum extent
practicable’’ does not even address the
level of toxic emissions during startup,
let alone reduce them to the maximum
extent achievable as is required under
CAA section 112(d)(2). Commenters
said, perhaps most importantly, that the
EPA’s proposed change impermissibly
assumes that existing older boilers and
control devices are not capable of being
upgraded—despite Congress’ mandate
in CAA section 112(d)(2)–(3) that
emissions standards and work practices
reflect what is achievable and actually
being achieved by the best-performing
sources. Commenters said further, under
CAA section 112(d), it is the
Administrator’s duty to establish
standards to achieve the required
emissions reductions—not the duty of
owners and operators. Commenters said
the EPA’s purported work practices
impermissibly allow operators
themselves to determine the standards
and their own emission reductions
achieved (or not) by the requirements.
Commenters said the EPA’s proposed
change leaves it up to each operator to
determine the amount of clean fuel use
that represents the ‘‘maximum extent
practicable,’’ and leaves it up to each
operator to determine what qualifies as
a ‘‘consideration such as boiler or
control device integrity.’’ Commenters
said that even though the requirement
for clean fuels states that EGUs must
have sufficient clean fuel capacity to
engage and operate PM control devices
within 1 hour of adding the primary fuel
(and even though a separate work
practice requires PM controls to be
engaged and operated within 1 hour),
these requirements do not establish
whether and to what point EGUs must
actually use clean fuels in startups.
These comments primarily concern
issues that the EPA did not reopen in
the proposed document. Because those
issues were not reopened, the EPA did
not respond to these comments. We did
propose to change § 63.10011(g)(4)(v)(A)
as the commenter states. We continue to
believe that the use of clean fuels during
startup must be maximized to reduce
HAP emissions and have reconsidered
the proposed change of ‘‘possible’’ to
‘‘practicable.’’ We believe ‘‘possible’’ is
a more enforceable standard. The final
change to § 63.10011(g)(4)(v)(A) is: ‘‘to
the maximum extent possible, taking
into account considerations such as
boiler or control device integrity,
E:\FR\FM\06APR4.SGM
06APR4
srobinson on DSK5SPTVN1PROD with RULES4
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
throughout the startup period.’’ This
language is also included in section 4 of
Table 3, to clarify that this provision
applies during periods of shutdown.
The EPA is not finalizing the
proposed change because we have
determined that requiring clean fuel use
to the maximum extent ‘‘possible’’ is
more enforceable than the proposed
change to ‘‘practicable’’, and the Agency
believes it is critical that the work
practice be enforceable to ensure that
sources use as much clean fuel with its
inherently low HAP content as possible
when a source’s controls are not yet
fully engaged. At the same time, we
believe operators must be able to
consider the integrity of the EGU system
when determining the clean fuel use
that is ‘‘possible’’ for a given unit. We
believe the final rule addresses both
considerations.
9. Section 63.10030(e)(8)(iii) is added
to allow EGU owners or operators the
ability to switch between paragraphs 1
and 2 of the startup definition.
Commenters requested that switching
between paragraphs of the definition of
startup not be prohibited. We have no
objection to such switching provided
certain criteria are met. Just as we had
not considered that EGU owners or
operators would want to switch between
mass per year heat input emission limits
and mass per gross output emission
limits, but proposed to allow such
changes provided certain criteria are
met, we did not consider that an owner
or operator would want to switch
between the startup definitions for the
EGU. Given the commenter’s specific
request and the EPA’s conditional
approval based on the already existing
model given in § 63.10030(e)(7)(iii)(A),
§ 63.10030(e)(8)(iii) is added to the rule.
This new section allows EGU owners or
operators the ability to switch between
paragraphs 1 and 2 of the startup
definition provided, among other things,
that the EGUs involved in the switch are
identified, that a request is submitted 30
days prior to the anticipated switch, that
the request contains certification that all
previous plans, such as monitoring and
emissions averaging, are revised, that
records are maintained, and that the
new definition is not used until the next
reporting period after receipt of written
acknowledgement from the
Administrator or the delegated authority
of the switch.
10. Section 63.10031(c)(4) is revised
to clarify that the ‘‘date’’ of the tune-up
is the date the tune-up provisions
specified in § 63.10021(e)(6) and (7) are
completed. Commenters noted that
there will not necessarily be a single
date associated with completion of an
EGU’s tune-ups conducted under
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
§ 63.10021(e) and suggested that, related
to the possibility of a delayed burner
inspection, the Agency make it clear
that compliance with all requirements
besides the burner inspection must
occur by the compliance demonstration
date, but that the burner inspection may
be delayed, and to revise the provision
to recognize that as a result,
performance of subsequent inspections
and tune-ups may be on a separate 36month track and some EGUs may have
‘‘dates’’ rather than a ‘‘date’’ for
completion of requirements. Regardless
of when the burner inspection is
conducted, the tune-up is considered to
have been conducted on the date the
combustion optimization is completed.
The purpose of the tune-up is the
optimization of the combustion to
minimize organic HAP, carbon
monoxide, and nitrogen oxides (NOX)
and to improve or return the unit to its
design combustion efficiency (i.e.,
§ 63.10021(e)(6) and (7)). We realize that
EGUs may need to be taken off-line to
conduct an inspection of burners. So,
we allow that inspection to be delayed,
or as § 63.10021(e) is revised, to be
performed prior to the tune-up.
Therefore, subsequent tune-ups must be
performed within 36 months from when
the previous tune-up (i.e., the
requirements of § 63.10021(e)(6) and (7))
was completed, and the source must
conduct the next burner inspection on
a similar schedule.
11. Section 63.10031(c)(7) is added to
include the reporting requirements that
have been removed from
§ 63.10030(e)(7)(i). A commenter said
that there is no reason to submit
Notification of Compliance Status
(NOCS) for ongoing 3-year tests that are
performed to demonstrate that LEE
status is maintained, so the proposed
language in § 63.10030(e)(7)(i) should be
revised. We agree that not only the
ongoing 3-year LEE retests, but also the
annual and quarterly LEE retests and
annual retests that are performed to
establish operating limits, should not be
submitted as NOCS. According to the
introductory text of § 63.10030(e), the
NOCS is required only for reporting
initial compliance. Therefore,
§ 63.10030(e)(7)(i) has been removed
and reserved, and the reporting
requirements in § 63.10030(e)(7)(i) have
been moved to a new place, i.e.,
§ 63.10031(c)(7), and are part of the
compliance report requirements.
Likewise, the compliance certification
and deviation information requirements
in § 63.10030(e)(5) and (e)(6) apply for
compliance reports and are replicated in
new § 63.10031(c)(8) and (9), and each
of these paragraphs is included in the
PO 00000
Frm 00007
Fmt 4701
Sfmt 4700
20177
introductory text in § 63.10030(c) and in
Table 8.
12. The definitions of ‘‘Coal-fired
electric utility steam generating unit,’’
‘‘Fossil fuel-fired,’’ ‘‘Limited-use liquid
oil-fired subcategory,’’ and ‘‘Oil-fired
electric utility steam generating unit’’ in
§ 63.10042 are further revised to clarify
the period of time to be included in
determining the source’s applicability to
the MATS.
One commenter indicated that the
proposed rule does not address
permanent conversion to natural gas or
biomass, nor does it make clear that,
after the first 3 years of compliance,
EGUs are required to evaluate
applicability based on coal or oil usage
from the 3 previous calendars years on
an annual rolling basis. The commenter
said that the EPA’s clarifying proposals
are not clearly outlined in the proposed
revised definitions. The commenter
urged the EPA to revise the definition in
a manner consistent with the proposals
outlined in the preamble. Several
commenters indicated the proposed
changes do not prevent an EGU from
continuing to be subject to MATS for
several years after a fuel switch.
We agree that the proposed
clarification to the definitions does not
make it clear that, after the first 3 years
of compliance, an EGU is required to
evaluate applicability based on coal or
oil usage from the 3 previous calendar
years on an annual rolling basis. Thus,
we have revised the definitions for
‘‘Coal-fired electric utility steam
generating unit,’’ ‘‘Oil-fired electric
utility steam generating unit,’’ and
‘‘Fossil fuel-fired’’ to clarify that
applicability after the first 3 years of
compliance will be based on coal or oil
usage from the 3 previous calendar
years on an annual rolling basis.
Concerning the permanent fuels
switch, the EPA explained above that it
has addressed permanent conversions in
§ 63.10000(n) of the final rule, as
discussed in paragraph 2 above.
13. Appendix A is finalized with all
proposed revisions with the exception
of adding an alternative specification for
the relative accuracy test audit (RATA)
where commenters provided data to
support a different approach using an
absolute value criterion. However, due
to the current lack of available NISTtraceable elemental Hg gas cylinders,
owners or operators of EGUs that have
purchased/installed Hg CEMS that lack
integrated elemental Hg gas generators
may continue to use NIST-traceable
oxidized gases for calibration error tests
and daily checks until such time that
NIST-traceable compressed elemental
Hg gas standards are available and
traceable with a combined uncertainty
E:\FR\FM\06APR4.SGM
06APR4
20178
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
(K=2) of 5 percent. Once those standards
are available, we will issue a notice of
availability in the Federal Register.
Should NIST-traceable oxidized
mercury reference gases with a
combined uncertainty of 5% ultimately
be available, we will consider allowing
their use for calibration error tests and
checks.
14. Appendix B is finalized with all
proposed revisions except those related
to sections 10 and 11 regarding
recordkeeping and reporting for
hydrogen chloride (HCl) CEMS subject
to PS 18. Sections 10 and 11 will be
addressed in the upcoming MATS
Completion of Electronic Reporting
Requirements rule. One change has been
made that was not proposed. A minor
technical correction has been made to
section 9.4, requiring the HCl emission
rates to be reported to 2 significant
figures in scientific notation, which is
consistent with the way that the
emission standards are presented in
Tables 1 and 2.
III. Other Corrections and
Clarifications
In finalizing the rule, the EPA is
addressing several other technical
corrections and clarifications in the
regulatory language based on public
comments that were received on the
February 2015 proposal that the Agency
determined were necessary to conform
to changes included in the proposed
rule, as outlined in Table 2 of this
preamble.
TABLE 2—SUMMARY OF TECHNICAL CORRECTIONS AND CLARIFICATIONS SINCE FEBRUARY 17, 2015, PROPOSAL
Section of subpart UUUUU
(40 CFR part 63)
Description of correction
(40 CFR part 63)
40 CFR 63.10000(a) ...........................................
Revise this paragraph by adding ‘‘items 3 and 4’’ to clarify which items in Table 3 must be
met.
Revise this paragraph to add ‘‘Except as provided under paragraph (n) of this section’’ due to
the addition of paragraph (n) clarifying the applicability of a permanent conversion to natural
gas or biomass.
Revise this paragraph to add ‘‘Except as provided under paragraph (n) of this section’’ due to
the addition of paragraph (n) clarifying the applicability of a permanent conversion to natural
gas or biomass.
Revise this paragraph to clarify that an EGU, no longer subject to MATS, must be in compliance with applicable CAA section 112 or 129 standards consistent with paragraphs (g) and
(n).
Revise this paragraph to replace the terms ‘‘electrical’’ and ‘‘electrical load’’ with the terms
‘‘gross’’ and ‘‘gross output,’’ respectively, to be consistent with the proposed changes to
other sections.
Revise this paragraph to replace the terms ‘‘electrical’’ and ‘‘electrical load’’ with the terms
‘‘gross’’ and ‘‘gross output,’’ respectively, to be consistent with the proposed changes to
other sections.
Revise this paragraph to replace the term ‘‘electrical load’’ with the term ‘‘gross output’’ to be
consistent with the proposed changes to other sections.
Revise to be consistent with EPA’s intent, as explained in the preamble to the proposed rule,
to only clarify the timing of initial and subsequent tune-ups.
Revise since specifying the date is problematic for sources that have been granted a compliance extension.
Revise this paragraph to replace the term ‘‘electrical load’’ with the term ‘‘gross output’’ to be
consistent with the proposed changes to other sections.
Revise this paragraph to replace the term ‘‘electrical load’’ with the term ‘‘gross output’’ to be
consistent with the proposed changes to other sections.
Revise this paragraph to replace the term ‘‘electrical load’’ with the term ‘‘gross output’’ to be
consistent with the proposed changes to other sections.
Revise since specifying the date is problematic for sources that have been granted a compliance extension.
Revise this paragraph to replace the term ‘‘electrical load’’ with the term ‘‘gross output’’ to be
consistent with the proposed changes to other sections.
Revise this paragraph to replace the term ‘‘electrical load’’ with the term ‘‘gross output’’ to be
consistent with the proposed changes to other sections.
Revise this table to replace the term ‘‘electrical’’ with the term ‘‘gross’’ to be consistent with
the proposed changes to other sections.
Revise this paragraph to replace the term ‘‘electrical load’’ with the term ‘‘gross output’’ to be
consistent with the proposed changes to other sections.
40 CFR 63.10000(f) ............................................
40 CFR 63.10000(g) ...........................................
40 CFR 63.10000(i)(1) ........................................
40 CFR 63.10005(a) ...........................................
40 CFR 63.10005(a)(2)(ii) ...................................
40 CFR 63.10005(b)(4) .......................................
40 CFR 63.10005(f) ............................................
40 CFR 63.10005(h)(3)(i)(D) ...............................
40 CFR 63.10005(h)(3)(iii) ..................................
40 CFR 63.10007(f)(2) ........................................
40 CFR 63.10009(e) and (j)(2) ...........................
40 CFR 63.10010(f)(4) ........................................
40 CFR 63.10021(h)(1) .......................................
Table 5 ................................................................
Paragraph 7.1.8.5 of appendix A ........................
srobinson on DSK5SPTVN1PROD with RULES4
IV. Affirmative Defense for Violation of
Emission Standards During
Malfunction
The EPA received numerous
comments on the affirmative defense to
civil penalties for violations caused by
malfunctions that the EPA proposed to
remove in the current rule. Several
commenters supported the removal of
the affirmative defense for malfunctions.
Other commenters opposed the removal
of the affirmative defense provision.
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
As stated in the February 17, 2015,
proposal, the United States Court of
Appeals for the District of Columbia
Circuit vacated an affirmative defense in
one of the EPA’s CAA section 112(d)
regulations. NRDC v. EPA, No. 10–1371
(D.C. Cir. April 18, 2014) 2014 U.S.
App. LEXIS 7281 (vacating affirmative
defense provisions in CAA section
112(d) rule establishing emission
standards for Portland cement kilns).
The court found that the EPA lacked
PO 00000
Frm 00008
Fmt 4701
Sfmt 4700
authority to establish an affirmative
defense for private civil suits and held
that under the CAA, the authority to
determine civil penalty amounts in such
cases lies exclusively with the courts,
not the EPA. Specifically, the court
found: ‘‘As the language of the statute
makes clear, the courts determine, on a
case-by-case basis, whether civil
penalties are ‘appropriate.’ ’’ See NRDC,
2014 U.S. App. LEXIS 7281 at *21
(‘‘[U]nder this statute, deciding whether
E:\FR\FM\06APR4.SGM
06APR4
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
penalties are ‘appropriate’ in a given
private civil suit is a job for the courts,
not EPA.’’). The EPA is finalizing the
proposed removal of the regulatory
affirmative defense provision from
MATS. In the event that a source fails
to comply with an applicable CAA
section 112(d) standard as a result of a
malfunction event, the EPA’s ability to
exercise its case-by-case-enforcement
discretion to determine an appropriate
response provides sufficient flexibility
in such circumstances as was explained
in the preamble to the proposed rule.
Further, as the D.C. Circuit recognized,
in an EPA or citizen enforcement action,
the court has the discretion to consider
any defense raised and determine
whether penalties are appropriate. Cf.
NRDC, 2014 U.S. App. LEXIS 7281 at
*24 (arguments that violation were
caused by unavoidable technology
failure can be made to the courts in
future civil cases when the issue arises).
The same is true for the presiding officer
in EPA administrative enforcement
actions. For all these reasons, this final
rule removes the affirmative defense
provisions.
V. Impacts of This Final Rule
This action finalizes certain
provisions and makes technical and
clarifying corrections, but does not
promulgate substantive changes to the
February 2012 final MATS (77 FR 9304).
Therefore, there are no environmental,
energy, or economic impacts associated
with this final action. The impacts
associated with MATS are discussed in
detail in the February 16, 2012, final
MATS rule.
2012 final MATS rule, so that the
information collection estimate of
project cost and hour burden from the
final MATS have not been revised.
C. Regulatory Flexibility Act (RFA)
I certify that this action will not have
a significant economic impact on a
substantial number of small entities
under the RFA. This action will not
impose any requirements on small
entities. This action finalizes changes to
MATS to correct and clarify
implementation issues raised by
stakeholders.
D. Unfunded Mandates Reform Act
(UMRA)
This action does not contain an
unfunded mandate as described in
UMRA, 2 U.S.C. 1531–1538, and does
not significantly or uniquely affect small
governments. This rule promulgates
amendments to the February 2012 final
MATS, but the amendments are
clarifications to existing rule language to
aid in implementation. Therefore, the
action imposes no enforceable duty on
any state, local, or tribal governments or
the private sector.
E. Executive Order 13132: Federalism
This action does not have federalism
implications. It will not have substantial
direct effects on the states, on the
relationship between the national
government and the states, or on the
distribution of power and
responsibilities among the various
levels of government.
A. Executive Order 12866: Regulatory
Planning and Review and Executive
Order 13563: Improving Regulation and
Regulatory Review
This action is not a significant
regulatory action and was, therefore, not
submitted to the Office of Management
and Budget (OMB) for review.
F. Executive Order 13175: Consultation
and Coordination With Indian Tribal
Governments
This action does not have tribal
implications, as specified in Executive
Order 13175. It will not have substantial
direct effects on tribal governments, on
the relationship between the federal
government and Indian tribes, or on the
distribution of power and
responsibilities between the federal
government and Indian tribes, as
specified in Executive Order 13175.
This action clarifies certain components
of the February 2012 final MATS. Thus,
Executive Order 13175 does not apply
to this action.
B. Paperwork Reduction Act (PRA)
This action does not impose any new
information collection burden under the
PRA. OMB has previously approved the
information collection activities
contained in the existing regulations (40
CFR part 63, subpart UUUUU) and has
assigned OMB control number 2060–
0567. This action is believed to result in
no changes to the ICR of the February
G. Executive Order 13045: Protection of
Children From Environmental Health
Risks and Safety Risks
The EPA interprets Executive Order
13045 as applying only to those
regulatory actions that concern
environmental health or safety risks that
the EPA has reason to believe may
disproportionately affect children, per
the definition of ‘‘covered regulatory
srobinson on DSK5SPTVN1PROD with RULES4
VI. Statutory and Executive Order
Reviews
Additional information about these
statutes and Executive Orders can be
found at https://www2.epa.gov/lawsregulations/laws-and-executive-orders.
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
PO 00000
Frm 00009
Fmt 4701
Sfmt 4700
20179
action’’ in section 2–202 of the
Executive Order. This action is not
subject to Executive Order 13045
because it does not concern an
environmental health risk or safety risk.
H. Executive Order 13211: Actions
Concerning Regulations That
Significantly Affect Energy Supply,
Distribution or Use
This action is not subject to Executive
Order 13211 because it is not a
significant regulatory action under
Executive Order 12866.
I. National Technology Transfer and
Advancement Act (NTTAA)
This action does not involve technical
standards from those contained in the
February 16, 2012, final rule. Therefore,
the EPA did not consider the use of any
voluntary consensus standards. See 77
FR 9441–9443 for the NTTAA
discussion in the February 16, 2012,
final rule.
J. Executive Order 12898: Federal
Actions To Address Environmental
Justice in Minority Populations and
Low-Income Populations
The EPA believes the human health or
environmental risk addressed by this
action will not have potential
disproportionately high and adverse
human health or environmental effects
on minority, low-income, or indigenous
populations because it does not affect
the level of protection provided to
human health or the environment.
The environmental justice finding in
the February 2012 final MATS remains
relevant in this action, which finalizes
changes to the rule to correct and clarify
implementation issues raised by
stakeholders.
K. Congressional Review Act (CRA)
This action is subject to the CRA, and
the EPA will submit a rule report to
each House of the Congress and to the
Comptroller General of the United
States. This action is not a ‘‘major rule’’
as defined by 5 U.S.C. 804(2).
List of Subjects
40 CFR Part 60
Environmental protection,
Administrative practice and procedure,
Air pollution control, Intergovernmental
relations, Reporting and recordkeeping
requirements.
40 CFR Part 63
Environmental protection,
Administrative practice and procedure,
Air pollution control, Hazardous
substances, Intergovernmental relations,
Reporting and recordkeeping
requirements.
E:\FR\FM\06APR4.SGM
06APR4
20180
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
Dated: March 17, 2016.
Gina McCarthy,
Administrator.
For the reasons discussed in the
preamble, the EPA amends 40 CFR parts
60 and 63 as follows:
PART 60—STANDARDS OF
PERFORMANCE FOR NEW
STATIONARY SOURCES
1. The authority citation for part 60
continues to read as follows:
Authority: 42 U.S.C. 7401 et seq.
2. Section 60.48Da is amended by
revising paragraph (f) to read as follows:
■
Compliance provisions.
*
*
*
*
(f) For affected facilities for which
construction, modification, or
reconstruction commenced before May
4, 2011, compliance with the applicable
daily average PM emissions limit is
determined by calculating the
arithmetic average of all hourly
emission rates each boiler operating
day, except for data obtained during
startup, shutdown, or malfunction
periods. Daily averages are only
calculated for boiler operating days that
have non-out-of-control data for at least
18 hours of unit operation during which
the standard applies. Instead, all of the
non-out-of-control hourly emission rates
of the operating day(s) not meeting the
minimum 18 hours non-out-of-control
data daily average requirement are
averaged with all of the non-out-ofcontrol hourly emission rates of the next
boiler operating day with 18 hours or
more of non-out-of-control PM CEMS
data to determine compliance. For
affected facilities for which construction
or reconstruction commenced after May
3, 2011 that elect to demonstrate
compliance using PM CEMS,
compliance with the applicable PM
emissions limit in § 60.42Da is
determined on a 30-boiler operating day
rolling average basis by calculating the
arithmetic average of all hourly PM
emission rates for the 30 successive
boiler operating days, except for data
obtained during periods of startup and
shutdown.
*
*
*
*
*
srobinson on DSK5SPTVN1PROD with RULES4
*
PART 63—NATIONAL EMISSION
STANDARDS FOR HAZARDOUS AIR
POLLUTANTS FOR SOURCE
CATEGORIES
3. The authority citation for part 63
continues to read as follows:
■
Authority: 42 U.S.C. 7401 et seq.
■
4. Section 63.9983 is amended by:
VerDate Sep<11>2014
20:09 Apr 05, 2016
§ 63.9983 Are any fossil fuel-fired electric
generating units not subject to this
subpart?
*
■
§ 60.48Da
a. Revising the section heading and
paragraphs (a), (b), and (c); and
■ b. Adding paragraph (e).
The revisions and addition read as
follows:
■
Jkt 238001
*
*
*
*
(a) Any unit designated as a major
source stationary combustion turbine
subject to subpart YYYY of this part and
any unit designated as an area source
stationary combustion turbine, other
than an integrated gasification
combined cycle (IGCC) unit.
(b) Any electric utility steam
generating unit that is not a coal- or oilfired EGU and that meets the definition
of a natural gas-fired EGU in § 63.10042.
(c) Any electric utility steam
generating unit that has the capability of
combusting more than 25 MW of coal or
oil but does not meet the definition of
a coal- or oil-fired EGU because it did
not fire sufficient coal or oil to satisfy
the average annual heat input
requirement set forth in the definitions
for coal-fired and oil-fired EGUs in
§ 63.10042. Heat input means heat
derived from combustion of fuel in an
EGU and does not include the heat
derived from preheated combustion air,
recirculated flue gases or exhaust gases
from other sources (such as stationary
gas turbines, internal combustion
engines, and industrial boilers).
*
*
*
*
*
(e) Any electric utility steam
generating unit that meets the definition
of a natural gas-fired EGU under this
subpart and that fires at least 10 percent
biomass is an industrial boiler subject to
standards established under subpart
DDDDD of this part, if it otherwise
meets the applicability provisions in
that rule.
■ 5. Section 63.9991 is amended by
revising paragraphs (c)(1) and (2) to read
as follows:
§ 63.9991 What emission limitations, work
practice standards, and operating limits
must I meet?
*
*
*
*
*
(c) * * *
(1) Has a system using wet or dry flue
gas desulfurization technology and an
SO2 continuous emissions monitoring
system (CEMS) installed on the EGU;
and
(2) At all times, you operate the wet
or dry flue gas desulfurization
technology and the SO2 CEMS installed
on the EGU consistent with
§ 63.10000(b).
■ 6. Section 63.10000 is amended by
revising paragraphs (a), (c)(1)(i),
PO 00000
Frm 00010
Fmt 4701
Sfmt 4700
(c)(2)(iii), (f), (g), and (i)(1) and adding
paragraphs (m) and (n) to read as
follows:
§ 63.10000 What are my general
requirements for complying with this
subpart?
(a) You must be in compliance with
the emission limits and operating limits
in this subpart. These limits apply to
you at all times except during periods
of startup and shutdown; however, for
coal-fired, liquid oil-fired, or solid oilderived fuel-fired EGUs, you are
required to meet the work practice
requirements, items 3 and 4, in Table 3
to this subpart during periods of startup
or shutdown.
*
*
*
*
*
(c)(1) * * *
(i) For a coal-fired or solid oil-derived
fuel-fired EGU or IGCC EGU, you may
conduct initial performance testing in
accordance with § 63.10005(h), to
determine whether the EGU qualifies as
a low emitting EGU (LEE) for one or
more applicable emission limits, except
as otherwise provided in paragraphs
(c)(1)(i)(A) and (B) of this section:
(A) Except as provided in paragraph
(c)(1)(i)(C) of this section, you may not
pursue the LEE option if your coal-fired,
IGCC, or solid oil-derived fuel-fired
EGU is equipped with a main stack and
a bypass stack or bypass duct
configuration that allows the effluent to
bypass any pollutant control device.
(B) You may not pursue the LEE
option for Hg if your coal-fired, solid
oil-derived fuel-fired EGU or IGCC EGU
is new.
(C) You may pursue the LEE option
provided that:
(1) Your EGU’s control device bypass
emissions are measured in the bypass
stack or duct or your control device
bypass exhaust is routed through the
EGU main stack so that emissions are
measured during the bypass event; or
(2) Except for hours during which
only clean fuel is combusted, you
bypass your EGU control device only
during emergency periods for no more
than a total of 2 percent of your EGU’s
annual operating hours; you use clean
fuels to the maximum extent possible
during an emergency period; and you
prepare and submit a report describing
the emergency event, its cause,
corrective action taken, and estimates of
emissions released during the
emergency event. You must include
these emergency emissions along with
performance test results in assessing
whether your EGU maintains LEE
status.
*
*
*
*
*
(2) * * *
E:\FR\FM\06APR4.SGM
06APR4
srobinson on DSK5SPTVN1PROD with RULES4
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
(iii) If your existing liquid oil-fired
unit does not qualify as a LEE for
hydrogen chloride (HCl) or for hydrogen
fluoride (HF), you may demonstrate
initial and continuous compliance
through use of an HCl CEMS, an HF
CEMS, or an HCl and HF CEMS,
installed and operated in accordance
with Appendix B to this rule. As an
alternative to HCl CEMS, HF CEMS, or
HCl and HF CEMS, you may
demonstrate initial and continuous
compliance through quarterly
performance testing and parametric
monitoring for HCl and HF. If you
choose to use quarterly testing and
parametric monitoring, then you must
also develop a site-specific monitoring
plan that identifies the CMS you will
use to ensure that the operations of the
EGU remains consistent with those
during the performance test. As another
alternative, you may measure or obtain,
and keep records of, fuel moisture
content; as long as fuel moisture does
not exceed 1.0 percent by weight, you
need not conduct other HCl or HF
monitoring or testing.
*
*
*
*
*
(f) Except as provided under
paragraph (n) of this section, you are
subject to the requirements of this
subpart for at least 6 months following
the last date you met the definition of
an EGU subject to this subpart (e.g., 6
months after a cogeneration unit
provided more than one third of its
potential electrical output capacity and
more than 25 megawatts electrical
output to any power distributions
system for sale). You may opt to remain
subject to the provisions of this subpart
beyond 6 months after the last date you
met the definition of an EGU subject to
this subpart, unless your unit is a solid
waste incineration unit subject to
standards under CAA section 129 (e.g.,
40 CFR part 60, subpart CCCC (New
Source Performance Standards (NSPS)
for Commercial and Industrial Solid
Waste Incineration Units, or subpart
DDDD (Emissions Guidelines (EG) for
Existing Commercial and Industrial
Solid Waste Incineration Units).
Notwithstanding the provisions of this
subpart, an EGU that starts combusting
solid waste is immediately subject to
standards under CAA section 129 and
the EGU remains subject to those
standards until the EGU no longer meets
the definition of a solid waste
incineration unit consistent with the
provisions of the applicable CAA
section 129 standards.
(g) Except as provided under
paragraph (n) of this section, if your unit
no longer meets the definition of an
EGU subject to this subpart you must be
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
in compliance with any newly
applicable standards on the date you are
no longer subject to this subpart. The
date you are no longer subject to this
subpart is a date selected by you, that
must be at least 6 months from the date
that your unit last met the definition of
an EGU subject to this subpart or the
date you begin combusting solid waste,
consistent with § 63.9983(d). Your
source must remain in compliance with
this subpart until the date you select to
cease complying with this subpart or the
date you begin combusting solid waste,
whichever is earlier.
*
*
*
*
*
(i)(1) If you own or operate an EGU
subject to this subpart and cease to
operate in a manner that causes your
unit to meet the definition of an EGU
subject to this subpart, you must be in
compliance with any newly applicable
section 112 or 129 standards on the date
you selected consistent with paragraphs
(g) and (n) of this section.
*
*
*
*
*
(m) Should you choose to rely on
paragraph (2) of the definition of
‘‘startup’’ in § 63.10042 for your EGU,
on or before the date your EGU is
subject to this subpart, you must install,
verify, operate, maintain, and quality
assure each monitoring system
necessary for demonstrating compliance
with the work practice standards for PM
or non-mercury HAP metals controls
during startup periods and shutdown
periods required to comply with
§ 63.10020(e).
(1) You may rely on monitoring
system specifications or instructions or
manufacturer’s specifications when
installing, verifying, operating,
maintaining, and quality assuring each
monitoring system.
(2) You must collect, record, report,
and maintain data obtained from these
monitoring systems during startup
periods and shutdown periods.
(n) If you have permanently converted
your EGU from coal or oil to natural gas
or biomass after your compliance date
(or, if applicable, after your approved
extended compliance date), as
demonstrated by being subject to a
permit provision or physical limitation
(including retirement) that prevents you
from operating in a manner that would
subject you to this subpart, you are no
longer subject to this subpart,
notwithstanding the coal or oil usage in
the previous calendar years. The date on
which you are no longer subject to this
subpart is the date on which you
converted to natural gas or biomass
firing; it is also the date on which you
must be in compliance with any newly
applicable standards.
PO 00000
Frm 00011
Fmt 4701
Sfmt 4700
§ 63.10001
20181
[Removed and Reserved]
7. Section 63.10001 is removed and
reserved.
■ 8. Section 63.10005 is amended by:
■ a. Revising paragraphs (a)
introductory text, (a)(2) introductory
text, (a)(2)(i) and (ii), and (b)(4);
■ b. Adding paragraph (b)(6);
■ c. Revising paragraphs (d)(3), (d)(4)(i),
(f), (h) introductory text, (h)(3)
introductory text, (h)(3)(i)(D), and
(h)(3)(iii) introductory text; and
■ d. Removing paragraphs (i)(4)(iii) and
(iv).
The revisions and additions read as
follows:
■
§ 63.10005 What are my initial compliance
requirements and by what date must I
conduct them?
(a) General requirements. For each of
your affected EGUs, you must
demonstrate initial compliance with
each applicable emissions limit in Table
1 or 2 of this subpart through
performance testing. Where two
emissions limits are specified for a
particular pollutant (e.g., a heat inputbased limit in lb/MMBtu and a gross
output-based limit in lb/MWh), you may
demonstrate compliance with either
emission limit. For a particular
compliance demonstration, you may be
required to conduct one or more of the
following activities in conjunction with
performance testing: collection of data,
e.g., hourly gross output data
(megawatts); establishment of operating
limits according to § 63.10011 and
Tables 4 and 7 to this subpart; and CMS
performance evaluations. In all cases,
you must demonstrate initial
compliance no later than the date in
paragraph (f) of this section for tune-up
work practices for existing EGUs; the
date that compliance must be
demonstrated, as given in § 63.9984 for
other requirements for existing EGUs;
and in paragraph (g) of this section for
all requirements for new EGUs.
*
*
*
*
*
(2) To demonstrate initial compliance
using either a CMS that measures HAP
concentrations directly (i.e., an Hg, HCl,
or HF CEMS, or a sorbent trap
monitoring system) or an SO2 or PM
CEMS, the initial performance test shall
consist of 30- or, for certain coal-fired
existing EGUs that use emissions
averaging for Hg, 90-boiler operating
days. If the CMS is certified prior to the
compliance date (or, if applicable, the
approved extended compliance date),
the test shall begin with the first
operating day on or after that date,
except as otherwise provided in
paragraph (b) of this section. If the CMS
is not certified prior to the compliance
E:\FR\FM\06APR4.SGM
06APR4
srobinson on DSK5SPTVN1PROD with RULES4
20182
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
date, the test shall begin with the first
operating day after certification testing
is successfully completed. In all cases,
the initial 30- or 90- operating day
averaging period must be completed on
or before the date that compliance must
be demonstrated (i.e., 180 days after the
applicable compliance date).
(i) The CMS performance test must
demonstrate compliance with the
applicable Hg, HCl, HF, PM, or SO2
emissions limit in Table 1 or 2 to this
subpart.
(ii) You must collect hourly data from
auxiliary monitoring systems (i.e., stack
gas flow rate, CO2, O2, or moisture, as
applicable) during the performance test
period, in order to convert the pollutant
concentrations to units of the standard.
If you choose to comply with a gross
output-based emission limit, you must
also collect hourly gross output data
during the performance test period.
*
*
*
*
*
(b) * * *
(4) A record of all parameters needed
to convert pollutant concentrations to
units of the emission standard (e.g.,
stack flow rate, diluent gas
concentrations, hourly gross outputs) is
available for the entire performance test
period; and
*
*
*
*
*
(6) For performance stack test data
that are collected prior to the date that
compliance must be demonstrated and
are used to demonstrate initial
compliance with applicable emissions
limits, the interval for subsequent stack
tests begins on the date that compliance
must be demonstrated.
*
*
*
*
*
(d) * * *
(3) For affected EGUs that are either
required to or elect to demonstrate
initial compliance with the applicable
Hg emission limit in Table 1 or 2 of this
subpart using Hg CEMS or sorbent trap
monitoring systems, initial compliance
must be demonstrated no later than the
applicable date specified in § 63.9984(f)
for existing EGUs and in paragraph (g)
of this section for new EGUs. Initial
compliance is achieved if the arithmetic
average of 30- (or 90-) boiler operating
days of quality-assured CEMS (or
sorbent trap monitoring system) data,
expressed in units of the standard (see
section 6.2 of appendix A to this
subpart), meets the applicable Hg
emission limit in Table 1 or 2 to this
subpart.
(4) * * *
(i) You must demonstrate initial
compliance no later than the applicable
date specified in § 63.9984(f) for existing
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
EGUs and in paragraph (g) of this
section for new EGUs.
*
*
*
*
*
(f) For an existing EGU without a
neural network, a tune-up, following the
procedures in § 63.10021(e), must occur
within 6 months (180 days) after April
16, 2015. For an existing EGU with a
neural network, a tune-up must occur
within 18 months (545 days) after April
16, 2016. If a tune-up occurs prior to
April 16, 2015, you must keep records
showing that the tune-up met all rule
requirements.
*
*
*
*
*
(h) Low emitting EGUs. The
provisions of this paragraph (h) apply to
pollutants with emissions limits from
new EGUs except Hg and to all
pollutants with emissions limits from
existing EGUs. You may pursue this
compliance option unless prohibited
pursuant to § 63.10000(c)(1)(i).
*
*
*
*
*
(3) For Hg, you must conduct a 30- (or
90-) boiler operating day performance
test using Method 30B in appendix A–
8 to part 60 of this chapter to determine
whether a unit qualifies for LEE status.
Locate the Method 30B sampling probe
tip at a point within 10 percent of the
duct area centered about the duct’s
centroid at a location that meets Method
1 in appendix A–1 to part 60 of this
chapter and conduct at least three
nominally equal length test runs over
the 30- (or 90-) boiler operating day test
period. You may use a pair of sorbent
traps to sample the stack gas for a period
consistent with that given in section
5.2.1 of appendix A to this subpart.
Collect Hg emissions data continuously
over the entire test period (except when
changing sorbent traps or performing
required reference method QA
procedures). As an alternative to
constant rate sampling per Method 30B,
you may use proportional sampling per
section 8.2.2 of Performance
Specification 12 B in appendix B to part
60 of this chapter.
(i) * * *
(D) Hourly gross output data
(megawatts), from facility records.
*
*
*
*
*
(iii) Calculate the average Hg
concentration, in mg/m3 (dry basis), for
the 30- (or 90-) boiler operating day
performance test, as the arithmetic
average of all Method 30B sorbent trap
results. Also calculate, as applicable, the
average values of CO2 or O2
concentration, stack gas flow rate, stack
gas moisture content, and gross output
for the test period. Then:
*
*
*
*
*
PO 00000
Frm 00012
Fmt 4701
Sfmt 4700
9. Section 63.10006 is amended by
revising paragraph (f) and removing
paragraph (j) to read as follows:
■
§ 63.10006 When must I conduct
subsequent performance tests or tune-ups?
*
*
*
*
*
(f) Time between performance tests.
(1) Notwithstanding the provisions of
§ 63.10021(d)(1), the requirements listed
in paragraphs (g) and (h) of this section,
and the requirements of paragraph (f)(3)
of this section, you must complete
performance tests for your EGU as
follows:
(i) At least 45 calendar days,
measured from the test’s end date, must
separate performance tests conducted
every quarter;
(ii) For annual testing:
(A) At least 320 calendar days,
measured from the test’s end date, must
separate performance tests;
(B) At least 320 calendar days,
measured from the test’s end date, must
separate annual sorbent trap mercury
testing for 30-boiler operating day LEE
tests;
(C) At least 230 calendar days,
measured from the test’s end date, must
separate annual sorbent trap mercury
testing for 90-boiler operating day LEE
tests; and
(iii) At least 1,050 calendar days,
measured from the test’s end date, must
separate performance tests conducted
every 3 years.
(2) For units demonstrating
compliance through quarterly emission
testing, you must conduct a
performance test in the 4th quarter of a
calendar year if your EGU has skipped
performance tests in the first 3 quarters
of the calendar year.
(3) If your EGU misses a performance
test deadline due to being inoperative
and if 168 or more boiler operating
hours occur in the next test period, you
must complete an additional
performance test in that period as
follows:
(i) At least 15 calendar days must
separate two performance tests
conducted in the same quarter.
(ii) At least 107 calendar days must
separate two performance tests
conducted in the same calendar year.
(iii) At least 350 calendar days must
separate two performance tests
conducted in the same 3 year period.
*
*
*
*
*
■ 10. Section 63.10007 is amended by
revising paragraph (f)(2) to read as
follows:
§ 63.10007 What methods and other
procedures must I use for the performance
tests?
*
E:\FR\FM\06APR4.SGM
*
*
06APR4
*
*
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
20183
sustainable gross output of the EGUs
that are operating but have a total of
zero gross output must be used to
calculate the hourly gross output-based
pollutant emissions rate.
*
*
*
*
*
■ 11. Section 63.10009 is amended by
revising paragraphs (a)(2) introductory
text, (a)(2)(i), (b)(1) through (3), (e), (f)
introductory text, (f)(2), (g), (j)(1)(ii), and
(j)(2) introductory text to read as
follows:
Where:
WAERm = Maximum Weighted Average
Emission Rate in terms of lb/heat input
or lb/gross output,
Hermi,j = hourly emission rate (e.g., lb/
MMBtu, lb/MWh) from CEMS or sorbent
trap monitoring as determined during the
initial compliance determination from
EGU j,
Rmmj = Maximum rated heat input,
MMBtu/h, or maximum rated gross output,
MWh/h, for EGU j,
p = number of EGUs in emissions averaging
group that rely on CEMS,
Terk = Emissions rate (lb/MMBTU or lb/
MWh) as determined during the initial
compliance determination of EGU k,
Rmtk = Maximum rated heat input,
MMBtu/h, or maximum rated gross output,
MWh/h, for EGU k, and
m = number of EGUs in emissions averaging
group that rely on emissions testing.
Where:
Variables with the similar names share the
descriptions for Equation 1a of this section,
Smmj = maximum steam generation,
lbsteam/h or lb/gross output, for EGU j,
Cfmj = conversion factor, calculated from the
most recent compliance test results, in
terms units of heat output or gross output
per pound of steam generated (MMBtu/
lbsteam or MWh/lbsteam) from EGU j,
Smtk = maximum steam generation, lbsteam/h
or lb/gross output, for EGU k, and
Cfmk = conversion factor, calculated from the
most recent compliance test results, in
terms units of heat output or gross output
per pound of steam generated (MMBtu/
lbsteam or MWh/lbsteam) from EGU k.
(2) Weighted 30-boiler operating day
rolling average emissions rate equations for
pollutants other than Hg. Use Equation 2a or
2b of this section to calculate the 30 day
rolling average emissions daily.
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
(a) * * *
(2) You may demonstrate compliance
by emissions averaging among the
existing EGUs in the same subcategory,
if your averaged Hg emissions for EGUs
in the ‘‘unit designed for coal ≥8,300
Btu/lb’’ subcategory are equal to or less
than 1.2 lb/TBtu or 1.3E–2 lb/GWh on
a 30-boiler operating day basis or if your
averaged emissions of individual, other
pollutants from other subcategories of
such EGUs are equal to or less than the
applicable emissions limit in Table 2 to
this subpart, according to the
procedures in this section. Note that
except for the alternate Hg emissions
limit from EGUs in the ‘‘unit designed
for coal ≥ 8,300 Btu/lb’’ subcategory, the
averaging time for emissions averaging
for pollutants is 30 days (rolling daily)
PO 00000
Frm 00013
Fmt 4701
Sfmt 4700
E:\FR\FM\06APR4.SGM
06APR4
ER06AP16.002
§ 63.10009 May I use emissions averaging
to comply with this subpart?
using data from CEMS or a combination
of data from CEMS and manual
performance (LEE) testing. The
averaging time for emissions averaging
for the alternate Hg limit (equal to or
less than 1.0 lb/TBtu or 1.1E–2 lb/GWh)
from EGUs in the ‘‘unit designed for
coal ≥ 8,300 Btu/lb’’ subcategory is 90boiler operating days (rolling daily)
using data from CEMS, sorbent trap
monitoring, or a combination of
monitoring data and data from manual
performance (LEE) testing. For the
purposes of this paragraph, 30(or 90-) group boiler operating days is
defined as a period during which at
least one unit in the emissions averaging
group operates on each of the 30 or 90
days. You must calculate the weighted
average emissions rate for the group in
accordance with the procedures in this
paragraph using the data from all units
in the group including any that operate
fewer than 30 (or 90) days during the
preceding 30 (or 90) group boiler days.
