Airworthiness Directives; The Boeing Company Airplanes, 19472-19482 [2016-07150]
Download as PDF
19472
Federal Register / Vol. 81, No. 65 / Tuesday, April 5, 2016 / Rules and Regulations
(1) Is not a ‘‘significant regulatory
action’’ under Executive Order 12866,
(2) Is not a ‘‘significant rule’’ under
DOT Regulatory Policies and Procedures
(44 FR 11034, February 26, 1979),
(3) Will not affect intrastate aviation
in Alaska, and
(4) Will not have a significant
economic impact, positive or negative,
on a substantial number of small entities
under the criteria of the Regulatory
Flexibility Act.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation
safety, Incorporation by reference,
Safety.
Adoption of the Amendment
Accordingly, under the authority
delegated to me by the Administrator,
the FAA amends 14 CFR part 39 as
follows:
PART 39—AIRWORTHINESS
DIRECTIVES
1. The authority citation for part 39
continues to read as follows:
■
Authority: 49 U.S.C. 106(g), 40113, 44701.
§ 39.13
[Amended]
2. The FAA amends § 39.13 by adding
the following new airworthiness
directive (AD):
■
2016–07–08 The Boeing Company:
Amendment 39–18453; Docket No.
FAA–2016–5036; Directorate Identifier
2015–NM–180–AD.
(a) Effective Date
This AD is effective April 20, 2016.
(b) Affected ADs
None.
(c) Applicability
This AD applies to The Boeing Company
Model DC–9–83 (MD–83) airplane, fuselage
number 2155 (variable number 80E718, serial
number 53192), certificated in any category.
(d) Subject
Air Transport Association (ATA) of
America Code 28: Fuel.
Lhorne on DSK5TPTVN1PROD with RULES
(e) Unsafe Condition
This AD was prompted by fuel system
reviews conducted by the manufacturer. We
are issuing this AD to prevent the potential
of ignition sources inside fuel tanks, which,
in combination with flammable fuel vapors,
could result in fuel tank explosions and
consequent loss of the airplane.
(f) Compliance
Comply with this AD within the
compliance times specified, unless already
done.
(g) Fuse Installation
Within 60 months after the effective date
of this AD, install fuel level float and
VerDate Sep<11>2014
13:15 Apr 04, 2016
Jkt 238001
pressure switch in-line fuses, and do
applicable wiring changes, on the left, right,
and center wing forward spars, forward
auxiliary fuel tank, and aft auxiliary fuel
tank. Do the actions in accordance with the
Accomplishment Instructions of Boeing
Service Bulletin MD80–28–226, Revision 1,
dated March 6, 2015.
(h) Credit for Previous Actions
This paragraph provides credit for the
actions required by paragraph (g) of this AD,
if those actions were performed before the
effective date of this AD using Boeing Service
Bulletin MD80–28–226, dated April 14, 2010,
which is incorporated by reference in AD
2011–01–16, Amendment 39–16573 (76 FR
1993, January 12, 2011).
(i) Alternative Methods of Compliance
(AMOCs)
(1) The Manager, Los Angeles Aircraft
Certification Office (ACO), FAA, has the
authority to approve AMOCs for this AD, if
requested using the procedures found in 14
CFR 39.19. In accordance with 14 CFR 39.19,
send your request to your principal inspector
or local Flight Standards District Office, as
appropriate. If sending information directly
to the manager of the Los Angeles ACO, send
it to the attention of the person identified in
paragraph (j)(1) of this AD. Information may
be emailed to: 9-ANM-LAACO-AMOCRequests@faa.gov.
(2) Before using any approved AMOC,
notify your appropriate principal inspector,
or lacking a principal inspector, the manager
of the local flight standards district office/
certificate holding district office.
(3) An AMOC that provides an acceptable
level of safety may be used for any repair,
modification, or alteration required by this
AD if it is approved by the Boeing
Commercial Airplanes Organization
Designation Authorization (ODA) that has
been authorized by the Manager, Los Angeles
ACO, to make those findings. To be
approved, the repair method, modification
deviation, or alteration deviation must meet
the certification basis of the airplane, and the
approval must specifically refer to this AD.
(j) Related Information
(1) For more information about this AD,
contact Samuel Lee, Aerospace Engineer,
Propulsion Branch, ANM–140L, FAA, Los
Angeles ACO, 3960 Paramount Boulevard,
Lakewood, CA 90712–4137; phone: 562–627–
5262; fax: 562–627–5210; email: samuel.lee@
faa.gov.
(2) Service information identified in this
AD that is not incorporated by reference is
available at the addresses specified in
paragraphs (k)(3) and (k)(4) of this AD.
(k) Material Incorporated by Reference
(1) The Director of the Federal Register
approved the incorporation by reference
(IBR) of the service information listed in this
paragraph under 5 U.S.C. 552(a) and 1 CFR
part 51.
(2) You must use this service information
as applicable to do the actions required by
this AD, unless the AD specifies otherwise.
(i) Boeing Service Bulletin MD80–28–226,
Revision 1, dated March 6, 2015.
(ii) Reserved.
PO 00000
Frm 00006
Fmt 4700
Sfmt 4700
(3) For Boeing service information
identified in this AD, contact Boeing
Commercial Airplanes, Attention: Data &
Services Management, 3855 Lakewood
Boulevard, MC D800–0019, Long Beach, CA
90846–0001; telephone 206–544–5000,
extension 2; fax 206–766–5683; Internet
https://www.myboeingfleet.com.
(4) You may view this service information
at FAA, Transport Airplane Directorate, 1601
Lind Avenue SW., Renton, Washington. For
information on the availability of this
material at the FAA, call 425–227–1221.
(5) You may view this service information
that is incorporated by reference at the
National Archives and Records
Administration (NARA). For information on
the availability of this material at NARA, call
202–741–6030, or go to: https://
www.archives.gov/federal-register/cfr/ibrlocations.html.
Issued in Renton, Washington, on March
22, 2016.
Michael Kaszycki,
Acting Manager, Transport Airplane
Directorate, Aircraft Certification Service.
[FR Doc. 2016–07230 Filed 4–4–16; 8:45 am]
BILLING CODE 4910–13–P
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA–2012–0187; Directorate
Identifier 2011–NM–094–AD; Amendment
39–18452; AD 2016–07–07]
RIN 2120–AA64
Airworthiness Directives; The Boeing
Company Airplanes
Federal Aviation
Administration (FAA), DOT.
ACTION: Final rule.
AGENCY:
We are adopting a new
airworthiness directive (AD) for certain
The Boeing Company Model 757
airplanes. This AD was prompted by
fuel system reviews conducted by the
manufacturer. This AD requires
modifying the fuel quantity indication
system (FQIS) wiring to prevent
development of an ignition source
inside the center fuel tank. We are
issuing this AD to prevent ignition
sources inside the center fuel tank,
which, in combination with flammable
fuel vapors, could result in a fuel tank
explosion and consequent loss of the
airplane.
SUMMARY:
This AD is effective May 10,
2016.
The Director of the Federal Register
approved the incorporation by reference
of a certain publication listed in this AD
as of May 10, 2016.
DATES:
E:\FR\FM\05APR1.SGM
05APR1
Federal Register / Vol. 81, No. 65 / Tuesday, April 5, 2016 / Rules and Regulations
For service information
identified in this final rule, contact
Boeing Commercial Airplanes,
Attention: Data & Services Management,
P. O. Box 3707, MC 2H–65, Seattle, WA
98124–2207; telephone 206–544–5000,
extension 1; fax 206–766–5680; Internet
https://www.myboeingfleet.com. You
may view this referenced service
information at the FAA, Transport
Airplane Directorate, 1601 Lind Avenue
SW., Renton, WA. For information on
the availability of this material at the
FAA, call 425–227–1221. It is also
available on the Internet at https://
www.regulations.gov by searching for
and locating Docket No. FAA–2012–
0187.
ADDRESSES:
Examining the AD Docket
You may examine the AD docket on
the Internet at https://
www.regulations.gov by searching for
and locating Docket No. FAA–2012–
0187; or in person at the Docket
Management Facility between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays. The AD docket
contains this AD, the regulatory
evaluation, any comments received, and
other information. The address for the
Docket Office (phone: 800–647–5527) is
Docket Management Facility, U.S.
Department of Transportation, Docket
Operations, M–30, West Building
Ground Floor, Room W12–140, 1200
New Jersey Avenue SE., Washington,
DC 20590.
FOR FURTHER INFORMATION CONTACT: Jon
Regimbal, Aerospace Engineer,
Propulsion Branch, ANM–140S, FAA,
Seattle Aircraft Certification Office
(ACO), 1601 Lind Avenue SW., Renton,
WA 98057–3356; phone: 425–917–6506;
fax: 425–917–6590; email:
jon.regimbal@faa.gov.
SUPPLEMENTARY INFORMATION:
Lhorne on DSK5TPTVN1PROD with RULES
Discussion
We issued a supplemental notice of
proposed rulemaking (SNPRM) to
amend 14 CFR part 39 by adding an AD
that would apply to certain The Boeing
Company Model 757 airplanes. The
SNPRM published in the Federal
Register on February 23, 2015 (80 FR
9400) (‘‘the SNPRM’’). We preceded the
SNPRM with a notice of proposed
rulemaking (NPRM) that published in
the Federal Register on March 1, 2012
(77 FR 12506). The NPRM proposed to
require modifying the fuel quantity
indication system (FQIS) wiring or fuel
tank systems to prevent development of
an ignition source inside the center fuel
tank. The NPRM was prompted by fuel
system reviews conducted by the
manufacturer. The SNPRM proposed to
VerDate Sep<11>2014
13:15 Apr 04, 2016
Jkt 238001
revise the applicability, including
alternative actions for cargo airplanes,
and extend the compliance time. We are
issuing this AD to prevent ignition
sources inside the center fuel tank,
which, in combination with flammable
fuel vapors, could result in fuel tank
explosions and consequent loss of the
airplane.
Record of Ex Parte Communication
In preparation of AD actions such as
NPRMs and immediately adopted rules,
it is the practice of the FAA to obtain
technical information and information
on the operational and economic impact
from design approval holders and
aircraft operators. We discussed certain
issues related to this final rule in a
meeting held December 1, 2015, with
Airlines for America (A4A) and other
members of the aviation industry. This
final rule addresses the issues discussed
during that meeting that are relevant to
this final rule. A summary of this
meeting can be found in the rulemaking
docket at https://www.regulations.gov by
searching for and locating Docket No.
