Notice of Effectiveness of Exempt Wholesale Generator Status, 19599 [2016-07723]

Download as PDF Federal Register / Vol. 81, No. 65 / Tuesday, April 5, 2016 / Notices Docket No. EL15–67, Linden VFT, LLC v. PJM Interconnection, L.L.C. Docket No. EL05–121, PJM Interconnection, L.L.C. Docket No. ER13–198, PJM Interconnection, L.L.C. For more information, contact the following: Jonathan Fernandez, Office of Energy Market Regulation, Federal Energy Regulatory Commission, (202) 502– 6604, Jonathan.Fernandez@ferc.gov. Alina Halay, Office of Energy Market Regulation, Federal Energy Regulatory Commission, (202) 502–6474, Alina.Halay@ferc.gov. Dated: March 30, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–07728 Filed 4–4–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Effectiveness of Exempt Wholesale Generator Status FTS Project Owner 1, LLC. FTS Master Tenant 1, LLC. Javelina Interconnection, LLC. Avalon Solar Partners II LLC. Goal Line L.P ................ Voyager Wind I, LLC ... Pasadena Cogen, LLC ... Wind Service Sp. z.o.o. EG16–26–000 EG16–27–000 EG16–28–000 EG16–29–000 EG16–30–000 EG16–31–000 EG16–32–000 FC16–1–000 Take notice that during the month of February 2016, the status of the abovecaptioned entities as Exempt Wholesale Generators or Foreign Utility Companies became effective by operation of the Commission’s regulations. 18 CFR 366.7(a). Dated: March 30, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–07723 Filed 4–4–16; 8:45 am] BILLING CODE 6717–01–P asabaliauskas on DSK3SPTVN1PROD with NOTICES DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL16–50–000] Percheron Power, LLC; Notice of Petition for Declaratory Order Take notice that on March 25, 2016, pursuant to Rule 207(a)(2) of the Federal Energy Regulatory Commission’s VerDate Sep<11>2014 17:18 Apr 04, 2016 Jkt 238001 (Commission) Rules of Practice and Procedure, 18 CFR 385.207(a)(2) (2015), Percheron Power, LLC (Percheron), filed a petition for a declaratory order requesting that the Commission find that it has jurisdiction to authorize small conduit hydroelectric projects of five megawatts or less within the Columbia Basin Project (CBP), and specifically at five incidental features within CBP for which preliminary permits previously had been granted for the PEC 1973 Drop Hydroelectric Project (expired Permit No. 14316); the Scooteney Inlet Drop Project (expired Permit No. 14318); Scooteney Outlet Hydroelectric Project (surrendered Permit No. 14317); 16.4 Wasteway Hydroelectric Project (expired Permit No. 14349); and 46A Wasteway Hydroelectric Project (expired Permit No. 14351), all as more fully explained in the petition. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Petitioner. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern time on April 25, 2016. PO 00000 Frm 00051 Fmt 4703 Sfmt 4703 19599 Dated: March 30, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–07724 Filed 4–4–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings # 1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC16–95–000. Applicants: Calhoun Power Company, LLC. Description: Application of Calhoun Power Company, LLC for Authorization Under Section 203 of the Federal Power Act for Disposition of Jurisdictional Facilities and Requests for Waivers, Expedited Action, and Confidential Treatment. Filed Date: 3/29/16. Accession Number: 20160329–5212. Comments Due: 5 p.m. ET 4/19/16. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–1585–008; ER12–60–010; ER10–1632–010; ER10– 1628–008; ER10–1623–004; ER10–1617– 008; ER10–1616–004; ER10–1594–008. Applicants: Alabama Electric Marketing, LLC, California Electric Marketing, LLC, New Covert Generating Company, LLC, New Mexico Electric Marketing, LLC, Tenaska Frontier Partners, Ltd., Tenaska Power Management, LLC, Tenaska Power Services Co., Texas Electric Marketing, LLC. Description: Supplement to June 30, 2015 Triennial Market Power Analysis for the Central Region of the Tenaska MBR Sellers. Filed Date: 3/30/16. Accession Number: 20160330–5170. Comments Due: 5 p.m. ET 4/20/16. Docket Numbers: ER16–885–001. Applicants: Entergy Arkansas, Inc. Description: Tariff Amendment: Union Power Station Joint Operating Agreement to be effective 3/3/2016. Filed Date: 3/15/16. Accession Number: 20160315–5164. Comments Due: 5 p.m. ET 4/20/16. Docket Numbers: ER16–890–001. Applicants: Summer Solar LLC. Description: Tariff Amendment: Summer Solar LLC MBR Tariff to be effective 3/4/2016. Filed Date: 3/29/16. Accession Number: 20160329–5203. E:\FR\FM\05APN1.SGM 05APN1

Agencies

[Federal Register Volume 81, Number 65 (Tuesday, April 5, 2016)]
[Notices]
[Page 19599]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-07723]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Effectiveness of Exempt Wholesale Generator Status

FTS Project Owner 1, LLC..............  EG16-26-000
FTS Master Tenant 1, LLC..............  EG16-27-000
Javelina Interconnection, LLC.........  EG16-28-000
Avalon Solar Partners II LLC..........  EG16-29-000
Goal Line L.P.........................  EG16-30-000
Voyager Wind I, LLC...................  EG16-31-000
Pasadena Cogen, LLC...................  EG16-32-000
Wind Service Sp. z.o.o................  FC16-1-000
 

    Take notice that during the month of February 2016, the status of 
the above-captioned entities as Exempt Wholesale Generators or Foreign 
Utility Companies became effective by operation of the Commission's 
regulations. 18 CFR 366.7(a).

    Dated: March 30, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-07723 Filed 4-4-16; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.