(i) You may choose to have your EGU
emissions averaging group meet either
the heat input basis (MMBtu or TBtu, as
appropriate for the pollutant) or gross
output basis (MWh or GWh, as
appropriate for the pollutant).
*
*
*
*
*
(b) * * *
(1) Group eligibility equations.
ER06AP16.001
srobinson on DSK5SPTVN1PROD with RULES4
(f) * * *
(2) Default gross output. If you use
CEMS to continuously monitor Hg, HCl,
HF, SO2, or PM emissions (or, if
applicable, sorbent trap monitoring
systems to continuously collect Hg
emissions data), the following default
value is available for use in the emission
rate calculations during startup periods
or shutdown periods (as defined in
§ 63.10042). For the purposes of this
subpart, this default value is not
considered to be substitute data. For a
startup or shutdown hour in which
there is heat input to an affected EGU
but zero gross output, you must
calculate the pollutant emission rate
using a value equivalent to 5% of the
maximum sustainable gross output,
expressed in megawatts, as defined in
section 6.5.2.1(a)(1) of appendix A to
part 75 of this chapter. This default
gross output is either the nameplate
capacity of the EGU or the highest gross
output observed in at least four
representative quarters of EGU
operation. For a monitored common
stack, the default gross output is used
only when all EGUs are operating (i.e.,
combusting fuel) are in startup or
shutdown mode, and have zero
electrical generation. Under those
conditions, a default gross output equal
to 5% of the combined maximum
20184
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
generated or gross output per pound of
steam generated, from unit i that uses
emissions testing.
(3) Weighted 90-boiler operating day
rolling average emissions rate equations for
Hg emissions from EGUs in the ‘‘coal-fired
unit not low rank virgin coal’’ subcategory.
Use Equation 3a or 3b of this section to
calculate the 90-day rolling average
emissions daily.
Rmi = hourly heat input or gross output from
unit i for the preceding 90-group boiler
operating days,
p = number of EGUs in emissions averaging
group that rely on CEMS,
n = number of hours that hourly rates are
collected over the 90-group boiler
operating days,
Teri = Emissions rate from most recent
emissions test of unit i in terms of lb/
heat input or lb/gross output,
Rti = Total heat input or gross output of unit
i for the preceding 90-boiler operating
days, and
m = number of EGUs in emissions averaging
group that rely on emissions testing.
Where:
variables with similar names share the
descriptions for Equation 2a of this
section,
Smi = steam generation in units of pounds
from unit i that uses CEMS or a Hg
sorbent trap monitoring for the preceding
90-group boiler operating days,
Cfmi = conversion factor, calculated from the
most recent compliance test results, in
units of heat input per pound of steam
generated or gross output per pound of
steam generated, from unit i that uses
CEMS or sorbent trap monitoring from
the preceding 90-group boiler operating
days,
Sti = steam generation in units of pounds
from unit i that uses emissions testing,
and
Cfti = conversion factor, calculated from the
most recent emissions test results, in
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
units of heat input per pound of steam
generated or gross output per pound of
steam generated, from unit i that uses
emissions testing.
*
*
*
*
*
(e) The weighted-average emissions
rate from the existing EGUs
participating in the emissions averaging
option must be in compliance with the
limits in Table 2 to this subpart at all
times following the date that you begin
emissions averaging.
(f) Emissions averaging group
eligibility demonstration. You must
demonstrate the ability for the EGUs
included in the emissions averaging
group to demonstrate initial compliance
according to paragraph (f)(1) or (2) of
this section using the maximum rated
PO 00000
Frm 00014
Fmt 4701
Sfmt 4700
heat input or gross output over a 30- (or
90-) boiler operating day period of each
EGU and the results of the initial
performance tests. For this
demonstration and prior to preparing
your emissions averaging plan, you
must conduct required emissions
monitoring for 30- (or 90-) days of boiler
operation and any required manual
performance testing to calculate
maximum weighted average emissions
rate in accordance with this section. If,
before the start of your initial
compliance demonstration, the
Administrator becomes aware that you
intend to use emissions averaging for
that demonstration, or if your initial
Notification of Compliance Status
(NOCS) indicates that you intend to
E:\FR\FM\06APR4.SGM
06APR4
ER06AP16.005
Where:
Heri = hourly emission rate from unit i’s
CEMS or Hg sorbent trap monitoring
system for the preceding 90-group boiler
operating days,
ER06AP16.004
units of heat input per pound of steam
generated or gross output per pound of
steam generated, from unit i that uses
CEMS from the preceding 30 group
boiler operating days,
Sti = steam generation in units of pounds
from unit i that uses emissions testing,
and
Cfti = conversion factor, calculated from the
most recent compliance test results, in
units of heat input per pound of steam
ER06AP16.006
Teri = Emissions rate from most recent
emissions test of unit i in terms of lb/
heat input or lb/gross output,
Rti = Total heat input or gross output of unit
i for the preceding 30-boiler operating
days, and
m = number of EGUs in emissions averaging
group that rely on emissions testing.
ER06AP16.003
p = number of EGUs in emissions averaging
group that rely on CEMS or sorbent trap
monitoring,
n = number of hours that hourly rates are
collected over 30-group boiler operating
days,
Where:
variables with similar names share the
descriptions for Equation 2a of this
section,
Smi = steam generation in units of pounds
from unit i that uses CEMS for the
preceding 30-group boiler operating
days,
Cfmi = conversion factor, calculated from the
most recent compliance test results, in
srobinson on DSK5SPTVN1PROD with RULES4
Where:
Heri = hourly emission rate (e.g., lb/MMBtu,
lb/MWh) from unit i’s CEMS for the
preceding 30-group boiler operating days,
Rmi = hourly heat input or gross output from
unit i for the preceding 30-group boiler
operating days,
srobinson on DSK5SPTVN1PROD with RULES4
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
implement emissions averaging at a
future date, the Administrator may
require you to submit your proposed
emissions averaging plan and
supporting data for approval. If the
Administrator requires approval of your
plan, you may not begin using
emissions averaging until the
Administrator approves your plan.
*
*
*
*
*
(2) If you are not capable of
monitoring heat input or gross output,
and the EGU generates steam for
purposes other than generating
electricity, you may use Equation 1b of
paragraph (b) of this section as an
alternative to using Equation 1a of
paragraph (b) of this section to
demonstrate that the maximum
weighted average emissions rates of
filterable PM, HF, SO2, HCl, non-Hg
HAP metals, or Hg emissions from the
existing units participating in the
emissions averaging group do not
exceed the emission limits in Table 2 to
this subpart.
(g) You must determine the weighted
average emissions rate in units of the
applicable emissions limit on a 30 group
boiler operating day rolling average
basis (or, if applicable, on a 90 group
boiler operating day rolling average
basis for Hg) according to paragraphs
(g)(1) and (2) of this section. The first
averaging period ends on the 30th (or,
if applicable, 90th for the alternate Hg
emission limit) group boiler operating
day after the date that you begin
emissions averaging.
(1) You must use Equation 2a or 3a of
paragraph (b) of this section to calculate
the weighted average emissions rate
using the actual heat input or gross
output for each existing unit
participating in the emissions averaging
option.
(2) If you are not capable of
monitoring heat input or gross output,
you may use Equation 2b or 3b of
paragraph (b) of this section as an
alternative to using Equation 2a of
paragraph (b) of this section to calculate
the average weighted emission rate
using the actual steam generation from
the units participating in the emissions
averaging option.
*
*
*
*
*
(j) * * *
(1) * * *
(ii) The process weighting parameter
(heat input, gross output, or steam
generated) that will be monitored for
each averaging group;
*
*
*
*
*
(2) If, as described in paragraph (f) of
this section, the Administrator requests
you to submit the averaging plan for
review and approval, you must receive
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
approval before initiating emissions
averaging.
*
*
*
*
*
■ 12. Section 63.10010 is amended by
revising paragraphs (a)(4), (f)(3) and (4),
(h)(6)(i) and (ii), (i)(5)(i)(A) and (B),
(j)(1)(i), (j)(4)(i)(A) and (B), and (l) to
read as follows:
§ 63.10010 What are my monitoring,
installation, operation, and maintenance
requirements?
(a) * * *
(4) Unit with a main stack and a
bypass stack that exhausts to the
atmosphere independent of the main
stack. If the exhaust configuration of an
affected unit consists of a main stack
and a bypass stack, you shall install
CEMS on both the main stack and the
bypass stack. If it is not feasible to
certify and quality-assure the data from
a monitoring system on the bypass
stack, you shall:
(i) Route the exhaust from the bypass
through the main stack and its
monitoring so that bypass emissions are
measured; or
(ii) Install a CEMS only on the main
stack and count hours that the bypass
stack is in use as hours of deviation
from the monitoring requirements.
*
*
*
*
*
(f) * * *
(3) Calculate and record a 30-boiler
operating day rolling average SO2
emission rate in the units of the
standard, updated after each new boiler
operating day. Each 30-boiler operating
day rolling average emission rate is the
average of all of the valid hourly SO2
emission rates in the 30 boiler operating
day period.
(4) Use only unadjusted, qualityassured SO2 concentration values in the
emissions calculations; do not apply
bias adjustment factors to the part 75
SO2 data and do not use part 75
substitute data values. For startup or
shutdown hours (as defined in
§ 63.10042) the default gross output and
the diluent cap are available for use in
the hourly SO2 emission rate
calculations, as described in
§ 63.10007(f). Use a flag to identify each
startup or shutdown hour and report a
special code if the diluent cap or default
gross output is used to calculate the SO2
emission rate for any of these hours.
*
*
*
*
*
(h) * * *
(6) * * *
(i) Any data collected during periods
of monitoring system malfunctions,
repairs associated with monitoring
system malfunctions, or required
monitoring system quality assurance or
quality control activities that
PO 00000
Frm 00015
Fmt 4701
Sfmt 4700
20185
temporarily interrupt the measurement
of output data from the PM CPMS. You
must report any monitoring system
malfunctions or out of control periods
in your annual deviation reports. You
must report any monitoring system
quality assurance or quality control
activities per the requirements of
§ 63.10031(b);
(ii) Any data collected during periods
when the monitoring system is out of
control as specified in your site-specific
monitoring plan, repairs associated with
periods when the monitoring system is
out of control, or required monitoring
system quality assurance or quality
control activities conducted during outof-control periods. You must report any
such periods in your annual deviation
report;
*
*
*
*
*
(i) * * *
(5) * * *
(i) * * *
(A) Any data collected during periods
of monitoring system malfunctions,
repairs associated with monitoring
system malfunctions, or required
monitoring system quality assurance or
quality control activities that
temporarily interrupt the measurement
of emissions (e.g., calibrations, certain
audits). You must report any monitoring
system malfunctions or out of control
periods in your annual deviation
reports. You must report any monitoring
system quality assurance or quality
control activities per the requirements
of § 63.10031(b);
(B) Any data collected during periods
when the monitoring system is out of
control as specified in your site-specific
monitoring plan, repairs associated with
periods when the monitoring system is
out of control, or required monitoring
system quality assurance or quality
control activities conducted during outof-control periods. You must report any
such periods in your annual deviation
report;
*
*
*
*
*
(j) * * *
(1)(i) Install, calibrate, operate, and
maintain your HAP metals CEMS
according to your CMS quality control
program, as described in § 63.8(d)(2).
The reportable measurement output
from the HAP metals CEMS must be
expressed in units of the applicable
emissions limit (e.g., lb/MMBtu, lb/
MWh) and in the form of a 30-boiler
operating day rolling average.
*
*
*
*
*
(4) * * *
(i) * * *
(A) Any data collected during periods
of monitoring system malfunctions,
repairs associated with monitoring
E:\FR\FM\06APR4.SGM
06APR4
srobinson on DSK5SPTVN1PROD with RULES4
20186
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
system malfunctions, or required
monitoring system quality assurance or
quality control activities that
temporarily interrupt the measurement
of emissions (e.g., calibrations, certain
audits). You must report any monitoring
system malfunctions or out of control
periods in your annual deviation
reports. You must report any monitoring
system quality assurance or quality
control activities per the requirements
of § 63.10031(b);
(B) Any data collected during periods
when the monitoring system is out of
control as specified in your site-specific
monitoring plan, repairs associated with
periods when the monitoring system is
out of control, or required monitoring
system quality assurance or quality
control activities conducted during outof-control periods. You must report any
monitoring system malfunctions or out
of control periods in your annual
deviation reports. You must report any
monitoring system quality assurance or
quality control activities per the
requirements of § 63.10031(b);
*
*
*
*
*
(l) Should you choose to rely on
paragraph (2) of the definition of
‘‘startup’’ in § 63.10042 for your EGU,
you must install, verify, operate,
maintain, and quality assure each
monitoring system necessary for
demonstrating compliance with the PM
or non-mercury metals work practice
standards required to comply with
§ 63.10020(e).
(1) You shall develop a site-specific
monitoring plan for PM or non-mercury
metals work practice monitoring during
startup periods.
(2) You shall submit the site-specific
monitoring plan upon request by the
Administrator.
(3) The provisions of the monitoring
plan must address the following items:
(i) Monitoring system installation;
(ii) Performance and equipment
specifications;
(iii) Schedule for initial and periodic
performance evaluations;
(iv) Performance evaluation
procedures and acceptance criteria;
(v) On-going operation and
maintenance procedures; and
(vi) On-going recordkeeping and
reporting procedures.
(4) You may rely on monitoring
system specifications or instructions or
manufacturer’s specifications to address
paragraphs (l)(3)(i) through (vi) of this
section.
(5) You must operate and maintain
the monitoring system according to the
site-specific monitoring plan.
■ 13. Section 63.10011 is amended by
revising paragraphs (b), (c), (e), and (g)
to read as follows:
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
§ 63.10011 How do I demonstrate initial
compliance with the emissions limits and
work practice standards?
*
*
*
*
*
(b) If you are subject to an operating
limit in Table 4 to this subpart, you
demonstrate initial compliance with
HAP metals or filterable PM emission
limit(s) through performance stack tests
and you elect to use a PM CPMS to
demonstrate continuous performance, or
if, for a liquid oil-fired EGU, and you
use quarterly stack testing for HCl and
HF plus site-specific parameter
monitoring to demonstrate continuous
performance, you must also establish a
site-specific operating limit, in
accordance with § 63.10007 and Table 6
to this subpart. You may use only the
parametric data recorded during
successful performance tests (i.e., tests
that demonstrate compliance with the
applicable emissions limits) to establish
an operating limit.
(c)(1) If you use CEMS or sorbent trap
monitoring systems to measure a HAP
(e.g., Hg or HCl) directly, the initial
performance test, shall consist of a 30boiler operating day (or, for certain coalfired, existing EGUs that use emissions
averaging for Hg, a 90-boiler operating
day) rolling average emissions rate
obtained with a certified CEMS or
sorbent trap system, expressed in units
of the standard. If the monitoring system
is certified prior to the applicable
compliance date, the initial averaging
period shall either begin with: The first
boiler operating day on or after the
compliance date; or 30 (or, if applicable,
90) boiler operating days prior to that
date, as described in § 63.10005(b). In
all cases, the initial 30- or 90-boiler
operating day averaging period must be
completed on or before the date that
compliance must be demonstrated, in
accordance with § 63.9984(f). Initial
compliance is demonstrated if the
results of the performance test meet the
applicable emission limit in Table 1 or
2 to this subpart.
(2) For an EGU that uses a CEMS to
measure SO2 or PM emissions for initial
compliance, the initial performance test
shall consist of a 30-boiler operating day
average emission rate obtained with
certified CEMS, expressed in units of
the standard. If the monitoring system is
certified prior to the applicable
compliance date, the initial averaging
period shall either begin with: The first
boiler operating day on or after the
compliance date; or 30 boiler operating
days prior to that date, as described in
§ 63.10005(b). In all cases, the initial 30boiler operating day averaging period
must be completed on or before the date
that compliance must be demonstrated,
in accordance with § 63.9984(f). Initial
PO 00000
Frm 00016
Fmt 4701
Sfmt 4700
compliance is demonstrated if the
results of the performance test meet the
applicable SO2 or PM emission limit in
Table 1 or 2 to this subpart.
*
*
*
*
*
(e) You must submit a Notification of
Compliance Status containing the
results of the initial compliance
demonstration, in accordance with
§ 63.10030(e).
*
*
*
*
*
(g) You must follow the startup or
shutdown requirements as established
in Table 3 to this subpart for each coalfired, liquid oil-fired, or solid oilderived fuel-fired EGU.
(1) You may use the diluent cap and
default gross output values, as described
in § 63.10007(f), during startup periods
or shutdown periods.
(2) You must operate all CMS, collect
data, calculate pollutant emission rates,
and record data during startup periods
or shutdown periods.
(3) You must report the information as
required in § 63.10031.
(4) If you choose to use paragraph (2)
of the definition of ‘‘startup’’ in
§ 63.10042 and you find that you are
unable to safely engage and operate your
particulate matter (PM) control(s) within
1 hour of first firing of coal, residual oil,
or solid oil-derived fuel, you may
choose to rely on paragraph (1) of
definition of ‘‘startup’’ in § 63.10042 or
you may submit a request to use an
alternative non-opacity emissions
standard, as described below.
(i) As mentioned in § 63.6(g)(1), your
request will be published in the Federal
Register for notice and comment
rulemaking. Until promulgation in the
Federal Register of the final alternative
non-opacity emission standard, you
shall comply with paragraph (1) of the
definition of ‘‘startup’’ in § 63.10042.
You shall not implement the alternative
non-opacity emissions standard until
promulgation in the Federal Register of
the final alternative non-opacity
emission standard.
(ii) Your request need not address the
items contained in § 63.6(g)(2).
(iii) Your request shall provide
evidence of a documented
manufacturer-identified safety issue.
(iv) Your request shall provide
information to document that the PM
control device is adequately designed
and sized to meet the PM emission limit
applicable to the EGU.
(v) In addition, your request shall
contain documentation that:
(A) Your EGU is using clean fuels to
the maximum extent possible, taking
into account considerations such as not
compromising boiler or control device
integrity, to bring your EGU and PM
E:\FR\FM\06APR4.SGM
06APR4
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
control device up to the temperature
necessary to alleviate or prevent the
identified safety issues prior to the
combustion of primary fuel in your
EGU;
(B) You have followed explicitly your
EGU manufacturer’s procedures to
alleviate or prevent the identified safety
issue; and
(C) You have identified with
specificity the details of your EGU
manufacturer’s statement of concern.
(vi) Your request shall specify the
other work practice standards you will
take to limit HAP emissions during
startup periods and shutdown periods
to ensure a control level consistent with
the work practice standards of the final
rule.
(vii) You must comply with all other
work practice requirements, including
but not limited to data collection,
recordkeeping, and reporting
requirements.
■ 14. Section 63.10020 is amended by
revising paragraph (e) to read as follows:
§ 63.10020 How do I monitor and collect
data to demonstrate continuous
compliance?
srobinson on DSK5SPTVN1PROD with RULES4
*
*
*
*
*
(e) Additional requirements during
startup periods or shutdown periods if
you choose to rely on paragraph (2) of
the definition of ‘‘startup’’ in § 63.10042
for your EGU.
(1) During each period of startup, you
must record for each EGU:
(i) The date and time that clean fuels
being combusted for the purpose of
startup begins;
(ii) The quantity and heat input of
clean fuel for each hour of startup;
(iii) The gross output for each hour of
startup;
(iv) The date and time that non-clean
fuel combustion begins; and
(v) The date and time that clean fuels
being combusted for the purpose of
startup ends.
(2) During each period of shutdown,
you must record for each EGU:
(i) The date and time that clean fuels
being combusted for the purpose of
shutdown begins;
(ii) The quantity and heat input of
clean fuel for each hour of shutdown;
(iii) The gross output for each hour of
shutdown;
(iv) The date and time that non-clean
fuel combustion ends; and
(v) The date and time that clean fuels
being combusted for the purpose of
shutdown ends.
(3) For PM or non-mercury HAP
metals work practice monitoring during
startup periods, you must monitor and
collect data according to this section
and the site-specific monitoring plan
required by § 63.10010(l).
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
20187
(i) Except for an EGU that uses PM
CEMS or PM CPMS to demonstrate
compliance with the PM emissions
limit, or that has LEE status for filterable
PM or total non-Hg HAP metals for nonliquid oil-fired EGUs (or HAP metals
emissions for liquid oil-fired EGUs), or
individual non-mercury metals CEMS,
you must:
(A) Record temperature and
combustion air flow or calculated flow
as determined from combustion
equations of post-combustion (exhaust)
gas, as well as amperage of forced draft
fan(s), upstream of the filterable PM
control devices during each hour of
startup.
(B) Record temperature and flow of
exhaust gas, as well as amperage of any
induced draft fan(s), downstream of the
filterable PM control devices during
each hour of startup.
(C) For an EGU with an electrostatic
precipitator, record the number of fields
in service, as well as each field’s
secondary voltage and secondary
current during each hour of startup.
(D) For an EGU with a fabric filter,
record the number of compartments in
service, as well as the differential
pressure across the baghouse during
each hour of startup.
(E) For an EGU with a wet scrubber
needed for filterable PM control, record
the scrubber liquid to flue gas ratio and
the pressure drop across the scrubber
during each hour of startup.
(ii) [Reserved]
■ 15. Section 63.10021 is amended by
revising paragraphs (d)(3), (e)
introductory text, (e)(9), and (h)(1) to
read as follows:
scheduled EGU outage provided you
meet the requirements of § 63.10005.
Subsequently, you must perform an
inspection of the burner at least once
every 36 calendar months unless your
EGU employs neural network
combustion optimization during normal
operations in which case you must
perform an inspection of the burner and
combustion controls at least once every
48 calendar months. If your EGU is
offline when a deadline to perform the
tune-up passes, you shall perform the
tune-up work practice requirements
within 30 days after the re-start of the
affected unit.
*
*
*
*
*
(9) Report the dates of the initial and
subsequent tune-ups in hard copy, as
specified in § 63.10031(f)(5), until April
16, 2017. After April 16, 2017, report
the date of all tune-ups electronically, in
accordance with § 63.10031(f). The
tune-up report date is the date when
tune-up requirements in paragraphs
(e)(6) and (7) of this section are
completed.
*
*
*
*
*
(h) * * *
(1) You may use the diluent cap and
default gross output values, as described
in § 63.10007(f), during startup periods
or shutdown periods.
*
*
*
*
*
■ 16. Section 63.10023 is amended by
removing and reserving paragraph (b)(1)
and revising paragraph (b)(2)
introductory text to read as follows:
§ 63.10021 How do I demonstrate
continuous compliance with the emission
limitations, operating limits, and work
practice standards?
*
*
*
*
*
*
(d) * * *
(3) Must conduct site-specific
monitoring using CMS to demonstrate
compliance with the site-specific
monitoring requirements in Table 7 to
this subpart pertaining to HCl and HF
emissions from a liquid oil-fired EGU to
ensure compliance with the HCl and HF
emission limits in Tables 1 and 2 to this
subpart, in accordance with the
requirements of § 63.10000(c)(2)(iii).
The monitoring must meet the general
operating requirements provided in
§ 63.10020.
(e) Conduct periodic performance
tune-ups of your EGU(s), as specified in
paragraphs (e)(1) through (9) of this
section. For your first tune-up, you may
perform the burner inspection any time
prior to the tune-up or you may delay
the first burner inspection until the next
PO 00000
Frm 00017
Fmt 4701
Sfmt 4700
§ 63.10023 How do I establish my PM
CPMS operating limit and determine
compliance with it?
*
*
*
*
(b) * * *
(2) Determine your operating limit as
follows:
*
*
*
*
*
■ 17. Section 63.10030 is amended by:
■ a. Revising paragraphs (e)(1) and
(e)(7)(i);
■ b. Adding paragraph (e)(7)(iii);
■ c. Revising paragraph (e)(8); and
■ d. Adding paragraph (f).
The revisions and additions read as
follows:
§ 63.10030 What notifications must I
submit and when?
*
*
*
*
*
(e) * * *
(1) A description of the affected
source(s), including identification of the
subcategory of the source, the design
capacity of the source, a description of
the add-on controls used on the source,
description of the fuel(s) burned,
including whether the fuel(s) were
determined by you or EPA through a
E:\FR\FM\06APR4.SGM
06APR4
srobinson on DSK5SPTVN1PROD with RULES4
20188
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
petition process to be a non-waste under
40 CFR 241.3, whether the fuel(s) were
processed from discarded nonhazardous secondary materials within
the meaning of 40 CFR 241.3, and
justification for the selection of fuel(s)
burned during the performance test.
*
*
*
*
*
(7) * * *
(i) A summary of the results of the
annual performance tests and
documentation of any operating limits
that were reestablished during this test,
if applicable. If you are conducting stack
tests once every 3 years consistent with
§ 63.10005(h)(1)(i), the date of each
stack test conducted during the previous
3 years, a comparison of emission level
you achieved in each stack test
conducted during the previous 3 years
to the 50 percent emission limit
threshold required in § 63.10006(i), and
a statement as to whether there have
been any operational changes since the
last stack test that could increase
emissions.
*
*
*
*
*
(iii) For each of your existing EGUs,
identification of each emissions limit as
specified in Table 2 to this subpart with
which you plan to comply.
(A) You may switch from a mass per
heat input to a mass per gross output
limit (or vice-versa), provided that:
(1) You submit a request that
identifies for each EGU or EGU
emissions averaging group involved in
the proposed switch both the current
and proposed emission limit;
(2) Your request arrives to the
Administrator at least 30 calendar days
prior to the date that the switch is
proposed to occur;
(3) Your request demonstrates through
performance stack test results
completed within 30 days prior to your
submission, compliance for each EGU or
EGU emissions averaging group with
both the mass per heat input and mass
per gross output limits;
(4) You revise and submit all other
applicable plans, e.g., monitoring and
emissions averaging, with your request;
and
(5) You maintain records of all
information regarding your choice of
emission limits.
(B) You begin to use the revised
emission limits starting in the next
reporting period, after receipt of written
acknowledgement from the
Administrator of the switch.
(C) From submission of your request
until start of the next reporting period
after receipt of written
acknowledgement from the
Administrator of the switch, you
demonstrate compliance with both the
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
mass per heat input and mass per gross
output emission limits for each
pollutant for each EGU or EGU
emissions averaging group.
(8) Identification of whether you plan
to rely on paragraph (1) or (2) of the
definition of ‘‘startup’’ in § 63.10042.
(i) Should you choose to rely on
paragraph (2) of the definition of
‘‘startup’’ in § 63.10042 for your EGU,
you shall include a report that
identifies:
(A) The original EGU installation
date;
(B) The original EGU design
characteristics, including, but not
limited to, fuel mix and PM controls;
(C) Each design PM control device
efficiency established during
performance testing or while operating
in periods other than startup and
shutdown periods;
(D) The design PM emission rate from
the EGU in terms of pounds PM per
MMBtu and pounds PM per hour
established during performance testing
or while operating in periods other than
startup and shutdown periods;
(E) The design time from start of fuel
combustion to necessary conditions for
each PM control device startup;
(F) Each design PM control device
efficiency upon startup of the PM
control device, if different from the
efficiency provided in paragraph
(e)(8)(i)(C) of this section;
(G) Current EGU PM producing
characteristics, including, but not
limited to, fuel mix and PM controls, if
different from the characteristics
provided in paragraph (e)(8)(i)(B) of this
section;
(H) Current PM control device
efficiency from each PM control device,
if different from the efficiency provided
in paragraph (e)(8)(i)(C) of this section;
(I) Current PM emission rate from the
EGU in terms of pounds PM per MMBtu
and pounds per hour, if different from
the rate provided in paragraph
(e)(8)(i)(D) of this section;
(J) Current time from start of fuel
combustion to conditions necessary for
each PM control device startup, if
different from the time provided in
paragraph (e)(8)(i)(E) of this section; and
(K) Current PM control device
efficiency upon startup of each PM
control device, if different from the
efficiency provided in paragraph
(e)(8)(i)(H) of this section.
(ii) The report shall be prepared,
signed, and sealed by a professional
engineer licensed in the state where
your EGU is located.
(iii) You may switch from paragraph
(1) of the definition of ‘‘startup’’ in
§ 63.10042 to paragraph (2) of the
PO 00000
Frm 00018
Fmt 4701
Sfmt 4700
definition of ‘‘startup’’ (or vice-versa),
provided that:
(A) You submit a request that
identifies for each EGU or EGU
emissions averaging group involved in
the proposed switch both the current
definition of ‘‘startup’’ relied on and the
proposed definition you plan to rely on;
(B) Your request arrives to the
Administrator at least 30 calendar days
prior to the date that the switch is
proposed to occur;
(C) You revise and submit all other
applicable plans, e.g., monitoring and
emissions averaging, with your
submission;
(D) You maintain records of all
information regarding your choice of the
definition of ‘‘startup’’; and
(E) You begin to use the revised
definition of ‘‘startup’’ in the next
reporting period after receipt of written
acknowledgement from the
Administrator of the switch.
(f) You must submit the notifications
in § 63.10000(h)(2) and (i)(2) that may
apply to you by the dates specified.
■ 18. Section 63.10031 is amended by
revising paragraphs (c) introductory text
and (c)(4) and (5) and adding paragraphs
(c)(6), (7), (8), and (9) to read as follows:
§ 63.10031
when?
What reports must I submit and
*
*
*
*
*
(c) The compliance report must
contain the information required in
paragraphs (c)(1) through (9) of this
section.
*
*
*
*
*
(4) Include the date of the most recent
tune-up for each EGU. The date of the
tune-up is the date the tune-up
provisions specified in § 63.10021(e)(6)
and (7) were completed.
(5) Should you choose to rely on
paragraph (2) of the definition of
‘‘startup’’ in § 63.10042 for your EGU,
for each instance of startup or shutdown
you shall:
(i) Include the maximum clean fuel
storage capacity and the maximum
hourly heat input that can be provided
for each clean fuel determined
according to the requirements of
§ 63.10032(f).
(ii) Include the information required
to be monitored, collected, or recorded
according to the requirements of
§ 63.10020(e).
(iii) If you choose to use CEMS to
demonstrate compliance with numerical
limits, include hourly average CEMS
values and hourly average flow values
during startup periods or shutdown
periods. Use units of milligrams per
cubic meter for PM CEMS values,
micrograms per cubic meter for Hg
CEMS values, and ppmv for HCl, HF, or
E:\FR\FM\06APR4.SGM
06APR4
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
SO2 CEMS values. Use units of standard
cubic meters per hour on a wet basis for
flow values.
(iv) If you choose to use a separate
sorbent trap measurement system for
startup or shutdown reporting periods,
include hourly average mercury
concentration values in terms of
micrograms per cubic meter.
(v) If you choose to use a PM CPMS,
include hourly average operating
parameter values in terms of the
operating limit, as well as the operating
parameter to PM correlation equation.
(6) You must report emergency bypass
information annually from EGUs with
LEE status.
(7) A summary of the results of the
annual performance tests and
documentation of any operating limits
that were reestablished during the test,
if applicable. If you are conducting stack
tests once every 3 years to maintain LEE
status, consistent with § 63.10006(b), the
date of each stack test conducted during
the previous 3 years, a comparison of
emission level you achieved in each
stack test conducted during the previous
3 years to the 50 percent emission limit
threshold required in
§ 63.10005(h)(1)(i), and a statement as to
whether there have been any
operational changes since the last stack
test that could increase emissions.
(8) A certification.
(9) If you have a deviation from any
emission limit, work practice standard,
or operating limit, you must also submit
a brief description of the deviation, the
duration of the deviation, emissions
point identification, and the cause of the
deviation.
*
*
*
*
*
■ 19. Section 63.10032 is amended by
revising paragraph (f) to read as follows:
§ 63.10032
What records must I keep?
srobinson on DSK5SPTVN1PROD with RULES4
*
*
*
*
*
(f) Regarding startup periods or
shutdown periods:
(1) Should you choose to rely on
paragraph (1) of the definition of
‘‘startup’’ in § 63.10042 for your EGU,
you must keep records of the occurrence
and duration of each startup or
shutdown.
(2) Should you choose to rely on
paragraph (2) of the definition of
‘‘startup’’ in § 63.10042 for your EGU,
you must keep records of:
(i) The determination of the maximum
possible clean fuel capacity for each
EGU;
(ii) The determination of the
maximum possible hourly clean fuel
heat input and of the hourly clean fuel
heat input for each EGU; and
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
(iii) The information required in
§ 63.10020(e).
*
*
*
*
*
■ 20. Section 63.10042 is amended by:
■ a. Revising the definitions of ‘‘Coalfired electric utility steam generating
unit,’’ ‘‘Coal refuse,’’ ‘‘Fossil fuel-fired,’’
‘‘Integrated gasification combined cycle
electric utility steam generating unit or
IGCC,’’ ‘‘Limited-use liquid oil-fired
subcategory,’’ and ‘‘Natural gas-fired
electric utility steam generating unit’’;
■ b. Adding, in alphabetical order,
definition of ‘‘Neural network or neural
net’’; and
■ c. Revising the definition of ‘‘Oil-fired
electric utility steam generating unit.’’
The revisions and additions read as
follows:
§ 63.10042
subpart?
What definitions apply to this
*
*
*
*
*
Coal-fired electric utility steam
generating unit means an electric utility
steam generating unit meeting the
definition of ‘‘fossil fuel-fired’’ that
burns coal for more than 10.0 percent of
the average annual heat input during the
3 previous calendar years after the
compliance date for your facility in
§ 63.9984 or for more than 15.0 percent
of the annual heat input during any one
of those calendar years. EGU owners
and operators must estimate coal, oil,
and natural gas usage for the first 3
calendar years after the applicable
compliance date and they are solely
responsible for assuring compliance
with this final rule or other applicable
standard based on their fuel usage
projections. After the first 3 years of
compliance, EGUs are required to
evaluate applicability based on coal or
oil usage from the three previous
calendars years on an annual rolling
basis.
Coal refuse means waste products of
coal mining, physical coal cleaning, and
coal preparation operations (e.g. culm,
gob, etc.) containing coal, matrix
material, clay, and other organic and
inorganic material.
*
*
*
*
*
Fossil fuel-fired means an electric
utility steam generating unit (EGU) that
is capable of producing more than 25
MW of electrical output from the
combustion of fossil fuels. To be
‘‘capable of combusting’’ fossil fuels, an
EGU would need to have these fuels
allowed in its operating permit and have
the appropriate fuel handling facilities
on-site or otherwise available (e.g., coal
handling equipment, including coal
storage area, belts and conveyers,
pulverizers, etc.; oil storage facilities). In
addition, fossil fuel-fired means any
PO 00000
Frm 00019
Fmt 4701
Sfmt 4700
20189
EGU that fired fossil fuels for more than
10.0 percent of the average annual heat
input during the 3 previous calendar
years after the compliance date for your
facility in § 63.9984 or for more than
15.0 percent of the annual heat input
during any one of those calendar years.
EGU owners and operators must
estimate coal, oil, and natural gas usage
for the first 3 calendar years after the
applicable compliance date and they are
solely responsible for assuring
compliance with this final rule or other
applicable standard based on their fuel
usage projections. After the first 3 years
of compliance, EGUs are required to
evaluate applicability based on coal or
oil usage from the three previous
calendars years on an annual rolling
basis.
*
*
*
*
*
Integrated gasification combined
cycle electric utility steam generating
unit or IGCC means an electric utility
steam generating unit meeting the
definition of ‘‘fossil fuel-fired’’ that
burns a synthetic gas derived from coal
and/or solid oil-derived fuel for more
than 10.0 percent of the average annual
heat input during the 3 previous
calendar years after the compliance date
for your facility in § 63.9984 or for more
than 15.0 percent of the annual heat
input during any one of those calendar
years in a combined-cycle gas turbine.
EGU owners and operators must
estimate coal, oil, and natural gas usage
for the first 3 calendar years after the
applicable compliance date and they are
solely responsible for assuring
compliance with this final rule or other
applicable standard based on their fuel
usage projections. No solid coal or solid
oil-derived fuel is directly burned in the
unit during operation. After the first 3
years of compliance, EGUs are required
to evaluate applicability based on coal
or oil usage from the three previous
calendars years on an annual rolling
basis.
*
*
*
*
*
Limited-use liquid oil-fired
subcategory means an oil-fired electric
utility steam generating unit with an
annual capacity factor when burning oil
of less than 8 percent of its maximum
or nameplate heat input, whichever is
greater, averaged over a 24-month block
contiguous period commencing on the
first of the month following the
compliance date specified in § 63.9984.
*
*
*
*
*
Natural gas-fired electric utility steam
generating unit means an electric utility
steam generating unit meeting the
definition of ‘‘fossil fuel-fired’’ that is
not a coal-fired, oil-fired, or IGCC
electric utility steam generating unit and
E:\FR\FM\06APR4.SGM
06APR4
20190
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
that burns natural gas for more than 10.0
percent of the average annual heat input
during the 3 previous calendar years
after the compliance date for your
facility in § 63.9984 or for more than
15.0 percent of the annual heat input
during any one of those calendar years.
EGU owners and operators must
estimate coal, oil, and natural gas usage
for the first 3 calendar years after the
applicable compliance date and they are
solely responsible for assuring
compliance with this final rule or other
applicable standard based on their fuel
usage projections.
*
*
*
*
*
Neural network or neural net for
purposes of this rule means an
automated boiler optimization system.
A neural network typically has the
ability to process data from many inputs
to develop, remember, update, and
enable algorithms for efficient boiler
operation.
*
*
*
*
*
Oil-fired electric utility steam
generating unit means an electric utility
steam generating unit meeting the
definition of ‘‘fossil fuel-fired’’ that is
not a coal-fired electric utility steam
generating unit and that burns oil for
more than 10.0 percent of the average
annual heat input during the 3 previous
calendar years after the compliance date
for your facility in § 63.9984 or for more
than 15.0 percent of the annual heat
input during any one of those calendar
years. EGU owners and operators must
estimate coal, oil, and natural gas usage
for the first 3 calendar years after the
applicable compliance date and they are
solely responsible for assuring
compliance with this final rule or other
applicable standard based on their fuel
usage projections. After the first 3 years
of compliance, EGUs are required to
evaluate applicability based on coal or
oil usage from the three previous
calendars years on an annual rolling
basis.
*
*
*
*
*
21. Revise Table 1 to subpart UUUUU
of part 63 to read as follows:
■
TABLE 1 TO SUBPART UUUUU OF PART 63—EMISSION LIMITS FOR NEW OR RECONSTRUCTED EGUS
[As stated in § 63.9991, you must comply with the following applicable emission limits:]
If your EGU is in this
subcategory . . .
For the following
pollutants . . .
You must meet the following
emission limits and work
practice standards . . .
Using these requirements, as appropriate
(e.g., specified sampling volume or test run
duration) and limitations with the test
methods in Table 5 to this Subpart . . .
1. Coal-fired unit not low rank
virgin coal.
a. Filterable particulate matter
(PM).
OR ..........................................
Total non-Hg HAP metals ......
OR ..........................................
Individual HAP metals: ...........
Antimony (Sb) .........................
Arsenic (As) ............................
Beryllium (Be) .........................
Cadmium (Cd) ........................
Chromium (Cr) ........................
Cobalt (Co) .............................
Lead (Pb) ................................
Manganese (Mn) ....................
Nickel (Ni) ...............................
Selenium (Se) .........................
b. Hydrogen chloride (HCl) ....
9.0E-2 lb/MWh 1 .....................
Collect a minimum of 4 dscm per run.
OR
6.0E-2 lb/GWh ........................
OR
Collect a minimum of 4 dscm per run.
OR
Sulfur dioxide (SO2) 3 .............
c. Mercury (Hg) ......................
srobinson on DSK5SPTVN1PROD with RULES4
2. Coal-fired units low rank virgin coal.
a. Filterable particulate matter
(PM).
OR ..........................................
Total non-Hg HAP metals ......
OR ..........................................
Individual HAP metals: ...........
Antimony (Sb) .........................
Arsenic (As) ............................
Beryllium (Be) .........................
Cadmium (Cd) ........................
Chromium (Cr) ........................
Cobalt (Co) .............................
Lead (Pb) ................................
Manganese (Mn) ....................
Nickel (Ni) ...............................
Selenium (Se) .........................
b. Hydrogen chloride (HCl) ....
Collect a minimum of 3 dscm per run.
8.0E-3
3.0E-3
6.0E-4
4.0E-4
7.0E-3
2.0E-3
2.0E-2
4.0E-3
4.0E-2
5.0E-2
1.0E-2
lb/GWh
lb/GWh
lb/GWh
lb/GWh
lb/GWh
lb/GWh
lb/GWh
lb/GWh
lb/GWh
lb/GWh
lb/MWh
........................
........................
........................
........................
........................
........................
........................
........................
........................
........................
........................
1.0 lb/MWh .............................
3.0E-3 lb/GWh ........................
9.0E-2 lb/MWh 1 .....................
OR
6.0E-2 lb/GWh ........................
OR
For Method 26A at appendix A–8 to part 60
of this chapter, collect a minimum of 3
dscm per run. For ASTM D6348–03 2 or
Method 320 at appendix A to part 63 of
this chapter, sample for a minimum of 1
hour.
SO2 CEMS.
Hg CEMS or sorbent trap monitoring system
only.
Collect a minimum of 4 dscm per run.
Collect a minimum of 4 dscm per run.
Collect a minimum of 3 dscm per run.
8.0E-3
3.0E-3
6.0E-4
4.0E-4
7.0E-3
2.0E-3
2.0E-2
4.0E-3
4.0E-2
5.0E-2
1.0E-2
lb/GWh
lb/GWh
lb/GWh
lb/GWh
lb/GWh
lb/GWh
lb/GWh
lb/GWh
lb/GWh
lb/GWh
lb/MWh
........................
........................
........................
........................
........................
........................
........................
........................
........................
........................
........................
For Method 26A, collect a minimum of 3
dscm per run For ASTM D6348–03 2 or
Method 320, sample for a minimum of 1
hour.
OR
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
PO 00000
Frm 00020
Fmt 4701
Sfmt 4700
E:\FR\FM\06APR4.SGM
06APR4
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
20191
TABLE 1 TO SUBPART UUUUU OF PART 63—EMISSION LIMITS FOR NEW OR RECONSTRUCTED EGUS—Continued
[As stated in § 63.9991, you must comply with the following applicable emission limits:]
You must meet the following
emission limits and work
practice standards . . .
Using these requirements, as appropriate
(e.g., specified sampling volume or test run
duration) and limitations with the test
methods in Table 5 to this Subpart . . .
1.0 lb/MWh .............................
4.0E-2 lb/GWh ........................
a. Filterable particulate matter
(PM).
OR ..........................................
Total non-Hg HAP metals ......
OR ..........................................
Individual HAP metals: ...........
Antimony (Sb) .........................
Arsenic (As) ............................
Beryllium (Be) .........................
Cadmium (Cd) ........................
Chromium (Cr) ........................
Cobalt (Co) .............................
Lead (Pb) ................................
Manganese (Mn) ....................
Nickel (Ni) ...............................
Selenium (Se) .........................
b. Hydrogen chloride (HCl) ....
7.0E-2 lb/MWh 4 9.0E–2 lb/
MWh 5.
OR
4.0E-1 lb/GWh ........................
OR
SO2 CEMS.
Hg CEMS or sorbent trap monitoring system
only.
Collect a minimum of 1 dscm per run.