FAA–2012–0187.
Comments
We gave the public the opportunity to
participate in developing this AD. The
following presents the comments
received on the SNPRM and the FAA’s
response to each comment.
Request To Withdraw SNPRM: New
Certification Requirements for
Flammability Reduction Means (FRM)
Unwarranted
A4A, representing U.S. cargo
operators, stated that the FAA intends to
issue rulemaking requiring U.S. cargo
operators to do additional fuel safety
modifications to meet the latest aircraft
certification requirements.
We infer that A4A considers that
requiring airplanes to meet the latest
certification requirements is not
warranted and that the SNPRM should
therefore be withdrawn. We assume that
by ‘‘the latest aircraft certification
requirements,’’ A4A is referring to the
relatively new requirements for FRM
contained in 14 CFR part 125.
We do not agree that the SNPRM
should be withdrawn. This AD is not
specifically intended to require that the
affected airplanes meet the flammability
requirements of 14 CFR part 125. It is
instead intended to address an unsafe
condition as required by 14 CFR part 39
identified by the FAA under the policy
contained in the FAA’s Special Federal
Aviation Regulation No. 88 (14 CFR part
21, SFAR 88) AD decision policy (Policy
Memorandum ANM–100–2003–112–15)
(https://rgl.faa.gov/Regulatory_and_
PO 00000
Frm 00007
Fmt 4700
Sfmt 4700
19473
Guidance_Library/rgPolicy.nsf/0/
DC94C3A46396950386256
D5E006AED11?OpenDocument&High
light=anm-100-2003-112-15), dated
February 25, 2003, and the FAA’s
Transport Airplane Risk Assessment
Methodology (TARAM) (Policy
Statement PS–ANM–25–05) (https://
rgl.faa.gov/Regulatory_and_Guidance_
Library/rgPolicy.nsf/0/4E5AE8707164
674A862579510061F96B?Open
Document&Highlight=ps-anm-25-05).
The FAA determined that installing
FRM that meets 14 CFR part 125 would
be one acceptable way to address the
identified unsafe condition, so airplanes
on which such a modification was
incorporated were excluded from the
applicability of the SNPRM. Other
modifications identified later in this
discussion are available as alternative
actions to installing FRM for certain
operations. We have determined it is
necessary to proceed with issuance of
this final rule.
Request To Withdraw SNPRM:
Intrusive, Expensive, Unnecessary
A4A stated that Airbus and Boeing
have indicated to them that the service
bulletins for the wire separation
modification that is part of the cargo
airplane alternative actions will be
intrusive and expensive and will not
significantly improve safety. A4A stated
that the safety analyses performed by
the aircraft manufacturers do not
classify the proposed modifications as
safety critical. A4A noted that those
service bulletins will not be issued as
‘‘Alert’’ service bulletins. Additionally,
A4A stated that foreign regulatory
authorities, aircraft manufacturers, and
airlines do not support that a safety
issue remains.
We infer that A4A is requesting that
we withdraw the SNPRM because the
airplane manufacturers have determined
that an unsafe condition does not exist
and the SNPRM will not significantly
improve safety. We do not agree that the
SNPRM should be withdrawn. We
acknowledge that Boeing does not
consider the condition associated with
FQIS on these airplanes to be unsafe.
We disagree with Boeing’s assertions,
for the reasons discussed extensively in
our response to Boeing’s similar
comment in the SNPRM, under
‘‘Request to Withdraw NPRM (77 FR
12506, March 1, 2012): Unjustified by
Risk.’’ We have determined that it is
necessary to proceed with issuance of
this final rule.
E:\FR\FM\05APR1.SGM
05APR1
19474
Federal Register / Vol. 81, No. 65 / Tuesday, April 5, 2016 / Rules and Regulations
Lhorne on DSK5TPTVN1PROD with RULES
Request To Withdraw SNPRM: Global
Economic Disadvantage to U.S.
Operators
A4A does not expect that foreign
regulators will require modification of
affected foreign-registered aircraft, and
stated that the competitive position of
U.S. cargo operators will be harmed as
a result. A4A stated that foreign
regulatory agencies did not mandate
retrofit of FRM for cargo airplanes, and
therefore A4A did not expect that those
authorities will mandate FQIS changes
for their operators. A4A’s comment
made reference to documents published
by the European Aviation Safety Agency
(EASA), the Civil Aviation Authority of
China (CAAC), and the Japan Civil
Aviation Bureau (JCAB) as evidence that
those agencies are not planning action
to address any unsafe condition
associated with FQIS.
We infer that A4A is requesting that
we withdraw the NPRM because other
foreign regulatory agencies have
determined that an unsafe condition
does not exist with regard to FQIS as
addressed by the proposed AD.
We were unable to examine the EASA
document A4A attempted to reference
because the reference number was
incomplete. We do not agree that the
CAAC and JCAB documents indicate a
position on the unsafe condition
addressed by the SNPRM. Both of those
documents simply state a requirement
for existing type certificate holders to
review fuel tank designs that is similar
to the FAA’s SFAR 88. Those
documents do not state positions on any
unsafe conditions or AD proposals
identified by the FAA, the CAAC, or the
JCAB.
A4A stated that the U.S. air cargo
industry is currently in an extremely
competitive global market. Additional
lower deck capacity on passenger
aircraft, especially through Middle East
hubs, has significantly increased the
need for cargo industry capacity.
Several cargo carriers have ceased
operations, and many others have
parked some aircraft. U.S. carriers
compete directly with foreign cargo
operators. A4A stated that any
additional costs on U.S. cargo operators
that are not incurred by foreign
operators will make U.S. operators less
competitive and will lead to the loss of
jobs in the U.S.
We infer that A4A is requesting that
we withdraw the proposal to require
corrective action on cargo airplanes
because non-U.S. cargo operators will
not be required to make similar
modifications, and the FAA AD action
would harm the competitive position of
VerDate Sep<11>2014
13:15 Apr 04, 2016
Jkt 238001
U.S. cargo operators, resulting in the
loss of U.S. jobs.
We do not agree to withdraw the
SNPRM for corrective action on cargo
airplanes. As part of the AD
development process, the FAA works
with the affected manufacturer to
develop a cost estimate for the
corrective actions in a proposed AD.
The FAA considers all possible
corrective actions proposed by a
manufacturer in an attempt to minimize
the cost burden on operators. In some
cases the FAA even makes a specific
suggestion to a manufacturer for a less
costly alternative. In the end, the
manufacturer is responsible for
development of an appropriate
corrective action.
While the FAA attempts to minimize
the costs associated with a required
corrective action for a U.S. product,
ultimately the FAA has the
responsibility as the civil aviation
authority (CAA) of the state of design to
address unsafe conditions through AD
action. Other CAAs overseeing foreign
operators will typically apply the FAA
AD or develop a similar AD for U.S.
products operated under each CAA’s
jurisdiction. Other CAAs rely heavily on
the knowledge and judgment of the
CAA of the state of design to identify
unsafe conditions and appropriate
corrective actions for products of that
state. The FAA is not aware at this time
of any affected CAAs that do not plan
to issue a corresponding mandate to
address the unsafe condition associated
with FQIS identified in the proposed
AD. Even if such a situation occurs, the
FAA would not use a foreign CAA’s
position as a justification for not
addressing an unsafe condition
identified by the FAA. While we
acknowledge such a situation could
harm the competitive position of a U.S.
operator, we are still obligated by U.S.
law and by international treaties to
address the identified unsafe condition.
We have determined that it is necessary
to proceed with issuance of this final
rule.
Request To Withdraw SNPRM: Costs of
Compliance
A4A stated that the proposed
modifications are very costly, and noted
that United Parcel Service (UPS) has
estimated a total cost of $16 million for
its fleet of four aircraft types that are
potentially affected by the SNPRM and
other similar planned ADs. A4A pointed
out that U.S. cargo operators have
already spent tens of millions of dollars
on fuel tank safety improvements. UPS
alone has spent $35.5 million to comply
with 51 SFAR 88 ADs on the four fleet
types potentially affected. A4A noted
PO 00000
Frm 00008
Fmt 4700
Sfmt 4700
that cargo operators already have
recurring expenses for Enhanced
Airworthiness Program for Airplane
Safety (EAPAS) maintenance program
tasks that continue to help ensure fuel
tank safety. A4A added that cargo
operators have already invested in
improved and more expensive fuel tank
component repair and overhaul
processes.
We infer that A4A is requesting that
we withdraw the SNPRM because the
costs of addressing previously identified
fuel tank unsafe conditions has been
high, and that the additional cost to
address the FQIS latent-plus-one issue
will also be high, with very little safety
benefit.
We do not agree to withdraw the
SNPRM. We acknowledge that the total
industry cost to address other fuel tank
system unsafe conditions has been high.
The SFAR 88 studies for Boeing
airplanes identified several basic design
deficiencies in lightning protection that
could cause an ignition source in a fuel
tank in the event of a lightning strike,
and several issues with fuel pump
systems and fuel valve systems where a
single failure could result in an ignition
source in a fuel tank. Fuel pump issues
are suspected to have caused several
fuel tank ignition events, so these issues
were considered to be the highest
priority for the development of
corrective actions and related AD
actions. The FAA considers the cost of
addressing those issues to be clearly
justified. Deficiencies in maintenance
programs and inappropriate component
repair actions that could lead to
inadvertent significant increases in the
risk of an ignition source in a fuel tank
were also identified, and the cost of
airworthiness limitations to address
those issues is also considered to be
justified.
The SFAR 88 studies and the FAA’s
subsequent decision-making process
identified FQIS vulnerability of Model
707, 727, 737, 747, 757, 767, and 777
airplanes as an unsafe condition
requiring corrective action. While the
more recently designed of these airplane
models have significant improvements
in FQIS design details, they all have
similar FQIS design architecture with
respect to the identified failure scenario.