2.0E-2
2.0E-2
1.0E-3
2.0E-3
4.0E-2
4.0E-3
9.0E-3
2.0E-2
7.0E-2
3.0E-1
2.0E-3
OR
Sulfur dioxide (SO2) 3 .............
c. Mercury (Hg) ......................
3. IGCC unit .............................
For the following
pollutants . . .
Sulfur dioxide (SO2) 3 .............
c. Mercury (Hg) ......................
If your EGU is in this
subcategory . . .
4.0E-1 lb/MWh ........................
3.0E-3 lb/GWh ........................
Collect a minimum of 2 dscm per run.
lb/GWh
lb/GWh
lb/GWh
lb/GWh
lb/GWh
lb/GWh
lb/GWh
lb/GWh
lb/GWh
lb/GWh
lb/MWh
........................
........................
........................
........................
........................
........................
........................
........................
........................
........................
........................
srobinson on DSK5SPTVN1PROD with RULES4
4.0E-4 lb/MWh ........................
4.0E-4 lb/MWh ........................
a. Filterable particulate matter
(PM).
2.0E–1 lb/MWh 1 .....................
OR ..........................................
Total HAP metals ...................
OR ..........................................
Individual HAP metals: ...........
20:09 Apr 05, 2016
OR
2.0E-4 lb/MWh ........................
OR
c. Hydrogen fluoride (HF) .......
VerDate Sep<11>2014
3.0E-1 lb/MWh 1 .....................
b. Hydrogen chloride (HCl) ....
5. Liquid oil-fired unit—noncontinental (excluding limited-use liquid oil-fired subcategory units).
a. Filterable particulate matter
(PM).
OR ..........................................
Total HAP metals ...................
OR ..........................................
Individual HAP metals: ...........
Antimony (Sb) .........................
Arsenic (As) ............................
Beryllium (Be) .........................
Cadmium (Cd) ........................
Chromium (Cr) ........................
Cobalt (Co) .............................
Lead (Pb) ................................
Manganese (Mn) ....................
Nickel (Ni) ...............................
Selenium (Se) .........................
Mercury (Hg) ..........................
4. Liquid oil-fired unit—continental (excluding limited-use
liquid oil-fired subcategory
units).
OR
7.0E-3 lb/MWh ........................
OR
Jkt 238001
PO 00000
Frm 00021
Collect a minimum of 1 dscm per run.
For Method 26A, collect a minimum of 1
dscm per run; for Method 26 at appendix
A–8 to part 60 of this chapter, collect a
minimum of 120 liters per run. For ASTM
D6348–03 2 or Method 320, sample for a
minimum of 1 hour.
SO2 CEMS.
Hg CEMS or sorbent trap monitoring system
only.
Collect a minimum of 1 dscm per run.
Collect a minimum of 2 dscm per run.
Collect a minimum of 2 dscm per run.
1.0E-2
3.0E-3
5.0E-4
2.0E-4
2.0E-2
3.0E-2
8.0E-3
2.0E-2
9.0E-2
2.0E-2
1.0E-4
Fmt 4701
lb/GWh
lb/GWh
lb/GWh
lb/GWh
lb/GWh
lb/GWh
lb/GWh
lb/GWh
lb/GWh
lb/GWh
lb/GWh
........................
........................
........................
........................
........................
........................
........................
........................
........................
........................
........................
For Method 30B at appendix A–8 to part 60
of this chapter sample volume determination (Section 8.2.4), the estimated Hg concentration should nominally be < 1⁄2 the
standard.
For Method 26A, collect a minimum of 3
dscm per run. For ASTM D6348–03 2 or
Method 320, sample for a minimum of 1
hour.
For Method 26A, collect a minimum of 3
dscm per run. For ASTM D6348–03 2 or
Method 320, sample for a minimum of 1
hour.
Collect a minimum of 1 dscm per run.
Collect a minimum of 1 dscm per run.
Collect a minimum of 3 dscm per run.
Sfmt 4700
E:\FR\FM\06APR4.SGM
06APR4
20192
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
TABLE 1 TO SUBPART UUUUU OF PART 63—EMISSION LIMITS FOR NEW OR RECONSTRUCTED EGUS—Continued
[As stated in § 63.9991, you must comply with the following applicable emission limits:]
You must meet the following
emission limits and work
practice standards . . .
8.0E-3 lb/GWh ........................
6.0E-2 lb/GWh ........................
2.0E-3 lb/GWh ........................
2.0E-3 lb/GWh ........................
2.0E-2 lb/GWh ........................
3.0E-1 lb/GWh ........................
3.0E-2 lb/GWh ........................
1.0E-1 lb/GWh ........................
4.1E0 lb/GWh .........................
2.0E-2 lb/GWh ........................
4.0E-4 lb/GWh ........................
b. Hydrogen chloride (HCl) ....
2.0E-3 lb/MWh ........................
c. Hydrogen fluoride (HF) .......
5.0E-4 lb/MWh ........................
a. Filterable particulate matter
(PM).
OR ..........................................
Total non-Hg HAP metals ......
OR ..........................................
Individual HAP metals: ...........
Antimony (Sb) .........................
Arsenic (As) ............................
Beryllium (Be) .........................
Cadmium (Cd) ........................
Chromium (Cr) ........................
Cobalt (Co) .............................
Lead (Pb) ................................
Manganese (Mn) ....................
Nickel (Ni) ...............................
Selenium (Se) .........................
b. Hydrogen chloride (HCl) ....
3.0E-2 lb/MWh 1 .....................
8.0E–3 lb/GWh .......................
3.0E-3 lb/GWh ........................
6.0E-4 lb/GWh ........................
7.0E-4 lb/GWh ........................
6.0E-3 lb/GWh ........................
2.0E-3 lb/GWh ........................
2.0E-2 lb/GWh ........................
7.0E-3 lb/GWh ........................
4.0E-2 lb/GWh ........................
6.0E-3 lb/GWh ........................
4.0E-4 lb/MWh ........................
OR
Sulfur dioxide (SO2) 3 .............
c. Mercury (Hg) ......................
6. Solid oil-derived fuel-fired
unit.
For the following
pollutants . . .
Antimony (Sb) .........................
Arsenic (As) ............................
Beryllium (Be) .........................
Cadmium (Cd) ........................
Chromium (Cr) ........................
Cobalt (Co) .............................
Lead (Pb) ................................
Manganese (Mn) ....................
Nickel (Ni) ...............................
Selenium (Se) .........................
Mercury (Hg) ..........................
If your EGU is in this
subcategory . . .
1.0 lb/MWh .............................
2.0E-3 lb/GWh ........................
OR
6.0E-1 lb/GWh ........................
OR
Using these requirements, as appropriate
(e.g., specified sampling volume or test run
duration) and limitations with the test
methods in Table 5 to this Subpart . . .
For Method 30B sample volume determination (Section 8.2.4), the estimated Hg concentration should nominally be < 1⁄2 the
standard.
For Method 26A, collect a minimum of 1
dscm per run;for Method 26, collect a minimum of 120 liters per run. For ASTM
D6348–03 2 or Method 320, sample for a
minimum of 1 hour.
For Method 26A, collect a minimum of 3
dscm per run.For ASTM D6348–03 2 or
Method 320, sample for a minimum of 1
hour.
Collect a minimum of 1 dscm per run.
Collect a minimum of 1 dscm per run.
Collect a minimum of 3 dscm per run.
For Method 26A, collect a minimum of 3
dscm per run. For ASTM D6348–03 2 or
Method 320, sample for a minimum of 1
hour.
SO2 CEMS.
Hg CEMS or Sorbent trap monitoring system
only.
1
Gross output.
Incorporated by reference, see § 63.14.
You may not use the alternate SO2 limit if your EGU does not have some form of FGD system (or, in the case of IGCC EGUs, some other
acid gas removal system either upstream or downstream of the combined cycle block) and SO2 CEMS installed.
4 Duct burners on syngas; gross output.
5 Duct burners on natural gas; gross output.
2
3
22. Revise Table 2 to subpart UUUUU
of part 63 to read as follows:
srobinson on DSK5SPTVN1PROD with RULES4
■
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
PO 00000
Frm 00022
Fmt 4701
Sfmt 4700
E:\FR\FM\06APR4.SGM
06APR4
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
20193
TABLE 2 TO SUBPART UUUUU OF PART 63—EMISSION LIMITS FOR EXISTING EGUS
[As stated in § 63.9991, you must comply with the following applicable emission limits: 1]
If your EGU is in this
subcategory . . .
For the following pollutants . . .
1. Coal-fired unit not low rank virgin coal.
a.
Filterable particulate matter
(PM).
OR ................................................
Total non-Hg HAP metals ............
OR ................................................
Individual HAP metals: .................
Antimony (Sb) ...............................
Arsenic (As) ..................................
Beryllium (Be) ...............................
Cadmium (Cd) ..............................
Chromium (Cr) ..............................
Cobalt (Co) ...................................
Lead (Pb) ......................................
Manganese (Mn) ..........................
Nickel (Ni) .....................................
Selenium (Se) ...............................
b. Hydrogen chloride (HCl) ...........
OR
Sulfur dioxide (SO2) 4 ...................
c. Mercury (Hg) .............................
You must meet the following
emission limits and work practice
standards . . .
3.0E-2 lb/MMBtu or 3.0E-1 lb/
MWh 2.
OR
5.0E-5 lb/MMBtu or 5.0E-1 lb/
GWh.
OR
a.
Filterable particulate matter
(PM).
OR ................................................
Total non-Hg HAP metals ............
srobinson on DSK5SPTVN1PROD with RULES4
OR ................................................
Individual HAP metals: .................
Antimony (Sb) ...............................
Arsenic (As) ..................................
Beryllium (Be) ...............................
Cadmium (Cd) ..............................
Chromium (Cr) ..............................
Cobalt (Co) ...................................
Lead (Pb) ......................................
Manganese (Mn) ..........................
Nickel (Ni) .....................................
Selenium (Se) ...............................
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
PO 00000
Frm 00023
Fmt 4701
Collect a minimum of 1 dscm per
run.
Collect a minimum of 1 dscm per
run.
Collect a minimum of 3 dscm per
run.
8.0E-1 lb/TBtu or 8.0E-3 lb/GWh
1.1E0 lb/TBtu or 2.0E-2 lb/GWh ..
2.0E-1 lb/TBtu or 2.0E-3 lb/GWh
3.0E-1 lb/TBtu or 3.0E-3 lb/GWh
2.8E0 lb/TBtu or 3.0E-2 lb/GWh ..
8.0E-1 lb/TBtu or 8.0E-3 lb/GWh
1.2E0 lb/TBtu or 2.0E-2 lb/GWh ..
4.0E0 lb/TBtu or 5.0E-2 lb/GWh ..
3.5E0 lb/TBtu or 4.0E-2 lb/GWh ..
5.0E0 lb/TBtu or 6.0E-2 lb/GWh ..
2.0E-3 lb/MMBtu or 2.0E-2 lb/
MWh.
2.0E-1 lb/MMBtu or 1.5E0 lb/MWh
1.2E0 lb/TBtu or 1.3E-2 lb/GWh ..
OR.
1.0E0 lb/TBtu or 1.1E-2 lb/GWh ..
2. Coal-fired unit low rank virgin
coal.
Using these requirements, as appropriate (e.g., specified sampling
volume or test run duration) and
limitations with the test methods
in Table 5 to this Subpart . . .
3.0E-2 lb/MMBtu or 3.0E-1 lb/
MWh 2.
OR.
5.0E-5 lb/MMBtu or 5.0E-1 lb/
GWh.
OR.
For Method 26A at appendix A–8
to part 60 of this chapter, collect a minimum of 0.75 dscm
per run; for Method 26, collect
a minimum of 120 liters per run.
For ASTM D6348–03 3 or Method 320 at appendix A to part 63
of this chapter, sample for a
minimum of 1 hour.
SO2 CEMS.
LEE Testing for 30 days with a
sampling period consistent with
that given in section 5.2.1 of
appendix A to this subpart per
Method 30B at appendix A–8 to
part 60 of this chapter run or
Hg CEMS or sorbent trap monitoring system only.
LEE Testing for 90 days with a
sampling period consistent with
that given in section 5.2.1 of
appendix A to this subpart per
Method 30B run or Hg CEMS
or sorbent trap monitoring system only.
Collect a minimum of 1 dscm per
run.
Collect a minimum of 1 dscm per
run.
Collect a minimum of 3 dscm per
run.
8.0E-1 lb/TBtu or 8.0E-3 lb/GWh
1.1E0 lb/TBtu or 2.0E-2 lb/GWh ..
2.0E-1 lb/TBtu or 2.0E-3 lb/GWh
3.0E-1 lb/TBtu or 3.0E-3 lb/GWh
2.8E0 lb/TBtu or 3.0E-2 lb/GWh ..
8.0E-1 lb/TBtu or 8.0E-3 lb/GWh
1.2E0 lb/TBtu or 2.0E-2 lb/GWh ..
4.0E0 lb/TBtu or 5.0E-2 lb/GWh ..
3.5E0 lb/TBtu or 4.0E-2 lb/GWh ..
5.0E0 lb/TBtu or 6.0E-2 lb/GWh ..
Sfmt 4700
E:\FR\FM\06APR4.SGM
06APR4
20194
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
TABLE 2 TO SUBPART UUUUU OF PART 63—EMISSION LIMITS FOR EXISTING EGUS—Continued
[As stated in § 63.9991, you must comply with the following applicable emission limits: 1]
If your EGU is in this
subcategory . . .
For the following pollutants . . .
b. Hydrogen chloride (HCl) ...........
OR
Sulfur dioxide (SO2) 4 ...................
c. Mercury (Hg) .............................
3. IGCC unit ...................................
a.
Filterable particulate matter
(PM).
OR ................................................
Total non-Hg HAP metals ............
OR ................................................
Individual HAP metals: .................
You must meet the following
emission limits and work practice
standards . . .
2.0E-3 lb/MMBtu or 2.0E-2 lb/
MWh.
For Method 26A, collect a minimum of 0.75 dscm per run; for
Method 26 at appendix A–8 to
part 60 of this chapter, collect a
minimum of 120 liters per run.
For ASTM D6348–03 3 or Method 320, sample for a minimum
of 1 hour.
2.0E-1 lb/MMBtu or 1.5E0 lb/MWh
4.0E0 lb/TBtu or 4.0E-2 lb/GWh ..
SO2 CEMS.
LEE Testing for 30 days with a
sampling period consistent with
that given in section 5.2.1 of
appendix A to this subpart per
Method 30B run or Hg CEMS
or sorbent trap monitoring system only.
Collect a minimum of 1 dscm per
run.
4.0E-2 lb/MMBtu or 4.0E-1 lb/
MWh 2.
OR
6.0E-5 lb/MMBtu or 5.0E-1 lb/
GWh.
OR
1.4E0 lb/TBtu or 2.0E-2 lb/GWh ..
1.5E0 lb/TBtu or 2.0E-2 lb/GWh ..
1.0E-1 lb/TBtu or 1.0E-3 lb/GWh
1.5E-1 lb/TBtu or 2.0E-3 lb/GWh
2.9E0 lb/TBtu or 3.0E-2 lb/GWh ..
1.2E0 lb/TBtu or 2.0E-2 lb/GWh ..
1.9E+2 lb/TBtu or 1.8E0 lb/GWh ..
2.5E0 lb/TBtu or 3.0E-2 lb/GWh ..
6.5E0 lb/TBtu or 7.0E-2 lb/GWh ..
2.2E+1 lb/TBtu or 3.0E-1 lb/GWh
5.0E-4 lb/MMBtu or 5.0E-3 lb/
MWh.
c. Mercury (Hg) .............................
2.5E0 lb/TBtu or 3.0E-2 lb/GWh ..
a.
matter
3.0E-2 lb/MMBtu or 3.0E-1 lb/
MWh 2.
OR ................................................
Total HAP metals .........................
OR
8.0E-4 lb/MMBtu or 8.0E-3 lb/
MWh.
OR
Filterable
(PM).
particulate
srobinson on DSK5SPTVN1PROD with RULES4
OR ................................................
Individual HAP metals: .................
Antimony (Sb) ...............................
Arsenic (As) ..................................
Beryllium (Be) ...............................
Cadmium (Cd) ..............................
Chromium (Cr) ..............................
Cobalt (Co) ...................................
Lead (Pb) ......................................
Manganese (Mn) ..........................
Nickel (Ni) .....................................
VerDate Sep<11>2014
20:51 Apr 05, 2016
Jkt 238001
PO 00000
Frm 00024
Fmt 4701
Collect a minimum of 1 dscm per
run.
Collect a minimum of 2 dscm per
run.
Antimony (Sb) ...............................
Arsenic (As) ..................................
Beryllium (Be) ...............................
Cadmium (Cd) ..............................
Chromium (Cr) ..............................
Cobalt (Co) ...................................
Lead (Pb) ......................................
Manganese (Mn) ..........................
Nickel (Ni) .....................................
Selenium (Se) ...............................
b. Hydrogen chloride (HCl) ...........
4. Liquid oil-fired unit—continental
(excluding limited-use liquid oilfired subcategory units).
Using these requirements, as appropriate (e.g., specified sampling
volume or test run duration) and
limitations with the test methods
in Table 5 to this Subpart . . .
For Method 26A, collect a minimum of 1 dscm per run; for
Method 26, collect a minimum
of 120 liters per run. For ASTM
D6348–03 3 or Method 320,
sample for a minimum of 1
hour.
LEE Testing for 30 days with a
sampling period consistent with
that given in section 5.2.1 of
appendix A to this subpart per
Method 30B run or Hg CEMS
or sorbent trap monitoring system only.
Collect a minimum of 1 dscm per
run.
Collect a minimum of 1 dscm per
run.
Collect a minimum of 1 dscm per
run.
1.3E+1 lb/TBtu or 2.0E-1 lb/GWh
2.8E0 lb/TBtu or 3.0E-2 lb/GWh ..
2.0E-1 lb/TBtu or 2.0E-3 lb/GWh
3.0E-1 lb/TBtu or 2.0E-3 lb/GWh
5.5E0 lb/TBtu or 6.0E-2 lb/GWh ..
2.1E+1 lb/TBtu or 3.0E-1 lb/GWh
8.1E0 lb/TBtu or 8.0E-2 lb/GWh ..
2.2E+1 lb/TBtu or 3.0E-1 lb/GWh
1.1E+2 lb/TBtu or 1.1E0 lb/GWh ..
Sfmt 4700
E:\FR\FM\06APR4.SGM
06APR4
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
20195
TABLE 2 TO SUBPART UUUUU OF PART 63—EMISSION LIMITS FOR EXISTING EGUS—Continued
[As stated in § 63.9991, you must comply with the following applicable emission limits: 1]
For the following pollutants . . .
3.3E0 lb/TBtu or 4.0E-2 lb/GWh ..
2.0E-1 lb/TBtu or 2.0E-3 lb/GWh
b. Hydrogen chloride (HCl) ...........
2.0E-3 lb/MMBtu or 1.0E-2 lb/
MWh.
c. Hydrogen fluoride (HF) .............
4.0E-4 lb/MMBtu or 4.0E-3 lb/
MWh.
a.
matter
3.0E-2 lb/MMBtu or 3.0E-1 lb/
MWh 2.
OR ................................................
Total HAP metals .........................
5. Liquid oil-fired unit—non-continental (excluding limited-use liquid oil-fired subcategory units).
You must meet the following
emission limits and work practice
standards . . .
Selenium (Se) ...............................
Mercury (Hg) .................................
If your EGU is in this
subcategory . . .
OR
6.0E-4 lb/MMBtu or 7.0E-3 lb/
MWh.
OR
Filterable
(PM).
particulate
OR ................................................
Individual HAP metals: .................
b. Hydrogen chloride (HCl) ...........
2.0E-4 lb/MMBtu or 2.0E-3 lb/
MWh.
c. Hydrogen fluoride (HF) .............
srobinson on DSK5SPTVN1PROD with RULES4
2.2E0 lb/TBtu or 2.0E-2 lb/GWh ..
4.3E0 lb/TBtu or 8.0E-2 lb/GWh ..
6.0E-1 lb/TBtu or 3.0E-3 lb/GWh
3.0E-1 lb/TBtu or 3.0E-3 lb/GWh
3.1E+1 lb/TBtu or 3.0E-1 lb/GWh
1.1E+2 lb/TBtu or 1.4E0 lb/GWh ..
4.9E0 lb/TBtu or 8.0E-2 lb/GWh ..
2.0E+1 lb/TBtu or 3.0E-1 lb/GWh
4.7E+2 lb/TBtu or 4.1E0 lb/GWh ..
9.8E0 lb/TBtu or 2.0E-1 lb/GWh ..
4.0E-2 lb/TBtu or 4.0E-4 lb/GWh
6.0E-5 lb/MMBtu or 5.0E-4 lb/
MWh.
a.
8.0E-3 lb/MMBtu or 9.0E-2 lb/
MWh 2.
OR
4.0E-5 lb/MMBtu or 6.0E-1 lb/
GWh.
OR
Filterable particulate matter
(PM).
OR ................................................
Total non-Hg HAP metals ............
OR ................................................
Individual HAP metals: .................
Antimony (Sb) ...............................
Arsenic (As) ..................................
Beryllium (Be) ...............................
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
PO 00000
Frm 00025
Fmt 4701
For Method 30B sample volume
determination (Section 8.2.4),
the estimated Hg concentration
should nominally be < 1⁄2 the
standard.
For Method 26A, collect a minimum of 1 dscm per run; for
Method 26, collect a minimum
of 120 liters per run. For ASTM
D6348–03 3 or Method 320,
sample for a minimum of 1
hour.
For Method 26A, collect a minimum of 1 dscm per run; for
Method 26, collect a minimum
of 120 liters per run. For ASTM
D6348–03 3 or Method 320,
sample for a minimum of 1
hour.
Collect a minimum of 1 dscm per
run.
Collect a minimum of 1 dscm per
run.
Collect a minimum of 2 dscm per
run.
Antimony (Sb) ...............................
Arsenic (As) ..................................
Beryllium (Be) ...............................
Cadmium (Cd) ..............................
Chromium (Cr) ..............................
Cobalt (Co) ...................................
Lead (Pb) ......................................
Manganese (Mn) ..........................
Nickel (Ni) .....................................
Selenium (Se) ...............................
Mercury (Hg) .................................
6. Solid oil-derived fuel-fired unit ...
Using these requirements, as appropriate (e.g., specified sampling
volume or test run duration) and
limitations with the test methods
in Table 5 to this Subpart . . .
For Method 30B sample volume
determination (Section 8.2.4),
the estimated Hg concentration
should nominally be < 1⁄2 the
standard.
For Method 26A, collect a minimum of 1 dscm per run; for
Method 26, collect a minimum
of 120 liters per run. For ASTM
D6348–03 3 or Method 320,
sample for a minimum of 2
hours.
For Method 26A, collect a minimum of 3 dscm per run. For
ASTM D6348–03 3 or Method
320, sample for a minimum of 2
hours.
Collect a minimum of 1 dscm per
run.
Collect a minimum of 1 dscm per
run.
Collect a minimum of 3 dscm per
run.
8.0E-1 lb/TBtu or 7.0E-3 lb/GWh
3.0E-1 lb/TBtu or 5.0E-3 lb/GWh
6.0E-2 lb/TBtu or 5.0E-4 lb/GWh
Sfmt 4700
E:\FR\FM\06APR4.SGM
06APR4
20196
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
TABLE 2 TO SUBPART UUUUU OF PART 63—EMISSION LIMITS FOR EXISTING EGUS—Continued
[As stated in § 63.9991, you must comply with the following applicable emission limits: 1]
If your EGU is in this
subcategory . . .
For the following pollutants . . .
Cadmium (Cd) ..............................
Chromium (Cr) ..............................
Cobalt (Co) ...................................
Lead (Pb) ......................................
Manganese (Mn) ..........................
Nickel (Ni) .....................................
Selenium (Se) ...............................
b. Hydrogen chloride (HCl) ...........
OR
Sulfur dioxide (SO2) 4 ...................
c. Mercury (Hg) .............................
You must meet the following
emission limits and work practice
standards . . .
3.0E-1 lb/TBtu or 4.0E-3 lb/GWh
8.0E-1 lb/TBtu or 2.0E-2 lb/GWh
1.1E0 lb/TBtu or 2.0E-2 lb/GWh ..
8.0E-1 lb/TBtu or 2.0E-2 lb/GWh
2.3E0 lb/TBtu or 4.0E-2 lb/GWh ..
9.0E0 lb/TBtu or 2.0E-1 lb/GWh ..
1.2E0 lb/Tbtu or 2.0E-2 lb/GWh ...
5.0E-3 lb/MMBtu or 8.0E-2 lb/
MWh.
3.0E-1 lb/MMBtu or 2.0E0 lb/MWh
2.0E-1 lb/TBtu or 2.0E-3 lb/GWh
Using these requirements, as appropriate (e.g., specified sampling
volume or test run duration) and
limitations with the test methods
in Table 5 to this Subpart . . .
For Method 26A, collect a minimum of 0.75 dscm per run; for
Method 26, collect a minimum
of 120 liters per run. For ASTM
D6348–03 3 or Method 320,
sample for a minimum of 1
hour.
SO2 CEMS.
LEE Testing for 30 days with a
sampling period consistent with
that given in section 5.2.1 of
appendix A to this subpart per
Method 30B run or Hg CEMS
or sorbent trap monitoring system only.
1 For LEE emissions testing for total PM, total HAP metals, individual HAP metals, HCl, and HF, the required minimum sampling volume must
be increased nominally by a factor of two.
2 Gross output.
3 Incorporated by reference, see § 63.14.
4 You may not use the alternate SO limit if your EGU does not have some form of FGD system and SO CEMS installed.
2
2
23. Revise Table 3 to subpart UUUUU
of part 63 to read as follows:
■
TABLE 3 TO SUBPART UUUUU OF PART 63—WORK PRACTICE STANDARDS
[As stated in § 63.9991, you must comply with the following applicable work practice standards:]
If your EGU is . . .
You must meet the following . . .
1. An existing EGU ......
Conduct a tune-up of the EGU burner and combustion controls at least each 36 calendar months, or each 48 calendar
months if neural network combustion optimization software is employed, as specified in § 63.10021(e).
Conduct a tune-up of the EGU burner and combustion controls at least each 36 calendar months, or each 48 calendar
months if neural network combustion optimization software is employed, as specified in § 63.10021(e).
a. You have the option of complying using either of the following work practice standards:
(1) If you choose to comply using paragraph (1) of the definition of ‘‘startup’’ in § 63.10042, you must operate all
CMS during startup. Startup means either the first-ever firing of fuel in a boiler for the purpose of producing
electricity, or the firing of fuel in a boiler after a shutdown event for any purpose. Startup ends when any of the
steam from the boiler is used to generate electricity for sale over the grid or for any other purpose (including on
site use). For startup of a unit, you must use clean fuels as defined in § 63.10042 for ignition. Once you convert
to firing coal, residual oil, or solid oil-derived fuel, you must engage all of the applicable control technologies except dry scrubber and SCR. You must start your dry scrubber and SCR systems, if present, appropriately to
comply with relevant standards applicable during normal operation. You must comply with all applicable emissions limits at all times except for periods that meet the applicable definitions of startup and shutdown in this
subpart. You must keep records during startup periods. You must provide reports concerning activities and
startup periods, as specified in § 63.10011(g) and § 63.10021(h) and (i).
(2) If you choose to comply using paragraph (2) of the definition of ‘‘startup’’ in § 63.10042, you must operate all
CMS during startup. You must also collect appropriate data, and you must calculate the pollutant emission rate
for each hour of startup.
For startup of an EGU, you must use one or a combination of the clean fuels defined in § 63.10042 to the maximum extent possible, taking into account considerations such as boiler or control device integrity, throughout
the startup period. You must have sufficient clean fuel capacity to engage and operate your PM control device
within one hour of adding coal, residual oil, or solid oil-derived fuel to the unit. You must meet the startup period
work practice requirements as identified in § 63.10020(e).
Once you start firing coal, residual oil, or solid oil-derived fuel, you must vent emissions to the main stack(s). You
must comply with the applicable emission limits beginning with the hour after startup ends. You must engage
and operate your particulate matter control(s) within 1 hour of first firing of coal, residual oil, or solid oil-derived
fuel.
srobinson on DSK5SPTVN1PROD with RULES4
2. A new or reconstructed EGU.
3. A coal-fired, liquid
oil-fired (excluding
limited-use liquid oilfired subcategory
units), or solid oil-derived fuel-fired EGU
during startup.
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
PO 00000
Frm 00026
Fmt 4701
Sfmt 4700
E:\FR\FM\06APR4.SGM
06APR4
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
20197
TABLE 3 TO SUBPART UUUUU OF PART 63—WORK PRACTICE STANDARDS—Continued
[As stated in § 63.9991, you must comply with the following applicable work practice standards:]
If your EGU is . . .
4. A coal-fired, liquid
oil-fired (excluding
limited-use liquid oilfired subcategory
units), or solid oil-derived fuel-fired EGU
during shutdown.
You must meet the following . . .
You must start all other applicable control devices as expeditiously as possible, considering safety and manufacturer/supplier recommendations, but, in any case, when necessary to comply with other standards made applicable to the EGU by a permit limit or a rule other than this Subpart that require operation of the control devices.
b. Relative to the syngas not fired in the combustion turbine of an IGCC EGU during startup, you must either: (1)
Flare the syngas, or (2) route the syngas to duct burners, which may need to be installed, and route the flue
gas from the duct burners to the heat recovery steam generator.
c. If you choose to use just one set of sorbent traps to demonstrate compliance with the applicable Hg emission
limit, you must comply with the limit at all times; otherwise, you must comply with the applicable emission limit
at all times except for startup and shutdown periods.
d. You must collect monitoring data during startup periods, as specified in § 63.10020(a) and (e). You must keep
records during startup periods, as provided in §§ 63.10032 and 63.10021(h). You must provide reports concerning activities and startup periods, as specified in §§ 63.10011(g), 63.10021(i), and 63.10031.
You must operate all CMS during shutdown. You must also collect appropriate data, and you must calculate the pollutant emission rate for each hour of shutdown for those pollutants for which a CMS is used.
While firing coal, residual oil, or solid oil-derived fuel during shutdown, you must vent emissions to the main stack(s)
and operate all applicable control devices and continue to operate those control devices after the cessation of coal,
residual oil, or solid oil-derived fuel being fed into the EGU and for as long as possible thereafter considering operational and safety concerns. In any case, you must operate your controls when necessary to comply with other
standards made applicable to the EGU by a permit limit or a rule other than this Subpart and that require operation
of the control devices.
If, in addition to the fuel used prior to initiation of shutdown, another fuel must be used to support the shutdown
process, that additional fuel must be one or a combination of the clean fuels defined in § 63.10042 and must be
used to the maximum extent possible, taking into account considerations such as not compromising boiler or
control device integrity.
Relative to the syngas not fired in the combustion turbine of an IGCC EGU during shutdown, you must either: (1)
Flare the syngas, or (2) route the syngas to duct burners, which may need to be installed, and route the flue
gas from the duct burners to the heat recovery steam generator.
You must comply with all applicable emission limits at all times except during startup periods and shutdown periods at which time you must meet this work practice. You must collect monitoring data during shutdown periods,
as specified in § 63.10020(a). You must keep records during shutdown periods, as provided in §§ 63.10032 and
63.10021(h). Any fraction of an hour in which shutdown occurs constitutes a full hour of shutdown. You must
provide reports concerning activities and shutdown periods, as specified in §§ 63.10011(g), 63.10021(i), and
63.10031.
24. Revise Table 4 to subpart UUUUU
of part 63 to read as follows:
■
TABLE 4 TO SUBPART UUUUU OF PART 63 — OPERATING LIMITS FOR EGUS
[As stated in § 63.9991, you must comply with the applicable operating limits:]
If you demonstrate
compliance using . . .
You must meet these operating limits . . .
PM CPMS ....................
Maintain the 30-boiler operating day rolling average PM CPMS output determined in accordance with the requirements
of § 63.10023(b)(2) and obtained during the most recent performance test run demonstrating compliance with the filterable PM, total non-mercury HAP metals (total HAP metals, for liquid oil-fired units), or individual non-mercury
HAP metals (individual HAP metals including Hg, for liquid oil-fired units) emissions limitation(s).
25. Revise Table 5 to subpart UUUUU
of part 63 to read as follows:
■
srobinson on DSK5SPTVN1PROD with RULES4
TABLE 5 TO SUBPART UUUUU OF PART 63—PERFORMANCE TESTING REQUIREMENTS
[As stated in § 63.10007, you must comply with the following requirements for performance testing for existing, new or reconstructed affected
sources: 1]
You must perform the following activities, as applicable
to your input- or output-based
emission limit . . .
To conduct a performance test
for the following pollutant . . .
Using . . .
1. Filterable Particulate matter
(PM).
Emissions Testing ..................
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
PO 00000
Frm 00027
a. Select sampling ports location and the number of traverse points.
b. Determine velocity and volumetric flow-rate of the
stack gas.
Fmt 4701
Sfmt 4700
Using . . .2
Method 1 at appendix A–1 to part 60 of this
chapter.
Method 2, 2A, 2C, 2F, 2G or 2H at appendix
A–1 or A–2 to part 60 of this chapter.
E:\FR\FM\06APR4.SGM
06APR4
20198
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
TABLE 5 TO SUBPART UUUUU OF PART 63—PERFORMANCE TESTING REQUIREMENTS—Continued
[As stated in § 63.10007, you must comply with the following requirements for performance testing for existing, new or reconstructed affected
sources: 1]
To conduct a performance test
for the following pollutant . . .
You must perform the following activities, as applicable
to your input- or output-based
emission limit . . .
Using . . .
c. Determine oxygen and carbon dioxide concentrations
of the stack gas.
d. Measure the moisture content of the stack gas.
e. Measure the filterable PM
concentration.
f. Convert emissions concentration to lb/MMBtu or
lb/MWh emissions rates.
OR ..........................................
PM CEMS ...............................
2. Total or individual non-Hg
HAP metals.
srobinson on DSK5SPTVN1PROD with RULES4
3. Hydrogen chloride (HCl) and
hydrogen fluoride (HF).
VerDate Sep<11>2014
20:09 Apr 05, 2016
Emissions Testing ..................
Emissions Testing ..................
Jkt 238001
PO 00000
Frm 00028
OR.
a. Install, certify, operate, and
maintain the PM CEMS.
b. Install, certify, operate, and
maintain the diluent gas,
flow rate, and/or moisture
monitoring systems.
c. Convert hourly emissions
concentrations to 30 boiler
operating day rolling average lb/MMBtu or lb/MWh
emissions rates.
a. Select sampling ports location and the number of traverse points..
b. Determine velocity and volumetric flow-rate of the
stack gas.
c. Determine oxygen and carbon dioxide concentrations
of the stack gas.
d. Measure the moisture content of the stack gas.
e. Measure the HAP metals
emissions concentrations
and determine each individual HAP metals emissions concentration, as well
as the total filterable HAP
metals emissions concentration and total HAP
metals emissions concentration.
f. Convert emissions concentrations (individual HAP
metals, total filterable HAP
metals, and total HAP metals) to lb/MMBtu or lb/MWh
emissions rates.
a. Select sampling ports location and the number of traverse points..
b. Determine velocity and volumetric flow-rate of the
stack gas.
c. Determine oxygen and carbon dioxide concentrations
of the stack gas.
d. Measure the moisture content of the stack gas.
Fmt 4701
Sfmt 4700
Using . . .2
Method 3A or 3B at appendix A–2 to part 60
of this chapter, or ANSI/ASME PTC 19.10–
1981.3
Method 4 at appendix A–3 to part 60 of this
chapter.
Method 5 at appendix A–3 to part 60 of this
chapter.
For positive pressure fabric filters, Method 5D
at appendix A–3 to part 60 of this chapter
for filterable PM emissions.
Note that the Method 5 front half temperature
shall be 160° ± 14° C (320° ± 25° F).
Method 19 F-factor methodology at appendix
A–7 to part 60 of this chapter, or calculate
using mass emissions rate and gross output data (see § 63.10007(e)).
Performance Specification 11 at appendix B
to part 60 of this chapter and Procedure 2
at appendix F to part 60 of this chapter.
Part 75 of this chapter and § 63.10010(a),
(b), (c), and (d).
Method 19 F-factor methodology at appendix
A–7 to part 60 of this chapter, or calculate
using mass emissions rate and gross output data (see § 63.10007(e)).
Method 1 at appendix A–1 to part 60 of this
chapter.
Method 2, 2A, 2C, 2F, 2G or 2H at appendix
A–1 or A–2 to part 60 of this chapter.
Method 3A or 3B at appendix A–2 to part 60
of this chapter, or ANSI/ASME PTC 19.10–
1981.3
Method 4 at appendix A–3 to part 60 of this
chapter.
Method 29 at appendix A–8 to part 60 of this
chapter. For liquid oil-fired units, Hg is included in HAP metals and you may use
Method 29, Method 30B at appendix A–8
to part 60 of this chapter; for Method 29,
you must report the front half and back half
results separately. When using Method 29,
report metals matrix spike and recovery
levels.
Method 19 F-factor methodology at appendix
A–7 to part 60 of this chapter, or calculate
using mass emissions rate and gross output data (see § 63.10007(e)).
Method 1 at appendix A–1 to part 60 of this
chapter.
Method 2, 2A, 2C, 2F, 2G or 2H at appendix
A–1 or A–2 to part 60 of this chapter.
Method 3A or 3B at appendix A–2 to part 60
of this chapter, or ANSI/ASME PTC 19.10–
1981.3
Method 4 at appendix A–3 to part 60 of this
chapter.
E:\FR\FM\06APR4.SGM
06APR4
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
20199
TABLE 5 TO SUBPART UUUUU OF PART 63—PERFORMANCE TESTING REQUIREMENTS—Continued
[As stated in § 63.10007, you must comply with the following requirements for performance testing for existing, new or reconstructed affected
sources: 1]
To conduct a performance test
for the following pollutant . . .
You must perform the following activities, as applicable
to your input- or output-based
emission limit . . .
Using . . .
e. Measure the HCl and HF
emissions concentrations.
3.e.1(D) The %R value for each
compound must be reported in the test
report and all field measurements
corrected with the calculated %R value
Using . . .2
Method 26 or Method 26A at appendix A–8
to part 60 of this chapter or Method 320 at
appendix A to part 63 of this chapter or
ASTM 6348–03 3 with
(1) the following conditions when using
ASTM D6348–03:
(A) The test plan preparation and implementation in the Annexes to ASTM D6348–03,
Sections A1 through A8 are mandatory;
(B) For ASTM D6348–03 Annex A5 (Analyte
Spiking Technique), the percent (%) R
must be determined for each target analyte
(see Equation A5.5);
(C) For the ASTM D6348–03 test data to be
acceptable for a target analyte, %R must
be 70% ≥ R ≤ 130%; and
for that compound using the following
equation:
and
You must perform the following activities, as applicable
to your input- or output-based
emission limit . . . (cont’d)
.................................................
.................................................
f. Convert emissions concentration to lb/MMBtu or lb/
MWh emissions rates.
OR ..........................................
HCl and/or HF CEMS .............
OR.
a. Install, certify, operate, and
maintain the HCl or HF
CEMS.
b. Install, certify, operate, and
maintain the diluent gas,
flow rate, and/or moisture
monitoring systems.
c. Convert hourly emissions
concentrations to 30 boiler
operating day rolling average lb/MMBtu or lb/MWh
emissions rates.
a. Select sampling ports location and the number of traverse points.
b. Determine velocity and volumetric flow-rate of the
stack gas.
c. Determine oxygen and carbon dioxide concentrations
of the stack gas.
.................................................
srobinson on DSK5SPTVN1PROD with RULES4
.................................................
4. Mercury (Hg) .......................
Emissions Testing ..................
.................................................
.................................................
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
PO 00000
Frm 00029
Fmt 4701
Sfmt 4700
Using . . .2 (cont’d)
(2) spiking levels nominally no greater than
two times the level corresponding to the
applicable emission limit.
Method 26A must be used if there are entrained water droplets in the exhaust
stream.
Method 19 F-factor methodology at appendix
A–7 to part 60 of this chapter, or calculate
using mass emissions rate and gross output data (see § 63.10007(e)).
Appendix B of this subpart.
Part 75 of this chapter and § 63.10010(a), (b),
(c), and (d).
Method 19 F-factor methodology at appendix
A–7 to part 60 of this chapter, or calculate
using mass emissions rate and gross output data (see § 63.10007(e)).
Method 1 at appendix A–1 to part 60 of this
chapter or Method 30B at Appendix A–8 for
Method 30B point selection.
Method 2, 2A, 2C, 2F, 2G or 2H at appendix
A–1 or A–2 to part 60 of this chapter.
Method 3A or 3B at appendix A–1 to part 60
of this chapter, or ANSI/ASME PTC 19.10–
1981.3
E:\FR\FM\06APR4.SGM
06APR4
ER06AP16.007
Using . . . (cont’d)
.................................................
To conduct a performance test
for the following pollutant . . .
(cont’d)
20200
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
To conduct a performance test
for the following pollutant . . .
(cont’d)
You must perform the following activities, as applicable
to your input- or output-based
emission limit . . . (cont’d)
Using . . . (cont’d)
.................................................
.................................................
d. Measure the moisture content of the stack gas.
e. Measure the Hg emission
concentration.
.................................................
f. Convert emissions concentration to lb/TBtu or lb/
GWh emission rates.
OR ..........................................
Hg CEMS ................................
OR.
a. Install, certify, operate, and
maintain the CEMS.
b. Install, certify, operate, and
maintain the diluent gas,
flow rate, and/or moisture
monitoring systems.
c. Convert hourly emissions
concentrations to 30 boiler
operating day rolling average lb/TBtu or lb/GWh
emissions rates.
OR.
a. Install, certify, operate, and
maintain the sorbent trap
monitoring system.
b. Install, operate, and maintain the diluent gas, flow
rate, and/or moisture monitoring systems.
c. Convert emissions concentrations to 30 boiler operating day rolling average
lb/TBtu or lb/GWh emissions rates.
OR.
a. Select sampling ports location and the number of traverse points.
.................................................
.................................................
OR ..........................................
Sorbent trap monitoring system.
.................................................
.................................................
OR ..........................................
LEE testing .............................
b. Determine velocity and volumetric flow-rate of the
stack gas.
.................................................
c. Determine oxygen and carbon dioxide concentrations
of the stack gas.
.................................................
d. Measure the moisture content of the stack gas.
.................................................
srobinson on DSK5SPTVN1PROD with RULES4
.................................................
e. Measure the Hg emission
concentration.
.................................................
f. Convert emissions concentrations from the LEE
test to lb/TBtu or lb/GWh
emissions rates.
g. Convert average lb/TBtu or
lb/GWh Hg emission rate to
lb/year, if you are attempting to meet the 29.0 lb/year
threshold.
.................................................
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
PO 00000
Frm 00030
Fmt 4701
Sfmt 4700
Using . . .2 (cont’d)
Method 4 at appendix A–3 to part 60 of this
chapter.
Method 30B at appendix A–8 to part 60 of
this chapter, ASTM D6784,3 or Method 29
at appendix A–8 to part 60 of this chapter;
for Method 29, you must report the front
half and back half results separately.
Method 19 F-factor methodology at appendix
A–7 to part 60 of this chapter, or calculate
using mass emissions rate and gross output data (see § 63.10007(e)).
Sections 3.2.1 and 5.1 of appendix A of this
subpart.
Part 75 of this chapter and § 63.10010(a), (b),
(c), and (d).
Section 6 of appendix A to this subpart.
Sections 3.2.2 and 5.2 of appendix A to this
subpart.
Part 75 of this chapter and § 63.10010(a), (b),
(c), and (d).
Section 6 of appendix A to this subpart.
Single point located at the 10% centroidal
area of the duct at a port location per
Method 1 at appendix A–1 to part 60 of this
chapter or Method 30B at Appendix A–8 for
Method 30B point selection.
Method 2, 2A, 2C, 2F, 2G, or 2H at appendix
A–1 or A–2 to part 60 of this chapter or
flow monitoring system certified per appendix A of this subpart.
Method 3A or 3B at appendix A–1 to part 60
of this chapter, or ANSI/ASME PTC 19.10–
1981,3 or diluent gas monitoring systems
certified according to part 75 of this chapter.
Method 4 at appendix A–3 to part 60 of this
chapter, or moisture monitoring systems
certified according to part 75 of this chapter.
Method 30B at appendix A–8 to part 60 of
this chapter; perform a 30 operating day
test, with a maximum of 10 operating days
per run (i.e., per pair of sorbent traps) or
sorbent trap monitoring system or Hg
CEMS certified per appendix A of this subpart.
Method 19 F-factor methodology at appendix
A–7 to part 60 of this chapter, or calculate
using mass emissions rate and gross output data (see § 63.10007(e)).
Potential maximum annual heat input in TBtu
or potential maximum electricity generated
in GWh.
E:\FR\FM\06APR4.SGM
06APR4
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
You must perform the following activities, as applicable
to your input- or output-based
emission limit . . . (cont’d)
To conduct a performance test
for the following pollutant . . .
(cont’d)
Using . . . (cont’d)
5. Sulfur dioxide (SO2) ............
SO2 CEMS ..............................
.................................................
.................................................
a. Install, certify, operate, and
maintain the CEMS.
b. Install, operate, and maintain the diluent gas, flow
rate, and/or moisture monitoring systems.
c. Convert hourly emissions
concentrations to 30 boiler
operating day rolling average lb/MMBtu or lb/MWh
emissions rates.
20201
Using . . .2 (cont’d)
Part 75 of this chapter and § 63.10010(a) and
(f).
Part 75 of this chapter and § 63.10010(a), (b),
(c), and (d).
Method 19 F-factor methodology at appendix
A–7 to part 60 of this chapter, or calculate
using mass emissions rate and gross output data (see § 63.10007(e)).
1 Regarding
emissions data collected during periods of startup or shutdown, see §§ 63.10020(b) and (c) and 63.10021(h).
Tables 1 and 2 to this subpart for required sample volumes and/or sampling run times.
3 Incorporated by reference, see § 63.14.
2 See
26. Revise Table 6 to subpart UUUUU
of part 63 to read as follows:
■
TABLE 6 TO SUBPART UUUUU OF PART 63—ESTABLISHING PM CPMS OPERATING LIMITS
[As stated in § 63.10007, you must comply with the following requirements for establishing operating limits:]
If you have an applicable emission limit
for . . .
And you choose to establish PM
CPMS operating limits, you must
. . .
Filterable Particulate
matter (PM), total
non-mercury HAP
metals, individual
non-mercury HAP
metals, total HAP
metals, or individual
HAP metals for an
EGU.
Install, certify, maintain, and operate a PM CPMS for monitoring
emissions discharged to the atmosphere
according
to
§ 63.10010(h)(1).
And . . .
Using . . .
According to the following procedures . . .
Establish a site-specific operating limit
in units of PM
CPMS output signal
(e.g., milliamps, mg/
acm, or other raw
signal).
Data from the PM
CPMS and the PM
or HAP metals performance tests.
1. Collect PM CPMS output data
during the entire period of the
performance tests.
2. Record the average hourly PM
CPMS output for each test run
in the performance test.
3. Determine the PM CPMS operating limit in accordance with
the
requirements
of
§ 63.10023(b)(2) from data obtained during the performance
test demonstrating compliance
with the filterable PM or HAP
metals emissions limitations.
27. Revise Table 8 to subpart UUUUU
of part 63 to read as follows:
■
TABLE 8 TO SUBPART UUUUU OF PART 63—REPORTING REQUIREMENTS
[As stated in § 63.10031, you must comply with the following requirements:]
The report must contain . . .
You must submit the report . . .
1. Compliance
report.
srobinson on DSK5SPTVN1PROD with RULES4
You must submit
a
a. Information required in § 63.10031(c)(1) through (9); and ....................................
Semiannually according to the requirements in § 63.10031(b).
b. If there are no deviations from any emission limitation (emission limit and operating limit) that applies to you and there are no deviations from the requirements for work practice standards in Table 3 to this subpart that apply to you, a
statement that there were no deviations from the emission limitations and work
practice standards during the reporting period. If there were no periods during
which the CMSs, including continuous emissions monitoring system, and operating parameter monitoring systems, were out-of-control as specified in
§ 63.8(c)(7), a statement that there were no periods during which the CMSs
were out-of-control during the reporting period; and.
c. If you have a deviation from any emission limitation (emission limit and operating limit) or work practice standard during the reporting period, the report
must contain the information in § 63.10031(d). If there were periods during
which the CMSs, including continuous emissions monitoring systems and continuous parameter monitoring systems, were out-of-control, as specified in
§ 63.8(c)(7), the report must contain the information in § 63.10031(e)..
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
PO 00000
Frm 00031
Fmt 4701
Sfmt 4700
E:\FR\FM\06APR4.SGM
06APR4
20202
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
28. Revise Table 9 to subpart UUUUU
of part 63 to read as follows:
■
TABLE 9 TO SUBPART UUUUU OF PART 63—APPLICABILITY OF GENERAL PROVISIONS TO SUBPART UUUUU
[As stated in § 63.10040, you must comply with the applicable General Provisions according to the following:]
Citation
§ 63.1
§ 63.2
§ 63.3
§ 63.4
§ 63.5
Subject
..................................................................
..................................................................
..................................................................
..................................................................
..................................................................
§ 63.6(a), (b)(1) through (5), (b)(7), (c), (f)(2)
and (3), (h)(2) through (9), (i), (j).
§ 63.6(e)(1)(i) ......................................................
§ 63.6(e)(1)(ii) .....................................................
§ 63.6(e)(3) .........................................................
§ 63.6(f)(1) ..........................................................
§ 63.6(h)(1) .........................................................
§ 63.6(g) ..............................................................
Applies to subpart UUUUU
Applicability ......................................................
Definitions ........................................................
Units and Abbreviations ...................................
Prohibited Activities and Circumvention ..........
Preconstruction Review and Notification Requirements.
Compliance with Standards and Maintenance
Requirements.
General Duty to minimize emissions ...............
§ 63.8(c)(1)(iii) .....................................................
§ 63.8(d)(3) .........................................................
Requirement to correct malfunctions ASAP ....
SSM Plan requirements ...................................
SSM exemption ................................................
SSM exemption ................................................
Compliance with Standards and Maintenance
Requirements, Use of an alternative nonopacity emission standard.
Performance testing .........................................
Monitoring Requirements .................................
General duty to minimize emissions and CMS
operation.
Requirement to develop SSM Plan for CMS ...
Written procedures for CMS ............................
§ 63.9 ..................................................................
Notification Requirements ................................
§ 63.10(a), (b)(1), (c), (d)(1) and (2), (e), and (f)
Recordkeeping and Reporting Requirements
§ 63.10(b)(2)(i) ....................................................
Recordkeeping of occurrence and duration of
startups and shutdowns.
Recordkeeping of malfunctions .......................
§ 63.7(e)(1) .........................................................
§ 63.8 ..................................................................
§ 63.8(c)(1)(i) ......................................................
§ 63.10(b)(2)(ii) ...................................................
§ 63.10(b)(2)(iii) ..................................................
§ 63.10(b)(2)(iv) ..................................................
§ 63.10(c)(10) .....................................................
Maintenance records .......................................
Actions taken to minimize emissions during
SSM.
Actions taken to minimize emissions during
SSM.
Recordkeeping for CMS malfunctions .............
Other CMS requirements .................................
..........................................................................
Additional recordkeeping requirements for
CMS—identifying exceedances and excess
emissions.
Additional recordkeeping requirements for
CMS—identifying exceedances and excess
emissions.
Recording nature and cause of malfunctions ..
§ 63.10(c)(11) .....................................................
Recording corrective actions ...........................
§ 63.10(c)(15) .....................................................
§ 63.10(d)(5) .......................................................
Use of SSM Plan .............................................
SSM reports .....................................................
§ 63.11 ................................................................
§ 63.12 ................................................................
§§ 63.13 through 63.16 ......................................
Control Device Requirements ..........................
State Authority and Delegation ........................
Addresses, Incorporation by Reference, Availability of Information, Performance Track
Provisions.
§ 63.10(b)(2)(v) ...................................................
§ 63.10(b)(2)(vi) ..................................................
§ 63.10(b)(2)(vii) through (ix) ..............................
§ 63.10(b)(3) and (d)(3) through (5) ...................
§ 63.10(c)(7) .......................................................
srobinson on DSK5SPTVN1PROD with RULES4
§ 63.10(c)(8) .......................................................
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
PO 00000
Frm 00032
Fmt 4701
Sfmt 4700
Yes.
Yes. Additional terms defined in § 63.10042.
Yes.
Yes.
Yes.
Yes.
No. See § 63.10000(b) for general duty requirement.
No.
No.
No.
No.
Yes.
See
§§ 63.10011(g)(4)
and
63.10021(h)(4) for additional requirements.
No. See § 63.10007.
Yes.
No. See § 63.10000(b) for general duty requirement.
No.
Yes, except for last sentence, which refers to
an SSM plan. SSM plans are not required.
Yes, except (1) for the 60-day notification
prior to conducting a performance test in
§ 63.9(e); instead use a 30-day notification
period per § 63.10030(d), (2) the notification
of the CMS performance evaluation in
§ 63.9(g)(1) is limited to RATAs, and (3) the
information required per § 63.9(h)(2)(i); instead provide the information required per
§ 63.10030(e)(1) through (e)(6) and (e)(8).
Yes, except for the requirements to submit
written reports under § 63.10(e)(3)(v).
No.
No. See § 63.10001 for recordkeeping of (1)
occurrence and duration and (2) actions
taken during malfunction.
Yes.
No.
No.
Yes.
Yes.
No.
Yes.
Yes.
No. See § 63.10032(g) and (h) for malfunctions recordkeeping requirements.
No. See § 63.10032(g) and (h) for malfunctions recordkeeping requirements.
No.
No. See § 63.10021(h) and (i) for malfunction
reporting requirements.
No.
Yes.
Yes.
E:\FR\FM\06APR4.SGM
06APR4
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
20203
TABLE 9 TO SUBPART UUUUU OF PART 63—APPLICABILITY OF GENERAL PROVISIONS TO SUBPART UUUUU—Continued
[As stated in § 63.10040, you must comply with the applicable General Provisions according to the following:]
Citation
Subject
§§ 63.1(a)(5),(a)(7) through (9), (b)(2), (c)(3)
and (4), (d), 63.6(b)(6), (c)(3) and (4), (d),
(e)(2), (e)(3)(ii), (h)(3), (h)(5)(iv), 63.8(a)(3),
63.9(b)(3), (h)(4), 63.10(c)(2) through (4),
(c)(9)..
Reserved ..........................................................
29. Appendix A to subpart UUUUU of
part 63 is amended by revising
paragraphs 3.2.1.2.1, 4.1.1.1, and
4.1.1.3, table A–1, paragraphs 4.1.1.5,
4.1.1.5.2, 5.1.2.1, and 5.1.2.3, table A–2,
and paragraphs 5.2.1, 6.2.2.3, and
7.1.8.5 and adding paragraph 7.1.2.6 to
read as follows:
■
Appendix A to Subpart UUUUU of Part
63—Hg Monitoring Provisions
*
*
*
*
*
3. Mercury Emissions Measurement
Methods
*
*
*
*
*
3.2.1.2.1 NIST Traceability. Only
NIST-certified or NIST-traceable
calibration gas standards and reagents
(as defined in paragraphs 3.1.4 and 3.1.5
of this appendix), and including, but not
limited to, Hg gas generators and Hg gas
cylinders, shall be used for the tests and
procedures required under this subpart.
Calibration gases with known
concentrations of Hg0 and HgCl2 are
required. Special reagents and
equipment may be needed to prepare
the Hg0 and HgCl2 gas standards (e.g.,
NIST-traceable solutions of HgCl2 and
gas generators equipped with mass flow
controllers).
*
*
*
*
*
4. Certification and Recertification
Requirements
*
*
*
*
*
4.1.1.1 7-Day Calibration Error Test.
Perform the 7-day calibration error test
on 7 consecutive source operating days,
Applies to subpart UUUUU
using a zero-level gas and either a highlevel or a mid-level calibration gas
standard (as defined in paragraphs 3.1.8,
3.1.10, and 3.1.11 of this appendix). Use
a NIST-traceable elemental Hg gas
standard (as defined in paragraphs 3.1.4
of this appendix) for the test. If your Hg
CEMS lacks an integrated elemental Hg
gas generator, you may continue to use
NIST-traceable oxidized Hg gases for the
7-day calibration error test (or the daily
calibration error check) until such time
as NIST-traceable compressed elemental
Hg gas standards, at appropriate
concentration levels, are available from
gas vendors. If moisture is added to the
calibration gas, the dilution effect of the
moisture and/or chlorine addition on
the calibration gas concentration must
be accounted for in an appropriate
manner. Operate the Hg CEMS in its
normal sampling mode during the test.
The calibrations should be
approximately 24 hours apart, unless
the 7-day test is performed over nonconsecutive calendar days. On each day
of the test, inject the zero-level and
upscale gases in sequence and record
the analyzer responses. Pass the
calibration gas through all filters,
scrubbers, conditioners, and other
monitor components used during
normal sampling, and through as much
of the sampling probe as is practical. Do
not make any manual adjustments to the
monitor (i.e., resetting the calibration)
until after taking measurements at both
the zero and upscale concentration
levels. If automatic adjustments are
made following both injections, conduct
No.
the calibration error test such that the
magnitude of the adjustments can be
determined, and use only the
unadjusted analyzer responses in the
calculations. Calculate the calibration
error (CE) on each day of the test, as
described in Table A–1 of this
appendix. The CE on each day of the
test must either meet the main
performance specification or the
alternative specification in Table A–1 of
this appendix.
*
*
*
*
*
4.1.1.3 Three-Level System Integrity
Check. Perform the 3-level system
integrity check using low, mid, and
high-level calibration gas concentrations
generated by a NIST-traceable source of
oxidized Hg. If your Hg CEMS lacks an
integrated elemental Hg gas generator,
you may continue to use NIST-traceable
oxidized Hg gases for the 7-day
calibration error test (or the daily
calibration error check) until such time
as NIST-traceable compressed elemental
Hg gas standards, at appropriate
concentration levels, are available from
gas vendors. Follow the same basic
procedure as for the linearity check. If
moisture and/or chlorine is added to the
calibration gas, the dilution effect of the
moisture and/or chlorine addition on
the calibration gas concentration must
be accounted for in an appropriate
manner. Calculate the system integrity
error (SIE), as described in Table A–1 of
this appendix. The SIE must either meet
the main performance specification or
the alternative specification in Table A–
1 of this appendix.
TABLE A–1—REQUIRED CERTIFICATION TESTS AND PERFORMANCE SPECIFICATIONS FOR Hg CEMS
The main performance specification 1 is . . .
The alternate performance
specification 1 is . . .
And the conditions of the alternate specification are . . .
7-day calibration error test 2 6 ...
srobinson on DSK5SPTVN1PROD with RULES4
For this required certification
test . . .
|R ¥ A| ≤ 5.0% of span value,
for both the zero and
upscale gases, on each of
the 7 days..
|R ¥ Aavg | ≤ 10.0% of the reference gas concentration at
each calibration gas level
(low, mid, or high)..
|R ¥ Aavg | ≤ 10.0% of the reference gas concentration at
each calibration gas level..
|R ¥ A| ≤ 1.0 μg/scm .............
The alternate specification may be used on
any day of the test.
|R ¥ Aavg | ≤ 0.8 μg/scm ........
The alternate specification may be used at
any gas level.
|R ¥ Aavg | ≤ 0.8 μg/scm ........
The alternate specification may be used at
any gas level.
Linearity check 3 6 .....................
3-level system integrity check 4
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
PO 00000
Frm 00033
Fmt 4701
Sfmt 4700
E:\FR\FM\06APR4.SGM
06APR4
20204
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
TABLE A–1—REQUIRED CERTIFICATION TESTS AND PERFORMANCE SPECIFICATIONS FOR Hg CEMS—Continued
For this required certification
test . . .
The main performance specification 1 is . . .
The alternate performance
specification 1 is . . .
And the conditions of the alternate specification are . . .
RATA ........................................
20.0% RA ...............................
|RMavg ¥ Cavg| + |CC| ≤ 0.5
μg/scm 7.
RMavg < 2.5μg/scm
Cycle time test 5 .......................
15 minutes where the stability
criteria are readings change
by < 2.0% of span or by ≤
0.5 μg/scm, for 2 minutes..
1 Note that |R ¥ A| is the absolute value of the difference between the reference gas value and the analyzer reading. |R ¥ A
avg| is the absolute value of the difference between the reference gas concentration and the average of the analyzer responses, at a particular gas level.
2 Use elemental Hg standards; a mid-level or high-level upscale gas may be used.
3 Use elemental Hg standards.
4 Use oxidized Hg standards.
5 Use elemental Hg standards; a high-level upscale gas must be used. The cycle time test is not required for Hg CEMS that use integrated
batch sampling; however, those monitoring systems must be capable of recording at least one Hg concentration reading every 15 minutes.
6 If your Hg CEMS lacks an integrated elemental Hg gas generator, you may continue to use NIST-traceable oxidized Hg gases until such time
as NIST-traceable compressed elemental Hg gas standards, at appropriate concentration levels, are available from gas vendors.
7 Note that |RM
avg ¥ Cavg| is the absolute difference between the mean reference method value and the mean CEMS value from the RATA;
CC is the confidence coefficient from Equation 2–5 of Performance Specification 2 in appendix B to part 60 of this chapter.
*
*
*
*
4.1.1.5 Relative Accuracy Test Audit
(RATA). Perform the RATA of the Hg
CEMS at normal load. Acceptable Hg
reference methods for the RATA include
ASTM D6784–02 (Reapproved 2008),
‘‘Standard Test Method for Elemental,
Oxidized, Particle-Bound and Total
Mercury in Flue Gas Generated from
Coal-Fired Stationary Sources (Ontario
Hydro Method)’’ (incorporated by
reference, see § 63.14) and Methods 29,
30A, and 30B in appendix A–8 to part
60 of this chapter. When Method 29 or
ASTM D6784–02 is used, paired
sampling trains are required and the
filterable portion of the sample need not
be included when making comparisons
to the Hg CEMS results for purposes of
a RATA. To validate a Method 29 or
ASTM D6784–02 test run, calculate the
relative deviation (RD) using Equation
A–1 of this section, and assess the
results as follows to validate the run.
The RD must not exceed 10 percent,
when the average Hg concentration is
greater than 1.0 mg/dscm. If the RD
specification is met, the results of the
two samples shall be averaged
arithmetically.
Where:
RD = Relative Deviation between the Hg
concentrations of samples ‘‘a’’ and ‘‘b’’
(percent),
Ca = Hg concentration of Hg sample ‘‘a’’ (m g/
dscm), and
Cb = Hg concentration of Hg sample ‘‘b’’ (m g/
dscm).
the average RM value when the average
emissions for the test are less than 50
percent of the applicable emissions
limit. For purposes of calculating the
relative accuracy, ensure that the
reference method and monitoring
system data are on a consistent basis,
either wet or dry. The CEMS must either
meet the main performance
specification or the alternative
specification in Table A–1 of this
appendix.
*
*
*
*
*
traceable elemental Hg gas standard for
these calibrations. If your Hg CEMS
lacks an integrated elemental Hg gas
generator, you may continue to use
NIST-traceable oxidized Hg gases for the
7-day calibration error test (or the daily
calibration error check) until such time
as NIST-traceable compressed elemental
Hg gas standards, at appropriate
concentration levels, are available from
gas vendors. Both a zero-level gas and
either a mid-level or high-level gas are
required for these calibrations.
*
*
*
*
*
5.1.2.3 Perform a single-level system
integrity check weekly, i.e., once every
7 operating days (see the third column
in Table A–2 of this appendix).
*
*
*
*
*
*
*
*
*
4.1.1.5.2 Calculation of RATA
Results. Calculate the relative accuracy
(RA) of the monitoring system, on a
m g/scm basis, as described in section 12
of Performance Specification (PS) 2 in
appendix B to part 60 of this chapter
(see Equations 2–3 through 2–6 of PS2)
including the option to substitute the
emission limit value (in this case the
equivalent concentration) in the
denominator of Equation 2–6 in place of
srobinson on DSK5SPTVN1PROD with RULES4
*
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
5. Ongoing Quality Assurance (QA) and
Data Validation
*
*
*
*
*
5.1.2.1 Calibration error tests of the
Hg CEMS are required daily, except
during unit outages. Use a NIST-
PO 00000
Frm 00034
Fmt 4701
Sfmt 4700
E:\FR\FM\06APR4.SGM
06APR4
ER06AP16.008
*
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
20205
TABLE A–2—ON-GOING QA TEST REQUIREMENTS FOR Hg CEMS
Perform this type of QA test
. . .
At this frequency . . .
With these qualifications and
exceptions . . .
Acceptance criteria . . .
Calibration error test 5 ..............
Daily ........................................
|R ¥ A| ≤ 5.0% of span value
or
|R ¥ A| ≤ 1.0 μg/scm.
Single-level system integrity
check.
Weekly 1 ..................................
• Use either a mid- or highlevel gas.
• Use elemental Hg ...............
• Calibrations are not required when the unit is not
in operation..
• Use oxidized Hg—either
mid- or high-level.
Linearity check or 3-level system integrity check.
Quarterly 3 ...............................
RATA ........................................
Annual 4 ..................................
• Required in each ‘‘QA operating quarter’’ 2 and no less
than once every 4 calendar
quarters.
• 168 operating hour grace
period available.
• Use elemental Hg for linearity check.
• Use oxidized Hg for system
integrity check.
• Test deadline may be extended for ‘‘non-QA operating quarters,’’ up to a
maximum of 8 quarters
from the quarter of the previous test..
• 720 operating hour grace
period available.
|R ¥ Aavg| ≤ 10.0% of the reference gas
value
or
|R ¥ Aavg| ≤ 0.8 μg/scm.
|R ¥ Aavg | ≤ 10.0% of the reference gas
value, at each calibration gas level
or
|R ¥ Aavg| ≤ 0.8 μg/scm.
≤20.0% RA when Cavg ≥ 2.5 μg/scm
or
|RMavg ¥ Cavg| + |CC| ≤ 0.5 μgμ/scm, if
RMavg < 2.5 μg/scm.
1 ‘‘Weekly’’
means once every 7 operating days.
‘‘QA operating quarter’’ is a calendar quarter with at least 168 unit or stack operating hours.
means once every QA operating quarter.
4 ‘‘Annual’’ means once every four QA operating quarters.
5 If your Hg CEMS lacks an integrated elemental Hg gas generator, you may continue to use NIST-traceable oxidized Hg gases until such time
as NIST-traceable compressed elemental Hg gas standards, at appropriate concentration levels, are available from gas vendors.
2A
3 ‘‘Quarterly’’
*
*
*
*
5.2.1 Each sorbent trap monitoring
system shall be continuously operated
and maintained in accordance with
Performance Specification (PS) 12B in
appendix B to part 60 of this chapter.
The QA/QC criteria for routine
operation of the system are summarized
in Table 12B–1 of PS 12B. Each pair of
sorbent traps may be used to sample the
stack gas for up to 15 operating days.
*
*
*
*
*
6. Data Reductions and Calculations
srobinson on DSK5SPTVN1PROD with RULES4
*
*
*
*
*
6.2.2.3 The applicable gross outputbased Hg emission rate limit in Table 1
or 2 to this subpart must be met on a
30- (or 90-) boiler operating day rolling
average basis, except as otherwise
provided in § 63.10009(a)(2). Use
Equation A–5 of this appendix to
calculate the Hg emission rate for each
averaging period.
Where:
Eo = Hg emission rate for the averaging
period (lb/GWh),
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
Eho = Gross output-based hourly Hg emission
rate for unit or stack sampling hour ‘‘h’’
in the averaging period, from Equation
A–4 of this appendix (lb/GWh), and
n = Number of unit or stack operating hours
in the averaging period in which valid
data were obtained for all parameters.
(Note: Do not include non-operating
hours with zero emission rates in the
average).
*
*
*
*
*
f. Adding paragraphs 5.4, 5.4.1, 5.4.2,
5.4.2.1, 5.4.2.2, 5.4.2.2.1, 5.4.2.2.2,
5.4.2.3, 5.4.2.3.1, 5.4.2.3.2, 5.4.2.3.3, and
5.4.3; and
■ g. Revising section 8 introductory text
and paragraph 9.3.2.
The revisions and additions read as
follows:
■
Appendix B to Subpart UUUUU of Part
63—HCl and HF Monitoring Provisions
7. Recordkeeping and Reporting
*
*
2. Monitoring of HCl and/or HF
Emissions
*
*
*
*
7.1.2.6 The EGUs that constitute an
emissions averaging group.
*
*
*
*
*
7.1.8.5 If applicable, a code to
indicate that the default gross output (as
defined in § 63.10042) was used to
calculate the Hg emission rate.
*
*
*
*
*
■ 30. Appendix B to subpart UUUUU of
part 63 is amended by:
■ a. Revising paragraphs 2.1 and 2.3;
■ b. Adding paragraphs 2.3.1 and 2.3.2;
■ c. Revising paragraphs 3.1 and 3.2 and
adding paragraph 3.3;
■ d. Adding introductory text to section
5;
■ e. Revising paragraphs 5.1, 5.1.2, 5.2,
and 5.3;
PO 00000
Frm 00035
Fmt 4701
Sfmt 4700
*
*
*
*
2.1 Monitoring System Installation
Requirements. Install HCl and/or HF
CEMS and any additional monitoring
systems needed to convert pollutant
concentrations to units of the applicable
emissions limit in accordance with
§ 63.10010(a) and either Performance
Specification 15 (PS 15) of appendix B
to part 60 of this chapter for extractive
Fourier Transform Infrared
Spectroscopy (FTIR) continuous
emissions monitoring systems or
Performance Specification 18 (PS 18) of
appendix B to part 60 of this chapter for
HCl CEMS.
*
*
*
*
*
E:\FR\FM\06APR4.SGM
06APR4
ER06AP16.009
*
20206
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
2.3 FTIR Monitoring System
Equipment, Supplies, Definitions, and
General Operation. The following
provisions apply:
2.3.1 PS 15, Sections 2.0, 3.0, 4.0,
5.0, 6.0, and 10.0 of appendix B to part
60 of this chapter; or
2.3.2 PS 18, Sections 3.0, 6.0, and
11.0 of appendix B to part 60 of this
chapter.
3. Initial Certification Procedures
*
*
*
*
*
3.1 If you choose to follow PS 15 of
appendix B to part 60 of this chapter,
then your HCl and/or HF CEMS must be
certified according to PS 15 using the
procedures for gas auditing and
comparison to a reference method (RM)
as specified in sections 3.1.1 and 3.1.2
below.
*
*
*
*
*
3.2 If you choose to follow PS 18 of
appendix B to part 60 of this chapter,
then your HCl CEMS must be certified
according to PS 18, sections 7.0, 8.0,
11.0, 12.0, and 13.0.
3.3 Any additional stack gas flow
rate, diluent gas, and moisture
monitoring system(s) needed to express
pollutant concentrations in units of the
applicable emissions limit must be
certified according to part 75 of this
chapter.
*
*
*
*
*
srobinson on DSK5SPTVN1PROD with RULES4
5. On-Going Quality Assurance
Requirements
On-going QA test requirements for
HCl and HF CEMS must be
implemented as follows:
5.1 If you choose to follow
Performance Specification 15 (PS 15) of
appendix B to part 60 of this chapter,
then the quality assurance/quality
control procedures of PS 15 shall apply
as set forth in sections 5.1.1 through
5.1.3 and 5.4.2 of this appendix.
*
*
*
*
*
5.1.2 On a quarterly basis, you must
conduct a gas audit of the HCl and/or
HF CEMS as described in section 3.1.1
of this appendix. For the purposes of
this appendix, ‘‘quarterly’’ means once
every ‘‘QA operating quarter’’ (as
defined in section 3.1.20 of appendix A
to this subpart). You have the option to
use HCl gas in lieu of HF gas for
conducting this audit on an HF CEMS.
To the extent practicable, perform
consecutive quarterly gas audits at least
30 days apart. The initial quarterly audit
is due in the first QA operating quarter
following the calendar quarter in which
certification testing of the CEMS is
successfully completed. Up to three
consecutive exemptions from the
quarterly audit requirement are allowed
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
for ‘‘non-QA operating quarters’’ (i.e.,
calendar quarters in which there are less
than 168 unit or stack operating hours).
However, no more than four consecutive
calendar quarters may elapse without
performing a gas audit, except as
otherwise provided in section 5.4.2.2.1
of this appendix.
*
*
*
*
*
5.2 If you choose to follow
Performance Specification PS 18 of
appendix B to part 60 of this chapter,
then the quality assurance/quality
control procedures in Procedure 6 of
appendix F to part 60 of this chapter
shall apply. The quarterly and annual
QA tests required under Procedure 6
shall be performed, respectively, at the
frequencies specified in sections 5.1.2
and 5.1.3 of this appendix.
5.3 Stack gas flow rate, diluent gas,
and moisture monitoring systems must
meet the applicable on-going QA test
requirements of part 75 of this chapter.
*
*
*
*
*
5.4 Data Validation.
5.4.1 Out-of-Control Periods. An HCl
or HF CEMS that is used to provide data
under this appendix is considered to be
out-of-control, and data from the CEMS
may not be reported as quality-assured,
when any acceptance criteria for a
required QA test is not met. The HCl or
HF CEMS is also considered to be outof-control when a required QA test is
not performed on schedule or within an
allotted grace period. To end an out-ofcontrol period, the QA test that was
either failed or not done on time must
be performed and passed. Out-of-control
periods are counted as hours of
monitoring system downtime.
5.4.2 Grace Periods. For the
purposes of this appendix, a ‘‘grace
period’’ is defined as a specified number
of unit or stack operating hours after the
deadline for a required qualityassurance test of a continuous monitor
has passed, in which the test may be
performed and passed without loss of
data.
5.4.2.1 For the monitoring systems
described in section 5.3 of this
appendix, a 168 unit or stack operating
hour grace period is available for
quarterly linearity checks, and a 720
unit or stack operating hour grace
period is available for RATAs, as
provided, respectively, in sections 2.2.4
and 2.3.3 of appendix B to part 75 of
this chapter.
5.4.2.2 For the purposes of this
appendix, if the deadline for a required
gas audit/data accuracy assessment or
RATA of an HCl CEMS cannot be met
due to circumstances beyond the control
of the owner or operator:
5.4.2.2.1 A 168 unit or stack
operating hour grace period is available
PO 00000
Frm 00036
Fmt 4701
Sfmt 4700
in which to perform the gas audit or
other quarterly data accuracy
assessment; or
5.4.2.2.2 A 720 unit or stack
operating hour grace period is available
in which to perform the RATA.
5.4.2.3 If a required QA test is
performed during a grace period, the
deadline for the next test shall be
determined as follows:
5.4.2.3.1 For a gas audit or RATA of
the monitoring systems described in
sections 5.1 and 5.2 of this appendix,
determine the deadline for the next gas
audit or RATA (as applicable) in
accordance with section 2.2.4(b) or
2.3.3(d) of appendix B to part 75 of this
chapter; treat a gas audit in the same
manner as a linearity check.
5.4.2.3.2 For the gas audit or other
quarterly data accuracy assessment of an
HCl or HF CEMS, the grace period test
only satisfies the audit requirement for
the calendar quarter in which the test
was originally due. If the calendar
quarter in which the grace period audit
is performed is a QA operating quarter,
an additional gas audit/data accuracy
assessment is required for that quarter.
5.4.2.3.3 For the RATA of an HCl or
HF CEMS, the next RATA is due within
three QA operating quarters after the
calendar quarter in which the grace
period test is performed.
5.4.3 Conditional Data Validation.
For recertification and diagnostic testing
of the monitoring systems that are used
to provide data under this appendix, the
conditional data validation provisions
in § 75.20(b)(3)(ii) through (ix) of this
chapter may be used to avoid or
minimize data loss. The allotted
window of time to complete calibration
tests and RATAs shall be as specified in
§ 75.20(b)(3)(iv) of this chapter; the
allotted window of time to complete a
quarterly gas audit or data accuracy
assessment shall be the same as for a
linearity check (i.e., 168 unit or stack
operating hours).
*
*
*
*
*
8. QA/QC Program Requirements
The owner or operator shall develop
and implement a quality assurance/
quality control (QA/QC) program for the
HCl and/or HF CEMS that are used to
provide data under this subpart. At a
minimum, the program shall include a
written plan that describes in detail (or
that refers to separate documents
containing) complete, step-by-step
procedures and operations for the most
important QA/QC activities. Electronic
storage of the QA/QC plan is
permissible, provided that the
information can be made available in
hard copy to auditors and inspectors.
The QA/QC program requirements for
E:\FR\FM\06APR4.SGM
06APR4
Federal Register / Vol. 81, No. 66 / Wednesday, April 6, 2016 / Rules and Regulations
the other monitoring systems described
in section 5.3 of this appendix are
specified in section 1 of appendix B to
part 75 of this chapter.
*
*
*
*
*
9. Data Reduction and Calculations
*
*
*
*
9.3.2 For gross output-based
emission rates, first calculate the HCl or
srobinson on DSK5SPTVN1PROD with RULES4
*
VerDate Sep<11>2014
20:09 Apr 05, 2016
Jkt 238001
HF mass emission rate (lb/h), using an
equation that has the general form of
Equation A–2 or A–3 in appendix A to
this subpart (as applicable), replacing
the value of K with 9.43 × 10¥8 lb/scfppm (for HCl) or 5.18 × 10¥8 (for HF)
and defining Ch as the hourly average
HCl or HF concentration in ppm. Then,
divide the result by the hourly gross
output (megawatts) to convert it to units
PO 00000
Frm 00037
Fmt 4701
Sfmt 9990
20207
of lb/MWh. If the gross output is zero
during a startup or shutdown hour, use
the default gross output (as defined in
§ 63.10042) to calculate the HCl or HF
emission rate. The default gross output
is not considered to be a substitute data
value.
*
*
*
*
*
[FR Doc. 2016–06563 Filed 4–5–16; 8:45 am]
BILLING CODE 6560–50–P
E:\FR\FM\06APR4.SGM
06APR4
Agencies
[Federal Register Volume 81, Number 66 (Wednesday, April 6, 2016)]
[Rules and Regulations]
[Pages 20171-20207]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-06563]
[[Page 20171]]
Vol. 81
Wednesday,
No. 66
April 6, 2016
Part IV
Environmental Protection Agency
-----------------------------------------------------------------------
40 CFR Parts 60 and 63
National Emission Standards for Hazardous Air Pollutants From Coal- and
Oil-Fired Electric Utility Steam Generating Units and Standards of
Performance for Fossil-Fuel-Fired Electric Utility, Industrial-
Commercial-Institutional, and Small Industrial-Commercial-Institutional
Steam Generating Units; Technical Correction; Final Rule
Federal Register / Vol. 81 , No. 66 / Wednesday, April 6, 2016 /
Rules and Regulations
[[Page 20172]]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Parts 60 and 63
[EPA-HQ-OAR-2009-0234 and EPA-HQ-OAR-2011-0044; FRL-9942-28-OAR]
RIN 2060-AS41
National Emission Standards for Hazardous Air Pollutants From
Coal- and Oil-Fired Electric Utility Steam Generating Units and
Standards of Performance for Fossil-Fuel-Fired Electric Utility,
Industrial-Commercial-Institutional, and Small Industrial-Commercial-
Institutional Steam Generating Units; Technical Correction
AGENCY: Environmental Protection Agency (EPA).
ACTION: Final rule; technical corrections.
-----------------------------------------------------------------------
SUMMARY: This action finalizes the technical corrections that the
Environmental Protection Agency (EPA) proposed on February 17, 2015, to
correct and clarify certain text of the EPA's regulations regarding
``National Emission Standards for Hazardous Air Pollutants from Coal-
and Oil-fired Electric Utility Steam Generating Units and Standards of
Performance for Fossil-Fuel-Fired Electric Utility, Industrial-
Commercial-Institutional, and Small Industrial-Commercial-Institutional
Steam Generating Units''. We are also taking final action to remove the
rule provision establishing an affirmative defense for malfunction.
DATES: The effective date of this rule is April 6, 2016.
ADDRESSES: Docket. The EPA has established two dockets for this action:
Docket ID No. EPA-HQ-OAR-2011-0044 (new source performance standards
(NSPS) action) and Docket ID No. EPA-HQ-OAR-2009-0234 (Mercury and Air
Toxics Standards (MATS) action). All documents in the dockets are
listed in the https://www.regulations.gov index. Although listed in the
index, some information is not publicly available (e.g., confidential
business information or other information whose disclosure is
restricted by statute). Certain other material, such as copyrighted
material, will be publicly available only in hard copy form. Publicly
available docket materials are available either electronically in
https://www.regulations.gov or in hard copy at the EPA Docket Center,
Room 3334, EPA WJC West Building, 1301 Constitution Avenue NW.,
Washington, DC 20004. The Public Reading Room is open from 8:30 a.m. to
4:30 p.m., Monday through Friday, excluding legal holidays. The
telephone number for the Public Reading Room is (202) 566-1744, and the
telephone number for the Air Docket is (202) 566-1742.
FOR FURTHER INFORMATION CONTACT: For questions about the MATS action:
Mr. Jim Eddinger, Energy Strategies Group, Sector Policies and Programs
Division (D243-01), Office of Air Quality Planning and Standards, U.S.
Environmental Protection Agency, Research Triangle Park, North Carolina
27711; telephone number: (919) 541-5426; fax number (919) 541-5450;
email address: eddinger.jim@epa.gov. For questions about the NSPS
action: Mr. Christian Fellner, Energy Strategies Group, Sector Policies
and Programs Division (D243-01), Office of Air Quality Planning and
Standards, U.S. Environmental Protection Agency, Research Triangle
Park, North Carolina 27711; telephone number: (919) 541-4003; fax
number (919) 541-5450; email address: fellner.christian@epa.gov.
SUPPLEMENTARY INFORMATION:
A. How can I get copies of this document and other related information?
This Federal Register document and the document titled ``Summary of
Public Comments and Responses: MATS and Utility NSPS Technical
Corrections'' (TC RTC) are available in the dockets the EPA established
under Docket ID No. EPA-HQ-OAR-2009-0234 and Docket ID No. EPA-HQ-OAR-
2011-0044. The TC RTC is available in both the MATS and Utility NSPS
dockets by conducting a search of the title ``Summary of Public
Comments and Responses: MATS and Utility NSPS Technical Corrections.''
In addition to being available in the docket, electronic copies of
these documents are available on the www.regulations.gov Web site. This
Federal Register document and the TC RTC can also be found on the EPA's
Technology Transfer Network (TTN) Web site at https://www.epa.gov/ttn/atw/utility/utilitypg.html.
B. Judicial Review
Under CAA section 307(b)(1), judicial review of this final rule is
available only by filing a petition for review in the U.S. Court of
Appeals for the District of Columbia Circuit by June 6, 2016. Under CAA
section 307(d)(7)(B), only an objection to this final rule that was
raised with reasonable specificity during the period for public comment
can be raised during judicial review. Note, under CAA section
307(b)(2), the requirements established by this final rule may not be
challenged separately in any civil or criminal proceedings brought by
the EPA to enforce these requirements.
I. Background
The final Clean Air Act (CAA) rules published in the Federal
Register on February 16, 2012 (77 FR 9303), establish national emission
standards for hazardous air pollutants (NESHAP) from coal- and oil-
fired electric utility steam generating units (EGUs), referred to as
``MATS,'' and NSPS for fossil-fuel-fired electric utility, industrial-
commercial-institutional, and small industrial-commercial-institutional
steam generating units, referred to as the ``Utility NSPS''.
In the February 17, 2015, Federal Register (80 FR 8442), the EPA
proposed to correct certain regulatory text. The proposed corrections
were categorized generally as follows: (a) Resolution of conflicts
between preamble and regulatory text, (b) corrections that were
inadvertently not made that the EPA stated it would make in response to
comments, and (c) clarification of language in regulatory text. In the
proposed rule, the EPA identified each proposed technical correction to
the regulatory text as found in the Code of Federal Regulations (i.e.,
40 CFR). Table 1 of this preamble lists the proposed revisions to the
regulatory text that the EPA is finalizing. In Table 2 below, the EPA
lists additional changes that the Agency determined were necessary to
conform to changes the Agency included in the proposed rule.
[[Page 20173]]
Table 1--Summary of Proposed Technical Corrections and Clarifications
Being Finalized
------------------------------------------------------------------------
Section of subpart Da (40 CFR Description of correction (40 CFR
part 60) part 60)
------------------------------------------------------------------------
40 CFR 60.48Da(f)................. Revise procedures for calculating
compliance with the NSPS daily
average particulate matter (PM)
emission limit using PM continuous
emission monitoring system (CEMS).
------------------------------------------------------------------------
Section of subpart UUUUU (40 CFR Description of correction (40 CFR
part 63) part 63)
------------------------------------------------------------------------
40 CFR 63.9983(a)................. Revise to clarify that MATS does not
apply to either major or area
source combustion turbines, except
for integrated gasification
combined cycle (IGCC) units.
40 CFR 63.9983(b) and (c)......... Revise consistent with the
definitional changes in 40 CFR
63.10042.
40 CFR 63.9983(e)................. Add to clarify applicability to
units meeting the definition of a
natural gas-fired EGU in MATS, and,
because they combust greater than
10 percent biomass, also meet the
definition of a biomass-fired
boiler in the Industrial Boiler
NESHAP (subpart DDDDD).
40 CFR 63.9991(c)(1) and (2)...... Revise to clarify the conditions
that are required in order to use
the alternate sulfur dioxide (SO2)
limit.
40 CFR 63.10000(c)(1)(i)(A) and Revise to clarify the provisions of
63.10005(h). units designated as being low
emitting EGUs (LEE) when an acid
gas scrubber and a bypass stack are
present.
40 CFR 63.10000(c)(1)(i)(C)....... Add to allow EGUs the ability to
seek LEE status if their bypass
stacks that are able to measure
emissions and to allow EGUs with
LEE status the ability to bypass
emissions control devices during
emergency periods.
40 CFR 63.10000(c)(2)(iii)........ Revise to state that EGU choosing to
use quarterly testing and
parametric monitoring for hydrogen
fluoride (HF) or hydrogen chloride
(HCl) compliance must include the
continuous monitoring systems (CMS)
in their site-specific monitoring
plans.
40 CFR 63.10000(m)................ Add to clarify that EGUs choosing to
meet the work practice standards
contained in paragraph (2) of the
definition of startup may verify,
instead of certify, monitoring
systems used to meet the work
practice standards.