That architecture is vulnerable to a
combination of a latent in-tank wiring
failure and a subsequent wiring failure
outside of the tank that connects a high
power source to the FQIS tank circuit
creating an ignition source in a fuel
tank. This failure combination was
determined by the National
Transportation Safety Board (NTSB) to
have been the most likely cause of the
Model 747 fuel tank explosion accident
E:\FR\FM\05APR1.SGM
05APR1
Lhorne on DSK5TPTVN1PROD with RULES
Federal Register / Vol. 81, No. 65 / Tuesday, April 5, 2016 / Rules and Regulations
off Long Island in 1996. NTSB Safety
Recommendation A–98–038 (https://
www.ntsb.gov/about/employment/_
layouts/ntsb.recsearch/
Recommendation.aspx?Rec=A-98-038)
recommended that the FAA require that
FQIS wiring on all airplane models that
have similar wiring installations be
separated and shielded to the maximum
extent possible.
The FAA issued AD 98–20–40,
Amendment 39–10808 (63 FR 52147,
September 30, 1998); and AD 99–03–04,
Amendment 39–11018 (64 FR 4959,
February 2, 1999); to address this issue
on early Model 747 and Model 737
airplanes, respectively, which used the
same FQIS as the accident airplane. The
FAA subsequently (in 2003) determined
that this same architectural
vulnerability was an unsafe condition
for high flammability fuel tanks on all
Boeing jet transports existing at that
time. This determination was consistent
with the published FAA policy for
SFAR 88 corrective actions and with the
current FAA TARAM guidelines for
identification of unsafe conditions on
transport airplanes.
The FAA deferred acting on this
unsafe condition until after the FRM
rulemaking activity was complete
because introduction of FRM had the
potential to change the classification of
many of the affected fuel tanks to low
flammability. When the final decision
for the FRM rule did not include a
requirement for FRM on all airplanes,
the FAA resumed the planned actions to
address the identified FQIS unsafe
condition on the airplanes that were not
required to have FRM.
The FAA considers the safety benefit
of the SNPRM to be significant for both
passenger and cargo airplanes. We
estimate that the installation of
compliant FRM will provide
approximately an order of magnitude
reduction in the risk of a fuel tank
explosion on anticipated flights with a
latent failure of an FQIS circuit in the
center fuel tank. We estimate that the
periodic BITE checks in the cargo
airplane alternative actions will result
in a 75- to 90-percent reduction in the
number of flights that operate with a
latent in-tank failure that makes them
vulnerable to a single additional wiring
hot short failure creating an ignition
source in the center fuel tank. We
estimate that the proposed wire
separation modification in the cargo
airplane alternative actions will reduce
the risk of a hot short (and a resultant
ignition source) on flights that have a
latent in-tank failure by 50 to 75
percent. This estimated reduction in the
risk on anticipated flights with a latent
in-tank failure is sufficient to reduce the
VerDate Sep<11>2014
13:15 Apr 04, 2016
Jkt 238001
risk below the FAA’s TARAM
individual flight risk guideline level for
urgent action. As discussed below in
our response to ‘‘Request to Remove
Alternative Actions for Cargo
Airplanes,’’ we determined that further
changes to further reduce the risk below
the TARAM individual flight risk
corrective action guideline of 1 in 10
million per flight hour would
significantly increase the costs of
compliance and are not necessary to
adequately address the unsafe
condition. We have determined that it is
necessary to proceed with issuance of
this final rule.
Request To Withdraw SNPRM: Unsafe
Condition Addressed by Previous
Requirements
A4A stated that there have been no
fuel tank ignition incidents since the
previously issued fuel tank safety ADs
were implemented. A4A stated that this
provides direct evidence that FAA
projections for additional incidents
were overstated and that SFAR 88
changes have worked. They further
stated that no unsafe condition exists,
asserting that service experience has
shown that the fuel tank safety issues
have been sufficiently addressed with
significant previous modifications,
recurring maintenance, controlled
overhaul processes and repair processes,
and maintenance program tasks.
We infer that A4A is requesting that
we withdraw the SNPRM because
previously required actions have
adequately addressed the need for
improvements in fuel tank safety.
We do not agree to withdraw the
SNPRM. Until recently, fuel tank
ignition incidents on U.S.- and
European-manufactured transport
airplanes have occurred roughly once
every five to six years, with the most
recent event in May 2006 (a Model 727
airplane in India in 2006, a Model 737
airplane in Thailand in 2001, a Model
747 airplane near New York in 1996,
and a Model 737 airplane in the
Philippines in 1991). It has now been
ten years since the most recent event.
We agree that a significant
improvement in fuel tank safety has
occurred due to actions that have
reduced the potential for ignition
sources associated with single failures
of fuel pumps and fuel pump power
systems. That improvement alone
would be expected to increase the
average interval between fuel tank
ignition incidents to more than ten
years. However, the fact that no
incidents have occurred since 2006 is
not statistically significant, and is not
sufficient to predict that additional
events will not occur. In addition, even
PO 00000
Frm 00009
Fmt 4700
Sfmt 4700
19475
assuming the average interval between
events is significantly improved to the
extent that the overall fleet risk is
considered acceptable, we would still
address unsafe conditions identified
based on the published FAA policy for
SFAR 88 corrective actions and the
current FAA guidelines for
identification of unsafe conditions on
transport airplanes when the individual
flight safety risk exceeds our guidelines,
as in this case. We have determined that
it is necessary to proceed with issuance
of this final rule.
Request To Withdraw SNPRM: All
Related NTSB Safety Recommendations
Closed
A4A stated that the NTSB previously
issued the following safety
recommendations related to
flammability, wiring, and wiring
maintenance:
• A–96–174—Preclude flammable
fuel air mixtures in fuel tanks. Closed—
Acceptable Action: FRM Rulemaking.
Safety Recommendation A–96–174 can
be found at https://www.ntsb.gov/_
layouts/ntsb.recsearch/
Recommendation.aspx?Rec=A-96-174.
• A–98–038—Separation of FQIS
wires to the max extent possible.
Closed—Acceptable Action: SFAR 88
Rulemaking.
• A–98–039—Require surge
protection systems for FQIS wires.
Closed—Acceptable Action: SFAR 88
Rulemaking. Safety Recommendation
A–98–039 can be found at https://
www.ntsb.gov/about/employment/_
layouts/ntsb.recsearch/
Recommendation.aspx?Rec=A-98-039.
• A–00–106—Assess wiring
criticality and separation. Closed—
Acceptable Action: EAPAS/FTS
Rulemaking. Safety Recommendation
A–00–106 can be found at (https://
www.ntsb.gov/_layouts/ntsb.recsearch/
Recommendation.aspx?Rec=A-00-106.
• A–00–108—Repair of potentially
unsafe wiring conditions. Closed—
Acceptable Action: EAPAS/FTS
Rulemaking. Safety Recommendation
A–00–108 can be found at https://
www.ntsb.gov/_layouts/ntsb.recsearch/
Recommendation.aspx?Rec=A-00-108.
A4A noted that all applicable NTSB
safety recommendations are closed with
acceptable actions taken by the FAA.
A4A stated that none of the NTSB safety
recommendations called for the FAA to
address wire separation for the FQIS.
We infer that A4A is requesting that
we withdraw the SNPRM because the
NTSB considers the overall fuel tank
safety issue to be adequately addressed
by previous actions.
We do not agree to withdraw the
SNPRM. A4A appears to have
E:\FR\FM\05APR1.SGM
05APR1
19476
Federal Register / Vol. 81, No. 65 / Tuesday, April 5, 2016 / Rules and Regulations
Lhorne on DSK5TPTVN1PROD with RULES
misunderstood NTSB Safety
Recommendation A–98–038 and the
NTSB’s acceptance of the FAA’s
response to that safety recommendation.
NTSB Safety Recommendation A–98–
038 specifically called for the FAA to
require, in ‘‘airplanes with fuel quantity
indication system (FQIS) wire
installations that are co-routed with
wires that may be powered, the physical
separation and electrical shielding of
FQIS wires to the maximum extent
possible.’’ The NTSB classified that
recommendation as ‘‘closed, acceptable
action’’ after the FAA stated that it
would issue ADs to mandate FQIS
protection on the high flammability
tanks of aircraft on which the
installation of FRM is not required by
the Fuel Tank Flammability Reduction
(FTFR) rule (73 FR 42444, July 21,
2008). The communications between the
NTSB and the FAA on Safety
Recommendation A–98–038 can be
viewed at https://www.ntsb.gov/about/
employment/_layouts/ntsb.recsearch/
Recommendation.aspx?Rec=A-98-038.
We have determined that it is necessary
to proceed with issuance of this final
rule.
Request To Withdraw SNPRM:
Unjustified by Risk Assessment
A4A stated that the original
equipment manufacturers (OEMs) and
other regulatory agencies are having
difficulty calculating the true safety
value associated with the proposed
FQIS AD. A4A stated that its position is
that all the unsafe conditions have been
mitigated, operationally and across
industry, and all previous rules have
been effective. A4A added that, in light
of the operators’ financial and technical
investment to mitigate the unsafe
conditions in all areas, the SNPRM is
difficult to understand technically
relative to the amount of mitigation that
would be required, in light of a true risk
assessment. A4A stated that the FAA is
alone in believing that a safety issue still
exists.
We infer that A4A is requesting that
we withdraw the SNPRM because it has
not been justified by a risk assessment
and because previously required actions
have adequately addressed the need for
improvements in fuel tank safety.
We do not agree to withdraw the
SNPRM. We provided a detailed
response to similar comments and
described the FAA’s risk assessment in
the SNPRM in the sections ‘‘Request to
Withdraw NPRM (77 FR 12506, March
1, 2012): Unjustified by Risk,’’ ‘‘Request
to Withdraw NPRM (77 FR 12506,
March 1, 2012): Not Supported by Risk
Analysis,’’ and ‘‘Request to Withdraw
NPRM (77 FR 12506, March 1, 2012): No
VerDate Sep<11>2014
13:15 Apr 04, 2016
Jkt 238001
Unsafe Condition,’’ as well as in earlier
paragraphs in this discussion. We have
determined that it is necessary to
proceed with issuance of this final rule.