40 CFR 63.10001................... Revise to remove the affirmative
defense provisions.
40 CFR 63.10005(a)................ Revise to clarify that different
compliance demonstrations may
require different and additional
types of data collection and to
clarify the date by which
compliance must be demonstrated for
existing EGUs.
40 CFR 63.10005(a)(2)............. Revise to clarify the date by which
compliance must be demonstrated for
EGUs using CMS or sorbent trap
monitoring systems.
40 CFR 63.10005(a)(2)(i).......... Revise to clarify applicability of
the provision to both the 30- and
90-boiler operating day performance
testing requirements.
40 CFR 63.10005(b)(6)............. Add to clarify the date EGUs must
begin conducting required stack
tests when stack test data
collected prior to the applicable
compliance date are submitted to
satisfy initial performance test.
40 CFR 63.10005(d)(3) and Revise to more clearly state when
(d)(4)(i). compliance must be demonstrated.
40 CFR 63.10005(f)................ Revise to clarify when sources must
complete the initial tune-up after
the compliance date, and the timing
for subsequent tune-ups when the
initial tune-up is conducted prior
to the compliance date.
40 CFR 63.10005(h)(3)............. Revise to clarify that the alternate
30- and 90-day averaging provisions
are both applicable to mercury (Hg)
emission limits.
40 CFR 63.10005(i)(4)............. Revise to delete paragraphs (iii)
and (iv). The identified test
methods are not for determining
fuel moisture content, as required
in the provision.
40 CFR 63.10006(f)................ Revise to specify EGU operational
status with respect to performance
testing; the requirements if the
performance testing schedule is
missed; and intervals between
performance tests.
40 CFR 63.10009(a)(2) and Revise to clarify that the 90-boiler
(a)(2)(i). operating day averaging period is
an option for Hg emissions from non-
low rank virgin coal-fired EGUs.
40 CFR 63.10009(b)(1)............. Revise to clarify group eligibility
equations 1a and 1b.
40 CFR 63.10009(b)(2), (b)(3), Revise to correct the term ``gross
(f)(2), (g)(1), (g)(2), and electric output'' to ``gross
(j)(1)(ii). output'' which is the term defined
in 40 CFR 63.10042.
40 CFR 63.10009(f)................ Revise to clarify the conditions for
determining the ability of the
emissions averaging group to meet
the emissions limit and to clarify
use of the alternate Hg emission
limit.
40 CFR 63.10010(a)(4)............. Revise to add requirement to route
exhaust gases that bypass emissions
control devices through stacks that
contain monitoring so that
emissions can be measured and to
clarify that hours that a bypass
stack is in use are to be counted
as hours of deviation from
monitoring requirements.
40 CFR 63.10010(f)(3)............. Revise to clarify that 30-boiler
operating day rolling averages are
based only on valid hourly SO2
emission rates.
40 CFR 63.10010(h)(6)(i) and (ii), Revise to clarify that data
(i)(5)(i)(A) and (B), and collected during certain periods
(j)(4)(i)(A) and (B). are not to be included in
compliance assessments but such
periods are to be included in
annual deviation reports.
40 CFR 63.10010(j)(l)(i).......... Revise to replace the incorrect
reference to Sec. 63.7(e) with
the correct reference to Sec.
63.8(d)(2).
40 CFR 63.10010(l) and (l)(4)..... Revise to clarify that EGU owners or
operators who choose to meet the
work practice standards contained
in paragraph (2) of the definition
of startup may verify, instead of
certify, monitoring systems used.
40 CFR 63.10011(b)................ Revise to remove the incorrect
reference to Table 4 and to replace
the incorrect reference to Table 7
with the correct reference to Table
6.
------------------------------------------------------------------------
[[Page 20174]]
Table 1--Summary of Proposed Technical Corrections and Clarifications
Being Finalized--Continued
------------------------------------------------------------------------
Section of subpart UUUUU (40 CFR Description of correction (40 CFR
part 63) part 63)
------------------------------------------------------------------------
40 CFR 63.10011(c)(1) and (2)..... Revise to clarify the date by which
compliance must be demonstrated by
EGUs that use CEMS or sorbent trap
monitoring systems and to clarify
in 40 CFR 63.10011(c)(1) that the
alternate Hg emission limit may be
used.
40 CFR 63.10011(e)................ Revise to replace ``according to''
with ``in accordance with.''
40 CFR 63.10011(g)(4)(v)(A) and Revise to clarify our intent by
Table 3. changing ``to the maximum extent
possible'' to ``to the maximum
extent possible, taking into
account boiler or control device
integrity.''
40 CFR 63.10020(e)................ Revise to clarify that it applies
only to EGU owners or operators who
choose to meet the work practice
standards contained in paragraph
(2) of the definition of startup.
In addition, the undefined term
``electrical load'' has been
replaced with the defined term
``gross output'' and the incorrect
terms ``liquid to fuel ratio'' and
``the differential pressure of the
liquid'' have been replaced with
the correct terms ``liquid to flue
gas ratio'' and ``the pressure drop
across the scrubber.''
40 CFR 63.10021(d)(3)............. Revise to clarify the type of
monitoring that is to be used to
demonstrate compliance.
40 CFR 63.10021(e)................ Revise to clarify the condition that
allows delay of burner inspections
for initial tune-ups.
40 CFR 63.10021(e)(9)............. Revise to clarify the dates that
tune-ups must be reported.
40 CFR 63.10023(b) and Table 6.... Revise to clarify that all EGUs
using PM continuous parametric
monitoring systems (CPMS) for
compliance purposes are to follow
the same procedure for determining
the operating limit.
40 CFR 63.10030(e)(1)............. Revise to replace the phrase
``identification of which
subcategory the source is in'' with
``identification of the subcategory
of the source.''
40 CFR 63.10030(e)(7)(i).......... Revise to delete and reserve since
subsequent performance tests are
not part of the Notification of
Compliance Status.
40 CFR 63.10030(e)(7)(iii)........ Add to establish the procedures by
which an EGU owner or operator may
switch between mass per heat input
and mass per gross output emission
limits.
40 CFR 63.10030(e)(8)(i).......... Revise to clarify that it applies
only to EGU owners or operators who
choose to meet the work practice
standards contained in paragraph
(2) of the definition of startup.
Revise to clarify that PM control
device efficiencies and PM emission
rates are those of periods other
than startup and shutdown periods.
40 CFR 63.10030(e)(8)(ii)......... Revise to remove the requirement for
use of an independent professional
engineer.
40 CFR 63.10030(f)................ Revise to add notification
requirements for EGUs that move in
and out of MATS applicability.
40 CFR 63.10031(c)(4)............. Revise to clarify the reporting
requirements for EGU tune-ups.
40 CFR 63.10031(c)(5)............. Revise to clarify that it applies
only to EGU owners or operators who
choose to meet the work practice
standards contained in paragraph
(2) of the definition of startup.
40 CFR 63.10031(c)(6)............. Revise to add emergency bypass
reporting for EGUs with LEE status.
40 CFR 63.10032(f)................ Revise to clarify that the
requirements of Sec.
63.10032(f)(1) apply only to those
EGU owners or operators who choose
to meet the work practice standards
contained in paragraph (1) of the
definition of startup, while the
requirements of Sec.
63.10032(f)(2) apply only to those
EGU owners or operators who choose
to meet the work practice standards
contained in paragraph (2) of the
definition of startup.
40 CFR 63.10042................... The definitions of ``Coal-fired
electric utility steam generating
unit,'' ``Coal refuse,'' ``Fossil
fuel-fired,'' ``Integrated
gasification combined cycle
electric utility steam generating
unit or IGCC,'' ``Limited-use
liquid oil-fired subcategory,''
``Natural gas-fired electric
utility steam generating unit,''
and ``Oil-fired electric utility
steam generating unit'' are revised
to clarify the period of time to be
included in determining the
source's applicability to the MATS.
A definition of ``neural network''
is added because the term is used
in 40 CFR 63.10005(f), 63.10006(i),
and 63.10021(e) and Table 3 to
subpart UUUUU of Part 63 but is not
defined.
Table 1 to subpart UUUUU of part Revise to correct the term ``gross
63. electric output'' to ``gross
output'' which is the term defined
in 40 CFR 63.10042.
Table 2 to subpart UUUUU of part Revise to correct the term ``gross
63. electric output'' to ``gross
output'' which is the term defined
in 40 CFR 63.10042. Provision 1(c)
(the Hg limit for EGUs in the
subcategory ``unit designed for
coal >=8,300 Btu/lb'') is also
revised to clarify the
applicability of the alternate 90-
boiler operating day compliance
option.
Table 3 to subpart UUUUU of part Revise as described earlier to
63. clarify the term ``maximum extent
possible.''.
Table 4 to subpart UUUUU of part Revise to clarify that existing as
63. well as new EGUs using PM CPMS
share the same procedures for
developing operating limits.
Table 5 to subpart UUUUU of part Revise to clarify that when using
63. Method 29, the metals matrix spike
and recovery levels are to be
reported.
Table 6 to subpart UUUUU of part Revise to clarify that existing, as
63. well as new, EGUs using PM CPMS
share the same procedures for
developing operating limits.
Table 8 to subpart UUUUU of part Revise to clarify that compliance
63. reports are to include information
required by 40 CFR 63.10031(c)(5)
and (6).
Table 9 to subpart UUUUU of part Revise to correct an inadvertent
63. omission of 30-day notification
requirements of 40 CFR 63.9.
Paragraphs 4.1.1.3 and 5.1.2.3 and Revise to adjust Hg CEMS language
Tables A-1 and A-2 to appendix A. regarding converters.
Paragraph 7.1.2.5 to appendix A... Add to require that owners or
operators flag EGUs that are part
of emission averaging groups.
Paragraph 3.2.1.2.1 of appendix A. Revise to specifically indicate that
Hg gas generators and cylinders are
allowed.
Paragraphs 4.1.1.1, Table A-1, Revise to exclude use of oxidized Hg
Table A-2, 5.1.2.1, and 4.1.1.3 gas standards for daily calibration
of appendix A. of Hg CEMS.
Paragraph 5.1.2.3 of appendix A... Revise to make the weekly single
level system integrity check
mandatory.
------------------------------------------------------------------------
[[Page 20175]]
Table 1--Summary of Proposed Technical Corrections and Clarifications
Being Finalized--Continued
------------------------------------------------------------------------
Section of subpart UUUUU (40 CFR Description of correction (40 CFR
part 63) part 63)
------------------------------------------------------------------------
Paragraphs 4.1.1.5.2, Table A-1, Revise to provide an alternative
Table A-2, and 4.1.1.5 of relative accuracy test audit (RATA)
appendix A. procedure for EGUs with low
emissions.
Paragraph 5.2.1 of appendix A..... Revise to correct the number of days
for sorbent trap use from 14 to 15.
Paragraph 6.2.2.3 of appendix A... Revise to clarify that the 90-day
alternative Hg standard may be used
and that electrical output is gross
output.
Paragraph 7.1.2.6 of appendix A... Add to clarify that EGU owners or
operators are to keep records of
their EGUs that constitute
emissions averaging groups.
Paragraphs 2.1, 2.3, 2.3.1, 2.3.2, Revise to clarify that use of
3.1, 3.2, 3.3, 5, 5.1, 5.2, and Performance Specification (PS) 18,
5.3 of appendix B. when promulgated, will be allowed.
Paragraph 5.4 of appendix B....... Add as part of the renumbering due
to the addition of PS 18.
Paragraph 8 of appendix B......... Revise to accommodate use of PS 18.
Paragraphs 10.1.8, 10.1.8.1, Revise as part of the renumbering
10.1.8.1.1, and 10.1.8.1.2 of due to the addition of PS 18.
appendix B.
Paragraph 10.1.8.1.3 of appendix B Revise to clarify that records of
relative accuracy audits (RAAs) are
also required.
Paragraphs 10.1.8.2, 10.1.8.1.2.1, Revise to clarify the quarterly gas
and 10.1.8.1.2.2 of appendix B. audit recordkeeping requirements
for PS 15 and the quarterly data
accuracy assessments for PS 18
(which are reserved).
Paragraph 11.4 of appendix B...... Revise to replace the incorrect
abbreviation ``i.e.'' with
``e.g.''.
Paragraph 11.4.2 of appendix B.... Revise to specify the requirements
of the daily beam intensity checks
for EGUs using PS 18.
Paragraph 11.4.3 of Appendix B.... Revise to reflect the reporting
requirements for PS 15.
Paragraph 11.4.4 of appendix B.... Revise to reserve the reporting
requirements for quarterly
parameter verification checks for
PS 18.
Paragraphs 11.4.4.1, 11.4.5, Add to reserve the reporting
11.4.5.1, 11.4.6, 11.4.6.1 of requirements for quarterly gas
appendix B. audit information and for quarterly
dynamic spiking for PS 18.
Paragraph 11.4.7 of appendix B.... Add to include reporting
requirements for RAAs.
Paragraphs 11.4.7.1 through Add as part of the renumbering due
11.4.7.13 of appendix B. to the addition of PS 18.
Paragraph 11.5.3.4 of appendix B.. Revise to include reporting
requirements for beam intensity
checks for PS 18.
------------------------------------------------------------------------
Most of the corrections and clarifications remain the same as
presented in the proposed correction document and those changes are
being finalized without further discussion. However, the EPA has made
some changes in this final rule after consideration of the public
comments received on the proposed correction document. The changes are
to clarify applicability and implementation issues associated with
proposed changes, and the significant changes are discussed below in
this preamble. A summary of the comments received and our responses
thereto is contained in the document ``Summary of Public Comments and
Responses: MATS and Utility NSPS Technical Corrections'' located in the
dockets for these rulemakings.
II. Significant Changes Since Proposal
This section of the preamble summarizes the significant changes
made to the proposed corrections and clarifications.
1. Section 63.9984(f) is revised to add ``or the EGU's otherwise
applicable compliance date established by the EPA or the state.'' A
commenter stated that the EPA's proposed revision, which was adding
``the date that compliance must be demonstrated, as given'' in Sec.
63.9984, to the initial compliance requirements in Sec. 63.10005(a)
for existing EGUs, does not effectively clarify the date that
compliance must be demonstrated due to its reference to Sec. 63.9984
and paragraph (f) of Sec. 63.9984 because Sec. 63.9984(b) specifies a
compliance date of April 16, 2015 for existing EGUs. Also, Sec.
63.9984(f), which states the dates by which compliance must be
demonstrated, refers to Sec. 63.9984(b). Therefore, we revised Sec.
63.9984(f) because specifying a date for existing EGUs to demonstrate
compliance is confusing for existing sources that have been granted a
compliance extension.
2. Section 63.10000(n) is added to address comments that noted the
proposed technical corrections did not address the permanent conversion
to natural gas or biomass consistent with the proposals outlined in the
February 17, 2015 preamble. In the preamble (see 80 FR 8447), we stated
``The EPA is also proposing that sources that permanently convert to
natural gas or biomass after the compliance date are no longer subject
to MATS, notwithstanding the coal or oil usage the previous 3 calendar
years.'' However, we inadvertently did not include the necessary
language to address permanent conversions in the proposed regulatory
text. For that reason, we are revising paragraph (n) to incorporate the
proposed change as outlined in the preamble to the proposed rule.
3. The proposal to revise Sec. 63.10005(b)(1) to change the time
period allowed for existing EGUs to use stack test data collected prior
to the applicable compliance date has been withdrawn. Several
commenters did not support the proposed revision to change the window
in which initial compliance can be demonstrated, and said that EGUs
should be allowed to demonstrate initial compliance using stack tests
conducted on or after April 16, 2014. Commenters said the EPA's
proposed change is unfair, renders investments in stack testing
useless, and requires companies to perform new, unnecessary initial
compliance testing. For these reasons, and because the Agency believes
earlier stack tests may be representative under certain circumstances,
the EPA is not making the proposed change.
4. Section 63.10006(f) is revised to: (1) Correct the minimum time
between annual performance tests (from 370 to 320 calendar days); (2)
clarify the minimum time between annual sorbent trap mercury testing
for 30-boiler operating day low emitting EGU (LEE) retests (also 320
calendar days); and (3) provide the minimum time between annual sorbent
trap mercury testing for 90-boiler operating day LEE retests (230
calendar days). Commenters correctly stated that the 370-day interval
for annual tests was a typographical error, as they would expect the
interval to be 365 days or less. Commenters expressed concerns that,
while the proposed revised Sec. 63.10006(f) specified the time
[[Page 20176]]
periods between annual performance tests, it did not specify the time
periods between annual sorbent trap mercury testing for either the 30-
boiler operating day averaging periods or the 90-boiler operating day
averaging periods. The three revisions, listed above, being made to
Sec. 63.10006(f) address the commenters' concerns. In addition, Sec.
63.10010(i)(2)(i) and (ii) is revised to clarify the time periods
between quarterly, annual, and three year testing for particulate
matter continuous emissions monitoring system (PM CEMS) audits.
5. Section 63.10009(b)(1) is revised to clarify group eligibility
equations 1a and 1b. The purpose of the group eligibility equations is
to provide EGU owners or operators a quick method for demonstrating
initial compliance with the emission limits for all units participating
in the emission averaging group using the maximum rated heat input or
gross output of each unit and the results of the initial compliance
demonstrations. Commenters stated that the EPA proposed to drop the
double summation in the denominator, which is a correct step. However,
the commenters indicated they do not understand what the Agency was
thinking with respect to adding the ``qj'' term in both the
numerator and denominator and that the EPA defined ``qj'' to
be the hours in the averaging period (720 for 30-day averages and 2,160
for 90-day averages) because the term's presence in both the numerator
and denominator cancels out and has no effect. Commenters also stated
that they do not agree that the newly proposed group averaging
eligibility Equation 1a is more useful than the original equation.
Commenters said both the original equation and the newly proposed
equation are flawed and, thus, produce incorrect results. Commenters
said corrections need to be made to either equation that the EPA wants
to use. Commenters said the stack testing components of the equation
for each unit that is tested need to be weighted the same as units that
use continuous monitoring in order for any equation to produce correct
calculations. Commenters said the original equation works for the
continuous monitoring components, but is flawed because it does not
properly weight the stack testing components, and the newly proposed
equation is flawed on both fronts. Based on the commenters' concerns,
the equations have been revised so that individual EGU characteristics,
whether from continuous emission monitoring systems (CEMS) or stack
testing results, are easier to input. We agree that the added
``qj'' term and ``rk'' term have no effect, and
they have been deleted. We are also deleting the ``n'' term since
Equations 1a and 1b are to demonstrate initial compliance based on
using the initial compliance results and not continuous compliance that
is based on an averaging period. We have revised some of the terms'
descriptions to clarify that the emission rates used are those
determined during the initial compliance demonstration.
6. Section 63.10009(e), (g), and (j)(2) are revised to require
compliance with the weighted average emissions rate at all times
following the date that emissions averaging begins. A commenter argued
that the EPA must also revise these sections to remove the specifically
identified dates (e.g., April 16, 2015 and February 16, 2015). We agree
that the dates within Sec. 63.10009(e), (g), and (j)(2) should be
removed, and the dates have been replaced with ``the date that you
begin emission averaging.''
7. Section 63.10010(h)(6)(i), (i)(5)(i)(A), and (j)(4)(i)(A) and
(B) are revised to clarify when monitoring system quality assurance or
quality control activities are to be reported. Commenters said Sec.
63.10010(h)(6)(i), (i)(5)(i)(A), and (j)(4)(i)(A) and (B) specify what
data from particulate matter (PM) continuous parameter monitoring
system (CPMS), PM CEMS, and hazardous air pollutants (HAP) metal CEMS
must be excluded from compliance determinations and that the EPA
proposed to separate the language regarding deviation reporting that
currently appears at the end of these provisions into a separate
sentence to ``ease readability.'' The commenter disagreed that the
proposed revision improves readability and said that, to the contrary,
by separating out the sentence, the EPA implies that the periods when
data are not collected because of monitoring system malfunctions,
repairs, required quality assurance or quality control, as well as
periods when a monitoring system is out of control, are deviations from
monitoring requirements, which they are not. The commenter is
incorrectly interpreting the proposed change. Periods when data are not
collected because of monitoring system malfunctions are deviations. The
required quality assurance or quality control activities that are
deviations from monitoring requirements are, as stated in Sec.
63.10010(h)(6)(i), (i)(5)(i)(A), and (j)(4)(i)(A) and (B), those
conducted during monitoring systems malfunctions.
8. Section 63.10011(g)(4)(v)(A) is revised to change the proposed
language ``to the maximum extent practicable'' back to the language
``to the maximum extent possible'' as in the final rule. Commenters
said the requirement to use clean fuels ``to the maximum extent
practicable'' does not even address the level of toxic emissions during
startup, let alone reduce them to the maximum extent achievable as is
required under CAA section 112(d)(2). Commenters said, perhaps most
importantly, that the EPA's proposed change impermissibly assumes that
existing older boilers and control devices are not capable of being
upgraded--despite Congress' mandate in CAA section 112(d)(2)-(3) that
emissions standards and work practices reflect what is achievable and
actually being achieved by the best-performing sources. Commenters said
further, under CAA section 112(d), it is the Administrator's duty to
establish standards to achieve the required emissions reductions--not
the duty of owners and operators. Commenters said the EPA's purported
work practices impermissibly allow operators themselves to determine
the standards and their own emission reductions achieved (or not) by
the requirements. Commenters said the EPA's proposed change leaves it
up to each operator to determine the amount of clean fuel use that
represents the ``maximum extent practicable,'' and leaves it up to each
operator to determine what qualifies as a ``consideration such as
boiler or control device integrity.'' Commenters said that even though
the requirement for clean fuels states that EGUs must have sufficient
clean fuel capacity to engage and operate PM control devices within 1
hour of adding the primary fuel (and even though a separate work
practice requires PM controls to be engaged and operated within 1
hour), these requirements do not establish whether and to what point
EGUs must actually use clean fuels in startups. These comments
primarily concern issues that the EPA did not reopen in the proposed
document. Because those issues were not reopened, the EPA did not
respond to these comments. We did propose to change Sec.
63.10011(g)(4)(v)(A) as the commenter states. We continue to believe
that the use of clean fuels during startup must be maximized to reduce
HAP emissions and have reconsidered the proposed change of ``possible''
to ``practicable.'' We believe ``possible'' is a more enforceable
standard. The final change to Sec. 63.10011(g)(4)(v)(A) is: ``to the
maximum extent possible, taking into account considerations such as
boiler or control device integrity,
[[Page 20177]]
throughout the startup period.'' This language is also included in
section 4 of Table 3, to clarify that this provision applies during
periods of shutdown.
The EPA is not finalizing the proposed change because we have
determined that requiring clean fuel use to the maximum extent
``possible'' is more enforceable than the proposed change to
``practicable'', and the Agency believes it is critical that the work
practice be enforceable to ensure that sources use as much clean fuel
with its inherently low HAP content as possible when a source's
controls are not yet fully engaged. At the same time, we believe
operators must be able to consider the integrity of the EGU system when
determining the clean fuel use that is ``possible'' for a given unit.
We believe the final rule addresses both considerations.
9. Section 63.10030(e)(8)(iii) is added to allow EGU owners or
operators the ability to switch between paragraphs 1 and 2 of the
startup definition. Commenters requested that switching between
paragraphs of the definition of startup not be prohibited. We have no
objection to such switching provided certain criteria are met. Just as
we had not considered that EGU owners or operators would want to switch
between mass per year heat input emission limits and mass per gross
output emission limits, but proposed to allow such changes provided
certain criteria are met, we did not consider that an owner or operator
would want to switch between the startup definitions for the EGU. Given
the commenter's specific request and the EPA's conditional approval
based on the already existing model given in Sec.
63.10030(e)(7)(iii)(A), Sec. 63.10030(e)(8)(iii) is added to the rule.
This new section allows EGU owners or operators the ability to switch
between paragraphs 1 and 2 of the startup definition provided, among
other things, that the EGUs involved in the switch are identified, that
a request is submitted 30 days prior to the anticipated switch, that
the request contains certification that all previous plans, such as
monitoring and emissions averaging, are revised, that records are
maintained, and that the new definition is not used until the next
reporting period after receipt of written acknowledgement from the
Administrator or the delegated authority of the switch.
10. Section 63.10031(c)(4) is revised to clarify that the ``date''
of the tune-up is the date the tune-up provisions specified in Sec.
63.10021(e)(6) and (7) are completed. Commenters noted that there will
not necessarily be a single date associated with completion of an EGU's
tune-ups conducted under Sec. 63.10021(e) and suggested that, related
to the possibility of a delayed burner inspection, the Agency make it
clear that compliance with all requirements besides the burner
inspection must occur by the compliance demonstration date, but that
the burner inspection may be delayed, and to revise the provision to
recognize that as a result, performance of subsequent inspections and
tune-ups may be on a separate 36-month track and some EGUs may have
``dates'' rather than a ``date'' for completion of requirements.
Regardless of when the burner inspection is conducted, the tune-up is
considered to have been conducted on the date the combustion
optimization is completed. The purpose of the tune-up is the
optimization of the combustion to minimize organic HAP, carbon
monoxide, and nitrogen oxides (NOX) and to improve or return
the unit to its design combustion efficiency (i.e., Sec.
63.10021(e)(6) and (7)). We realize that EGUs may need to be taken off-
line to conduct an inspection of burners. So, we allow that inspection
to be delayed, or as Sec. 63.10021(e) is revised, to be performed
prior to the tune-up. Therefore, subsequent tune-ups must be performed
within 36 months from when the previous tune-up (i.e., the requirements
of Sec. 63.10021(e)(6) and (7)) was completed, and the source must
conduct the next burner inspection on a similar schedule.
11. Section 63.10031(c)(7) is added to include the reporting
requirements that have been removed from Sec. 63.10030(e)(7)(i). A
commenter said that there is no reason to submit Notification of
Compliance Status (NOCS) for ongoing 3-year tests that are performed to
demonstrate that LEE status is maintained, so the proposed language in
Sec. 63.10030(e)(7)(i) should be revised. We agree that not only the
ongoing 3-year LEE retests, but also the annual and quarterly LEE
retests and annual retests that are performed to establish operating
limits, should not be submitted as NOCS. According to the introductory
text of Sec. 63.10030(e), the NOCS is required only for reporting
initial compliance. Therefore, Sec. 63.10030(e)(7)(i) has been removed
and reserved, and the reporting requirements in Sec. 63.10030(e)(7)(i)
have been moved to a new place, i.e., Sec. 63.10031(c)(7), and are
part of the compliance report requirements. Likewise, the compliance
certification and deviation information requirements in Sec.
63.10030(e)(5) and (e)(6) apply for compliance reports and are
replicated in new Sec. 63.10031(c)(8) and (9), and each of these
paragraphs is included in the introductory text in Sec. 63.10030(c)
and in Table 8.
12. The definitions of ``Coal-fired electric utility steam
generating unit,'' ``Fossil fuel-fired,'' ``Limited-use liquid oil-
fired subcategory,'' and ``Oil-fired electric utility steam generating
unit'' in Sec. 63.10042 are further revised to clarify the period of
time to be included in determining the source's applicability to the
MATS.
One commenter indicated that the proposed rule does not address
permanent conversion to natural gas or biomass, nor does it make clear
that, after the first 3 years of compliance, EGUs are required to
evaluate applicability based on coal or oil usage from the 3 previous
calendars years on an annual rolling basis. The commenter said that the
EPA's clarifying proposals are not clearly outlined in the proposed
revised definitions. The commenter urged the EPA to revise the
definition in a manner consistent with the proposals outlined in the
preamble. Several commenters indicated the proposed changes do not
prevent an EGU from continuing to be subject to MATS for several years
after a fuel switch.
We agree that the proposed clarification to the definitions does
not make it clear that, after the first 3 years of compliance, an EGU
is required to evaluate applicability based on coal or oil usage from
the 3 previous calendar years on an annual rolling basis. Thus, we have
revised the definitions for ``Coal-fired electric utility steam
generating unit,'' ``Oil-fired electric utility steam generating
unit,'' and ``Fossil fuel-fired'' to clarify that applicability after
the first 3 years of compliance will be based on coal or oil usage from
the 3 previous calendar years on an annual rolling basis.
Concerning the permanent fuels switch, the EPA explained above that
it has addressed permanent conversions in Sec. 63.10000(n) of the
final rule, as discussed in paragraph 2 above.
13. Appendix A is finalized with all proposed revisions with the
exception of adding an alternative specification for the relative
accuracy test audit (RATA) where commenters provided data to support a
different approach using an absolute value criterion. However, due to
the current lack of available NIST-traceable elemental Hg gas
cylinders, owners or operators of EGUs that have purchased/installed Hg
CEMS that lack integrated elemental Hg gas generators may continue to
use NIST-traceable oxidized gases for calibration error tests and daily
checks until such time that NIST-traceable compressed elemental Hg gas
standards are available and traceable with a combined uncertainty
[[Page 20178]]
(K=2) of 5 percent. Once those standards are available, we will issue a
notice of availability in the Federal Register. Should NIST-traceable
oxidized mercury reference gases with a combined uncertainty of 5%
ultimately be available, we will consider allowing their use for
calibration error tests and checks.
14. Appendix B is finalized with all proposed revisions except
those related to sections 10 and 11 regarding recordkeeping and
reporting for hydrogen chloride (HCl) CEMS subject to PS 18. Sections
10 and 11 will be addressed in the upcoming MATS Completion of
Electronic Reporting Requirements rule. One change has been made that
was not proposed. A minor technical correction has been made to section
9.4, requiring the HCl emission rates to be reported to 2 significant
figures in scientific notation, which is consistent with the way that
the emission standards are presented in Tables 1 and 2.
III. Other Corrections and Clarifications
In finalizing the rule, the EPA is addressing several other
technical corrections and clarifications in the regulatory language
based on public comments that were received on the February 2015
proposal that the Agency determined were necessary to conform to
changes included in the proposed rule, as outlined in Table 2 of this
preamble.
Table 2--Summary of Technical Corrections and Clarifications Since
February 17, 2015, Proposal
------------------------------------------------------------------------
Section of subpart UUUUU (40 CFR Description of correction (40 CFR
part 63) part 63)
------------------------------------------------------------------------
40 CFR 63.10000(a)................ Revise this paragraph by adding
``items 3 and 4'' to clarify which
items in Table 3 must be met.
40 CFR 63.10000(f)................ Revise this paragraph to add
``Except as provided under
paragraph (n) of this section'' due
to the addition of paragraph (n)
clarifying the applicability of a
permanent conversion to natural gas
or biomass.
40 CFR 63.10000(g)................ Revise this paragraph to add
``Except as provided under
paragraph (n) of this section'' due
to the addition of paragraph (n)
clarifying the applicability of a
permanent conversion to natural gas
or biomass.
40 CFR 63.10000(i)(1)............. Revise this paragraph to clarify
that an EGU, no longer subject to
MATS, must be in compliance with
applicable CAA section 112 or 129
standards consistent with
paragraphs (g) and (n).
40 CFR 63.10005(a)................ Revise this paragraph to replace the
terms ``electrical'' and
``electrical load'' with the terms
``gross'' and ``gross output,''
respectively, to be consistent with
the proposed changes to other
sections.
40 CFR 63.10005(a)(2)(ii)......... Revise this paragraph to replace the
terms ``electrical'' and
``electrical load'' with the terms
``gross'' and ``gross output,''
respectively, to be consistent with
the proposed changes to other
sections.
40 CFR 63.10005(b)(4)............. Revise this paragraph to replace the
term ``electrical load'' with the
term ``gross output'' to be
consistent with the proposed
changes to other sections.
40 CFR 63.10005(f)................ Revise to be consistent with EPA's
intent, as explained in the
preamble to the proposed rule, to
only clarify the timing of initial
and subsequent tune-ups.
Revise since specifying the date is
problematic for sources that have
been granted a compliance
extension.
40 CFR 63.10005(h)(3)(i)(D)....... Revise this paragraph to replace the
term ``electrical load'' with the
term ``gross output'' to be
consistent with the proposed
changes to other sections.
40 CFR 63.10005(h)(3)(iii)........ Revise this paragraph to replace the
term ``electrical load'' with the
term ``gross output'' to be
consistent with the proposed
changes to other sections.
40 CFR 63.10007(f)(2)............. Revise this paragraph to replace the
term ``electrical load'' with the
term ``gross output'' to be
consistent with the proposed
changes to other sections.
40 CFR 63.10009(e) and (j)(2)..... Revise since specifying the date is
problematic for sources that have
been granted a compliance
extension.
40 CFR 63.10010(f)(4)............. Revise this paragraph to replace the
term ``electrical load'' with the
term ``gross output'' to be
consistent with the proposed
changes to other sections.
40 CFR 63.10021(h)(1)............. Revise this paragraph to replace the
term ``electrical load'' with the
term ``gross output'' to be
consistent with the proposed
changes to other sections.
Table 5........................... Revise this table to replace the
term ``electrical'' with the term
``gross'' to be consistent with the
proposed changes to other sections.
Paragraph 7.1.8.5 of appendix A... Revise this paragraph to replace the
term ``electrical load'' with the
term ``gross output'' to be
consistent with the proposed
changes to other sections.
------------------------------------------------------------------------
IV. Affirmative Defense for Violation of Emission Standards During
Malfunction
The EPA received numerous comments on the affirmative defense to
civil penalties for violations caused by malfunctions that the EPA
proposed to remove in the current rule. Several commenters supported
the removal of the affirmative defense for malfunctions. Other
commenters opposed the removal of the affirmative defense provision.
As stated in the February 17, 2015, proposal, the United States
Court of Appeals for the District of Columbia Circuit vacated an
affirmative defense in one of the EPA's CAA section 112(d) regulations.
NRDC v. EPA, No. 10-1371 (D.C. Cir. April 18, 2014) 2014 U.S. App.
LEXIS 7281 (vacating affirmative defense provisions in CAA section
112(d) rule establishing emission standards for Portland cement kilns).
The court found that the EPA lacked authority to establish an
affirmative defense for private civil suits and held that under the
CAA, the authority to determine civil penalty amounts in such cases
lies exclusively with the courts, not the EPA. Specifically, the court
found: ``As the language of the statute makes clear, the courts
determine, on a case-by-case basis, whether civil penalties are
`appropriate.' '' See NRDC, 2014 U.S. App. LEXIS 7281 at *21 (``[U]nder
this statute, deciding whether
[[Page 20179]]
penalties are `appropriate' in a given private civil suit is a job for
the courts, not EPA.''). The EPA is finalizing the proposed removal of
the regulatory affirmative defense provision from MATS. In the event
that a source fails to comply with an applicable CAA section 112(d)
standard as a result of a malfunction event, the EPA's ability to
exercise its case-by-case-enforcement discretion to determine an
appropriate response provides sufficient flexibility in such
circumstances as was explained in the preamble to the proposed rule.
Further, as the D.C. Circuit recognized, in an EPA or citizen
enforcement action, the court has the discretion to consider any
defense raised and determine whether penalties are appropriate. Cf.
NRDC, 2014 U.S. App. LEXIS 7281 at *24 (arguments that violation were
caused by unavoidable technology failure can be made to the courts in
future civil cases when the issue arises). The same is true for the
presiding officer in EPA administrative enforcement actions. For all
these reasons, this final rule removes the affirmative defense
provisions.
V. Impacts of This Final Rule
This action finalizes certain provisions and makes technical and
clarifying corrections, but does not promulgate substantive changes to
the February 2012 final MATS (77 FR 9304). Therefore, there are no
environmental, energy, or economic impacts associated with this final
action. The impacts associated with MATS are discussed in detail in the
February 16, 2012, final MATS rule.
VI. Statutory and Executive Order Reviews
Additional information about these statutes and Executive Orders
can be found at https://www2.epa.gov/laws-regulations/laws-and-executive-orders.
A. Executive Order 12866: Regulatory Planning and Review and Executive
Order 13563: Improving Regulation and Regulatory Review
This action is not a significant regulatory action and was,
therefore, not submitted to the Office of Management and Budget (OMB)
for review.
B. Paperwork Reduction Act (PRA)
This action does not impose any new information collection burden
under the PRA. OMB has previously approved the information collection
activities contained in the existing regulations (40 CFR part 63,
subpart UUUUU) and has assigned OMB control number 2060-0567. This
action is believed to result in no changes to the ICR of the February
2012 final MATS rule, so that the information collection estimate of
project cost and hour burden from the final MATS have not been revised.
C. Regulatory Flexibility Act (RFA)
I certify that this action will not have a significant economic
impact on a substantial number of small entities under the RFA. This
action will not impose any requirements on small entities. This action
finalizes changes to MATS to correct and clarify implementation issues
raised by stakeholders.
D. Unfunded Mandates Reform Act (UMRA)
This action does not contain an unfunded mandate as described in
UMRA, 2 U.S.C. 1531-1538, and does not significantly or uniquely affect
small governments. This rule promulgates amendments to the February
2012 final MATS, but the amendments are clarifications to existing rule
language to aid in implementation. Therefore, the action imposes no
enforceable duty on any state, local, or tribal governments or the
private sector.
E. Executive Order 13132: Federalism
This action does not have federalism implications. It will not have
substantial direct effects on the states, on the relationship between
the national government and the states, or on the distribution of power
and responsibilities among the various levels of government.
F. Executive Order 13175: Consultation and Coordination With Indian
Tribal Governments
This action does not have tribal implications, as specified in
Executive Order 13175. It will not have substantial direct effects on
tribal governments, on the relationship between the federal government
and Indian tribes, or on the distribution of power and responsibilities
between the federal government and Indian tribes, as specified in
Executive Order 13175. This action clarifies certain components of the
February 2012 final MATS. Thus, Executive Order 13175 does not apply to
this action.
G. Executive Order 13045: Protection of Children From Environmental
Health Risks and Safety Risks
The EPA interprets Executive Order 13045 as applying only to those
regulatory actions that concern environmental health or safety risks
that the EPA has reason to believe may disproportionately affect
children, per the definition of ``covered regulatory action'' in
section 2-202 of the Executive Order. This action is not subject to
Executive Order 13045 because it does not concern an environmental
health risk or safety risk.
H. Executive Order 13211: Actions Concerning Regulations That
Significantly Affect Energy Supply, Distribution or Use
This action is not subject to Executive Order 13211 because it is
not a significant regulatory action under Executive Order 12866.
I. National Technology Transfer and Advancement Act (NTTAA)
This action does not involve technical standards from those
contained in the February 16, 2012, final rule. Therefore, the EPA did
not consider the use of any voluntary consensus standards. See 77 FR
9441-9443 for the NTTAA discussion in the February 16, 2012, final
rule.
J. Executive Order 12898: Federal Actions To Address Environmental
Justice in Minority Populations and Low-Income Populations
The EPA believes the human health or environmental risk addressed
by this action will not have potential disproportionately high and
adverse human health or environmental effects on minority, low-income,
or indigenous populations because it does not affect the level of
protection provided to human health or the environment.
The environmental justice finding in the February 2012 final MATS
remains relevant in this action, which finalizes changes to the rule to
correct and clarify implementation issues raised by stakeholders.
K. Congressional Review Act (CRA)
This action is subject to the CRA, and the EPA will submit a rule
report to each House of the Congress and to the Comptroller General of
the United States. This action is not a ``major rule'' as defined by 5
U.S.C. 804(2).
List of Subjects
40 CFR Part 60
Environmental protection, Administrative practice and procedure,
Air pollution control, Intergovernmental relations, Reporting and
recordkeeping requirements.
40 CFR Part 63
Environmental protection, Administrative practice and procedure,
Air pollution control, Hazardous substances, Intergovernmental
relations, Reporting and recordkeeping requirements.
[[Page 20180]]
Dated: March 17, 2016.
Gina McCarthy,
Administrator.
For the reasons discussed in the preamble, the EPA amends 40 CFR
parts 60 and 63 as follows:
PART 60--STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES
0
1. The authority citation for part 60 continues to read as follows:
Authority: 42 U.S.C. 7401 et seq.
0
2. Section 60.48Da is amended by revising paragraph (f) to read as
follows:
Sec. 60.48Da Compliance provisions.
* * * * *
(f) For affected facilities for which construction, modification,
or reconstruction commenced before May 4, 2011, compliance with the
applicable daily average PM emissions limit is determined by
calculating the arithmetic average of all hourly emission rates each
boiler operating day, except for data obtained during startup,
shutdown, or malfunction periods. Daily averages are only calculated
for boiler operating days that have non-out-of-control data for at
least 18 hours of unit operation during which the standard applies.
Instead, all of the non-out-of-control hourly emission rates of the
operating day(s) not meeting the minimum 18 hours non-out-of-control
data daily average requirement are averaged with all of the non-out-of-
control hourly emission rates of the next boiler operating day with 18
hours or more of non-out-of-control PM CEMS data to determine
compliance. For affected facilities for which construction or
reconstruction commenced after May 3, 2011 that elect to demonstrate
compliance using PM CEMS, compliance with the applicable PM emissions
limit in Sec. 60.42Da is determined on a 30-boiler operating day
rolling average basis by calculating the arithmetic average of all
hourly PM emission rates for the 30 successive boiler operating days,
except for data obtained during periods of startup and shutdown.
* * * * *
PART 63--NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS
FOR SOURCE CATEGORIES
0
3. The authority citation for part 63 continues to read as follows:
Authority: 42 U.S.C. 7401 et seq.
0
4. Section 63.9983 is amended by:
0
a. Revising the section heading and paragraphs (a), (b), and (c); and
0
b. Adding paragraph (e).
The revisions and addition read as follows:
Sec. 63.9983 Are any fossil fuel-fired electric generating units not
subject to this subpart?
* * * * *
(a) Any unit designated as a major source stationary combustion
turbine subject to subpart YYYY of this part and any unit designated as
an area source stationary combustion turbine, other than an integrated
gasification combined cycle (IGCC) unit.
(b) Any electric utility steam generating unit that is not a coal-
or oil-fired EGU and that meets the definition of a natural gas-fired
EGU in Sec. 63.10042.
(c) Any electric utility steam generating unit that has the
capability of combusting more than 25 MW of coal or oil but does not
meet the definition of a coal- or oil-fired EGU because it did not fire
sufficient coal or oil to satisfy the average annual heat input
requirement set forth in the definitions for coal-fired and oil-fired
EGUs in Sec. 63.10042. Heat input means heat derived from combustion
of fuel in an EGU and does not include the heat derived from preheated
combustion air, recirculated flue gases or exhaust gases from other
sources (such as stationary gas turbines, internal combustion engines,
and industrial boilers).
* * * * *
(e) Any electric utility steam generating unit that meets the
definition of a natural gas-fired EGU under this subpart and that fires
at least 10 percent biomass is an industrial boiler subject to
standards established under subpart DDDDD of this part, if it otherwise
meets the applicability provisions in that rule.
0
5. Section 63.9991 is amended by revising paragraphs (c)(1) and (2) to
read as follows:
Sec. 63.9991 What emission limitations, work practice standards, and
operating limits must I meet?
* * * * *
(c) * * *
(1) Has a system using wet or dry flue gas desulfurization
technology and an SO2 continuous emissions monitoring system
(CEMS) installed on the EGU; and
(2) At all times, you operate the wet or dry flue gas
desulfurization technology and the SO2 CEMS installed on the
EGU consistent with Sec. 63.10000(b).
0
6. Section 63.10000 is amended by revising paragraphs (a), (c)(1)(i),
(c)(2)(iii), (f), (g), and (i)(1) and adding paragraphs (m) and (n) to
read as follows:
Sec. 63.10000 What are my general requirements for complying with
this subpart?
(a) You must be in compliance with the emission limits and
operating limits in this subpart. These limits apply to you at all
times except during periods of startup and shutdown; however, for coal-
fired, liquid oil-fired, or solid oil-derived fuel-fired EGUs, you are
required to meet the work practice requirements, items 3 and 4, in
Table 3 to this subpart during periods of startup or shutdown.
* * * * *
(c)(1) * * *
(i) For a coal-fired or solid oil-derived fuel-fired EGU or IGCC
EGU, you may conduct initial performance testing in accordance with
Sec. 63.10005(h), to determine whether the EGU qualifies as a low
emitting EGU (LEE) for one or more applicable emission limits, except
as otherwise provided in paragraphs (c)(1)(i)(A) and (B) of this
section:
(A) Except as provided in paragraph (c)(1)(i)(C) of this section,
you may not pursue the LEE option if your coal-fired, IGCC, or solid
oil-derived fuel-fired EGU is equipped with a main stack and a bypass
stack or bypass duct configuration that allows the effluent to bypass
any pollutant control device.
(B) You may not pursue the LEE option for Hg if your coal-fired,
solid oil-derived fuel-fired EGU or IGCC EGU is new.
(C) You may pursue the LEE option provided that:
(1) Your EGU's control device bypass emissions are measured in the
bypass stack or duct or your control device bypass exhaust is routed
through the EGU main stack so that emissions are measured during the
bypass event; or
(2) Except for hours during which only clean fuel is combusted, you
bypass your EGU control device only during emergency periods for no
more than a total of 2 percent of your EGU's annual operating hours;
you use clean fuels to the maximum extent possible during an emergency
period; and you prepare and submit a report describing the emergency
event, its cause, corrective action taken, and estimates of emissions
released during the emergency event. You must include these emergency
emissions along with performance test results in assessing whether your
EGU maintains LEE status.
* * * * *
(2) * * *
[[Page 20181]]
(iii) If your existing liquid oil-fired unit does not qualify as a
LEE for hydrogen chloride (HCl) or for hydrogen fluoride (HF), you may
demonstrate initial and continuous compliance through use of an HCl
CEMS, an HF CEMS, or an HCl and HF CEMS, installed and operated in
accordance with Appendix B to this rule. As an alternative to HCl CEMS,
HF CEMS, or HCl and HF CEMS, you may demonstrate initial and continuous
compliance through quarterly performance testing and parametric
monitoring for HCl and HF. If you choose to use quarterly testing and
parametric monitoring, then you must also develop a site-specific
monitoring plan that identifies the CMS you will use to ensure that the
operations of the EGU remains consistent with those during the
performance test. As another alternative, you may measure or obtain,
and keep records of, fuel moisture content; as long as fuel moisture
does not exceed 1.0 percent by weight, you need not conduct other HCl
or HF monitoring or testing.
* * * * *
(f) Except as provided under paragraph (n) of this section, you are
subject to the requirements of this subpart for at least 6 months
following the last date you met the definition of an EGU subject to
this subpart (e.g., 6 months after a cogeneration unit provided more
than one third of its potential electrical output capacity and more
than 25 megawatts electrical output to any power distributions system
for sale). You may opt to remain subject to the provisions of this
subpart beyond 6 months after the last date you met the definition of
an EGU subject to this subpart, unless your unit is a solid waste
incineration unit subject to standards under CAA section 129 (e.g., 40
CFR part 60, subpart CCCC (New Source Performance Standards (NSPS) for
Commercial and Industrial Solid Waste Incineration Units, or subpart
DDDD (Emissions Guidelines (EG) for Existing Commercial and Industrial
Solid Waste Incineration Units). Notwithstanding the provisions of this
subpart, an EGU that starts combusting solid waste is immediately
subject to standards under CAA section 129 and the EGU remains subject
to those standards until the EGU no longer meets the definition of a
solid waste incineration unit consistent with the provisions of the
applicable CAA section 129 standards.
(g) Except as provided under paragraph (n) of this section, if your
unit no longer meets the definition of an EGU subject to this subpart
you must be in compliance with any newly applicable standards on the
date you are no longer subject to this subpart. The date you are no
longer subject to this subpart is a date selected by you, that must be
at least 6 months from the date that your unit last met the definition
of an EGU subject to this subpart or the date you begin combusting
solid waste, consistent with Sec. 63.9983(d). Your source must remain
in compliance with this subpart until the date you select to cease
complying with this subpart or the date you begin combusting solid
waste, whichever is earlier.
* * * * *
(i)(1) If you own or operate an EGU subject to this subpart and
cease to operate in a manner that causes your unit to meet the
definition of an EGU subject to this subpart, you must be in compliance
with any newly applicable section 112 or 129 standards on the date you
selected consistent with paragraphs (g) and (n) of this section.
* * * * *
(m) Should you choose to rely on paragraph (2) of the definition of
``startup'' in Sec. 63.10042 for your EGU, on or before the date your
EGU is subject to this subpart, you must install, verify, operate,
maintain, and quality assure each monitoring system necessary for
demonstrating compliance with the work practice standards for PM or
non-mercury HAP metals controls during startup periods and shutdown
periods required to comply with Sec. 63.10020(e).
(1) You may rely on monitoring system specifications or
instructions or manufacturer's specifications when installing,
verifying, operating, maintaining, and quality assuring each monitoring
system.
(2) You must collect, record, report, and maintain data obtained
from these monitoring systems during startup periods and shutdown
periods.
(n) If you have permanently converted your EGU from coal or oil to
natural gas or biomass after your compliance date (or, if applicable,
after your approved extended compliance date), as demonstrated by being
subject to a permit provision or physical limitation (including
retirement) that prevents you from operating in a manner that would
subject you to this subpart, you are no longer subject to this subpart,
notwithstanding the coal or oil usage in the previous calendar years.
The date on which you are no longer subject to this subpart is the date
on which you converted to natural gas or biomass firing; it is also the
date on which you must be in compliance with any newly applicable
standards.
Sec. 63.10001 [Removed and Reserved]
0
7. Section 63.10001 is removed and reserved.
0
8. Section 63.10005 is amended by:
0
a. Revising paragraphs (a) introductory text, (a)(2) introductory text,
(a)(2)(i) and (ii), and (b)(4);
0
b. Adding paragraph (b)(6);
0
c. Revising paragraphs (d)(3), (d)(4)(i), (f), (h) introductory text,
(h)(3) introductory text, (h)(3)(i)(D), and (h)(3)(iii) introductory
text; and
0
d. Removing paragraphs (i)(4)(iii) and (iv).
The revisions and additions read as follows:
Sec. 63.10005 What are my initial compliance requirements and by what
date must I conduct them?
(a) General requirements. For each of your affected EGUs, you must
demonstrate initial compliance with each applicable emissions limit in
Table 1 or 2 of this subpart through performance testing. Where two
emissions limits are specified for a particular pollutant (e.g., a heat
input-based limit in lb/MMBtu and a gross output-based limit in lb/
MWh), you may demonstrate compliance with either emission limit. For a
particular compliance demonstration, you may be required to conduct one
or more of the following activities in conjunction with performance
testing: collection of data, e.g., hourly gross output data
(megawatts); establishment of operating limits according to Sec.
63.10011 and Tables 4 and 7 to this subpart; and CMS performance
evaluations. In all cases, you must demonstrate initial compliance no
later than the date in paragraph (f) of this section for tune-up work
practices for existing EGUs; the date that compliance must be
demonstrated, as given in Sec. 63.9984 for other requirements for
existing EGUs; and in paragraph (g) of this section for all
requirements for new EGUs.
* * * * *
(2) To demonstrate initial compliance using either a CMS that
measures HAP concentrations directly (i.e., an Hg, HCl, or HF CEMS, or
a sorbent trap monitoring system) or an SO2 or PM CEMS, the
initial performance test shall consist of 30- or, for certain coal-
fired existing EGUs that use emissions averaging for Hg, 90-boiler
operating days. If the CMS is certified prior to the compliance date
(or, if applicable, the approved extended compliance date), the test
shall begin with the first operating day on or after that date, except
as otherwise provided in paragraph (b) of this section. If the CMS is
not certified prior to the compliance
[[Page 20182]]
date, the test shall begin with the first operating day after
certification testing is successfully completed. In all cases, the
initial 30- or 90- operating day averaging period must be completed on
or before the date that compliance must be demonstrated (i.e., 180 days
after the applicable compliance date).
(i) The CMS performance test must demonstrate compliance with the
applicable Hg, HCl, HF, PM, or SO2 emissions limit in Table
1 or 2 to this subpart.
(ii) You must collect hourly data from auxiliary monitoring systems
(i.e., stack gas flow rate, CO2, O2, or moisture,
as applicable) during the performance test period, in order to convert
the pollutant concentrations to units of the standard. If you choose to
comply with a gross output-based emission limit, you must also collect
hourly gross output data during the performance test period.
* * * * *
(b) * * *
(4) A record of all parameters needed to convert pollutant
concentrations to units of the emission standard (e.g., stack flow
rate, diluent gas concentrations, hourly gross outputs) is available
for the entire performance test period; and
* * * * *
(6) For performance stack test data that are collected prior to the
date that compliance must be demonstrated and are used to demonstrate
initial compliance with applicable emissions limits, the interval for
subsequent stack tests begins on the date that compliance must be
demonstrated.
* * * * *
(d) * * *
(3) For affected EGUs that are either required to or elect to
demonstrate initial compliance with the applicable Hg emission limit in
Table 1 or 2 of this subpart using Hg CEMS or sorbent trap monitoring
systems, initial compliance must be demonstrated no later than the
applicable date specified in Sec. 63.9984(f) for existing EGUs and in
paragraph (g) of this section for new EGUs. Initial compliance is
achieved if the arithmetic average of 30- (or 90-) boiler operating
days of quality-assured CEMS (or sorbent trap monitoring system) data,
expressed in units of the standard (see section 6.2 of appendix A to
this subpart), meets the applicable Hg emission limit in Table 1 or 2
to this subpart.
(4) * * *
(i) You must demonstrate initial compliance no later than the
applicable date specified in Sec. 63.9984(f) for existing EGUs and in
paragraph (g) of this section for new EGUs.
* * * * *
(f) For an existing EGU without a neural network, a tune-up,
following the procedures in Sec. 63.10021(e), must occur within 6
months (180 days) after April 16, 2015. For an existing EGU with a
neural network, a tune-up must occur within 18 months (545 days) after
April 16, 2016. If a tune-up occurs prior to April 16, 2015, you must
keep records showing that the tune-up met all rule requirements.
* * * * *
(h) Low emitting EGUs. The provisions of this paragraph (h) apply
to pollutants with emissions limits from new EGUs except Hg and to all
pollutants with emissions limits from existing EGUs. You may pursue
this compliance option unless prohibited pursuant to Sec.
63.10000(c)(1)(i).
* * * * *
(3) For Hg, you must conduct a 30- (or 90-) boiler operating day
performance test using Method 30B in appendix A-8 to part 60 of this
chapter to determine whether a unit qualifies for LEE status. Locate
the Method 30B sampling probe tip at a point within 10 percent of the
duct area centered about the duct's centroid at a location that meets
Method 1 in appendix A-1 to part 60 of this chapter and conduct at
least three nominally equal length test runs over the 30- (or 90-)
boiler operating day test period. You may use a pair of sorbent traps
to sample the stack gas for a period consistent with that given in
section 5.2.1 of appendix A to this subpart. Collect Hg emissions data
continuously over the entire test period (except when changing sorbent
traps or performing required reference method QA procedures). As an
alternative to constant rate sampling per Method 30B, you may use
proportional sampling per section 8.2.2 of Performance Specification 12
B in appendix B to part 60 of this chapter.
(i) * * *
(D) Hourly gross output data (megawatts), from facility records.
* * * * *
(iii) Calculate the average Hg concentration, in [micro]g/m\3\ (dry
basis), for the 30- (or 90-) boiler operating day performance test, as
the arithmetic average of all Method 30B sorbent trap results. Also
calculate, as applicable, the average values of CO2 or
O2 concentration, stack gas flow rate, stack gas moisture
content, and gross output for the test period. Then:
* * * * *
0
9. Section 63.10006 is amended by revising paragraph (f) and removing
paragraph (j) to read as follows:
Sec. 63.10006 When must I conduct subsequent performance tests or
tune-ups?
* * * * *
(f) Time between performance tests. (1) Notwithstanding the
provisions of Sec. 63.10021(d)(1), the requirements listed in
paragraphs (g) and (h) of this section, and the requirements of
paragraph (f)(3) of this section, you must complete performance tests
for your EGU as follows:
(i) At least 45 calendar days, measured from the test's end date,
must separate performance tests conducted every quarter;
(ii) For annual testing:
(A) At least 320 calendar days, measured from the test's end date,
must separate performance tests;
(B) At least 320 calendar days, measured from the test's end date,
must separate annual sorbent trap mercury testing for 30-boiler
operating day LEE tests;
(C) At least 230 calendar days, measured from the test's end date,
must separate annual sorbent trap mercury testing for 90-boiler
operating day LEE tests; and
(iii) At least 1,050 calendar days, measured from the test's end
date, must separate performance tests conducted every 3 years.
(2) For units demonstrating compliance through quarterly emission
testing, you must conduct a performance test in the 4th quarter of a
calendar year if your EGU has skipped performance tests in the first 3
quarters of the calendar year.
(3) If your EGU misses a performance test deadline due to being
inoperative and if 168 or more boiler operating hours occur in the next
test period, you must complete an additional performance test in that
period as follows:
(i) At least 15 calendar days must separate two performance tests
conducted in the same quarter.
(ii) At least 107 calendar days must separate two performance tests
conducted in the same calendar year.
(iii) At least 350 calendar days must separate two performance
tests conducted in the same 3 year period.
* * * * *
0
10. Section 63.10007 is amended by revising paragraph (f)(2) to read as
follows:
Sec. 63.10007 What methods and other procedures must I use for the
performance tests?
* * * * *
[[Page 20183]]
(f) * * *
(2) Default gross output. If you use CEMS to continuously monitor
Hg, HCl, HF, SO2, or PM emissions (or, if applicable,
sorbent trap monitoring systems to continuously collect Hg emissions
data), the following default value is available for use in the emission
rate calculations during startup periods or shutdown periods (as
defined in Sec. 63.10042). For the purposes of this subpart, this
default value is not considered to be substitute data. For a startup or
shutdown hour in which there is heat input to an affected EGU but zero
gross output, you must calculate the pollutant emission rate using a
value equivalent to 5% of the maximum sustainable gross output,
expressed in megawatts, as defined in section 6.5.2.1(a)(1) of appendix
A to part 75 of this chapter. This default gross output is either the
nameplate capacity of the EGU or the highest gross output observed in
at least four representative quarters of EGU operation. For a monitored
common stack, the default gross output is used only when all EGUs are
operating (i.e., combusting fuel) are in startup or shutdown mode, and
have zero electrical generation. Under those conditions, a default
gross output equal to 5% of the combined maximum sustainable gross
output of the EGUs that are operating but have a total of zero gross
output must be used to calculate the hourly gross output-based
pollutant emissions rate.
* * * * *
0
11. Section 63.10009 is amended by revising paragraphs (a)(2)
introductory text, (a)(2)(i), (b)(1) through (3), (e), (f) introductory
text, (f)(2), (g), (j)(1)(ii), and (j)(2) introductory text to read as
follows:
Sec. 63.10009 May I use emissions averaging to comply with this
subpart?
(a) * * *
(2) You may demonstrate compliance by emissions averaging among the
existing EGUs in the same subcategory, if your averaged Hg emissions
for EGUs in the ``unit designed for coal >=8,300 Btu/lb'' subcategory
are equal to or less than 1.2 lb/TBtu or 1.3E-2 lb/GWh on a 30-boiler
operating day basis or if your averaged emissions of individual, other
pollutants from other subcategories of such EGUs are equal to or less
than the applicable emissions limit in Table 2 to this subpart,
according to the procedures in this section. Note that except for the
alternate Hg emissions limit from EGUs in the ``unit designed for coal
>= 8,300 Btu/lb'' subcategory, the averaging time for emissions
averaging for pollutants is 30 days (rolling daily) using data from
CEMS or a combination of data from CEMS and manual performance (LEE)
testing. The averaging time for emissions averaging for the alternate
Hg limit (equal to or less than 1.0 lb/TBtu or 1.1E-2 lb/GWh) from EGUs
in the ``unit designed for coal >= 8,300 Btu/lb'' subcategory is 90-
boiler operating days (rolling daily) using data from CEMS, sorbent
trap monitoring, or a combination of monitoring data and data from
manual performance (LEE) testing. For the purposes of this paragraph,
30- (or 90-) group boiler operating days is defined as a period during
which at least one unit in the emissions averaging group operates on
each of the 30 or 90 days. You must calculate the weighted average
emissions rate for the group in accordance with the procedures in this
paragraph using the data from all units in the group including any that
operate fewer than 30 (or 90) days during the preceding 30 (or 90)
group boiler days.
(i) You may choose to have your EGU emissions averaging group meet
either the heat input basis (MMBtu or TBtu, as appropriate for the
pollutant) or gross output basis (MWh or GWh, as appropriate for the
pollutant).
* * * * *
(b) * * *
(1) Group eligibility equations.
[GRAPHIC] [TIFF OMITTED] TR06AP16.001
Where:
WAERm = Maximum Weighted Average Emission Rate in terms
of lb/heat input or lb/gross output,
Hermi,j = hourly emission rate (e.g., lb/
MMBtu, lb/MWh) from CEMS or sorbent trap monitoring as determined
during the initial compliance determination from EGU j,
Rmmj = Maximum rated heat input, MMBtu/h, or maximum
rated gross output, MWh/h, for EGU j,
p = number of EGUs in emissions averaging group that rely on CEMS,
Terk = Emissions rate (lb/MMBTU or lb/MWh) as determined
during the initial compliance determination of EGU k,
Rmtk = Maximum rated heat input, MMBtu/h, or maximum
rated gross output, MWh/h, for EGU k, and
m = number of EGUs in emissions averaging group that rely on
emissions testing.
[GRAPHIC] [TIFF OMITTED] TR06AP16.002
Where:
Variables with the similar names share the descriptions for
Equation 1a of this section,
Smmj = maximum steam generation, lbsteam/h or
lb/gross output, for EGU j,
Cfmj = conversion factor, calculated from the most recent
compliance test results, in terms units of heat output or gross
output per pound of steam generated (MMBtu/lbsteam or
MWh/lbsteam) from EGU j,
Smtk = maximum steam generation, lbsteam/h or
lb/gross output, for EGU k, and
Cfmk = conversion factor, calculated from the most recent
compliance test results, in terms units of heat output or gross
output per pound of steam generated (MMBtu/lbsteam or
MWh/lbsteam) from EGU k.
(2) Weighted 30-boiler operating day rolling average emissions
rate equations for pollutants other than Hg. Use Equation 2a or 2b
of this section to calculate the 30 day rolling average emissions
daily.
[[Page 20184]]
[GRAPHIC] [TIFF OMITTED] TR06AP16.003
Where:
Heri = hourly emission rate (e.g., lb/MMBtu, lb/MWh) from
unit i's CEMS for the preceding 30-group boiler operating days,
Rmi = hourly heat input or gross output from unit i for
the preceding 30-group boiler operating days,
p = number of EGUs in emissions averaging group that rely on CEMS or
sorbent trap monitoring,
n = number of hours that hourly rates are collected over 30-group
boiler operating days,
Teri = Emissions rate from most recent emissions test of
unit i in terms of lb/heat input or lb/gross output,
Rti = Total heat input or gross output of unit i for the
preceding 30-boiler operating days, and
m = number of EGUs in emissions averaging group that rely on
emissions testing.
[GRAPHIC] [TIFF OMITTED] TR06AP16.004
Where:
variables with similar names share the descriptions for Equation 2a
of this section,
Smi = steam generation in units of pounds from unit i
that uses CEMS for the preceding 30-group boiler operating days,
Cfmi = conversion factor, calculated from the most recent
compliance test results, in units of heat input per pound of steam
generated or gross output per pound of steam generated, from unit i
that uses CEMS from the preceding 30 group boiler operating days,
Sti = steam generation in units of pounds from unit i
that uses emissions testing, and
Cfti = conversion factor, calculated from the most recent
compliance test results, in units of heat input per pound of steam
generated or gross output per pound of steam generated, from unit i
that uses emissions testing.
(3) Weighted 90-boiler operating day rolling average emissions
rate equations for Hg emissions from EGUs in the ``coal-fired unit
not low rank virgin coal'' subcategory. Use Equation 3a or 3b of
this section to calculate the 90-day rolling average emissions
daily.
[GRAPHIC] [TIFF OMITTED] TR06AP16.005
Where:
Heri = hourly emission rate from unit i's CEMS or Hg
sorbent trap monitoring system for the preceding 90-group boiler
operating days,
Rmi = hourly heat input or gross output from unit i for
the preceding 90-group boiler operating days,
p = number of EGUs in emissions averaging group that rely on CEMS,
n = number of hours that hourly rates are collected over the 90-
group boiler operating days,
Teri = Emissions rate from most recent emissions test of
unit i in terms of lb/heat input or lb/gross output,
Rti = Total heat input or gross output of unit i for the
preceding 90-boiler operating days, and
m = number of EGUs in emissions averaging group that rely on
emissions testing.
[GRAPHIC] [TIFF OMITTED] TR06AP16.006
Where:
variables with similar names share the descriptions for Equation 2a
of this section,
Smi = steam generation in units of pounds from unit i
that uses CEMS or a Hg sorbent trap monitoring for the preceding 90-
group boiler operating days,
Cfmi = conversion factor, calculated from the most recent
compliance test results, in units of heat input per pound of steam
generated or gross output per pound of steam generated, from unit i
that uses CEMS or sorbent trap monitoring from the preceding 90-
group boiler operating days,
Sti = steam generation in units of pounds from unit i
that uses emissions testing, and
Cfti = conversion factor, calculated from the most recent
emissions test results, in units of heat input per pound of steam
generated or gross output per pound of steam generated, from unit i
that uses emissions testing.
* * * * *
(e) The weighted-average emissions rate from the existing EGUs
participating in the emissions averaging option must be in compliance
with the limits in Table 2 to this subpart at all times following the
date that you begin emissions averaging.
(f) Emissions averaging group eligibility demonstration. You must
demonstrate the ability for the EGUs included in the emissions
averaging group to demonstrate initial compliance according to
paragraph (f)(1) or (2) of this section using the maximum rated heat
input or gross output over a 30- (or 90-) boiler operating day period
of each EGU and the results of the initial performance tests. For this
demonstration and prior to preparing your emissions averaging plan, you
must conduct required emissions monitoring for 30- (or 90-) days of
boiler operation and any required manual performance testing to
calculate maximum weighted average emissions rate in accordance with
this section. If, before the start of your initial compliance
demonstration, the Administrator becomes aware that you intend to use
emissions averaging for that demonstration, or if your initial
Notification of Compliance Status (NOCS) indicates that you intend to
[[Page 20185]]
implement emissions averaging at a future date, the Administrator may
require you to submit your proposed emissions averaging plan and
supporting data for approval. If the Administrator requires approval of
your plan, you may not begin using emissions averaging until the
Administrator approves your plan.
* * * * *
(2) If you are not capable of monitoring heat input or gross
output, and the EGU generates steam for purposes other than generating
electricity, you may use Equation 1b of paragraph (b) of this section
as an alternative to using Equation 1a of paragraph (b) of this section
to demonstrate that the maximum weighted average emissions rates of
filterable PM, HF, SO2, HCl, non-Hg HAP metals, or Hg
emissions from the existing units participating in the emissions
averaging group do not exceed the emission limits in Table 2 to this
subpart.
(g) You must determine the weighted average emissions rate in units
of the applicable emissions limit on a 30 group boiler operating day
rolling average basis (or, if applicable, on a 90 group boiler
operating day rolling average basis for Hg) according to paragraphs
(g)(1) and (2) of this section. The first averaging period ends on the
30th (or, if applicable, 90th for the alternate Hg emission limit)
group boiler operating day after the date that you begin emissions
averaging.
(1) You must use Equation 2a or 3a of paragraph (b) of this section
to calculate the weighted average emissions rate using the actual heat
input or gross output for each existing unit participating in the
emissions averaging option.
(2) If you are not capable of monitoring heat input or gross
output, you may use Equation 2b or 3b of paragraph (b) of this section
as an alternative to using Equation 2a of paragraph (b) of this section
to calculate the average weighted emission rate using the actual steam
generation from the units participating in the emissions averaging
option.
* * * * *
(j) * * *
(1) * * *
(ii) The process weighting parameter (heat input, gross output, or
steam generated) that will be monitored for each averaging group;
* * * * *
(2) If, as described in paragraph (f) of this section, the
Administrator requests you to submit the averaging plan for review and
approval, you must receive approval before initiating emissions
averaging.
* * * * *
0
12. Section 63.10010 is amended by revising paragraphs (a)(4), (f)(3)
and (4), (h)(6)(i) and (ii), (i)(5)(i)(A) and (B), (j)(1)(i),
(j)(4)(i)(A) and (B), and (l) to read as follows:
Sec. 63.10010 What are my monitoring, installation, operation, and
maintenance requirements?
(a) * * *
(4) Unit with a main stack and a bypass stack that exhausts to the
atmosphere independent of the main stack. If the exhaust configuration
of an affected unit consists of a main stack and a bypass stack, you
shall install CEMS on both the main stack and the bypass stack. If it
is not feasible to certify and quality-assure the data from a
monitoring system on the bypass stack, you shall:
(i) Route the exhaust from the bypass through the main stack and
its monitoring so that bypass emissions are measured; or
(ii) Install a CEMS only on the main stack and count hours that the
bypass stack is in use as hours of deviation from the monitoring
requirements.
* * * * *
(f) * * *
(3) Calculate and record a 30-boiler operating day rolling average
SO2 emission rate in the units of the standard, updated
after each new boiler operating day. Each 30-boiler operating day
rolling average emission rate is the average of all of the valid hourly
SO2 emission rates in the 30 boiler operating day period.
(4) Use only unadjusted, quality-assured SO2
concentration values in the emissions calculations; do not apply bias
adjustment factors to the part 75 SO2 data and do not use
part 75 substitute data values. For startup or shutdown hours (as
defined in Sec. 63.10042) the default gross output and the diluent cap
are available for use in the hourly SO2 emission rate
calculations, as described in Sec. 63.10007(f). Use a flag to identify
each startup or shutdown hour and report a special code if the diluent
cap or default gross output is used to calculate the SO2
emission rate for any of these hours.
* * * * *
(h) * * *
(6) * * *
(i) Any data collected during periods of monitoring system
malfunctions, repairs associated with monitoring system malfunctions,
or required monitoring system quality assurance or quality control
activities that temporarily interrupt the measurement of output data
from the PM CPMS. You must report any monitoring system malfunctions or
out of control periods in your annual deviation reports. You must
report any monitoring system quality assurance or quality control
activities per the requirements of Sec. 63.10031(b);
(ii) Any data collected during periods when the monitoring system
is out of control as specified in your site-specific monitoring plan,
repairs associated with periods when the monitoring system is out of
control, or required monitoring system quality assurance or quality
control activities conducted during out-of-control periods. You must
report any such periods in your annual deviation report;
* * * * *
(i) * * *
(5) * * *
(i) * * *
(A) Any data collected during periods of monitoring system
malfunctions, repairs associated with monitoring system malfunctions,
or required monitoring system quality assurance or quality control
activities that temporarily interrupt the measurement of emissions
(e.g., calibrations, certain audits). You must report any monitoring
system malfunctions or out of control periods in your annual deviation
reports. You must report any monitoring system quality assurance or
quality control activities per the requirements of Sec. 63.10031(b);
(B) Any data collected during periods when the monitoring system is
out of control as specified in your site-specific monitoring plan,
repairs associated with periods when the monitoring system is out of
control, or required monitoring system quality assurance or quality
control activities conducted during out-of-control periods. You must
report any such periods in your annual deviation report;
* * * * *
(j) * * *
(1)(i) Install, calibrate, operate, and maintain your HAP metals
CEMS according to your CMS quality control program, as described in
Sec. 63.8(d)(2). The reportable measurement output from the HAP metals
CEMS must be expressed in units of the applicable emissions limit
(e.g., lb/MMBtu, lb/MWh) and in the form of a 30-boiler operating day
rolling average.
* * * * *
(4) * * *
(i) * * *
(A) Any data collected during periods of monitoring system
malfunctions, repairs associated with monitoring
[[Page 20186]]
system malfunctions, or required monitoring system quality assurance or
quality control activities that temporarily interrupt the measurement
of emissions (e.g., calibrations, certain audits). You must report any
monitoring system malfunctions or out of control periods in your annual
deviation reports. You must report any monitoring system quality
assurance or quality control activities per the requirements of Sec.
63.10031(b);
(B) Any data collected during periods when the monitoring system is
out of control as specified in your site-specific monitoring plan,
repairs associated with periods when the monitoring system is out of
control, or required monitoring system quality assurance or quality
control activities conducted during out-of-control periods. You must
report any monitoring system malfunctions or out of control periods in
your annual deviation reports. You must report any monitoring system
quality assurance or quality control activities per the requirements of
Sec. 63.10031(b);
* * * * *
(l) Should you choose to rely on paragraph (2) of the definition of
``startup'' in Sec. 63.10042 for your EGU, you must install, verify,
operate, maintain, and quality assure each monitoring system necessary
for demonstrating compliance with the PM or non-mercury metals work
practice standards required to comply with Sec. 63.10020(e).
(1) You shall develop a site-specific monitoring plan for PM or
non-mercury metals work practice monitoring during startup periods.
(2) You shall submit the site-specific monitoring plan upon request
by the Administrator.
(3) The provisions of the monitoring plan must address the
following items:
(i) Monitoring system installation;
(ii) Performance and equipment specifications;
(iii) Schedule for initial and periodic performance evaluations;
(iv) Performance evaluation procedures and acceptance criteria;
(v) On-going operation and maintenance procedures; and
(vi) On-going recordkeeping and reporting procedures.
(4) You may rely on monitoring system specifications or
instructions or manufacturer's specifications to address paragraphs
(l)(3)(i) through (vi) of this section.
(5) You must operate and maintain the monitoring system according
to the site-specific monitoring plan.
0
13. Section 63.10011 is amended by revising paragraphs (b), (c), (e),
and (g) to read as follows:
Sec. 63.10011 How do I demonstrate initial compliance with the
emissions limits and work practice standards?
* * * * *
(b) If you are subject to an operating limit in Table 4 to this
subpart, you demonstrate initial compliance with HAP metals or
filterable PM emission limit(s) through performance stack tests and you
elect to use a PM CPMS to demonstrate continuous performance, or if,
for a liquid oil-fired EGU, and you use quarterly stack testing for HCl
and HF plus site-specific parameter monitoring to demonstrate
continuous performance, you must also establish a site-specific
operating limit, in accordance with Sec. 63.10007 and Table 6 to this
subpart. You may use only the parametric data recorded during
successful performance tests (i.e., tests that demonstrate compliance
with the applicable emissions limits) to establish an operating limit.
(c)(1) If you use CEMS or sorbent trap monitoring systems to
measure a HAP (e.g., Hg or HCl) directly, the initial performance test,
shall consist of a 30-boiler operating day (or, for certain coal-fired,
existing EGUs that use emissions averaging for Hg, a 90-boiler
operating day) rolling average emissions rate obtained with a certified
CEMS or sorbent trap system, expressed in units of the standard. If the
monitoring system is certified prior to the applicable compliance date,
the initial averaging period shall either begin with: The first boiler
operating day on or after the compliance date; or 30 (or, if
applicable, 90) boiler operating days prior to that date, as described
in Sec. 63.10005(b). In all cases, the initial 30- or 90-boiler
operating day averaging period must be completed on or before the date
that compliance must be demonstrated, in accordance with Sec.
63.9984(f). Initial compliance is demonstrated if the results of the
performance test meet the applicable emission limit in Table 1 or 2 to
this subpart.
(2) For an EGU that uses a CEMS to measure SO2 or PM
emissions for initial compliance, the initial performance test shall
consist of a 30-boiler operating day average emission rate obtained
with certified CEMS, expressed in units of the standard. If the
monitoring system is certified prior to the applicable compliance date,
the initial averaging period shall either begin with: The first boiler
operating day on or after the compliance date; or 30 boiler operating
days prior to that date, as described in Sec. 63.10005(b). In all
cases, the initial 30- boiler operating day averaging period must be
completed on or before the date that compliance must be demonstrated,
in accordance with Sec. 63.9984(f). Initial compliance is demonstrated
if the results of the performance test meet the applicable
SO2 or PM emission limit in Table 1 or 2 to this subpart.
* * * * *
(e) You must submit a Notification of Compliance Status containing
the results of the initial compliance demonstration, in accordance with
Sec. 63.10030(e).
* * * * *
(g) You must follow the startup or shutdown requirements as
established in Table 3 to this subpart for each coal-fired, liquid oil-
fired, or solid oil-derived fuel-fired EGU.
(1) You may use the diluent cap and default gross output values, as
described in Sec. 63.10007(f), during startup periods or shutdown
periods.
(2) You must operate all CMS, collect data, calculate pollutant
emission rates, and record data during startup periods or shutdown
periods.
(3) You must report the information as required in Sec. 63.10031.
(4) If you choose to use paragraph (2) of the definition of
``startup'' in Sec. 63.10042 and you find that you are unable to
safely engage and operate your particulate matter (PM) control(s)
within 1 hour of first firing of coal, residual oil, or solid oil-
derived fuel, you may choose to rely on paragraph (1) of definition of
``startup'' in Sec. 63.10042 or you may submit a request to use an
alternative non-opacity emissions standard, as described below.
(i) As mentioned in Sec. 63.6(g)(1), your request will be
published in the Federal Register for notice and comment rulemaking.
Until promulgation in the Federal Register of the final alternative
non-opacity emission standard, you shall comply with paragraph (1) of
the definition of ``startup'' in Sec. 63.10042. You shall not
implement the alternative non-opacity emissions standard until
promulgation in the Federal Register of the final alternative non-
opacity emission standard.
(ii) Your request need not address the items contained in Sec.
63.6(g)(2).
(iii) Your request shall provide evidence of a documented
manufacturer-identified safety issue.
(iv) Your request shall provide information to document that the PM
control device is adequately designed and sized to meet the PM emission
limit applicable to the EGU.
(v) In addition, your request shall contain documentation that:
(A) Your EGU is using clean fuels to the maximum extent possible,
taking into account considerations such as not compromising boiler or
control device integrity, to bring your EGU and PM
[[Page 20187]]
control device up to the temperature necessary to alleviate or prevent
the identified safety issues prior to the combustion of primary fuel in
your EGU;
(B) You have followed explicitly your EGU manufacturer's procedures
to alleviate or prevent the identified safety issue; and
(C) You have identified with specificity the details of your EGU
manufacturer's statement of concern.
(vi) Your request shall specify the other work practice standards
you will take to limit HAP emissions during startup periods and
shutdown periods to ensure a control level consistent with the work
practice standards of the final rule.
(vii) You must comply with all other work practice requirements,
including but not limited to data collection, recordkeeping, and
reporting requirements.
0
14. Section 63.10020 is amended by revising paragraph (e) to read as
follows:
Sec. 63.10020 How do I monitor and collect data to demonstrate
continuous compliance?
* * * * *
(e) Additional requirements during startup periods or shutdown
periods if you choose to rely on paragraph (2) of the definition of
``startup'' in Sec. 63.10042 for your EGU.
(1) During each period of startup, you must record for each EGU:
(i) The date and time that clean fuels being combusted for the
purpose of startup begins;
(ii) The quantity and heat input of clean fuel for each hour of
startup;
(iii) The gross output for each hour of startup;
(iv) The date and time that non-clean fuel combustion begins; and
(v) The date and time that clean fuels being combusted for the
purpose of startup ends.
(2) During each period of shutdown, you must record for each EGU:
(i) The date and time that clean fuels being combusted for the
purpose of shutdown begins;
(ii) The quantity and heat input of clean fuel for each hour of
shutdown;
(iii) The gross output for each hour of shutdown;
(iv) The date and time that non-clean fuel combustion ends; and
(v) The date and time that clean fuels being combusted for the
purpose of shutdown ends.
(3) For PM or non-mercury HAP metals work practice monitoring
during startup periods, you must monitor and collect data according to
this section and the site-specific monitoring plan required by Sec.
63.10010(l).
(i) Except for an EGU that uses PM CEMS or PM CPMS to demonstrate
compliance with the PM emissions limit, or that has LEE status for
filterable PM or total non-Hg HAP metals for non- liquid oil-fired EGUs
(or HAP metals emissions for liquid oil-fired EGUs), or individual non-
mercury metals CEMS, you must:
(A) Record temperature and combustion air flow or calculated flow
as determined from combustion equations of post-combustion (exhaust)
gas, as well as amperage of forced draft fan(s), upstream of the
filterable PM control devices during each hour of startup.
(B) Record temperature and flow of exhaust gas, as well as amperage
of any induced draft fan(s), downstream of the filterable PM control
devices during each hour of startup.
(C) For an EGU with an electrostatic precipitator, record the
number of fields in service, as well as each field's secondary voltage
and secondary current during each hour of startup.
(D) For an EGU with a fabric filter, record the number of
compartments in service, as well as the differential pressure across
the baghouse during each hour of startup.
(E) For an EGU with a wet scrubber needed for filterable PM
control, record the scrubber liquid to flue gas ratio and the pressure
drop across the scrubber during each hour of startup.
(ii) [Reserved]
0
15. Section 63.10021 is amended by revising paragraphs (d)(3), (e)
introductory text, (e)(9), and (h)(1) to read as follows:
Sec. 63.10021 How do I demonstrate continuous compliance with the
emission limitations, operating limits, and work practice standards?
* * * * *
(d) * * *
(3) Must conduct site-specific monitoring using CMS to demonstrate
compliance with the site-specific monitoring requirements in Table 7 to
this subpart pertaining to HCl and HF emissions from a liquid oil-fired
EGU to ensure compliance with the HCl and HF emission limits in Tables
1 and 2 to this subpart, in accordance with the requirements of Sec.
63.10000(c)(2)(iii). The monitoring must meet the general operating
requirements provided in Sec. 63.10020.
(e) Conduct periodic performance tune-ups of your EGU(s), as
specified in paragraphs (e)(1) through (9) of this section. For your
first tune-up, you may perform the burner inspection any time prior to
the tune-up or you may delay the first burner inspection until the next
scheduled EGU outage provided you meet the requirements of Sec.
63.10005. Subsequently, you must perform an inspection of the burner at
least once every 36 calendar months unless your EGU employs neural
network combustion optimization during normal operations in which case
you must perform an inspection of the burner and combustion controls at
least once every 48 calendar months. If your EGU is offline when a
deadline to perform the tune-up passes, you shall perform the tune-up
work practice requirements within 30 days after the re-start of the
affected unit.
* * * * *
(9) Report the dates of the initial and subsequent tune-ups in hard
copy, as specified in Sec. 63.10031(f)(5), until April 16, 2017. After
April 16, 2017, report the date of all tune-ups electronically, in
accordance with Sec. 63.10031(f). The tune-up report date is the date
when tune-up requirements in paragraphs (e)(6) and (7) of this section
are completed.
* * * * *
(h) * * *
(1) You may use the diluent cap and default gross output values, as
described in Sec. 63.10007(f), during startup periods or shutdown
periods.
* * * * *
0
16. Section 63.10023 is amended by removing and reserving paragraph
(b)(1) and revising paragraph (b)(2) introductory text to read as
follows:
Sec. 63.10023 How do I establish my PM CPMS operating limit and
determine compliance with it?
* * * * *
(b) * * *
(2) Determine your operating limit as follows:
* * * * *
0
17. Section 63.10030 is amended by:
0
a. Revising paragraphs (e)(1) and (e)(7)(i);
0
b. Adding paragraph (e)(7)(iii);
0
c. Revising paragraph (e)(8); and
0
d. Adding paragraph (f).
The revisions and additions read as follows:
Sec. 63.10030 What notifications must I submit and when?
* * * * *
(e) * * *
(1) A description of the affected source(s), including
identification of the subcategory of the source, the design capacity of
the source, a description of the add-on controls used on the source,
description of the fuel(s) burned, including whether the fuel(s) were
determined by you or EPA through a
[[Page 20188]]
petition process to be a non-waste under 40 CFR 241.3, whether the
fuel(s) were processed from discarded non-hazardous secondary materials
within the meaning of 40 CFR 241.3, and justification for the selection
of fuel(s) burned during the performance test.
* * * * *
(7) * * *
(i) A summary of the results of the annual performance tests and
documentation of any operating limits that were reestablished during
this test, if applicable. If you are conducting stack tests once every
3 years consistent with Sec. 63.10005(h)(1)(i), the date of each stack
test conducted during the previous 3 years, a comparison of emission
level you achieved in each stack test conducted during the previous 3
years to the 50 percent emission limit threshold required in Sec.
63.10006(i), and a statement as to whether there have been any
operational changes since the last stack test that could increase
emissions.
* * * * *
(iii) For each of your existing EGUs, identification of each
emissions limit as specified in Table 2 to this subpart with which you
plan to comply.
(A) You may switch from a mass per heat input to a mass per gross
output limit (or vice-versa), provided that:
(1) You submit a request that identifies for each EGU or EGU
emissions averaging group involved in the proposed switch both the
current and proposed emission limit;
(2) Your request arrives to the Administrator at least 30 calendar
days prior to the date that the switch is proposed to occur;
(3) Your request demonstrates through performance stack test
results completed within 30 days prior to your submission, compliance
for each EGU or EGU emissions averaging group with both the mass per
heat input and mass per gross output limits;
(4) You revise and submit all other applicable plans, e.g.,
monitoring and emissions averaging, with your request; and
(5) You maintain records of all information regarding your choice
of emission limits.
(B) You begin to use the revised emission limits starting in the
next reporting period, after receipt of written acknowledgement from
the Administrator of the switch.
(C) From submission of your request until start of the next
reporting period after receipt of written acknowledgement from the
Administrator of the switch, you demonstrate compliance with both the
mass per heat input and mass per gross output emission limits for each
pollutant for each EGU or EGU emissions averaging group.
(8) Identification of whether you plan to rely on paragraph (1) or
(2) of the definition of ``startup'' in Sec. 63.10042.
(i) Should you choose to rely on paragraph (2) of the definition of
``startup'' in Sec. 63.10042 for your EGU, you shall include a report
that identifies:
(A) The original EGU installation date;
(B) The original EGU design characteristics, including, but not
limited to, fuel mix and PM controls;
(C) Each design PM control device efficiency established during
performance testing or while operating in periods other than startup
and shutdown periods;
(D) The design PM emission rate from the EGU in terms of pounds PM
per MMBtu and pounds PM per hour established during performance testing
or while operating in periods other than startup and shutdown periods;
(E) The design time from start of fuel combustion to necessary
conditions for each PM control device startup;
(F) Each design PM control device efficiency upon startup of the PM
control device, if different from the efficiency provided in paragraph
(e)(8)(i)(C) of this section;
(G) Current EGU PM producing characteristics, including, but not
limited to, fuel mix and PM controls, if different from the
characteristics provided in paragraph (e)(8)(i)(B) of this section;
(H) Current PM control device efficiency from each PM control
device, if different from the efficiency provided in paragraph
(e)(8)(i)(C) of this section;
(I) Current PM emission rate from the EGU in terms of pounds PM per
MMBtu and pounds per hour, if different from the rate provided in
paragraph (e)(8)(i)(D) of this section;
(J) Current time from start of fuel combustion to conditions
necessary for each PM control device startup, if different from the
time provided in paragraph (e)(8)(i)(E) of this section; and
(K) Current PM control device efficiency upon startup of each PM
control device, if different from the efficiency provided in paragraph
(e)(8)(i)(H) of this section.