Request To Remove Requirement for
Corrective Actions for Cargo Airplanes
A4A stated that the alternative wire
separation modifications allowed for
cargo airplanes would not meet the
‘‘new design criteria.’’ (We assume that
A4A is referring to the wire separation
requirements for repairs and
modifications that are included in the
fuel tank system airworthiness
limitations required by recent ADs for
the various Boeing models.) A4A stated
that in the Model 757 service bulletin
under development by Boeing, only
about ‘‘5 percent’’ of FQIS wires can be
separated from other systems by a
distance of 2 inches, and that the
majority of the wire bundle relocation
will achieve only up to 0.5-inch
spacing. A4A stated that because the
wire separation requirements are not
met, partial exemptions from the
requirements of 14 CFR 25.981 are
required to allow approval of these wire
separation service bulletins. Based on
the reduced separation distance and the
need for exemptions, A4A considered
the proposed wire separation
requirements included in the cargo
airplane alternative actions to be a
symbolic gesture with no significant
safety benefit, while at the same time
being expensive and intrusive. A4A
further stated that operators have
reviewed the associated draft service
bulletins and are concerned about the
lack of a design target or adequate
rationale for the actions proposed by the
FAA. Finally, A4A stated that Boeing
had stated to them that Boeing does not
understand what design changes the
FAA wants or why the FAA considers
there to be a safety issue.
We infer that A4A is requesting that
we remove the alternative actions for a
wire separation modification on cargo
airplanes because A4A believes the wire
separation actions associated with the
cargo airplane alternative actions in the
SNPRM would have no significant
safety benefit since inadequate physical
wire separation is provided.
We do not agree to withdraw the
SNPRM. A4A appears to have
misunderstood the intent of the FQIS
wire separation requirements added to
the airworthiness limitations as a
critical design configuration control
limitation (CDCCL). The FQIS wire
separation CDCCL provides a set of wire
separation requirements that are
intended to be used as a default when
modifying or repairing an aircraft to
ensure that the intended level of
PO 00000
Frm 00010
Fmt 4700
Sfmt 4700
separation of the FQIS wiring from other
wiring is maintained. The Model 757
CDCCL (28–AWL–05) contains a simple
2-inch separation requirement as
originally proposed by Boeing. While
Boeing has not proposed changes to the
Model 757 FQIS wire separation
CDCCL, the corresponding CDCCL (28–
AWL–05) for Model 737–700, –800, and
–900 airplanes has numerous additional
provisions approving other design
approaches (typically combinations of
wire sleeving and smaller separation
distances) that Boeing or operators
proposed and that the FAA approved.
Each time wire separation configuration
options were approved for Boeing,
alternative CDCCL wording was
approved as an AMOC with the AD that
required the addition of the CDCCLs to
operators’ maintenance programs. A
similar AMOC will be granted for the
approved modifications to the FQIS for
Model 757 airplanes.
A4A also appears to have
misunderstood the reason that
exemptions would be required to allow
approval of the cargo airplane wire
separation modification. Lack of a full 2
inches of wire separation in all of the
changed areas is not the reason an
exemption is required. Rather, an
exemption is required because the
overall FQIS will not comply with 14
CFR 25.901(c) and 25.981(a)(3) due to
the existing noncompliance of the
unchanged areas of the system. Because
those rules require a system-level safety
analysis, we cannot find the changes to
the system compliant if a
noncompliance exists in the unchanged
areas of the system.
The proposed Boeing design uses
sleeving over the wire bundles and
extensive retention features to provide a
level of wire protection similar to the
protection that would be provided by a
greater separation distance. The design
measures are consistent with those
previously approved by the FAA in the
Model 737–700/800/900 CDCCL
mentioned previously.
We consider the safety benefit
provided by the proposed cargo airplane
alternative actions to be significant. The
unsafe condition determination and the
rationale and estimated safety benefit
for the cargo airplane alternative actions
were discussed extensively with Boeing
in several meetings, and we consider
that Boeing fully understands the FAA’s
position on each of those aspects of the
proposal. The proposed requirement for
a periodic check through the built-in
test equipment (BITE) of the FQIS
processor is intended to identify and
result in corrective actions for the
detectable fault conditions in the FQIS
in-tank wiring. We estimated that this
E:\FR\FM\05APR1.SGM
05APR1
Federal Register / Vol. 81, No. 65 / Tuesday, April 5, 2016 / Rules and Regulations
Lhorne on DSK5TPTVN1PROD with RULES
proposed requirement will result in a
75- to 90-percent reduction in the
number of flights that operate with a
latent in-tank failure that makes them
vulnerable to a single additional wiring
hot short failure creating an ignition
source in the center fuel tank. The
proposed FQIS wire separation
modification is intended to reduce the
risk of a hot short of power onto center
tank FQIS circuits by physically
isolating the portions of those circuits
that are outside of the tank in the areas
where those circuits are most vulnerable
to damage and most easily separated.
We did not propose to require
modifications of the wiring in the
electrical racks or in the cockpit areas
because of the difficulty involved in
accessing and achieving additional wire
separation in those areas, and in
recognition that the FQIS processor
provides some beneficial circuit
isolation to protect against hot shorts in
those areas. We estimated that the
proposed wire separation modification
would reduce the risk of a hot short on
flights that have a latent in-tank failure
by 50 to 75 percent. Those estimates
were reviewed with Boeing, and Boeing
did not disagree with those estimates.
We have determined it is necessary to
proceed with issuance of this final rule.
Request To Remove Alternative Actions
for Cargo Airplanes
Colin Edwards and an anonymous
commenter made no explicit request to
change the SNPRM, but objected to the
proposed addition of alternative actions
for cargo airplanes that would allow a
design change that does not fully
comply with the fuel tank system safety
requirements of 14 CFR part 25 (14 CFR
25.981(a)(3)) to be used to address the
unsafe condition. The commenters
stated that it should not be acceptable
to allow greater risk to exist on cargo
airplanes than that allowed for
passenger airplanes.
We infer that the commenters propose
the elimination of the proposed
alternative corrective action for cargo
airplanes. We disagree with this request.
We determined that an acceptable level
of safety would be provided for the
affected cargo airplanes, and explained
our position in depth in response to
similar comments in the SNPRM.
However, we will attempt to address the
commenters’ concerns by expanding on
the explanation of our safety
determination.
When assessing potential unsafe
conditions on transport airplanes to
determine if corrective action is
necessary, the FAA assesses the total
risk to the affected fleet of airplanes
exposed to the condition, and assesses
VerDate Sep<11>2014
13:15 Apr 04, 2016
Jkt 238001
the level of risk on individual airplanes
within the fleet. The FAA’s guidelines
for assessing the total fleet risk related
to the unsafe condition are slightly
different for cargo and passenger
airplanes due to operational usage
differences. In this case, however, the
total risk to the affected fleet is lower
than the unsafe condition risk
guidelines for both passenger and cargo
airplanes. Total fleet risk is therefore not
the risk assessment element driving the
proposed actions.
When assessing the level of risk on
individual airplanes, the FAA considers
the risk on the worst reasonably
anticipated flights to ensure that the
level of safety on each flight is
acceptable. Our individual flight risk
unsafe condition threshold is 1 × 10E–
7 events (or a 1-in-10-million chance of
a catastrophic event) per flight hour. In
addition, the worst reasonably
anticipated flights should not be
vulnerable to a single failure that causes
a fatal event, regardless of probability.
There is no difference in the individual
flight risk unsafe condition criteria for
cargo airplanes and passenger airplanes
because the operational differences are
not considered in this risk calculation.
In this case, we are concerned about
a latent failure inside the fuel tank that,
in combination with an electrical short
circuit in FQIS wiring outside of the
tank, could result in an electrical spark
or arc in the tank. An electrical arc or
spark in the fuel tank combined with
flammable conditions in the fuel tank
could result in a fuel tank explosion.
The worst reasonably anticipated flights
in this case are those that have both the
latent failure and flammable conditions
in the tank. The manufacturer’s analysis
indicates that a significant number of
flights would be expected to occur with
these conditions in the life of the
affected fleet if no corrective action is
taken. For those flights, one additional
failure—a short circuit between FQIS
wiring and power wiring—could cause
a fuel tank explosion. Also, the
probability of an explosion is between 1
in a million and 1 in 10 million, per
flight hour, which slightly exceeds the
numerical unsafe condition guideline
for individual flight risk discussed
above.
An issue that violates one or more of
the individual flight risk guidelines
would normally require corrective
action that reduces the risk to a level
that is below the unsafe condition
guidelines. However, in this case the
FAA acknowledged that the cost of
corrective action is high, and that the
available corrective action (fuel tank
FRM systems) would reduce, but not
eliminate, the number of expected
PO 00000
Frm 00011
Fmt 4700
Sfmt 4700
19477
flights with the condition we are
concerned about (a latent failure plus
flammable conditions inside the tank).
The alternative actions for cargo
airplanes would also reduce the number
of expected flights with the condition
we are concerned about, but to a lesser
degree. The FAA has determined that
allowing a moderate number of cargo
flights per year (on average) with this
condition provides an acceptable level
of safety. As part of making this
determination, we noted that the level
of risk on the worst reasonably
anticipated flights is similar to the level
of risk for private and commercial pilots
flying normal category airplanes.
We have not changed the final rule
regarding this issue.
Request To Require FQIS Modification
in all Fuel Tanks
National Air Traffic Controllers
Association (NATCA) requested that we
require changes to the FQIS to address
the potential ‘‘latent-plus-one-failure
scenario’’ in all fuel tanks, not just in
the center fuel tank.
NATCA stated that the failure
condition that is the subject of the
SNPRM should be classified as a
‘‘known’’ latent-plus-one-failure
condition when applying the FAA
Transport Airplane Directorate Policy
Memorandum 2003–112–15, ‘‘SFAR
88—Mandatory Action Decision
Criteria,’’ dated February 25, 2015
(https://rgl.faa.gov/Regulatory_and_
Guidance_Library/rgPolicy.nsf/0/
dc94c3a46396950386256d5e006aed11/
$FILE/Feb2503.pdf). NATCA stated that
this would have the effect of classifying
the failure condition as an unsafe
condition requiring corrective action in
all affected fuel tanks regardless of
flammability level.
NATCA considered the combination
of a latent in-tank failure with electrical
energy transmitted into the fuel tank via
the FQIS wiring due to an additional
failure outside of the tank to be a
‘‘known’’ failure condition because that
failure condition was considered to be
the most likely cause of the TWA Flight
800 Model 747 accident. (That accident
occurred on July 17, 1996, shortly after
takeoff from John F. Kennedy
International Airport in Jamaica, New
York.) NATCA concluded that because
the Model 757 FQIS is similar to that of
the Model 747, both models are
vulnerable to the same failure scenario.
NATCA cited the unsafe condition
statement for the SNPRM as evidence
that the scenario should be classified as
‘‘known.’’ NATCA pointed out that the
FAA issued AD 98–20–40, Amendment
39–10808 (63 FR 52147, September 30,
1998), to address this issue for Model
E:\FR\FM\05APR1.SGM
05APR1
19478
Federal Register / Vol. 81, No. 65 / Tuesday, April 5, 2016 / Rules and Regulations
747 airplanes, and pointed out that the
FAA TARAM Handbook specifically
states that Policy Memorandum 2003–
112–15 should be followed in
determining whether corrective action
should be required for fuel tank safety
concerns identified through SFAR 88.
We disagree with the request to
require modification of the FQIS in all
fuel tanks. We have determined that,
under the policy contained in the policy
memorandum, this failure condition for
the Model 757 FQIS should not be
classified as ‘‘known.’’ The memo
defines ‘‘known’’ failure conditions as
follows:
Lhorne on DSK5TPTVN1PROD with RULES
[T]hose conditions which have occurred
in-service and are likely to occur on other
products of the same or similar type design,
and conditions which have been subject to
mandatory corrective actions, following inservice findings, on products with a similar
design of fuel system.
We agree that the Model 757 FQIS has
the same high-level system architecture
and operating principles as those of the
Model 747 FQIS, resulting in
vulnerability to the same theoretical
latent-plus-one-failure scenario. There
are, however, significant differences in
the details of the Model 757 FQIS
design that reduce the likelihood of the
individual contributing failures. Those
differences include the following:
• Improved FQIS probe terminal
connector block design;
• The use of wiring that is not silver
plated and therefore does not create
silver sulfide deposits on the terminal
blocks;
• The use of improved wire types and
wiring installation practices outside of
the fuel tanks; and
• The use of a system processor that
provides significant isolation of the tank
probe circuits from the indication and
power circuits of the FQIS.
We therefore did not consider that the
FQIS designs for the Model 747 and
Model 757 were so similar that the
Model 757 FQIS design should be
considered to have a ‘‘known’’ latentplus-one-failure condition vulnerability
as defined in the policy memorandum.
The provisions in the above definition
for classifying a failure condition as
‘‘known’’ based on the existence of a
similar design were intended to allow
the FAA to evaluate the degree of
similarity in the design, and to make
discretionary judgments in determining
that a failure condition that is believed
to have occurred (and/or was addressed
by AD action) in one specific design
should be classified as ‘‘known’’ in a
different specific design. The
application of that discretion would be
expected to involve evaluation of design
detail differences and the effects of
VerDate Sep<11>2014
13:15 Apr 04, 2016
Jkt 238001
those differences on failure modes and
failure probability. Based on our
determination that sufficient design
differences exist between the Model 757
and Model 747 FQIS designs to not
classify the Model 757 FQIS latent-plusone-failure condition as ‘‘known,’’
under the direction contained in the
policy memorandum, this AD addresses
that failure condition vulnerability only
for the center fuel tank, which is the
only high-flammability fuel tank on the
Model 757.
NATCA expressed a concern that the
FAA did not understand NATCA’s
previous comment on this matter, and
stated that the FAA had not considered
the requirements of ‘‘Element 2.a)’’ from
Policy Memorandum 2003–112–15,
dated February 25, 2015. In fact, we had
addressed the requirements of ‘‘Element
2.a)’’ in the response to the comments
under ‘‘Request to Revise Proposed AD
Requirements to Apply to All Fuel
Tanks’’ of the SNPRM. The FAA
understood the earlier comment and
understands the more recent comment,
but has reached a different conclusion
about the classification of the failure
condition under the guidance in the
policy memorandum. We classified the
Model 757 FQIS latent-plus-one-failure
scenario as a theoretical vulnerability
rather than a ‘‘known’’ combination of
failures. Policy Memorandum 2003–
112–15, dated February 25, 2015, calls
for corrective action for theoretical
latent-plus-one-failure conditions only
in high-flammability fuel tanks.
Contrary to the assertion in the NATCA
comment, the acknowledgement of the
scenario as theoretically possible and
the consequent AD proposal to address
the scenario in the high flammability
center fuel tank do not automatically
drive classification of the failure as
‘‘known’’ under the policy
memorandum. We have not changed
this final rule regarding this issue.
Request To Address Unsafe Condition
in All Fuel Tanks, With or Without
FRM
NATCA requested that we require
design changes to the FQIS to address
the potential latent-plus-one-failure
scenario in all fuel tanks of all Model
757 airplanes, regardless whether FRM
is installed. NATCA stated that the
minimum performance standards for
FRM contained in 14 CFR part 25 allow
flights to occur with flammable
conditions in tanks that are required to
incorporate FRM due to system
performance as designed and due to
system failures. In addition, timelimited dispatch with an inoperative
FRM has been allowed in the master
minimum equipment list (MMEL) for
PO 00000
Frm 00012
Fmt 4700
Sfmt 4700
affected airplanes. Flights with
flammable conditions and a pre-existing
latent in-tank FQIS failure are
reasonably anticipated to occur in the
life of the affected fleet. For those
flights, a fuel tank explosion could
occur due to a single additional failure
(hot short of power onto FQIS tank
probe circuits). NATCA notes that four
fuel tank explosion events have
occurred in fuel tanks that are classified
as low flammability.
We disagree with the request. We
have determined that the proposed
corrective actions (either installation of
FRM or specific FQIS changes limited to
the center fuel tank) represent a
reasonable, cost-effective method to
achieve a meaningful reduction in the
risk of an accident due to potential FQIS
fuel tank ignition sources.
The service history of conventional
unheated aluminum wing tanks that
contain Jet A fuel indicates that there
would be little safety benefit by further
limiting the flammability of these tanks.
While NATCA expressed concern
because fuel vapor ignition events have
occurred in wing fuel tanks, NATCA did
not differentiate service experience
based on fuel type used (JP–4 versus Jet
A fuel).
Our review of the nine wing tank
ignition events we know to have
occurred on turbine-engine-powered
transport airplanes shows that five of
the nine airplanes were using JP–4 fuel,
and this type of fuel is no longer used
except on an emergency basis in the
U.S. Use of JP–4 fuel in other parts of
the world is also relatively rare, and is
normally limited to areas with
extremely cold airport conditions. Three
of the remaining four events were
caused by external heating of the wing
by engine fires, and the remaining event
occurred on the ground during
maintenance. To date, there have been
no fuel tank explosions in conventional
unheated aluminum wing tanks fueled
with Jet A fuel that have resulted in any
fatalities.
The flammability characteristics of
JP–4 fuel results in the fuel tanks being
flammable a significant portion of the
time when an airplane is in flight. This
is not the case for wing tanks containing
Jet A fuel. Therefore, based on the low
fleet average flammability of the Model
757 wing fuel tanks and on the specific
features of the Model 757 FQIS design,
we have determined that the latent-plusone vulnerability that exists in the
Model 757 wing tank FQIS is not an
unsafe condition requiring corrective
action on in-service airplanes.
We have not changed this final rule
regarding this issue.
E:\FR\FM\05APR1.SGM
05APR1
Lhorne on DSK5TPTVN1PROD with RULES
Federal Register / Vol. 81, No. 65 / Tuesday, April 5, 2016 / Rules and Regulations
Request To Require Design Changes for
Full Compliance with Airworthiness
Regulations
NATCA requested that we require
design changes to the FQIS that would
bring that system into full compliance
with the applicable airworthiness
regulations. NATCA stated that the
failure condition that is the subject of
the SNPRM represents a noncompliance
of the type design with the requirements
of 14 CFR 25.901(c) and 25.981(a)(3),
even for low-flammability fuel tanks.
NATCA stated that the proposed
corrective actions would not bring the
airplane design into compliance with
those regulations ‘‘as required by SFAR
88 and SFAR 88 Policy published by the
FAA as Mandatory Corrective Action
criteria in FAA Policy Statement No.
2003–112–15.’’ NATCA added that the
proposed alternative corrective actions
for cargo airplanes do not comply with
those regulations because the alternative
actions do not fully eliminate the
potential for the failure condition that is
addressed by the SNPRM.
We disagree with the request. SFAR
88, as modified by Amendment 21–82,
and Policy Memorandum 2003–112–15,
dated February 25, 2003, do not
specifically require noncompliant
designs discovered through SFAR 88 to
be brought into compliance. As
originally issued, SFAR 88 required
design approval holders to develop the
corrective actions necessary to bring any
noncompliant design fuel system
features into compliance. However,
SFAR 88 did not dictate that the FAA
require a given corrective action. In fact,
the FAA later published Amendment
21–82, ‘‘Equivalent Safety Provisions for
Fuel Tank System Fault Tolerance
Evaluations (SFAR 88),’’ to clarify that
the FAA would accept SFAR 88 reports
that do not provide corrective actions
that directly comply with 14 CFR
25.981(a)(3) provided any aspects that
do not comply are compensated for by
factors that provide an equivalent level
of safety. The FAA used the
introduction of flammability reduction
in place of corrective action for a
specific ignition source as an example of
a potentially acceptable compensating
factor.
Also, while the normal certification
process requires proposed design
changes to be compliant with the
applicable regulations, applicants are
permitted under 14 CFR part 11 to
petition for an exemption from any FAA
regulatory requirement. Policy
Memorandum 2003–112–15, dated
February 25, 2003, did not state that the
FAA would not consider a petition for
exemption from an airworthiness
VerDate Sep<11>2014
13:15 Apr 04, 2016
Jkt 238001
requirement for a proposed design
intended as corrective action for an
SFAR 88 issue. We therefore consider
that the applicant may petition for an
exemption and propose a noncompliant
design change, and the FAA may
approve and issue an AD to require a
noncompliant design change. Boeing’s
FRM design change for the Model 757
was approved some time ago. We have
determined that for Model 757
airplanes, installation of FRM, instead
of FQIS design changes, represents a
reasonable, cost-effective method to
achieve a meaningful overall reduction
in the risk of an accident due to fuel
tank ignition events. We therefore
excluded airplanes with FRM installed
from the applicability of this AD.
Request To Mandate Compliance with
Airworthiness Regulations for Newly
Produced Airplanes
NATCA requested that we require
newly produced airplanes to be in
compliance with 14 CFR 25.901,
25.981(a), and 25.981(b). NATCA
expressed concern that nearly 20 years
after the TWA Flight 800 accident,
manufacturers have been allowed to
continue production of airplanes
without making changes to eliminate
the FQIS latent-plus-one-failure
scenario, and that the FAA has granted
exemptions to approve certain design
changes without fully addressing the
issue.