(ii) The report shall be prepared, signed, and sealed by a
professional engineer licensed in the state where your EGU is located.
(iii) You may switch from paragraph (1) of the definition of
``startup'' in Sec. 63.10042 to paragraph (2) of the definition of
``startup'' (or vice-versa), provided that:
(A) You submit a request that identifies for each EGU or EGU
emissions averaging group involved in the proposed switch both the
current definition of ``startup'' relied on and the proposed definition
you plan to rely on;
(B) Your request arrives to the Administrator at least 30 calendar
days prior to the date that the switch is proposed to occur;
(C) You revise and submit all other applicable plans, e.g.,
monitoring and emissions averaging, with your submission;
(D) You maintain records of all information regarding your choice
of the definition of ``startup''; and
(E) You begin to use the revised definition of ``startup'' in the
next reporting period after receipt of written acknowledgement from the
Administrator of the switch.
(f) You must submit the notifications in Sec. 63.10000(h)(2) and
(i)(2) that may apply to you by the dates specified.
0
18. Section 63.10031 is amended by revising paragraphs (c) introductory
text and (c)(4) and (5) and adding paragraphs (c)(6), (7), (8), and (9)
to read as follows:
Sec. 63.10031 What reports must I submit and when?
* * * * *
(c) The compliance report must contain the information required in
paragraphs (c)(1) through (9) of this section.
* * * * *
(4) Include the date of the most recent tune-up for each EGU. The
date of the tune-up is the date the tune-up provisions specified in
Sec. 63.10021(e)(6) and (7) were completed.
(5) Should you choose to rely on paragraph (2) of the definition of
``startup'' in Sec. 63.10042 for your EGU, for each instance of
startup or shutdown you shall:
(i) Include the maximum clean fuel storage capacity and the maximum
hourly heat input that can be provided for each clean fuel determined
according to the requirements of Sec. 63.10032(f).
(ii) Include the information required to be monitored, collected,
or recorded according to the requirements of Sec. 63.10020(e).
(iii) If you choose to use CEMS to demonstrate compliance with
numerical limits, include hourly average CEMS values and hourly average
flow values during startup periods or shutdown periods. Use units of
milligrams per cubic meter for PM CEMS values, micrograms per cubic
meter for Hg CEMS values, and ppmv for HCl, HF, or
[[Page 20189]]
SO2 CEMS values. Use units of standard cubic meters per hour
on a wet basis for flow values.
(iv) If you choose to use a separate sorbent trap measurement
system for startup or shutdown reporting periods, include hourly
average mercury concentration values in terms of micrograms per cubic
meter.
(v) If you choose to use a PM CPMS, include hourly average
operating parameter values in terms of the operating limit, as well as
the operating parameter to PM correlation equation.
(6) You must report emergency bypass information annually from EGUs
with LEE status.
(7) A summary of the results of the annual performance tests and
documentation of any operating limits that were reestablished during
the test, if applicable. If you are conducting stack tests once every 3
years to maintain LEE status, consistent with Sec. 63.10006(b), the
date of each stack test conducted during the previous 3 years, a
comparison of emission level you achieved in each stack test conducted
during the previous 3 years to the 50 percent emission limit threshold
required in Sec. 63.10005(h)(1)(i), and a statement as to whether
there have been any operational changes since the last stack test that
could increase emissions.
(8) A certification.
(9) If you have a deviation from any emission limit, work practice
standard, or operating limit, you must also submit a brief description
of the deviation, the duration of the deviation, emissions point
identification, and the cause of the deviation.
* * * * *
0
19. Section 63.10032 is amended by revising paragraph (f) to read as
follows:
Sec. 63.10032 What records must I keep?
* * * * *
(f) Regarding startup periods or shutdown periods:
(1) Should you choose to rely on paragraph (1) of the definition of
``startup'' in Sec. 63.10042 for your EGU, you must keep records of
the occurrence and duration of each startup or shutdown.
(2) Should you choose to rely on paragraph (2) of the definition of
``startup'' in Sec. 63.10042 for your EGU, you must keep records of:
(i) The determination of the maximum possible clean fuel capacity
for each EGU;
(ii) The determination of the maximum possible hourly clean fuel
heat input and of the hourly clean fuel heat input for each EGU; and
(iii) The information required in Sec. 63.10020(e).
* * * * *
0
20. Section 63.10042 is amended by:
0
a. Revising the definitions of ``Coal-fired electric utility steam
generating unit,'' ``Coal refuse,'' ``Fossil fuel-fired,'' ``Integrated
gasification combined cycle electric utility steam generating unit or
IGCC,'' ``Limited-use liquid oil-fired subcategory,'' and ``Natural
gas-fired electric utility steam generating unit'';
0
b. Adding, in alphabetical order, definition of ``Neural network or
neural net''; and
0
c. Revising the definition of ``Oil-fired electric utility steam
generating unit.''
The revisions and additions read as follows:
Sec. 63.10042 What definitions apply to this subpart?
* * * * *
Coal-fired electric utility steam generating unit means an electric
utility steam generating unit meeting the definition of ``fossil fuel-
fired'' that burns coal for more than 10.0 percent of the average
annual heat input during the 3 previous calendar years after the
compliance date for your facility in Sec. 63.9984 or for more than
15.0 percent of the annual heat input during any one of those calendar
years. EGU owners and operators must estimate coal, oil, and natural
gas usage for the first 3 calendar years after the applicable
compliance date and they are solely responsible for assuring compliance
with this final rule or other applicable standard based on their fuel
usage projections. After the first 3 years of compliance, EGUs are
required to evaluate applicability based on coal or oil usage from the
three previous calendars years on an annual rolling basis.
Coal refuse means waste products of coal mining, physical coal
cleaning, and coal preparation operations (e.g. culm, gob, etc.)
containing coal, matrix material, clay, and other organic and inorganic
material.
* * * * *
Fossil fuel-fired means an electric utility steam generating unit
(EGU) that is capable of producing more than 25 MW of electrical output
from the combustion of fossil fuels. To be ``capable of combusting''
fossil fuels, an EGU would need to have these fuels allowed in its
operating permit and have the appropriate fuel handling facilities on-
site or otherwise available (e.g., coal handling equipment, including
coal storage area, belts and conveyers, pulverizers, etc.; oil storage
facilities). In addition, fossil fuel-fired means any EGU that fired
fossil fuels for more than 10.0 percent of the average annual heat
input during the 3 previous calendar years after the compliance date
for your facility in Sec. 63.9984 or for more than 15.0 percent of the
annual heat input during any one of those calendar years. EGU owners
and operators must estimate coal, oil, and natural gas usage for the
first 3 calendar years after the applicable compliance date and they
are solely responsible for assuring compliance with this final rule or
other applicable standard based on their fuel usage projections. After
the first 3 years of compliance, EGUs are required to evaluate
applicability based on coal or oil usage from the three previous
calendars years on an annual rolling basis.
* * * * *
Integrated gasification combined cycle electric utility steam
generating unit or IGCC means an electric utility steam generating unit
meeting the definition of ``fossil fuel-fired'' that burns a synthetic
gas derived from coal and/or solid oil-derived fuel for more than 10.0
percent of the average annual heat input during the 3 previous calendar
years after the compliance date for your facility in Sec. 63.9984 or
for more than 15.0 percent of the annual heat input during any one of
those calendar years in a combined-cycle gas turbine. EGU owners and
operators must estimate coal, oil, and natural gas usage for the first
3 calendar years after the applicable compliance date and they are
solely responsible for assuring compliance with this final rule or
other applicable standard based on their fuel usage projections. No
solid coal or solid oil-derived fuel is directly burned in the unit
during operation. After the first 3 years of compliance, EGUs are
required to evaluate applicability based on coal or oil usage from the
three previous calendars years on an annual rolling basis.
* * * * *
Limited-use liquid oil-fired subcategory means an oil-fired
electric utility steam generating unit with an annual capacity factor
when burning oil of less than 8 percent of its maximum or nameplate
heat input, whichever is greater, averaged over a 24-month block
contiguous period commencing on the first of the month following the
compliance date specified in Sec. 63.9984.
* * * * *
Natural gas-fired electric utility steam generating unit means an
electric utility steam generating unit meeting the definition of
``fossil fuel-fired'' that is not a coal-fired, oil-fired, or IGCC
electric utility steam generating unit and
[[Page 20190]]
that burns natural gas for more than 10.0 percent of the average annual
heat input during the 3 previous calendar years after the compliance
date for your facility in Sec. 63.9984 or for more than 15.0 percent
of the annual heat input during any one of those calendar years. EGU
owners and operators must estimate coal, oil, and natural gas usage for
the first 3 calendar years after the applicable compliance date and
they are solely responsible for assuring compliance with this final
rule or other applicable standard based on their fuel usage
projections.
* * * * *
Neural network or neural net for purposes of this rule means an
automated boiler optimization system. A neural network typically has
the ability to process data from many inputs to develop, remember,
update, and enable algorithms for efficient boiler operation.
* * * * *
Oil-fired electric utility steam generating unit means an electric
utility steam generating unit meeting the definition of ``fossil fuel-
fired'' that is not a coal-fired electric utility steam generating unit
and that burns oil for more than 10.0 percent of the average annual
heat input during the 3 previous calendar years after the compliance
date for your facility in Sec. 63.9984 or for more than 15.0 percent
of the annual heat input during any one of those calendar years. EGU
owners and operators must estimate coal, oil, and natural gas usage for
the first 3 calendar years after the applicable compliance date and
they are solely responsible for assuring compliance with this final
rule or other applicable standard based on their fuel usage
projections. After the first 3 years of compliance, EGUs are required
to evaluate applicability based on coal or oil usage from the three
previous calendars years on an annual rolling basis.
* * * * *
0
21. Revise Table 1 to subpart UUUUU of part 63 to read as follows:
Table 1 to Subpart UUUUU of Part 63--Emission Limits for New or Reconstructed EGUs
[As stated in Sec. 63.9991, you must comply with the following applicable emission limits:]
----------------------------------------------------------------------------------------------------------------
Using these
requirements, as
You must meet the appropriate (e.g.,
following emission specified sampling
If your EGU is in this subcategory . For the following limits and work volume or test run
. . pollutants . . . practice standards . . duration) and
. limitations with the
test methods in Table
5 to this Subpart . . .
----------------------------------------------------------------------------------------------------------------
1. Coal-fired unit not low rank a. Filterable 9.0E-2 lb/MWh \1\...... Collect a minimum of 4
virgin coal. particulate matter dscm per run.
(PM).
OR..................... OR .......................
Total non-Hg HAP metals 6.0E-2 lb/GWh.......... Collect a minimum of 4
dscm per run.
OR..................... OR .......................
Individual HAP metals:. Collect a minimum of 3
dscm per run.
Antimony (Sb).......... 8.0E-3 lb/GWh.......... .......................
Arsenic (As)........... 3.0E-3 lb/GWh.......... .......................
Beryllium (Be)......... 6.0E-4 lb/GWh.......... .......................
Cadmium (Cd)........... 4.0E-4 lb/GWh.......... .......................
Chromium (Cr).......... 7.0E-3 lb/GWh.......... .......................
Cobalt (Co)............ 2.0E-3 lb/GWh.......... .......................
Lead (Pb).............. 2.0E-2 lb/GWh.......... .......................
Manganese (Mn)......... 4.0E-3 lb/GWh.......... .......................
Nickel (Ni)............ 4.0E-2 lb/GWh.......... .......................
Selenium (Se).......... 5.0E-2 lb/GWh.......... .......................
b. Hydrogen chloride 1.0E-2 lb/MWh.......... For Method 26A at
(HCl). appendix A-8 to part
60 of this chapter,
collect a minimum of 3
dscm per run. For ASTM
D6348-03 \2\ or Method
320 at appendix A to
part 63 of this
chapter, sample for a
minimum of 1 hour.
OR
Sulfur dioxide (SO2) 1.0 lb/MWh............. SO2 CEMS.
\3\.
c. Mercury (Hg)........ 3.0E-3 lb/GWh.......... Hg CEMS or sorbent trap
monitoring system
only.
2. Coal-fired units low rank virgin a. Filterable 9.0E-2 lb/MWh \1\...... Collect a minimum of 4
coal. particulate matter dscm per run.
(PM).
OR..................... OR
Total non-Hg HAP metals 6.0E-2 lb/GWh.......... Collect a minimum of 4
dscm per run.
OR..................... OR
Individual HAP metals:. Collect a minimum of 3
dscm per run.
Antimony (Sb).......... 8.0E-3 lb/GWh.......... .......................
Arsenic (As)........... 3.0E-3 lb/GWh.......... .......................
Beryllium (Be)......... 6.0E-4 lb/GWh.......... .......................
Cadmium (Cd)........... 4.0E-4 lb/GWh.......... .......................
Chromium (Cr).......... 7.0E-3 lb/GWh.......... .......................
Cobalt (Co)............ 2.0E-3 lb/GWh.......... .......................
Lead (Pb).............. 2.0E-2 lb/GWh.......... .......................
Manganese (Mn)......... 4.0E-3 lb/GWh.......... .......................
Nickel (Ni)............ 4.0E-2 lb/GWh.......... .......................
Selenium (Se).......... 5.0E-2 lb/GWh.......... .......................
b. Hydrogen chloride 1.0E-2 lb/MWh.......... For Method 26A, collect
(HCl). a minimum of 3 dscm
per run For ASTM D6348-
03 \2\ or Method 320,
sample for a minimum
of 1 hour.
OR
[[Page 20191]]
Sulfur dioxide (SO2) 1.0 lb/MWh............. SO2 CEMS.
\3\.
c. Mercury (Hg)........ 4.0E-2 lb/GWh.......... Hg CEMS or sorbent trap
monitoring system
only.
3. IGCC unit......................... a. Filterable 7.0E-2 lb/MWh \4\ 9.0E- Collect a minimum of 1
particulate matter 2 lb/MWh \5\. dscm per run.
(PM).
OR..................... OR
Total non-Hg HAP metals 4.0E-1 lb/GWh.......... Collect a minimum of 1
dscm per run.
OR..................... OR
Individual HAP metals:. Collect a minimum of 2
dscm per run.
Antimony (Sb).......... 2.0E-2 lb/GWh.......... .......................
Arsenic (As)........... 2.0E-2 lb/GWh.......... .......................
Beryllium (Be)......... 1.0E-3 lb/GWh.......... .......................
Cadmium (Cd)........... 2.0E-3 lb/GWh.......... .......................
Chromium (Cr).......... 4.0E-2 lb/GWh.......... .......................
Cobalt (Co)............ 4.0E-3 lb/GWh.......... .......................
Lead (Pb).............. 9.0E-3 lb/GWh.......... .......................
Manganese (Mn)......... 2.0E-2 lb/GWh.......... .......................
Nickel (Ni)............ 7.0E-2 lb/GWh.......... .......................
Selenium (Se).......... 3.0E-1 lb/GWh.......... .......................
b. Hydrogen chloride 2.0E-3 lb/MWh.......... For Method 26A, collect
(HCl). a minimum of 1 dscm
per run; for Method 26
at appendix A-8 to
part 60 of this
chapter, collect a
minimum of 120 liters
per run. For ASTM
D6348-03 \2\ or Method
320, sample for a
minimum of 1 hour.
OR
Sulfur dioxide (SO2) 4.0E-1 lb/MWh.......... SO2 CEMS.
\3\.
c. Mercury (Hg)........ 3.0E-3 lb/GWh.......... Hg CEMS or sorbent trap
monitoring system
only.
4. Liquid oil-fired unit--continental a. Filterable 3.0E-1 lb/MWh \1\...... Collect a minimum of 1
(excluding limited-use liquid oil- particulate matter dscm per run.
fired subcategory units). (PM).
OR..................... OR
Total HAP metals....... 2.0E-4 lb/MWh.......... Collect a minimum of 2
dscm per run.
OR..................... OR
Individual HAP metals:. Collect a minimum of 2
dscm per run.
Antimony (Sb).......... 1.0E-2 lb/GWh.......... .......................
Arsenic (As)........... 3.0E-3 lb/GWh.......... .......................
Beryllium (Be)......... 5.0E-4 lb/GWh.......... .......................
Cadmium (Cd)........... 2.0E-4 lb/GWh.......... .......................
Chromium (Cr).......... 2.0E-2 lb/GWh.......... .......................
Cobalt (Co)............ 3.0E-2 lb/GWh.......... .......................
Lead (Pb).............. 8.0E-3 lb/GWh.......... .......................
Manganese (Mn)......... 2.0E-2 lb/GWh.......... .......................
Nickel (Ni)............ 9.0E-2 lb/GWh.......... .......................
Selenium (Se).......... 2.0E-2 lb/GWh.......... .......................
Mercury (Hg)........... 1.0E-4 lb/GWh.......... For Method 30B at
appendix A-8 to part
60 of this chapter
sample volume
determination (Section
8.2.4), the estimated
Hg concentration
should nominally be <
\1/2\ the standard.
b. Hydrogen chloride 4.0E-4 lb/MWh.......... For Method 26A, collect
(HCl). a minimum of 3 dscm
per run. For ASTM
D6348-03 \2\ or Method
320, sample for a
minimum of 1 hour.
c. Hydrogen fluoride 4.0E-4 lb/MWh.......... For Method 26A, collect
(HF). a minimum of 3 dscm
per run. For ASTM
D6348-03 \2\ or Method
320, sample for a
minimum of 1 hour.
5. Liquid oil-fired unit--non- a. Filterable 2.0E-1 lb/MWh \1\...... Collect a minimum of 1
continental (excluding limited-use particulate matter dscm per run.
liquid oil-fired subcategory units). (PM).
OR..................... OR .......................
Total HAP metals....... 7.0E-3 lb/MWh.......... Collect a minimum of 1
dscm per run.
OR..................... OR .......................
Individual HAP metals:. Collect a minimum of 3
dscm per run.
[[Page 20192]]
Antimony (Sb).......... 8.0E-3 lb/GWh.......... .......................
Arsenic (As)........... 6.0E-2 lb/GWh.......... .......................
Beryllium (Be)......... 2.0E-3 lb/GWh.......... .......................
Cadmium (Cd)........... 2.0E-3 lb/GWh.......... .......................
Chromium (Cr).......... 2.0E-2 lb/GWh.......... .......................
Cobalt (Co)............ 3.0E-1 lb/GWh.......... .......................
Lead (Pb).............. 3.0E-2 lb/GWh.......... .......................
Manganese (Mn)......... 1.0E-1 lb/GWh.......... .......................
Nickel (Ni)............ 4.1E0 lb/GWh........... .......................
Selenium (Se).......... 2.0E-2 lb/GWh.......... .......................
Mercury (Hg)........... 4.0E-4 lb/GWh.......... For Method 30B sample
volume determination
(Section 8.2.4), the
estimated Hg
concentration should
nominally be < \1/2\
the standard.
b. Hydrogen chloride 2.0E-3 lb/MWh.......... For Method 26A, collect
(HCl). a minimum of 1 dscm
per run;for Method 26,
collect a minimum of
120 liters per run.
For ASTM D6348-03 \2\
or Method 320, sample
for a minimum of 1
hour.
c. Hydrogen fluoride 5.0E-4 lb/MWh.......... For Method 26A, collect
(HF). a minimum of 3 dscm
per run.For ASTM D6348-
03 \2\ or Method 320,
sample for a minimum
of 1 hour.
6. Solid oil-derived fuel-fired unit. a. Filterable 3.0E-2 lb/MWh \1\...... Collect a minimum of 1
particulate matter dscm per run.
(PM).
OR..................... OR
Total non-Hg HAP metals 6.0E-1 lb/GWh.......... Collect a minimum of 1
dscm per run.
OR..................... OR
Individual HAP metals:. Collect a minimum of 3
dscm per run.
Antimony (Sb).......... 8.0E-3 lb/GWh.......... .......................
Arsenic (As)........... 3.0E-3 lb/GWh.......... .......................
Beryllium (Be)......... 6.0E-4 lb/GWh.......... .......................
Cadmium (Cd)........... 7.0E-4 lb/GWh.......... .......................
Chromium (Cr).......... 6.0E-3 lb/GWh.......... .......................
Cobalt (Co)............ 2.0E-3 lb/GWh.......... .......................
Lead (Pb).............. 2.0E-2 lb/GWh.......... .......................
Manganese (Mn)......... 7.0E-3 lb/GWh.......... .......................
Nickel (Ni)............ 4.0E-2 lb/GWh.......... .......................
Selenium (Se).......... 6.0E-3 lb/GWh.......... .......................
b. Hydrogen chloride 4.0E-4 lb/MWh.......... For Method 26A, collect
(HCl). a minimum of 3 dscm
per run. For ASTM
D6348-03 \2\ or Method
320, sample for a
minimum of 1 hour.
OR
Sulfur dioxide (SO2) 1.0 lb/MWh............. SO2 CEMS.
\3\.
c. Mercury (Hg)........ 2.0E-3 lb/GWh.......... Hg CEMS or Sorbent trap
monitoring system
only.
----------------------------------------------------------------------------------------------------------------
\1\ Gross output.
\2\ Incorporated by reference, see Sec. 63.14.
\3\ You may not use the alternate SO2 limit if your EGU does not have some form of FGD system (or, in the case
of IGCC EGUs, some other acid gas removal system either upstream or downstream of the combined cycle block)
and SO2 CEMS installed.
\4\ Duct burners on syngas; gross output.
\5\ Duct burners on natural gas; gross output.
0
22. Revise Table 2 to subpart UUUUU of part 63 to read as follows:
[[Page 20193]]
Table 2 to Subpart UUUUU of Part 63--Emission Limits for Existing EGUs
[As stated in Sec. 63.9991, you must comply with the following applicable emission limits: \1\]
----------------------------------------------------------------------------------------------------------------
Using these
requirements, as
You must meet the appropriate (e.g.,
following emission specified sampling
If your EGU is in this subcategory . For the following limits and work volume or test run
. . pollutants . . . practice standards . . duration) and
. limitations with the
test methods in Table 5
to this Subpart . . .
----------------------------------------------------------------------------------------------------------------
1. Coal-fired unit not low rank a. Filterable 3.0E-2 lb/MMBtu or 3.0E- Collect a minimum of 1
virgin coal. particulate matter 1 lb/MWh \2\. dscm per run.
(PM).
OR..................... OR
Total non-Hg HAP metals 5.0E-5 lb/MMBtu or 5.0E- Collect a minimum of 1
1 lb/GWh. dscm per run.
OR..................... OR
Individual HAP metals:. Collect a minimum of 3
dscm per run.
Antimony (Sb).......... 8.0E-1 lb/TBtu or 8.0E- .......................
3 lb/GWh.
Arsenic (As)........... 1.1E0 lb/TBtu or 2.0E-2 .......................
lb/GWh.
Beryllium (Be)......... 2.0E-1 lb/TBtu or 2.0E- .......................
3 lb/GWh.
Cadmium (Cd)........... 3.0E-1 lb/TBtu or 3.0E- .......................
3 lb/GWh.
Chromium (Cr).......... 2.8E0 lb/TBtu or 3.0E-2 .......................
lb/GWh.
Cobalt (Co)............ 8.0E-1 lb/TBtu or 8.0E- .......................
3 lb/GWh.
Lead (Pb).............. 1.2E0 lb/TBtu or 2.0E-2 .......................
lb/GWh.
Manganese (Mn)......... 4.0E0 lb/TBtu or 5.0E-2 .......................
lb/GWh.
Nickel (Ni)............ 3.5E0 lb/TBtu or 4.0E-2 .......................
lb/GWh.
Selenium (Se).......... 5.0E0 lb/TBtu or 6.0E-2 .......................
lb/GWh.
b. Hydrogen chloride 2.0E-3 lb/MMBtu or 2.0E- For Method 26A at
(HCl). 2 lb/MWh. appendix A-8 to part
60 of this chapter,
collect a minimum of
0.75 dscm per run; for
Method 26, collect a
minimum of 120 liters
per run. For ASTM
D6348-03 \3\ or Method
320 at appendix A to
part 63 of this
chapter, sample for a
minimum of 1 hour.
OR
Sulfur dioxide (SO2) 2.0E-1 lb/MMBtu or SO2 CEMS.
\4\. 1.5E0 lb/MWh.
c. Mercury (Hg)........ 1.2E0 lb/TBtu or 1.3E-2 LEE Testing for 30 days
lb/GWh. with a sampling period
consistent with that
given in section 5.2.1
of appendix A to this
subpart per Method 30B
at appendix A-8 to
part 60 of this
chapter run or Hg CEMS
or sorbent trap
monitoring system
only.
OR.....................
1.0E0 lb/TBtu or 1.1E-2 LEE Testing for 90 days
lb/GWh. with a sampling period
consistent with that
given in section 5.2.1
of appendix A to this
subpart per Method 30B
run or Hg CEMS or
sorbent trap
monitoring system
only.
2. Coal-fired unit low rank virgin a. Filterable 3.0E-2 lb/MMBtu or 3.0E- Collect a minimum of 1
coal. particulate matter 1 lb/MWh \2\. dscm per run.
(PM).
OR..................... OR.....................
Total non-Hg HAP metals 5.0E-5 lb/MMBtu or 5.0E- Collect a minimum of 1
1 lb/GWh. dscm per run.
OR..................... OR.....................
Individual HAP metals:. Collect a minimum of 3
dscm per run.
Antimony (Sb).......... 8.0E-1 lb/TBtu or 8.0E- .......................
3 lb/GWh.
Arsenic (As)........... 1.1E0 lb/TBtu or 2.0E-2 .......................
lb/GWh.
Beryllium (Be)......... 2.0E-1 lb/TBtu or 2.0E- .......................
3 lb/GWh.
Cadmium (Cd)........... 3.0E-1 lb/TBtu or 3.0E- .......................
3 lb/GWh.
Chromium (Cr).......... 2.8E0 lb/TBtu or 3.0E-2 .......................
lb/GWh.
Cobalt (Co)............ 8.0E-1 lb/TBtu or 8.0E- .......................
3 lb/GWh.
Lead (Pb).............. 1.2E0 lb/TBtu or 2.0E-2 .......................
lb/GWh.
Manganese (Mn)......... 4.0E0 lb/TBtu or 5.0E-2 .......................
lb/GWh.
Nickel (Ni)............ 3.5E0 lb/TBtu or 4.0E-2 .......................
lb/GWh.
Selenium (Se).......... 5.0E0 lb/TBtu or 6.0E-2 .......................
lb/GWh.
[[Page 20194]]
b. Hydrogen chloride 2.0E-3 lb/MMBtu or 2.0E- For Method 26A, collect
(HCl). 2 lb/MWh. a minimum of 0.75 dscm
per run; for Method 26
at appendix A-8 to
part 60 of this
chapter, collect a
minimum of 120 liters
per run. For ASTM
D6348-03 \3\ or Method
320, sample for a
minimum of 1 hour.
OR
Sulfur dioxide (SO2) 2.0E-1 lb/MMBtu or SO2 CEMS.
\4\. 1.5E0 lb/MWh.
c. Mercury (Hg)........ 4.0E0 lb/TBtu or 4.0E-2 LEE Testing for 30 days
lb/GWh. with a sampling period
consistent with that
given in section 5.2.1
of appendix A to this
subpart per Method 30B
run or Hg CEMS or
sorbent trap
monitoring system
only.
3. IGCC unit......................... a. Filterable 4.0E-2 lb/MMBtu or 4.0E- Collect a minimum of 1
particulate matter 1 lb/MWh \2\. dscm per run.
(PM).
OR..................... OR
Total non-Hg HAP metals 6.0E-5 lb/MMBtu or 5.0E- Collect a minimum of 1
1 lb/GWh. dscm per run.
OR..................... OR
Individual HAP metals:. Collect a minimum of 2
dscm per run.
Antimony (Sb).......... 1.4E0 lb/TBtu or 2.0E-2 .......................
lb/GWh.
Arsenic (As)........... 1.5E0 lb/TBtu or 2.0E-2 .......................
lb/GWh.
Beryllium (Be)......... 1.0E-1 lb/TBtu or 1.0E- .......................
3 lb/GWh.
Cadmium (Cd)........... 1.5E-1 lb/TBtu or 2.0E- .......................
3 lb/GWh.
Chromium (Cr).......... 2.9E0 lb/TBtu or 3.0E-2 .......................
lb/GWh.
Cobalt (Co)............ 1.2E0 lb/TBtu or 2.0E-2 .......................
lb/GWh.
Lead (Pb).............. 1.9E+2 lb/TBtu or 1.8E0 .......................
lb/GWh.
Manganese (Mn)......... 2.5E0 lb/TBtu or 3.0E-2 .......................
lb/GWh.
Nickel (Ni)............ 6.5E0 lb/TBtu or 7.0E-2 .......................
lb/GWh.
Selenium (Se).......... 2.2E+1 lb/TBtu or 3.0E- .......................
1 lb/GWh.
b. Hydrogen chloride 5.0E-4 lb/MMBtu or 5.0E- For Method 26A, collect
(HCl). 3 lb/MWh. a minimum of 1 dscm
per run; for Method
26, collect a minimum
of 120 liters per run.
For ASTM D6348-03 \3\
or Method 320, sample
for a minimum of 1
hour.
c. Mercury (Hg)........ 2.5E0 lb/TBtu or 3.0E-2 LEE Testing for 30 days
lb/GWh. with a sampling period
consistent with that
given in section 5.2.1
of appendix A to this
subpart per Method 30B
run or Hg CEMS or
sorbent trap
monitoring system
only.
4. Liquid oil-fired unit--continental a. Filterable 3.0E-2 lb/MMBtu or 3.0E- Collect a minimum of 1
(excluding limited-use liquid oil- particulate matter 1 lb/MWh \2\. dscm per run.
fired subcategory units). (PM).
OR..................... OR
Total HAP metals....... 8.0E-4 lb/MMBtu or 8.0E- Collect a minimum of 1
3 lb/MWh. dscm per run.
OR..................... OR
Individual HAP metals:. Collect a minimum of 1
dscm per run.
Antimony (Sb).......... 1.3E+1 lb/TBtu or 2.0E- .......................
1 lb/GWh.
Arsenic (As)........... 2.8E0 lb/TBtu or 3.0E-2 .......................
lb/GWh.
Beryllium (Be)......... 2.0E-1 lb/TBtu or 2.0E- .......................
3 lb/GWh.
Cadmium (Cd)........... 3.0E-1 lb/TBtu or 2.0E- .......................
3 lb/GWh.
Chromium (Cr).......... 5.5E0 lb/TBtu or 6.0E-2 .......................
lb/GWh.
Cobalt (Co)............ 2.1E+1 lb/TBtu or 3.0E- .......................
1 lb/GWh.
Lead (Pb).............. 8.1E0 lb/TBtu or 8.0E-2 .......................
lb/GWh.
Manganese (Mn)......... 2.2E+1 lb/TBtu or 3.0E- .......................
1 lb/GWh.
Nickel (Ni)............ 1.1E+2 lb/TBtu or 1.1E0 .......................
lb/GWh.
[[Page 20195]]
Selenium (Se).......... 3.3E0 lb/TBtu or 4.0E-2 .......................
lb/GWh.
Mercury (Hg)........... 2.0E-1 lb/TBtu or 2.0E- For Method 30B sample
3 lb/GWh. volume determination
(Section 8.2.4), the
estimated Hg
concentration should
nominally be < \1/2\
the standard.
b. Hydrogen chloride 2.0E-3 lb/MMBtu or 1.0E- For Method 26A, collect
(HCl). 2 lb/MWh. a minimum of 1 dscm
per run; for Method
26, collect a minimum
of 120 liters per run.
For ASTM D6348-03 \3\
or Method 320, sample
for a minimum of 1
hour.
c. Hydrogen fluoride 4.0E-4 lb/MMBtu or 4.0E- For Method 26A, collect
(HF). 3 lb/MWh. a minimum of 1 dscm
per run; for Method
26, collect a minimum
of 120 liters per run.
For ASTM D6348-03 \3\
or Method 320, sample
for a minimum of 1
hour.
5. Liquid oil-fired unit--non- a. Filterable 3.0E-2 lb/MMBtu or 3.0E- Collect a minimum of 1
continental (excluding limited-use particulate matter 1 lb/MWh \2\. dscm per run.
liquid oil-fired subcategory units). (PM).
OR..................... OR
Total HAP metals....... 6.0E-4 lb/MMBtu or 7.0E- Collect a minimum of 1
3 lb/MWh. dscm per run.
OR..................... OR
Individual HAP metals:. Collect a minimum of 2
dscm per run.
Antimony (Sb).......... 2.2E0 lb/TBtu or 2.0E-2 .......................
lb/GWh.
Arsenic (As)........... 4.3E0 lb/TBtu or 8.0E-2 .......................
lb/GWh.
Beryllium (Be)......... 6.0E-1 lb/TBtu or 3.0E- .......................
3 lb/GWh.
Cadmium (Cd)........... 3.0E-1 lb/TBtu or 3.0E- .......................
3 lb/GWh.
Chromium (Cr).......... 3.1E+1 lb/TBtu or 3.0E- .......................
1 lb/GWh.
Cobalt (Co)............ 1.1E+2 lb/TBtu or 1.4E0 .......................
lb/GWh.
Lead (Pb).............. 4.9E0 lb/TBtu or 8.0E-2 .......................
lb/GWh.
Manganese (Mn)......... 2.0E+1 lb/TBtu or 3.0E- .......................
1 lb/GWh.
Nickel (Ni)............ 4.7E+2 lb/TBtu or 4.1E0 .......................
lb/GWh.
Selenium (Se).......... 9.8E0 lb/TBtu or 2.0E-1 .......................
lb/GWh.
Mercury (Hg)........... 4.0E-2 lb/TBtu or 4.0E- For Method 30B sample
4 lb/GWh. volume determination
(Section 8.2.4), the
estimated Hg
concentration should
nominally be < \1/2\
the standard.
b. Hydrogen chloride 2.0E-4 lb/MMBtu or 2.0E- For Method 26A, collect
(HCl). 3 lb/MWh. a minimum of 1 dscm
per run; for Method
26, collect a minimum
of 120 liters per run.
For ASTM D6348-03 \3\
or Method 320, sample
for a minimum of 2
hours.
c. Hydrogen fluoride 6.0E-5 lb/MMBtu or 5.0E- For Method 26A, collect
(HF). 4 lb/MWh. a minimum of 3 dscm
per run. For ASTM
D6348-03 \3\ or Method
320, sample for a
minimum of 2 hours.
6. Solid oil-derived fuel-fired unit. a. Filterable 8.0E-3 lb/MMBtu or 9.0E- Collect a minimum of 1
particulate matter 2 lb/MWh \2\. dscm per run.
(PM).
OR..................... OR
Total non-Hg HAP metals 4.0E-5 lb/MMBtu or 6.0E- Collect a minimum of 1
1 lb/GWh. dscm per run.
OR..................... OR
Individual HAP metals:. Collect a minimum of 3
dscm per run.
Antimony (Sb).......... 8.0E-1 lb/TBtu or 7.0E- .......................
3 lb/GWh.
Arsenic (As)........... 3.0E-1 lb/TBtu or 5.0E- .......................
3 lb/GWh.
Beryllium (Be)......... 6.0E-2 lb/TBtu or 5.0E- .......................
4 lb/GWh.
[[Page 20196]]
Cadmium (Cd)........... 3.0E-1 lb/TBtu or 4.0E- .......................
3 lb/GWh.
Chromium (Cr).......... 8.0E-1 lb/TBtu or 2.0E- .......................
2 lb/GWh.
Cobalt (Co)............ 1.1E0 lb/TBtu or 2.0E-2 .......................
lb/GWh.
Lead (Pb).............. 8.0E-1 lb/TBtu or 2.0E- .......................
2 lb/GWh.
Manganese (Mn)......... 2.3E0 lb/TBtu or 4.0E-2 .......................
lb/GWh.
Nickel (Ni)............ 9.0E0 lb/TBtu or 2.0E-1 .......................
lb/GWh.
Selenium (Se).......... 1.2E0 lb/Tbtu or 2.0E-2 .......................
lb/GWh.
b. Hydrogen chloride 5.0E-3 lb/MMBtu or 8.0E- For Method 26A, collect
(HCl). 2 lb/MWh. a minimum of 0.75 dscm
per run; for Method
26, collect a minimum
of 120 liters per run.
For ASTM D6348-03 \3\
or Method 320, sample
for a minimum of 1
hour.
OR
Sulfur dioxide (SO2) 3.0E-1 lb/MMBtu or SO2 CEMS.
\4\. 2.0E0 lb/MWh.
c. Mercury (Hg)........ 2.0E-1 lb/TBtu or 2.0E- LEE Testing for 30 days
3 lb/GWh. with a sampling period
consistent with that
given in section 5.2.1
of appendix A to this
subpart per Method 30B
run or Hg CEMS or
sorbent trap
monitoring system
only.
----------------------------------------------------------------------------------------------------------------
\1\ For LEE emissions testing for total PM, total HAP metals, individual HAP metals, HCl, and HF, the required
minimum sampling volume must be increased nominally by a factor of two.
\2\ Gross output.
\3\ Incorporated by reference, see Sec. 63.14.
\4\ You may not use the alternate SO2 limit if your EGU does not have some form of FGD system and SO2 CEMS
installed.
0
23. Revise Table 3 to subpart UUUUU of part 63 to read as follows:
Table 3 to Subpart UUUUU of Part 63--Work Practice Standards
[As stated in Sec. 63.9991, you must comply with the following
applicable work practice standards:]
------------------------------------------------------------------------
If your EGU is . . . You must meet the following . . .
------------------------------------------------------------------------
1. An existing EGU................ Conduct a tune-up of the EGU burner
and combustion controls at least
each 36 calendar months, or each 48
calendar months if neural network
combustion optimization software is
employed, as specified in Sec.
63.10021(e).
2. A new or reconstructed EGU..... Conduct a tune-up of the EGU burner
and combustion controls at least
each 36 calendar months, or each 48
calendar months if neural network
combustion optimization software is
employed, as specified in Sec.
63.10021(e).
3. A coal-fired, liquid oil-fired a. You have the option of complying
(excluding limited-use liquid oil- using either of the following work
fired subcategory units), or practice standards:
solid oil-derived fuel-fired EGU (1) If you choose to comply using
during startup. paragraph (1) of the definition of
``startup'' in Sec. 63.10042, you
must operate all CMS during
startup. Startup means either the
first-ever firing of fuel in a
boiler for the purpose of producing
electricity, or the firing of fuel
in a boiler after a shutdown event
for any purpose. Startup ends when
any of the steam from the boiler is
used to generate electricity for
sale over the grid or for any other
purpose (including on site use).
For startup of a unit, you must use
clean fuels as defined in Sec.
63.10042 for ignition. Once you
convert to firing coal, residual
oil, or solid oil-derived fuel, you
must engage all of the applicable
control technologies except dry
scrubber and SCR. You must start
your dry scrubber and SCR systems,
if present, appropriately to comply
with relevant standards applicable
during normal operation. You must
comply with all applicable
emissions limits at all times
except for periods that meet the
applicable definitions of startup
and shutdown in this subpart. You
must keep records during startup
periods. You must provide reports
concerning activities and startup
periods, as specified in Sec.
63.10011(g) and Sec. 63.10021(h)
and (i).
(2) If you choose to comply using
paragraph (2) of the definition
of ``startup'' in Sec.
63.10042, you must operate all
CMS during startup. You must
also collect appropriate data,
and you must calculate the
pollutant emission rate for each
hour of startup.
For startup of an EGU, you must
use one or a combination of the
clean fuels defined in Sec.
63.10042 to the maximum extent
possible, taking into account
considerations such as boiler or
control device integrity,
throughout the startup period.
You must have sufficient clean
fuel capacity to engage and
operate your PM control device
within one hour of adding coal,
residual oil, or solid oil-
derived fuel to the unit. You
must meet the startup period
work practice requirements as
identified in Sec.
63.10020(e).
Once you start firing coal,
residual oil, or solid oil-
derived fuel, you must vent
emissions to the main stack(s).
You must comply with the
applicable emission limits
beginning with the hour after
startup ends. You must engage
and operate your particulate
matter control(s) within 1 hour
of first firing of coal,
residual oil, or solid oil-
derived fuel.
[[Page 20197]]
You must start all other
applicable control devices as
expeditiously as possible,
considering safety and
manufacturer/supplier
recommendations, but, in any
case, when necessary to comply
with other standards made
applicable to the EGU by a
permit limit or a rule other
than this Subpart that require
operation of the control
devices.
b. Relative to the syngas not
fired in the combustion turbine
of an IGCC EGU during startup,
you must either: (1) Flare the
syngas, or (2) route the syngas
to duct burners, which may need
to be installed, and route the
flue gas from the duct burners
to the heat recovery steam
generator.
c. If you choose to use just one
set of sorbent traps to
demonstrate compliance with the
applicable Hg emission limit,
you must comply with the limit
at all times; otherwise, you
must comply with the applicable
emission limit at all times
except for startup and shutdown
periods.
d. You must collect monitoring
data during startup periods, as
specified in Sec. 63.10020(a)
and (e). You must keep records
during startup periods, as
provided in Sec. Sec.
63.10032 and 63.10021(h). You
must provide reports concerning
activities and startup periods,
as specified in Sec. Sec.
63.10011(g), 63.10021(i), and
63.10031.
4. A coal-fired, liquid oil-fired You must operate all CMS during
(excluding limited-use liquid oil- shutdown. You must also collect
fired subcategory units), or appropriate data, and you must
solid oil-derived fuel-fired EGU calculate the pollutant emission
during shutdown. rate for each hour of shutdown for
those pollutants for which a CMS is
used.
While firing coal, residual oil, or
solid oil-derived fuel during
shutdown, you must vent emissions
to the main stack(s) and operate
all applicable control devices and
continue to operate those control
devices after the cessation of
coal, residual oil, or solid oil-
derived fuel being fed into the EGU
and for as long as possible
thereafter considering operational
and safety concerns. In any case,
you must operate your controls when
necessary to comply with other
standards made applicable to the
EGU by a permit limit or a rule
other than this Subpart and that
require operation of the control
devices.
If, in addition to the fuel used
prior to initiation of shutdown,
another fuel must be used to
support the shutdown process,
that additional fuel must be one
or a combination of the clean
fuels defined in Sec. 63.10042
and must be used to the maximum
extent possible, taking into
account considerations such as
not compromising boiler or
control device integrity.
Relative to the syngas not fired
in the combustion turbine of an
IGCC EGU during shutdown, you
must either: (1) Flare the
syngas, or (2) route the syngas
to duct burners, which may need
to be installed, and route the
flue gas from the duct burners
to the heat recovery steam
generator.
You must comply with all
applicable emission limits at
all times except during startup
periods and shutdown periods at
which time you must meet this
work practice. You must collect
monitoring data during shutdown
periods, as specified in Sec.
63.10020(a). You must keep
records during shutdown periods,
as provided in Sec. Sec.
63.10032 and 63.10021(h). Any
fraction of an hour in which
shutdown occurs constitutes a
full hour of shutdown. You must
provide reports concerning
activities and shutdown periods,
as specified in Sec. Sec.
63.10011(g), 63.10021(i), and
63.10031.