We disagree with the request. This AD
applies only to certain Model 757 series
airplanes, and the Model 757 is out of
production. The comment is therefore
outside of the scope of this AD. We have
not changed the final rule regarding this
issue.
Request To Allow Alternative
Procedure for BITE Check
FedEx proposed that we revise
paragraph (h)(1) of the SNPRM to allow
use of the FQIS BITE check procedure
in its airplane maintenance manual
(AMM) as an alternative to the
procedure in Boeing Service Bulletin
757–28–0136, dated June 5, 2014, which
does not apply to FedEx’s fleet. We
assume this is because FedEx operates
some airplanes that were converted to a
cargo configuration using a non-Boeing
supplemental type certificate.
We disagree with the request. FedEx’s
comment did not provide adequate
information to show that its AMM
procedure is equivalent to the procedure
described in Boeing Service Bulletin
757–28–0136, dated June 5, 2014.
FedEx’s comment also did not identify
the fault conditions for which dispatch
would be prohibited. We therefore do
not have sufficient information at this
PO 00000
Frm 00013
Fmt 4700
Sfmt 4700
19479
time to allow FedEx’s proposed
alternative procedure. However, under
the provisions of paragraph (i) of this
AD, we will consider requests for
approval of alternative procedures, if
sufficient data are submitted to
substantiate that the change would
provide an acceptable level of safety.
We have not changed this final rule
regarding this request.
Request To Reduce Compliance Time
NATCA requested that we reduce the
compliance time to 5 years or less.
NATCA noted that the proposed 72month compliance time would result in
a corrective action deadline that is
approximately 27 years after the TWA
Flight 800 accident. NATCA stated that
such a long delay in action is not in the
public interest.
We disagree with the request to
reduce the compliance time, which we
have determined is necessary to give
operators adequate time to prepare for
and perform the required modifications
without excessive disruption of
operations. We had initially proposed
60 months, but extended that to 72
months in response to operator
comments, which included extension
requests of up to 108 months. NATCA
made a similar comment to the NPRM
(77 FR 12506, March 1, 2012),
requesting a reduction in the
compliance time to 36 months, and the
FAA provided its response in the
SNPRM under ‘‘Request to Reduce
Compliance Time.’’ We have not
changed this final rule regarding this
issue.
Statement Regarding Compliance Time
for Wire Separation
FedEx stated that without service
information for the wire separation, it
cannot effectively determine whether
the proposed 72-month compliance time
is acceptable.
We had previously determined, as
specified in the SNPRM, that the work
involved for the cargo airplane wire
separation modification would take 230
work-hours, and a compliance time of
72 months would be adequate for
operators to perform the modification
on their affected fleets. Boeing has since
provided an updated estimate of 74
work-hours for the alternative
modification for cargo airplanes. We
have revised the cost estimate
accordingly in this final rule, but since
this change reduces the work-hour
estimate, it is not necessary to adjust the
compliance time to accommodate the
workload for this action for cargo
operators.
E:\FR\FM\05APR1.SGM
05APR1
19480
Federal Register / Vol. 81, No. 65 / Tuesday, April 5, 2016 / Rules and Regulations
Request To Remove Reference to ‘‘Fuel
Tank Systems’’
Request To Delay Final Rule Pending
New Service Information
Paragraph (g) of the SNPRM would
have required modification of ‘‘the FQIS
wiring or fuel tank systems.’’ Boeing
asked that we remove reference to ‘‘fuel
tank systems’’ in this proposed
requirement because a fuel tank system
modification could be done as an
AMOC.
We agree with the commenter’s
request and rationale. We have removed
the references to ‘‘fuel tank systems’’
throughout the preamble and in
paragraph (g) of this AD.
Boeing requested that we delay
issuance of the final rule pending
issuance of new service information that
would specifically define an acceptable
wiring configuration that complies with
the proposed requirements.
We disagree with the request because
the referenced service information was
not available at the time we were ready
to publish the final rule, and we cannot
reliably predict the time that service
information will be issued by Boeing.
We do not consider it in the public
interest to further delay this rulemaking.
We have determined that it is necessary
to proceed with issuing the final rule as
proposed. Operators may, however,
request approval under the provisions of
paragraph (i) of this AD to use a future
approved service bulletin, if developed,
as an AMOC with the requirements of
this AD, or we may approve the service
bulletin as a global AMOC.
Request To Clarify Condition Requiring
Repair
Boeing requested that we revise
paragraph (h)(1) of the SNPRM to
specify that repair is required for any
‘‘nondispatchable’’ fault code recorded
before or as a result of the BITE check.
(The SNPRM would have required
repair for any fault code.) Boeing
requested this change to make the repair
requirement consistent with the BITE
check service information referenced in
the SNPRM (Boeing Service Bulletin
757–28–0136, dated June 5, 2014).
We agree with the request. The intent
of the SNPRM was to require correction
only of faults identified as
‘‘nondispatchable.’’ The SNPRM used
the terminology ‘‘as applicable’’ to
indicate this intent, but we agree that
further clarification is appropriate. We
have revised paragraph (h)(1) in this AD
as requested by the commenter.
Request To Clarify End Point for FQIS
Wire Separation
Paragraph (h)(2) of the SNPRM
specified that the FQIS wiring
separation was to be done on the wiring
that runs between the FQIS processor
and the center fuel tank. Boeing
requested that we change ‘‘the center
fuel tank’’ to ‘‘the center fuel tank wall
penetrations.’’ Boeing requested this
change to clarify the end point for the
FQIS wire separation.
We agree with the request. Boeing’s
suggestion is consistent with the intent
of this AD, and improves the clarity of
the requirement. We have revised
paragraph (h)(2) in this AD to
incorporate Boeing’s request.
Statement Regarding Unsafe Condition
Boeing stated that it has accepted the
FAA’s requirement to provide service
information defining an acceptable wire
separation modification, but, based on
previously provided analysis,
maintained that the risk level is less
than extremely improbable. As asserted
in earlier comments, Boeing considers
the design of the affected airplanes safe
and the proposed requirements
therefore unnecessary.
We disagree with Boeing’s assertions
for the reasons discussed extensively in
our response to Boeing’s similar
comment in the SNPRM. The FAA’s
response to Boeing’s assertion is
covered in the response to comments in
the SNPRM under ‘‘Request to
Withdraw NPRM (77 FR 12506, March
1, 2012): Unjustified by Risk.’’
Additional Change Made to This AD
We have revised the introductory text
to paragraph (h) of this AD to clarify
that the alternative modification for
cargo airplanes must be accompanied by
periodic BITE checks started within 6
months after the effective date of this
AD. And, for airplanes converted to an
all-cargo configuration more than 6
months after the effective date of this
AD, operators must perform the first
BITE check before flight after the
conversion. In reviewing the proposed
requirements after publication of the
SNPRM, we recognized that operators
might interpret the requirements as
allowing a delay in the decision to
exercise the cargo airplane alternative
until late in the compliance period. That
is not the literal meaning of the
proposed language of the requirement,
and was not the FAA’s intent. However,
we determined that we should clarify
the language of paragraph (h) of this AD
regarding the required timing for the
first BITE check if an operator chooses
to exercise the cargo airplane
alternative.
Conclusion
We reviewed the relevant data,
considered the comments received, and
determined that air safety and the
public interest require adopting this AD
with the changes described previously
and minor editorial changes. We have
determined that these minor changes:
• Are consistent with the intent that
was proposed in the SNPRM for
correcting the unsafe condition; and
• Do not add any additional burden
upon the public than was already
proposed in the SNPRM.
We also determined that these
changes will not increase the economic
burden on any operator or increase the
scope of this AD.
Related Service Information Under 1
CFR Part 51
We have reviewed Boeing Service
Bulletin 757–28–0136, dated June 5,
2014, which describes procedures for a
BITE check (check of built-in test
equipment). This service information is
reasonably available because the
interested parties have access to it
through their normal course of business
or by the means identified in the
ADDRESSES section.
Costs of Compliance
We estimate that this AD affects 167
airplanes of U.S. registry. This estimate
includes 148 cargo airplanes and 19
non-air-carrier passenger airplanes. We
estimate the following costs to comply
with this AD:
Lhorne on DSK5TPTVN1PROD with RULES
ESTIMATED COSTS: BASIC REQUIREMENT FOR ALL AIRPLANES
Action
Labor cost
Fully correct FQIS vulnerability to latent-plus-onefailure conditions.
1,200 work-hours × $85 per hour = $102,000 ..........
VerDate Sep<11>2014
13:15 Apr 04, 2016
Jkt 238001
PO 00000
Frm 00014
Fmt 4700
Sfmt 4700
E:\FR\FM\05APR1.SGM
Parts cost
05APR1
$200,000
Cost per product
$302,000
19481
Federal Register / Vol. 81, No. 65 / Tuesday, April 5, 2016 / Rules and Regulations
ESTIMATED COSTS: BASIC REQUIREMENT FOR ALL AIRPLANES—Continued
Action
Labor cost
Cost per product
Parts cost
Estimated Costs: Alternative Actions for All Airplanes
Install FRM .................................................................
720 work-hours × $85 per hour = $61,200 ...............
323,000
$384,200.
$16,290.
Estimated Costs: Alternative Actions for Cargo Airplanes
Wire separation ..........................................................
74 work-hours × $85 per hour = $6,290 ...................
10,000
FQIS BITE check (required with wire separation alternative actions).
1 work-hour × $85 per hour = $85 ............................
0
Existing regulations already require
that air-carrier passenger airplanes be
equipped with FRM by December 26,
2017. We therefore assume that the FRM
installation specified in paragraph (g) of
this AD will be done on only the 19
affected non-air-carrier passenger
airplanes, for an estimated passenger
fleet cost of $7,299,800. We also assume
that the operators of the 148 affected
cargo airplanes would choose the less
costly actions specified in paragraph (h)
of this AD, at an estimated cost of
$2,410,920 for the wire separation
modification, plus $50,320 annually for
the BITE checks.
Lhorne on DSK5TPTVN1PROD with RULES
Authority for This Rulemaking
Title 49 of the United States Code
specifies the FAA’s authority to issue
rules on aviation safety. Subtitle I,
section 106, describes the authority of
the FAA Administrator. Subtitle VII:
Aviation Programs, describes in more
detail the scope of the Agency’s
authority.
We are issuing this rulemaking under
the authority described in Subtitle VII,
Part A, Subpart III, Section 44701:
‘‘General requirements.’’ Under that
section, Congress charges the FAA with
promoting safe flight of civil aircraft in
air commerce by prescribing regulations
for practices, methods, and procedures
the Administrator finds necessary for
safety in air commerce. This regulation
is within the scope of that authority
because it addresses an unsafe condition
that is likely to exist or develop on
products identified in this rulemaking
action.
Regulatory Findings
This AD will not have federalism
implications under Executive Order
13132. This AD will not have a
substantial direct effect on the States, on
the relationship between the national
government and the States, or on the
distribution of power and
responsibilities among the various
levels of government.
VerDate Sep<11>2014
13:15 Apr 04, 2016
Jkt 238001
For the reasons discussed above, I
certify that this AD:
(1) Is not a ‘‘significant regulatory
action’’ under Executive Order 12866,
(2) Is not a ‘‘significant rule’’ under
DOT Regulatory Policies and Procedures
(44 FR 11034, February 26, 1979),
(3) Will not affect intrastate aviation
in Alaska, and
(4) Will not have a significant
economic impact, positive or negative,
on a substantial number of small entities
under the criteria of the Regulatory
Flexibility Act.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation
safety, Incorporation by reference,
Safety.
Adoption of the Amendment
Accordingly, under the authority
delegated to me by the Administrator,
the FAA amends 14 CFR part 39 as
follows:
PART 39—AIRWORTHINESS
DIRECTIVES
1. The authority citation for part 39
continues to read as follows:
■
Authority: 49 U.S.C. 106(g), 40113, 44701.
§ 39.13
[Amended]
2. The FAA amends § 39.13 by adding
the following new airworthiness
directive (AD):
■
2016–07–07 The Boeing Company:
Amendment 39–18452; Docket No.
FAA–2012–0187; Directorate Identifier
2011–NM–094–AD.
(a) Effective Date
This AD is effective May 10, 2016.
(b) Affected ADs
None.
(c) Applicability
This AD applies to The Boeing Company
Model 757–200, –200PF, –200CB, and –300
series airplanes; certificated in any category;
except airplanes equipped with a
flammability reduction means (FRM)
PO 00000
Frm 00015
Fmt 4700
Sfmt 4700
$85 per check
(4 checks
per year).
approved by the FAA as compliant with the
Fuel Tank Flammability Reduction (FTFR)
rule (73 FR 42444, July 21, 2008)
requirements of 14 CFR 25.981(b) or 14 CFR
26.33(c)(1).
(d) Subject
Joint Aircraft System Component (JASC)
Code 7397: Engine fuel system wiring.
(e) Unsafe Condition
This AD was prompted by fuel system
reviews conducted by the manufacturer. We
are issuing this AD to prevent ignition
sources inside the center fuel tank, which, in
combination with flammable fuel vapors,
could result in a fuel tank explosion and
consequent loss of the airplane.
(f) Compliance
Comply with this AD within the
compliance times specified, unless already
done.
(g) Modification
Within 72 months after the effective date
of this AD, modify the fuel quantity
indication system (FQIS) wiring to prevent
development of an ignition source inside the
center fuel tank, using a method approved in
accordance with the procedures specified in
paragraph (i) of this AD.
(h) Alternative Actions for Cargo Airplanes
For airplanes used exclusively for cargo
operations: As an alternative to the
requirements of paragraph (g) of this AD, do
the actions specified in paragraphs (h)(1) and
(h)(2) of this AD, using methods approved in
accordance with the procedures specified in
paragraph (i) of this AD. To exercise this
alternative, operators must perform the first
inspection required under paragraph (h)(1) of
this AD within 6 months after the effective
date of this AD. To exercise this alternative
for airplanes returned to service after
conversion of the airplane from a passenger
configuration to an all-cargo configuration
more than 6 months after the effective date
of this AD, operators must perform the first
inspection required under paragraph (h)(1) of
this AD prior to further flight after the
conversion.
(1) Within 6 months after the effective date
of this AD, record the existing fault codes
stored in the FQIS processor and then do a
BITE check (check of built-in test equipment)
of the FQIS, in accordance with the
E:\FR\FM\05APR1.SGM
05APR1
19482
Federal Register / Vol. 81, No. 65 / Tuesday, April 5, 2016 / Rules and Regulations
Accomplishment Instructions of Boeing
Service Bulletin 757–28–0136, dated June 5,
2014. If any nondispatchable fault code is
recorded prior to the BITE check or as a
result of the BITE check, before further flight,
do all applicable repairs, and repeat the BITE
check until a successful test is performed
with no nondispatchable fault found, in
accordance with the Accomplishment
Instructions of Boeing Service Bulletin 757–
28–0136, dated June 5, 2014. Repeat these
actions thereafter at intervals not to exceed
750 flight hours.
(2) Within 72 months after the effective
date of this AD, modify the airplane by
separating FQIS wiring that runs between the
FQIS processor and the center fuel tank wall
penetrations, including any circuits that pass
through a main fuel tank, from other airplane
wiring that is not intrinsically safe.
(i) Alternative Methods of Compliance
(AMOCs)
(1) The Manager, Seattle Aircraft
Certification Office (ACO), FAA, has the
authority to approve AMOCs for this AD, if
requested using the procedures found in 14
CFR 39.19. In accordance with 14 CFR 39.19,
send your request to your principal inspector
or local Flight Standards District Office, as
appropriate. If sending information directly
to the manager of the ACO, send it to the
attention of the person identified in
paragraph (j) of this AD. Information may be
emailed to: 9-ANM-Seattle-ACO-AMOCRequests@faa.gov.
(2) Before using any approved AMOC,
notify your appropriate principal inspector,
or lacking a principal inspector, the manager
of the local flight standards district office/
certificate holding district office.
(3) An AMOC that provides an acceptable
level of safety may be used for any repair,
modification, or alteration required by this
AD if it is approved by the Boeing
Commercial Airplanes Organization
Designation Authorization (ODA) that has
been authorized by the Manager, Seattle
ACO, to make those findings. To be
approved, the repair method, modification
deviation, or alteration deviation must meet
the certification basis of the airplane, and the
approval must specifically refer to this AD.
Lhorne on DSK5TPTVN1PROD with RULES
(j) Related Information
For more information about this AD,
contact Jon Regimbal, Aerospace Engineer,
Propulsion Branch, ANM–140S, FAA, Seattle
ACO, 1601 Lind Avenue SW., Renton, WA
98057–3356; phone: 425–917–6506; fax: 425–
917–6590; email: jon.regimbal@faa.gov.
(k) Material Incorporated by Reference
(1) The Director of the Federal Register
approved the incorporation by reference
(IBR) of the service information listed in this
paragraph under 5 U.S.C. 552(a) and 1 CFR
part 51.
(2) You must use this service information
as applicable to do the actions required by
this AD, unless the AD specifies otherwise.
(i) Boeing Service Bulletin 757–28–0136,
dated June 5, 2014.
(ii) Reserved.
(3) For service information identified in
this AD, contact Boeing Commercial
Airplanes, Attention: Data & Services
VerDate Sep<11>2014
13:15 Apr 04, 2016
Jkt 238001
Management, P. O. Box 3707, MC 2H–65,
Seattle, WA 98124–2207; telephone 206–
544–5000, extension 1; fax 206–766–5680;
Internet https://www.myboeingfleet.com.
(4) You may view this service information
at FAA, Transport Airplane Directorate, 1601
Lind Avenue SW., Renton, WA. For
information on the availability of this
material at the FAA, call 425–227–1221.
(5) You may view this service information
that is incorporated by reference at the
National Archives and Records
Administration (NARA). For information on
the availability of this material at NARA, call
202–741–6030, or go to https://
www.archives.gov/federal-register/cfr/ibrlocations.html.
Rond Point Maurice Bellonte, 31707
Blagnac Cedex, France; telephone +33 5
61 93 36 96; fax +33 5 61 93 44 51; email
account.airworth-eas@airbus.com;
Internet https://www.airbus.com. You
may view this referenced service
information at the FAA, Transport
Airplane Directorate, 1601 Lind Avenue
SW., Renton, WA. For information on
the availability of this material at the
FAA, call 425–227–1221. It is also
available on the Internet at https://
www.regulations.gov by searching for
and locating Docket No. FAA–2015–
6537.
Issued in Renton, Washington, on March
21, 2016.
Michael Kaszycki,
Acting Manager, Transport Airplane
Directorate, Aircraft Certification Service.
Examining the AD Docket
[FR Doc. 2016–07150 Filed 4–4–16; 8:45 am]
BILLING CODE 4910–13–P
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA–2015–6537; Directorate
Identifier 2014–NM–154–AD; Amendment
39–18457; AD 2016–07–12]
RIN 2120–AA64
Airworthiness Directives; Airbus
Airplanes
Federal Aviation
Administration (FAA), Department of
Transportation (DOT).
ACTION: Final rule.
AGENCY:
We are adopting a new
airworthiness directive (AD) for certain
Airbus Model A318, A319, A320, and
A321 series airplanes. This AD was
prompted by reports of cracking of the
aft fixed fairing (AFF) of the pylons due
to fatigue damage of the structure. This
AD requires repetitive inspections for
damage and cracking of the AFF of the
pylons, and repair if necessary. We are
issuing this AD to detect and correct
damage and cracking of the AFF of the
pylons, which could result in
detachment of a pylon and consequent
reduced structural integrity of the
airplane.
SUMMARY:
This AD becomes effective May
10, 2016.
The Director of the Federal Register
approved the incorporation by reference
of a certain publication listed in this AD
as of May 10, 2016.
ADDRESSES: For service information
identified in this final rule, contact
Airbus, Airworthiness Office—EIAS, 1
DATES:
PO 00000
Frm 00016
Fmt 4700
Sfmt 4700
You may examine the AD docket on
the Internet at https://
www.regulations.gov by searching for
and locating Docket No. FAA–2015–
6537; or in person at the Docket
Management Facility between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays. The AD docket
contains this AD, the regulatory
evaluation, any comments received, and
other information. The street address for
the Docket Operations office (telephone
800–647–5527) is Docket Management
Facility, U.S. Department of
Transportation, Docket Operations, M–
30, West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue SE.,
Washington, DC.