------------------------------------------------------------------------
0
24. Revise Table 4 to subpart UUUUU of part 63 to read as follows:
Table 4 to Subpart UUUUU of Part 63 -- Operating Limits for EGUs
[As stated in Sec. 63.9991, you must comply with the applicable
operating limits:]
------------------------------------------------------------------------
If you demonstrate compliance You must meet these operating limits
using . . . . . .
------------------------------------------------------------------------
PM CPMS........................... Maintain the 30-boiler operating day
rolling average PM CPMS output
determined in accordance with the
requirements of Sec.
63.10023(b)(2) and obtained during
the most recent performance test
run demonstrating compliance with
the filterable PM, total non-
mercury HAP metals (total HAP
metals, for liquid oil-fired
units), or individual non-mercury
HAP metals (individual HAP metals
including Hg, for liquid oil-fired
units) emissions limitation(s).
------------------------------------------------------------------------
0
25. Revise Table 5 to subpart UUUUU of part 63 to read as follows:
Table 5 to Subpart UUUUU of Part 63--Performance Testing Requirements
[As stated in Sec. 63.10007, you must comply with the following requirements for performance testing for
existing, new or reconstructed affected sources: \1\]
----------------------------------------------------------------------------------------------------------------
You must perform the
following activities,
To conduct a performance test for the Using . . . as applicable to your Using . . .\2\
following pollutant . . . input- or output-based
emission limit . . .
----------------------------------------------------------------------------------------------------------------
1. Filterable Particulate matter (PM) Emissions Testing...... a. Select sampling Method 1 at appendix A-
ports location and the 1 to part 60 of this
number of traverse chapter.
points.
b. Determine velocity Method 2, 2A, 2C, 2F,
and volumetric flow- 2G or 2H at appendix A-
rate of the stack gas. 1 or A-2 to part 60 of
this chapter.
[[Page 20198]]
c. Determine oxygen and Method 3A or 3B at
carbon dioxide appendix A-2 to part
concentrations of the 60 of this chapter, or
stack gas. ANSI/ASME PTC 19.10-
1981.\3\
d. Measure the moisture Method 4 at appendix A-
content of the stack 3 to part 60 of this
gas. chapter.
e. Measure the Method 5 at appendix A-
filterable PM 3 to part 60 of this
concentration. chapter.
For positive pressure
fabric filters, Method
5D at appendix A-3 to
part 60 of this
chapter for filterable
PM emissions.
Note that the Method 5
front half temperature
shall be 160[deg]
14[deg] C
(320[deg]
25[deg] F).
f. Convert emissions Method 19 F-factor
concentration to lb/ methodology at
MMBtu or lb/MWh appendix A-7 to part
emissions rates. 60 of this chapter, or
calculate using mass
emissions rate and
gross output data (see
Sec. 63.10007(e)).
OR..................... OR..................
PM CEMS................ a. Install, certify, Performance
operate, and maintain Specification 11 at
the PM CEMS. appendix B to part 60
of this chapter and
Procedure 2 at
appendix F to part 60
of this chapter.
b. Install, certify, Part 75 of this chapter
operate, and maintain and Sec.
the diluent gas, flow 63.10010(a), (b), (c),
rate, and/or moisture and (d).
monitoring systems.
c. Convert hourly Method 19 F-factor
emissions methodology at
concentrations to 30 appendix A-7 to part
boiler operating day 60 of this chapter, or
rolling average lb/ calculate using mass
MMBtu or lb/MWh emissions rate and
emissions rates. gross output data (see
Sec. 63.10007(e)).
2. Total or individual non-Hg HAP Emissions Testing...... a. Select sampling Method 1 at appendix A-
metals. ports location and the 1 to part 60 of this
number of traverse chapter.
points..
b. Determine velocity Method 2, 2A, 2C, 2F,
and volumetric flow- 2G or 2H at appendix A-
rate of the stack gas. 1 or A-2 to part 60 of
this chapter.
c. Determine oxygen and Method 3A or 3B at
carbon dioxide appendix A-2 to part
concentrations of the 60 of this chapter, or
stack gas. ANSI/ASME PTC 19.10-
1981.\3\
d. Measure the moisture Method 4 at appendix A-
content of the stack 3 to part 60 of this
gas. chapter.
e. Measure the HAP Method 29 at appendix A-
metals emissions 8 to part 60 of this
concentrations and chapter. For liquid
determine each oil-fired units, Hg is
individual HAP metals included in HAP metals
emissions and you may use Method
concentration, as well 29, Method 30B at
as the total appendix A-8 to part
filterable HAP metals 60 of this chapter;
emissions for Method 29, you
concentration and must report the front
total HAP metals half and back half
emissions results separately.
concentration. When using Method 29,
report metals matrix
spike and recovery
levels.
f. Convert emissions Method 19 F-factor
concentrations methodology at
(individual HAP appendix A-7 to part
metals, total 60 of this chapter, or
filterable HAP metals, calculate using mass
and total HAP metals) emissions rate and
to lb/MMBtu or lb/MWh gross output data (see
emissions rates. Sec. 63.10007(e)).
3. Hydrogen chloride (HCl) and Emissions Testing...... a. Select sampling Method 1 at appendix A-
hydrogen fluoride (HF). ports location and the 1 to part 60 of this
number of traverse chapter.
points..
b. Determine velocity Method 2, 2A, 2C, 2F,
and volumetric flow- 2G or 2H at appendix A-
rate of the stack gas. 1 or A-2 to part 60 of
this chapter.
c. Determine oxygen and Method 3A or 3B at
carbon dioxide appendix A-2 to part
concentrations of the 60 of this chapter, or
stack gas. ANSI/ASME PTC 19.10-
1981.\3\
d. Measure the moisture Method 4 at appendix A-
content of the stack 3 to part 60 of this
gas. chapter.
[[Page 20199]]
e. Measure the HCl and Method 26 or Method 26A
HF emissions at appendix A-8 to
concentrations. part 60 of this
chapter or Method 320
at appendix A to part
63 of this chapter or
ASTM 6348-03 \3\ with
(1) the following
conditions when using
ASTM D6348-03:
(A) The test plan
preparation and
implementation in the
Annexes to ASTM D6348-
03, Sections A1
through A8 are
mandatory;
(B) For ASTM D6348-03
Annex A5 (Analyte
Spiking Technique),
the percent (%) R must
be determined for each
target analyte (see
Equation A5.5);
(C) For the ASTM D6348-
03 test data to be
acceptable for a
target analyte, %R
must be 70% >= R <=
130%; and
----------------------------------------------------------------------------------------------------------------
3.e.1(D) The %R value for each compound must be reported in the
test report and all field measurements corrected with the calculated %R
value for that compound using the following equation:
[GRAPHIC] [TIFF OMITTED] TR06AP16.007
and
----------------------------------------------------------------------------------------------------------------
You must perform the
following activities,
To conduct a performance test for the as applicable to your Using . . .\2\ (cont'd)
following pollutant . . . (cont'd) Using . . . (cont'd) input- or output-based
emission limit . . .
(cont'd)
----------------------------------------------------------------------------------------------------------------
....................... ....................... (2) spiking levels
nominally no greater
than two times the
level corresponding to
the applicable
emission limit.
Method 26A must be used
if there are entrained
water droplets in the
exhaust stream.
....................... f. Convert emissions Method 19 F-factor
concentration to lb/ methodology at
MMBtu or lb/MWh appendix A-7 to part
emissions rates. 60 of this chapter, or
calculate using mass
emissions rate and
gross output data (see
Sec. 63.10007(e)).
OR..................... OR.....................
HCl and/or HF CEMS..... a. Install, certify, Appendix B of this
operate, and maintain subpart.
the HCl or HF CEMS.
....................... b. Install, certify, Part 75 of this chapter
operate, and maintain and Sec.
the diluent gas, flow 63.10010(a), (b), (c),
rate, and/or moisture and (d).
monitoring systems.
....................... c. Convert hourly Method 19 F-factor
emissions methodology at
concentrations to 30 appendix A-7 to part
boiler operating day 60 of this chapter, or
rolling average lb/ calculate using mass
MMBtu or lb/MWh emissions rate and
emissions rates. gross output data (see
Sec. 63.10007(e)).
4. Mercury (Hg)...................... Emissions Testing...... a. Select sampling Method 1 at appendix A-
ports location and the 1 to part 60 of this
number of traverse chapter or Method 30B
points. at Appendix A-8 for
Method 30B point
selection.
....................... b. Determine velocity Method 2, 2A, 2C, 2F,
and volumetric flow- 2G or 2H at appendix A-
rate of the stack gas. 1 or A-2 to part 60 of
this chapter.
....................... c. Determine oxygen and Method 3A or 3B at
carbon dioxide appendix A-1 to part
concentrations of the 60 of this chapter, or
stack gas. ANSI/ASME PTC 19.10-
1981.\3\
[[Page 20200]]
....................... d. Measure the moisture Method 4 at appendix A-
content of the stack 3 to part 60 of this
gas. chapter.
....................... e. Measure the Hg Method 30B at appendix
emission concentration. A-8 to part 60 of this
chapter, ASTM
D6784,\3\ or Method 29
at appendix A-8 to
part 60 of this
chapter; for Method
29, you must report
the front half and
back half results
separately.
....................... f. Convert emissions Method 19 F-factor
concentration to lb/ methodology at
TBtu or lb/GWh appendix A-7 to part
emission rates. 60 of this chapter, or
calculate using mass
emissions rate and
gross output data (see
Sec. 63.10007(e)).
OR..................... OR.....................
Hg CEMS................ a. Install, certify, Sections 3.2.1 and 5.1
operate, and maintain of appendix A of this
the CEMS. subpart.
....................... b. Install, certify, Part 75 of this chapter
operate, and maintain and Sec.
the diluent gas, flow 63.10010(a), (b), (c),
rate, and/or moisture and (d).
monitoring systems.
....................... c. Convert hourly Section 6 of appendix A
emissions to this subpart.
concentrations to 30
boiler operating day
rolling average lb/
TBtu or lb/GWh
emissions rates.
OR..................... OR.....................
Sorbent trap monitoring a. Install, certify, Sections 3.2.2 and 5.2
system. operate, and maintain of appendix A to this
the sorbent trap subpart.
monitoring system.
....................... b. Install, operate, Part 75 of this chapter
and maintain the and Sec.
diluent gas, flow 63.10010(a), (b), (c),
rate, and/or moisture and (d).
monitoring systems.
....................... c. Convert emissions Section 6 of appendix A
concentrations to 30 to this subpart.
boiler operating day
rolling average lb/
TBtu or lb/GWh
emissions rates.
OR..................... OR.....................
LEE testing............ a. Select sampling Single point located at
ports location and the the 10% centroidal
number of traverse area of the duct at a
points. port location per
Method 1 at appendix A-
1 to part 60 of this
chapter or Method 30B
at Appendix A-8 for
Method 30B point
selection.
....................... b. Determine velocity Method 2, 2A, 2C, 2F,
and volumetric flow- 2G, or 2H at appendix
rate of the stack gas. A-1 or A-2 to part 60
of this chapter or
flow monitoring system
certified per appendix
A of this subpart.
....................... c. Determine oxygen and Method 3A or 3B at
carbon dioxide appendix A-1 to part
concentrations of the 60 of this chapter, or
stack gas. ANSI/ASME PTC 19.10-
1981,\3\ or diluent
gas monitoring systems
certified according to
part 75 of this
chapter.
....................... d. Measure the moisture Method 4 at appendix A-
content of the stack 3 to part 60 of this
gas. chapter, or moisture
monitoring systems
certified according to
part 75 of this
chapter.
....................... e. Measure the Hg Method 30B at appendix
emission concentration. A-8 to part 60 of this
chapter; perform a 30
operating day test,
with a maximum of 10
operating days per run
(i.e., per pair of
sorbent traps) or
sorbent trap
monitoring system or
Hg CEMS certified per
appendix A of this
subpart.
....................... f. Convert emissions Method 19 F-factor
concentrations from methodology at
the LEE test to lb/ appendix A-7 to part
TBtu or lb/GWh 60 of this chapter, or
emissions rates. calculate using mass
emissions rate and
gross output data (see
Sec. 63.10007(e)).
....................... g. Convert average lb/ Potential maximum
TBtu or lb/GWh Hg annual heat input in
emission rate to lb/ TBtu or potential
year, if you are maximum electricity
attempting to meet the generated in GWh.
29.0 lb/year threshold.
[[Page 20201]]
5. Sulfur dioxide (SO2).............. SO2 CEMS............... a. Install, certify, Part 75 of this chapter
operate, and maintain and Sec. 63.10010(a)
the CEMS. and (f).
....................... b. Install, operate, Part 75 of this chapter
and maintain the and Sec.
diluent gas, flow 63.10010(a), (b), (c),
rate, and/or moisture and (d).
monitoring systems.
....................... c. Convert hourly Method 19 F-factor
emissions methodology at
concentrations to 30 appendix A-7 to part
boiler operating day 60 of this chapter, or
rolling average lb/ calculate using mass
MMBtu or lb/MWh emissions rate and
emissions rates. gross output data (see
Sec. 63.10007(e)).
----------------------------------------------------------------------------------------------------------------
\1\ Regarding emissions data collected during periods of startup or shutdown, see Sec. Sec. 63.10020(b) and
(c) and 63.10021(h).
\2\ See Tables 1 and 2 to this subpart for required sample volumes and/or sampling run times.
\3\ Incorporated by reference, see Sec. 63.14.
0
26. Revise Table 6 to subpart UUUUU of part 63 to read as follows:
Table 6 to Subpart UUUUU of Part 63--Establishing PM CPMS Operating Limits
[As stated in Sec. 63.10007, you must comply with the following requirements for establishing operating
limits:]
----------------------------------------------------------------------------------------------------------------
And you choose to
If you have an applicable establish PM CPMS According to the
emission limit for . . . operating limits, And . . . Using . . . following
you must . . . procedures . . .
----------------------------------------------------------------------------------------------------------------
Filterable Particulate matter Install, certify, Establish a site- Data from the PM 1. Collect PM CPMS
(PM), total non-mercury HAP maintain, and specific CPMS and the PM output data
metals, individual non-mercury operate a PM CPMS operating limit or HAP metals during the entire
HAP metals, total HAP metals, for monitoring in units of PM performance tests. period of the
or individual HAP metals for an emissions CPMS output performance
EGU. discharged to the signal (e.g., tests.
atmosphere milliamps, mg/ 2. Record the
according to Sec. acm, or other raw average hourly PM
63.10010(h)(1). signal). CPMS output for
each test run in
the performance
test.
3. Determine the
PM CPMS operating
limit in
accordance with
the requirements
of Sec.
63.10023(b)(2)
from data
obtained during
the performance
test
demonstrating
compliance with
the filterable PM
or HAP metals
emissions
limitations.
----------------------------------------------------------------------------------------------------------------
0
27. Revise Table 8 to subpart UUUUU of part 63 to read as follows:
Table 8 to Subpart UUUUU of Part 63--Reporting Requirements
[As stated in Sec. 63.10031, you must comply with the following
requirements:]
------------------------------------------------------------------------
The report must contain You must submit the
You must submit a . . . report . . .
------------------------------------------------------------------------
1. Compliance report..... a. Information required Semiannually
in Sec. according to the
63.10031(c)(1) through requirements in
(9); and. Sec.
63.10031(b).
b. If there are no
deviations from any
emission limitation
(emission limit and
operating limit) that
applies to you and
there are no deviations
from the requirements
for work practice
standards in Table 3 to
this subpart that apply
to you, a statement
that there were no
deviations from the
emission limitations
and work practice
standards during the
reporting period. If
there were no periods
during which the CMSs,
including continuous
emissions monitoring
system, and operating
parameter monitoring
systems, were out-of-
control as specified in
Sec. 63.8(c)(7), a
statement that there
were no periods during
which the CMSs were out-
of-control during the
reporting period; and.
c. If you have a
deviation from any
emission limitation
(emission limit and
operating limit) or
work practice standard
during the reporting
period, the report must
contain the information
in Sec. 63.10031(d).
If there were periods
during which the CMSs,
including continuous
emissions monitoring
systems and continuous
parameter monitoring
systems, were out-of-
control, as specified
in Sec. 63.8(c)(7),
the report must contain
the information in Sec.
63.10031(e)..
------------------------------------------------------------------------
[[Page 20202]]
0
28. Revise Table 9 to subpart UUUUU of part 63 to read as follows:
Table 9 to Subpart UUUUU of Part 63--Applicability of General Provisions
to Subpart UUUUU
[As stated in Sec. 63.10040, you must comply with the applicable
General Provisions according to the following:]
------------------------------------------------------------------------
Applies to subpart
Citation Subject UUUUU
------------------------------------------------------------------------
Sec. 63.1................. Applicability....... Yes.
Sec. 63.2................. Definitions......... Yes. Additional
terms defined in
Sec. 63.10042.
Sec. 63.3................. Units and Yes.
Abbreviations.
Sec. 63.4................. Prohibited Yes.
Activities and
Circumvention.
Sec. 63.5................. Preconstruction Yes.
Review and
Notification
Requirements.
Sec. 63.6(a), (b)(1) Compliance with Yes.
through (5), (b)(7), (c), Standards and
(f)(2) and (3), (h)(2) Maintenance
through (9), (i), (j). Requirements.
Sec. 63.6(e)(1)(i)........ General Duty to No. See Sec.
minimize emissions. 63.10000(b) for
general duty
requirement.
Sec. 63.6(e)(1)(ii)....... Requirement to No.
correct
malfunctions ASAP.
Sec. 63.6(e)(3)........... SSM Plan No.
requirements.
Sec. 63.6(f)(1)........... SSM exemption....... No.
Sec. 63.6(h)(1)........... SSM exemption....... No.
Sec. 63.6(g).............. Compliance with Yes. See Sec. Sec.
Standards and 63.10011(g)(4) and
Maintenance 63.10021(h)(4) for
Requirements, Use additional
of an alternative requirements.
non-opacity
emission standard.
Sec. 63.7(e)(1)........... Performance testing. No. See Sec.
63.10007.
Sec. 63.8................. Monitoring Yes.
Requirements.
Sec. 63.8(c)(1)(i)........ General duty to No. See Sec.
minimize emissions 63.10000(b) for
and CMS operation. general duty
requirement.
Sec. 63.8(c)(1)(iii)...... Requirement to No.
develop SSM Plan
for CMS.
Sec. 63.8(d)(3)........... Written procedures Yes, except for last
for CMS. sentence, which
refers to an SSM
plan. SSM plans are
not required.
Sec. 63.9................. Notification Yes, except (1) for
Requirements. the 60-day
notification prior
to conducting a
performance test in
Sec. 63.9(e);
instead use a 30-
day notification
period per Sec.
63.10030(d), (2)
the notification of
the CMS performance
evaluation in Sec.
63.9(g)(1) is
limited to RATAs,
and (3) the
information
required per Sec.
63.9(h)(2)(i);
instead provide the
information
required per Sec.
63.10030(e)(1)
through (e)(6) and
(e)(8).
Sec. 63.10(a), (b)(1), Recordkeeping and Yes, except for the
(c), (d)(1) and (2), (e), Reporting requirements to
and (f). Requirements. submit written
reports under Sec.
63.10(e)(3)(v).
Sec. 63.10(b)(2)(i)....... Recordkeeping of No.
occurrence and
duration of
startups and
shutdowns.
Sec. 63.10(b)(2)(ii)...... Recordkeeping of No. See Sec.
malfunctions. 63.10001 for
recordkeeping of
(1) occurrence and
duration and (2)
actions taken
during malfunction.
Sec. 63.10(b)(2)(iii)..... Maintenance records. Yes.
Sec. 63.10(b)(2)(iv)...... Actions taken to No.
minimize emissions
during SSM.
Sec. 63.10(b)(2)(v)....... Actions taken to No.
minimize emissions
during SSM.
Sec. 63.10(b)(2)(vi)...... Recordkeeping for Yes.
CMS malfunctions.
Sec. 63.10(b)(2)(vii) Other CMS Yes.
through (ix). requirements.
Sec. 63.10(b)(3) and .................... No.
(d)(3) through (5).
Sec. 63.10(c)(7).......... Additional Yes.
recordkeeping
requirements for
CMS--identifying
exceedances and
excess emissions.
Sec. 63.10(c)(8).......... Additional Yes.
recordkeeping
requirements for
CMS--identifying
exceedances and
excess emissions.
Sec. 63.10(c)(10)......... Recording nature and No. See Sec.
cause of 63.10032(g) and (h)
malfunctions. for malfunctions
recordkeeping
requirements.
Sec. 63.10(c)(11)......... Recording corrective No. See Sec.
actions. 63.10032(g) and (h)
for malfunctions
recordkeeping
requirements.
Sec. 63.10(c)(15)......... Use of SSM Plan..... No.
Sec. 63.10(d)(5).......... SSM reports......... No. See Sec.
63.10021(h) and (i)
for malfunction
reporting
requirements.
Sec. 63.11................ Control Device No.
Requirements.
Sec. 63.12................ State Authority and Yes.
Delegation.
Sec. Sec. 63.13 through Addresses, Yes.
63.16. Incorporation by
Reference,
Availability of
Information,
Performance Track
Provisions.
[[Page 20203]]
Sec. Sec. Reserved............ No.
63.1(a)(5),(a)(7) through
(9), (b)(2), (c)(3) and
(4), (d), 63.6(b)(6),
(c)(3) and (4), (d),
(e)(2), (e)(3)(ii), (h)(3),
(h)(5)(iv), 63.8(a)(3),
63.9(b)(3), (h)(4),
63.10(c)(2) through (4),
(c)(9)..
------------------------------------------------------------------------
0
29. Appendix A to subpart UUUUU of part 63 is amended by revising
paragraphs 3.2.1.2.1, 4.1.1.1, and 4.1.1.3, table A-1, paragraphs
4.1.1.5, 4.1.1.5.2, 5.1.2.1, and 5.1.2.3, table A-2, and paragraphs
5.2.1, 6.2.2.3, and 7.1.8.5 and adding paragraph 7.1.2.6 to read as
follows:
Appendix A to Subpart UUUUU of Part 63--Hg Monitoring Provisions
* * * * *
3. Mercury Emissions Measurement Methods
* * * * *
3.2.1.2.1 NIST Traceability. Only NIST-certified or NIST-traceable
calibration gas standards and reagents (as defined in paragraphs 3.1.4
and 3.1.5 of this appendix), and including, but not limited to, Hg gas
generators and Hg gas cylinders, shall be used for the tests and
procedures required under this subpart. Calibration gases with known
concentrations of Hg\0\ and HgCl2 are required. Special
reagents and equipment may be needed to prepare the Hg\0\ and
HgCl2 gas standards (e.g., NIST-traceable solutions of
HgCl2 and gas generators equipped with mass flow
controllers).
* * * * *
4. Certification and Recertification Requirements
* * * * *
4.1.1.1 7-Day Calibration Error Test. Perform the 7-day calibration
error test on 7 consecutive source operating days, using a zero-level
gas and either a high-level or a mid-level calibration gas standard (as
defined in paragraphs 3.1.8, 3.1.10, and 3.1.11 of this appendix). Use
a NIST-traceable elemental Hg gas standard (as defined in paragraphs
3.1.4 of this appendix) for the test. If your Hg CEMS lacks an
integrated elemental Hg gas generator, you may continue to use NIST-
traceable oxidized Hg gases for the 7-day calibration error test (or
the daily calibration error check) until such time as NIST-traceable
compressed elemental Hg gas standards, at appropriate concentration
levels, are available from gas vendors. If moisture is added to the
calibration gas, the dilution effect of the moisture and/or chlorine
addition on the calibration gas concentration must be accounted for in
an appropriate manner. Operate the Hg CEMS in its normal sampling mode
during the test. The calibrations should be approximately 24 hours
apart, unless the 7-day test is performed over non-consecutive calendar
days. On each day of the test, inject the zero-level and upscale gases
in sequence and record the analyzer responses. Pass the calibration gas
through all filters, scrubbers, conditioners, and other monitor
components used during normal sampling, and through as much of the
sampling probe as is practical. Do not make any manual adjustments to
the monitor (i.e., resetting the calibration) until after taking
measurements at both the zero and upscale concentration levels. If
automatic adjustments are made following both injections, conduct the
calibration error test such that the magnitude of the adjustments can
be determined, and use only the unadjusted analyzer responses in the
calculations. Calculate the calibration error (CE) on each day of the
test, as described in Table A-1 of this appendix. The CE on each day of
the test must either meet the main performance specification or the
alternative specification in Table A-1 of this appendix.
* * * * *
4.1.1.3 Three-Level System Integrity Check. Perform the 3-level
system integrity check using low, mid, and high-level calibration gas
concentrations generated by a NIST-traceable source of oxidized Hg. If
your Hg CEMS lacks an integrated elemental Hg gas generator, you may
continue to use NIST-traceable oxidized Hg gases for the 7-day
calibration error test (or the daily calibration error check) until
such time as NIST-traceable compressed elemental Hg gas standards, at
appropriate concentration levels, are available from gas vendors.
Follow the same basic procedure as for the linearity check. If moisture
and/or chlorine is added to the calibration gas, the dilution effect of
the moisture and/or chlorine addition on the calibration gas
concentration must be accounted for in an appropriate manner. Calculate
the system integrity error (SIE), as described in Table A-1 of this
appendix. The SIE must either meet the main performance specification
or the alternative specification in Table A-1 of this appendix.
Table A-1--Required Certification Tests and Performance Specifications for Hg CEMS
----------------------------------------------------------------------------------------------------------------
The alternate
For this required certification test The main performance performance And the conditions of
. . . specification \1\ is . specification \1\ is . the alternate
. . . . specification are . . .
----------------------------------------------------------------------------------------------------------------
7-day calibration error test 2 6..... [verbar]R - A[verbar] [verbar]R - A[verbar] The alternate
<= 5.0% of span value, <= 1.0 [mu]g/scm. specification may be
for both the zero and used on any day of the
upscale gases, on each test.
of the 7 days..
Linearity check 3 6.................. [verbar]R - Aavg [verbar]R - Aavg The alternate
[verbar] <= 10.0% of [verbar] <= 0.8 [mu]g/ specification may be
the reference gas scm. used at any gas level.
concentration at each
calibration gas level
(low, mid, or high)..
3-level system integrity check \4\... [verbar]R - Aavg [verbar]R - Aavg The alternate
[verbar] <= 10.0% of [verbar] <= 0.8 [mu]g/ specification may be
the reference gas scm. used at any gas level.
concentration at each
calibration gas level..
[[Page 20204]]
RATA................................. 20.0% RA............... [verbar]RMavg - RMavg < 2.5[mu]g/scm
Cavg[verbar] +
[verbar]CC[verbar] <=
0.5 [mu]g/scm \7\.
Cycle time test \5\.................. 15 minutes where the
stability criteria are
readings change by <
2.0% of span or by <=
0.5 [mu]g/scm, for 2
minutes..
----------------------------------------------------------------------------------------------------------------
\1\ Note that [verbar]R - A[verbar] is the absolute value of the difference between the reference gas value and
the analyzer reading. [verbar]R - Aavg[verbar] is the absolute value of the difference between the reference
gas concentration and the average of the analyzer responses, at a particular gas level.
\2\ Use elemental Hg standards; a mid-level or high-level upscale gas may be used.
\3\ Use elemental Hg standards.
\4\ Use oxidized Hg standards.
\5\ Use elemental Hg standards; a high-level upscale gas must be used. The cycle time test is not required for
Hg CEMS that use integrated batch sampling; however, those monitoring systems must be capable of recording at
least one Hg concentration reading every 15 minutes.
\6\ If your Hg CEMS lacks an integrated elemental Hg gas generator, you may continue to use NIST-traceable
oxidized Hg gases until such time as NIST-traceable compressed elemental Hg gas standards, at appropriate
concentration levels, are available from gas vendors.
\7\ Note that [verbar]RMavg - Cavg[verbar] is the absolute difference between the mean reference method value
and the mean CEMS value from the RATA; CC is the confidence coefficient from Equation 2-5 of Performance
Specification 2 in appendix B to part 60 of this chapter.
* * * * *
4.1.1.5 Relative Accuracy Test Audit (RATA). Perform the RATA of
the Hg CEMS at normal load. Acceptable Hg reference methods for the
RATA include ASTM D6784-02 (Reapproved 2008), ``Standard Test Method
for Elemental, Oxidized, Particle-Bound and Total Mercury in Flue Gas
Generated from Coal-Fired Stationary Sources (Ontario Hydro Method)''
(incorporated by reference, see Sec. 63.14) and Methods 29, 30A, and
30B in appendix A-8 to part 60 of this chapter. When Method 29 or ASTM
D6784-02 is used, paired sampling trains are required and the
filterable portion of the sample need not be included when making
comparisons to the Hg CEMS results for purposes of a RATA. To validate
a Method 29 or ASTM D6784-02 test run, calculate the relative deviation
(RD) using Equation A-1 of this section, and assess the results as
follows to validate the run. The RD must not exceed 10 percent, when
the average Hg concentration is greater than 1.0 [mu]g/dscm. If the RD
specification is met, the results of the two samples shall be averaged
arithmetically.
[GRAPHIC] [TIFF OMITTED] TR06AP16.008
Where:
RD = Relative Deviation between the Hg concentrations of samples
``a'' and ``b'' (percent),
Ca = Hg concentration of Hg sample ``a'' ([mu] g/dscm),
and
Cb = Hg concentration of Hg sample ``b'' ([mu] g/dscm).
* * * * *
4.1.1.5.2 Calculation of RATA Results. Calculate the relative
accuracy (RA) of the monitoring system, on a [mu] g/scm basis, as
described in section 12 of Performance Specification (PS) 2 in appendix
B to part 60 of this chapter (see Equations 2-3 through 2-6 of PS2)
including the option to substitute the emission limit value (in this
case the equivalent concentration) in the denominator of Equation 2-6
in place of the average RM value when the average emissions for the
test are less than 50 percent of the applicable emissions limit. For
purposes of calculating the relative accuracy, ensure that the
reference method and monitoring system data are on a consistent basis,
either wet or dry. The CEMS must either meet the main performance
specification or the alternative specification in Table A-1 of this
appendix.
* * * * *
5. Ongoing Quality Assurance (QA) and Data Validation
* * * * *
5.1.2.1 Calibration error tests of the Hg CEMS are required daily,
except during unit outages. Use a NIST-traceable elemental Hg gas
standard for these calibrations. If your Hg CEMS lacks an integrated
elemental Hg gas generator, you may continue to use NIST-traceable
oxidized Hg gases for the 7-day calibration error test (or the daily
calibration error check) until such time as NIST-traceable compressed
elemental Hg gas standards, at appropriate concentration levels, are
available from gas vendors. Both a zero-level gas and either a mid-
level or high-level gas are required for these calibrations.
* * * * *
5.1.2.3 Perform a single-level system integrity check weekly, i.e.,
once every 7 operating days (see the third column in Table A-2 of this
appendix).
* * * * *
[[Page 20205]]
Table A-2--On-Going QA Test Requirements for Hg CEMS
----------------------------------------------------------------------------------------------------------------
With these
Perform this type of QA test . . . At this frequency . . . qualifications and Acceptance criteria . .
exceptions . . . .
----------------------------------------------------------------------------------------------------------------
Calibration error test \5\........... Daily.................. Use either a [verbar]R - A[verbar]
mid- or high-level gas. <= 5.0% of span value
Use elemental or
Hg. [verbar]R - A[verbar]
Calibrations <= 1.0 [mu]g/scm.
are not required when
the unit is not in
operation..
Single-level system integrity check.. Weekly \1\............. Use oxidized [verbar]R -
Hg--either mid- or Aavg[verbar] <= 10.0%
high-level. of the reference gas
value
or
[verbar]R -
Aavg[verbar] <= 0.8
[mu]g/scm.
Linearity check or 3-level system Quarterly \3\.......... Required in [verbar]R - Aavg
integrity check. each ``QA operating [verbar] <= 10.0% of
quarter'' \2\ and no the reference gas
less than once every 4 value, at each
calendar quarters. calibration gas level
168 operating or
hour grace period [verbar]R -
available. Aavg[verbar] <= 0.8
Use elemental [mu]g/scm.
Hg for linearity check.
Use oxidized
Hg for system
integrity check.
RATA................................. Annual \4\............. Test deadline <=20.0% RA when Cavg >=
may be extended for 2.5 [mu]g/scm
``non-QA operating or
quarters,'' up to a [verbar]RMavg -
maximum of 8 quarters Cavg[verbar] +
from the quarter of [verbar]CC[verbar] <=
the previous test.. 0.5 [mu]g[mu]/scm, if
720 operating RMavg < 2.5 [mu]g/scm.
hour grace period
available.
----------------------------------------------------------------------------------------------------------------
\1\ ``Weekly'' means once every 7 operating days.
\2\ A ``QA operating quarter'' is a calendar quarter with at least 168 unit or stack operating hours.
\3\ ``Quarterly'' means once every QA operating quarter.
\4\ ``Annual'' means once every four QA operating quarters.
\5\ If your Hg CEMS lacks an integrated elemental Hg gas generator, you may continue to use NIST-traceable
oxidized Hg gases until such time as NIST-traceable compressed elemental Hg gas standards, at appropriate
concentration levels, are available from gas vendors.
* * * * *
5.2.1 Each sorbent trap monitoring system shall be continuously
operated and maintained in accordance with Performance Specification
(PS) 12B in appendix B to part 60 of this chapter. The QA/QC criteria
for routine operation of the system are summarized in Table 12B-1 of PS
12B. Each pair of sorbent traps may be used to sample the stack gas for
up to 15 operating days.
* * * * *
6. Data Reductions and Calculations
* * * * *
6.2.2.3 The applicable gross output-based Hg emission rate limit in
Table 1 or 2 to this subpart must be met on a 30- (or 90-) boiler
operating day rolling average basis, except as otherwise provided in
Sec. 63.10009(a)(2). Use Equation A-5 of this appendix to calculate
the Hg emission rate for each averaging period.
[GRAPHIC] [TIFF OMITTED] TR06AP16.009
Where:
Eo = Hg emission rate for the averaging period (lb/GWh),
Eho = Gross output-based hourly Hg emission rate for unit
or stack sampling hour ``h'' in the averaging period, from Equation
A-4 of this appendix (lb/GWh), and
n = Number of unit or stack operating hours in the averaging period
in which valid data were obtained for all parameters. (Note: Do not
include non-operating hours with zero emission rates in the
average).
* * * * *
7. Recordkeeping and Reporting
* * * * *
7.1.2.6 The EGUs that constitute an emissions averaging group.
* * * * *
7.1.8.5 If applicable, a code to indicate that the default gross
output (as defined in Sec. 63.10042) was used to calculate the Hg
emission rate.
* * * * *
0
30. Appendix B to subpart UUUUU of part 63 is amended by:
0
a. Revising paragraphs 2.1 and 2.3;
0
b. Adding paragraphs 2.3.1 and 2.3.2;
0
c. Revising paragraphs 3.1 and 3.2 and adding paragraph 3.3;
0
d. Adding introductory text to section 5;
0
e. Revising paragraphs 5.1, 5.1.2, 5.2, and 5.3;
0
f. Adding paragraphs 5.4, 5.4.1, 5.4.2, 5.4.2.1, 5.4.2.2, 5.4.2.2.1,
5.4.2.2.2, 5.4.2.3, 5.4.2.3.1, 5.4.2.3.2, 5.4.2.3.3, and 5.4.3; and
0
g. Revising section 8 introductory text and paragraph 9.3.2.
The revisions and additions read as follows:
Appendix B to Subpart UUUUU of Part 63--HCl and HF Monitoring
Provisions
* * * * *
2. Monitoring of HCl and/or HF Emissions
2.1 Monitoring System Installation Requirements. Install HCl and/or
HF CEMS and any additional monitoring systems needed to convert
pollutant concentrations to units of the applicable emissions limit in
accordance with Sec. 63.10010(a) and either Performance Specification
15 (PS 15) of appendix B to part 60 of this chapter for extractive
Fourier Transform Infrared Spectroscopy (FTIR) continuous emissions
monitoring systems or Performance Specification 18 (PS 18) of appendix
B to part 60 of this chapter for HCl CEMS.
* * * * *
[[Page 20206]]
2.3 FTIR Monitoring System Equipment, Supplies, Definitions, and
General Operation. The following provisions apply:
2.3.1 PS 15, Sections 2.0, 3.0, 4.0, 5.0, 6.0, and 10.0 of appendix
B to part 60 of this chapter; or
2.3.2 PS 18, Sections 3.0, 6.0, and 11.0 of appendix B to part 60
of this chapter.
3. Initial Certification Procedures
* * * * *
3.1 If you choose to follow PS 15 of appendix B to part 60 of this
chapter, then your HCl and/or HF CEMS must be certified according to PS
15 using the procedures for gas auditing and comparison to a reference
method (RM) as specified in sections 3.1.1 and 3.1.2 below.
* * * * *
3.2 If you choose to follow PS 18 of appendix B to part 60 of this
chapter, then your HCl CEMS must be certified according to PS 18,
sections 7.0, 8.0, 11.0, 12.0, and 13.0.
3.3 Any additional stack gas flow rate, diluent gas, and moisture
monitoring system(s) needed to express pollutant concentrations in
units of the applicable emissions limit must be certified according to
part 75 of this chapter.
* * * * *
5. On-Going Quality Assurance Requirements
On-going QA test requirements for HCl and HF CEMS must be
implemented as follows:
5.1 If you choose to follow Performance Specification 15 (PS 15) of
appendix B to part 60 of this chapter, then the quality assurance/
quality control procedures of PS 15 shall apply as set forth in
sections 5.1.1 through 5.1.3 and 5.4.2 of this appendix.
* * * * *
5.1.2 On a quarterly basis, you must conduct a gas audit of the HCl
and/or HF CEMS as described in section 3.1.1 of this appendix. For the
purposes of this appendix, ``quarterly'' means once every ``QA
operating quarter'' (as defined in section 3.1.20 of appendix A to this
subpart). You have the option to use HCl gas in lieu of HF gas for
conducting this audit on an HF CEMS. To the extent practicable, perform
consecutive quarterly gas audits at least 30 days apart. The initial
quarterly audit is due in the first QA operating quarter following the
calendar quarter in which certification testing of the CEMS is
successfully completed. Up to three consecutive exemptions from the
quarterly audit requirement are allowed for ``non-QA operating
quarters'' (i.e., calendar quarters in which there are less than 168
unit or stack operating hours). However, no more than four consecutive
calendar quarters may elapse without performing a gas audit, except as
otherwise provided in section 5.4.2.2.1 of this appendix.
* * * * *
5.2 If you choose to follow Performance Specification PS 18 of
appendix B to part 60 of this chapter, then the quality assurance/
quality control procedures in Procedure 6 of appendix F to part 60 of
this chapter shall apply. The quarterly and annual QA tests required
under Procedure 6 shall be performed, respectively, at the frequencies
specified in sections 5.1.2 and 5.1.3 of this appendix.
5.3 Stack gas flow rate, diluent gas, and moisture monitoring
systems must meet the applicable on-going QA test requirements of part
75 of this chapter.
* * * * *
5.4 Data Validation.
5.4.1 Out-of-Control Periods. An HCl or HF CEMS that is used to
provide data under this appendix is considered to be out-of-control,
and data from the CEMS may not be reported as quality-assured, when any
acceptance criteria for a required QA test is not met. The HCl or HF
CEMS is also considered to be out-of-control when a required QA test is
not performed on schedule or within an allotted grace period. To end an
out-of-control period, the QA test that was either failed or not done
on time must be performed and passed. Out-of-control periods are
counted as hours of monitoring system downtime.
5.4.2 Grace Periods. For the purposes of this appendix, a ``grace
period'' is defined as a specified number of unit or stack operating
hours after the deadline for a required quality-assurance test of a
continuous monitor has passed, in which the test may be performed and
passed without loss of data.
5.4.2.1 For the monitoring systems described in section 5.3 of this
appendix, a 168 unit or stack operating hour grace period is available
for quarterly linearity checks, and a 720 unit or stack operating hour
grace period is available for RATAs, as provided, respectively, in
sections 2.2.4 and 2.3.3 of appendix B to part 75 of this chapter.
5.4.2.2 For the purposes of this appendix, if the deadline for a
required gas audit/data accuracy assessment or RATA of an HCl CEMS
cannot be met due to circumstances beyond the control of the owner or
operator:
5.4.2.2.1 A 168 unit or stack operating hour grace period is
available in which to perform the gas audit or other quarterly data
accuracy assessment; or
5.4.2.2.2 A 720 unit or stack operating hour grace period is
available in which to perform the RATA.
5.4.2.3 If a required QA test is performed during a grace period,
the deadline for the next test shall be determined as follows:
5.4.2.3.1 For a gas audit or RATA of the monitoring systems
described in sections 5.1 and 5.2 of this appendix, determine the
deadline for the next gas audit or RATA (as applicable) in accordance
with section 2.2.4(b) or 2.3.3(d) of appendix B to part 75 of this
chapter; treat a gas audit in the same manner as a linearity check.
5.4.2.3.2 For the gas audit or other quarterly data accuracy
assessment of an HCl or HF CEMS, the grace period test only satisfies
the audit requirement for the calendar quarter in which the test was
originally due. If the calendar quarter in which the grace period audit
is performed is a QA operating quarter, an additional gas audit/data
accuracy assessment is required for that quarter.
5.4.2.3.3 For the RATA of an HCl or HF CEMS, the next RATA is due
within three QA operating quarters after the calendar quarter in which
the grace period test is performed.
5.4.3 Conditional Data Validation. For recertification and
diagnostic testing of the monitoring systems that are used to provide
data under this appendix, the conditional data validation provisions in
Sec. 75.20(b)(3)(ii) through (ix) of this chapter may be used to avoid
or minimize data loss. The allotted window of time to complete
calibration tests and RATAs shall be as specified in Sec.
75.20(b)(3)(iv) of this chapter; the allotted window of time to
complete a quarterly gas audit or data accuracy assessment shall be the
same as for a linearity check (i.e., 168 unit or stack operating
hours).
* * * * *
8. QA/QC Program Requirements
The owner or operator shall develop and implement a quality
assurance/quality control (QA/QC) program for the HCl and/or HF CEMS
that are used to provide data under this subpart. At a minimum, the
program shall include a written plan that describes in detail (or that
refers to separate documents containing) complete, step-by-step
procedures and operations for the most important QA/QC activities.
Electronic storage of the QA/QC plan is permissible, provided that the
information can be made available in hard copy to auditors and
inspectors. The QA/QC program requirements for
[[Page 20207]]
the other monitoring systems described in section 5.3 of this appendix
are specified in section 1 of appendix B to part 75 of this chapter.
* * * * *
9. Data Reduction and Calculations
* * * * *
9.3.2 For gross output-based emission rates, first calculate the
HCl or HF mass emission rate (lb/h), using an equation that has the
general form of Equation A-2 or A-3 in appendix A to this subpart (as
applicable), replacing the value of K with 9.43 x 10-8 lb/
scf-ppm (for HCl) or 5.18 x 10-8 (for HF) and defining
Ch as the hourly average HCl or HF concentration in ppm.
Then, divide the result by the hourly gross output (megawatts) to
convert it to units of lb/MWh. If the gross output is zero during a
startup or shutdown hour, use the default gross output (as defined in
Sec. 63.10042) to calculate the HCl or HF emission rate. The default
gross output is not considered to be a substitute data value.
* * * * *
[FR Doc. 2016-06563 Filed 4-5-16; 8:45 am]
BILLING CODE 6560-50-P