FOR FURTHER INFORMATION CONTACT:
Sanjay Ralhan, Aerospace Engineer,
International Branch, ANM–116,
Transport Airplane Directorate, FAA,
1601 Lind Avenue SW., Renton, WA
98057–3356; telephone 425–227–1405;
fax 425–227–1149.
SUPPLEMENTARY INFORMATION:
Discussion
We issued a notice of proposed
rulemaking (NPRM) to amend 14 CFR
part 39 by adding an AD that would
apply to certain Airbus Model A318,
A319, A320, and A321 series airplanes.
The NPRM published in the Federal
Register on November 30, 2015 (80 FR
74729) (‘‘the NPRM’’).
The European Aviation Safety Agency
(EASA), which is the Technical Agent
for the Member States of the European
Union, has issued EASA Airworthiness
Directive 2014–0154, dated July 2, 2014
(referred to after this as the Mandatory
Continuing Airworthiness Information,
or ‘‘the MCAI’’), to correct an unsafe
condition for certain Airbus Model
A318, A319, A320, and A321 series
airplanes. The MCAI states:
On aeroplanes equipped with post-mod
33844 CFM pylons, several operators have
reported cracks on the Aft Fixed Fairing
(AFF). After material analysis, it appears that
E:\FR\FM\05APR1.SGM
05APR1
Agencies
[Federal Register Volume 81, Number 65 (Tuesday, April 5, 2016)]
[Rules and Regulations]
[Pages 19472-19482]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-07150]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2012-0187; Directorate Identifier 2011-NM-094-AD;
Amendment 39-18452; AD 2016-07-07]
RIN 2120-AA64
Airworthiness Directives; The Boeing Company Airplanes
AGENCY: Federal Aviation Administration (FAA), DOT.
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: We are adopting a new airworthiness directive (AD) for certain
The Boeing Company Model 757 airplanes. This AD was prompted by fuel
system reviews conducted by the manufacturer. This AD requires
modifying the fuel quantity indication system (FQIS) wiring to prevent
development of an ignition source inside the center fuel tank. We are
issuing this AD to prevent ignition sources inside the center fuel
tank, which, in combination with flammable fuel vapors, could result in
a fuel tank explosion and consequent loss of the airplane.
DATES: This AD is effective May 10, 2016.
The Director of the Federal Register approved the incorporation by
reference of a certain publication listed in this AD as of May 10,
2016.
[[Page 19473]]
ADDRESSES: For service information identified in this final rule,
contact Boeing Commercial Airplanes, Attention: Data & Services
Management, P. O. Box 3707, MC 2H-65, Seattle, WA 98124-2207; telephone
206-544-5000, extension 1; fax 206-766-5680; Internet https://www.myboeingfleet.com. You may view this referenced service information
at the FAA, Transport Airplane Directorate, 1601 Lind Avenue SW.,
Renton, WA. For information on the availability of this material at the
FAA, call 425-227-1221. It is also available on the Internet at https://www.regulations.gov by searching for and locating Docket No. FAA-2012-
0187.
Examining the AD Docket
You may examine the AD docket on the Internet at https://www.regulations.gov by searching for and locating Docket No. FAA-2012-
0187; or in person at the Docket Management Facility between 9 a.m. and
5 p.m., Monday through Friday, except Federal holidays. The AD docket
contains this AD, the regulatory evaluation, any comments received, and
other information. The address for the Docket Office (phone: 800-647-
5527) is Docket Management Facility, U.S. Department of Transportation,
Docket Operations, M-30, West Building Ground Floor, Room W12-140, 1200
New Jersey Avenue SE., Washington, DC 20590.
FOR FURTHER INFORMATION CONTACT: Jon Regimbal, Aerospace Engineer,
Propulsion Branch, ANM-140S, FAA, Seattle Aircraft Certification Office
(ACO), 1601 Lind Avenue SW., Renton, WA 98057-3356; phone: 425-917-
6506; fax: 425-917-6590; email: jon.regimbal@faa.gov.
SUPPLEMENTARY INFORMATION:
Discussion
We issued a supplemental notice of proposed rulemaking (SNPRM) to
amend 14 CFR part 39 by adding an AD that would apply to certain The
Boeing Company Model 757 airplanes. The SNPRM published in the Federal
Register on February 23, 2015 (80 FR 9400) (``the SNPRM''). We preceded
the SNPRM with a notice of proposed rulemaking (NPRM) that published in
the Federal Register on March 1, 2012 (77 FR 12506). The NPRM proposed
to require modifying the fuel quantity indication system (FQIS) wiring
or fuel tank systems to prevent development of an ignition source
inside the center fuel tank. The NPRM was prompted by fuel system
reviews conducted by the manufacturer. The SNPRM proposed to revise the
applicability, including alternative actions for cargo airplanes, and
extend the compliance time. We are issuing this AD to prevent ignition
sources inside the center fuel tank, which, in combination with
flammable fuel vapors, could result in fuel tank explosions and
consequent loss of the airplane.
Record of Ex Parte Communication
In preparation of AD actions such as NPRMs and immediately adopted
rules, it is the practice of the FAA to obtain technical information
and information on the operational and economic impact from design
approval holders and aircraft operators. We discussed certain issues
related to this final rule in a meeting held December 1, 2015, with
Airlines for America (A4A) and other members of the aviation industry.
This final rule addresses the issues discussed during that meeting that
are relevant to this final rule. A summary of this meeting can be found
in the rulemaking docket at https://www.regulations.gov by searching for
and locating Docket No. FAA-2012-0187.
Comments
We gave the public the opportunity to participate in developing
this AD. The following presents the comments received on the SNPRM and
the FAA's response to each comment.
Request To Withdraw SNPRM: New Certification Requirements for
Flammability Reduction Means (FRM) Unwarranted
A4A, representing U.S. cargo operators, stated that the FAA intends
to issue rulemaking requiring U.S. cargo operators to do additional
fuel safety modifications to meet the latest aircraft certification
requirements.
We infer that A4A considers that requiring airplanes to meet the
latest certification requirements is not warranted and that the SNPRM
should therefore be withdrawn. We assume that by ``the latest aircraft
certification requirements,'' A4A is referring to the relatively new
requirements for FRM contained in 14 CFR part 125.
We do not agree that the SNPRM should be withdrawn. This AD is not
specifically intended to require that the affected airplanes meet the
flammability requirements of 14 CFR part 125. It is instead intended to
address an unsafe condition as required by 14 CFR part 39 identified by
the FAA under the policy contained in the FAA's Special Federal
Aviation Regulation No. 88 (14 CFR part 21, SFAR 88) AD decision policy
(Policy Memorandum ANM-100-2003-112-15) (https://rgl.faa.gov/Regulatory_and_Guidance_Library/rgPolicy.nsf/0/DC94C3A46396950386256D5E006AED11?OpenDocument&Highlight=anm-100-2003-112-15), dated February 25, 2003, and the FAA's Transport Airplane Risk
Assessment Methodology (TARAM) (Policy Statement PS-ANM-25-05) (https://rgl.faa.gov/Regulatory_and_Guidance_Library/rgPolicy.nsf/0/4E5AE8707164674A862579510061F96B?OpenDocument&Highlight=ps-anm-25-05).
The FAA determined that installing FRM that meets 14 CFR part 125 would
be one acceptable way to address the identified unsafe condition, so
airplanes on which such a modification was incorporated were excluded
from the applicability of the SNPRM. Other modifications identified
later in this discussion are available as alternative actions to
installing FRM for certain operations. We have determined it is
necessary to proceed with issuance of this final rule.
Request To Withdraw SNPRM: Intrusive, Expensive, Unnecessary
A4A stated that Airbus and Boeing have indicated to them that the
service bulletins for the wire separation modification that is part of
the cargo airplane alternative actions will be intrusive and expensive
and will not significantly improve safety. A4A stated that the safety
analyses performed by the aircraft manufacturers do not classify the
proposed modifications as safety critical. A4A noted that those service
bulletins will not be issued as ``Alert'' service bulletins.
Additionally, A4A stated that foreign regulatory authorities, aircraft
manufacturers, and airlines do not support that a safety issue remains.
We infer that A4A is requesting that we withdraw the SNPRM because
the airplane manufacturers have determined that an unsafe condition
does not exist and the SNPRM will not significantly improve safety. We
do not agree that the SNPRM should be withdrawn. We acknowledge that
Boeing does not consider the condition associated with FQIS on these
airplanes to be unsafe. We disagree with Boeing's assertions, for the
reasons discussed extensively in our response to Boeing's similar
comment in the SNPRM, under ``Request to Withdraw NPRM (77 FR 12506,
March 1, 2012): Unjustified by Risk.'' We have determined that it is
necessary to proceed with issuance of this final rule.
[[Page 19474]]
Request To Withdraw SNPRM: Global Economic Disadvantage to U.S.
Operators
A4A does not expect that foreign regulators will require
modification of affected foreign-registered aircraft, and stated that
the competitive position of U.S. cargo operators will be harmed as a
result. A4A stated that foreign regulatory agencies did not mandate
retrofit of FRM for cargo airplanes, and therefore A4A did not expect
that those authorities will mandate FQIS changes for their operators.
A4A's comment made reference to documents published by the European
Aviation Safety Agency (EASA), the Civil Aviation Authority of China
(CAAC), and the Japan Civil Aviation Bureau (JCAB) as evidence that
those agencies are not planning action to address any unsafe condition
associated with FQIS.
We infer that A4A is requesting that we withdraw the NPRM because
other foreign regulatory agencies have determined that an unsafe
condition does not exist with regard to FQIS as addressed by the
proposed AD.
We were unable to examine the EASA document A4A attempted to
reference because the reference number was incomplete. We do not agree
that the CAAC and JCAB documents indicate a position on the unsafe
condition addressed by the SNPRM. Both of those documents simply state
a requirement for existing type certificate holders to review fuel tank
designs that is similar to the FAA's SFAR 88. Those documents do not
state positions on any unsafe conditions or AD proposals identified by
the FAA, the CAAC, or the JCAB.
A4A stated that the U.S. air cargo industry is currently in an
extremely competitive global market. Additional lower deck capacity on
passenger aircraft, especially through Middle East hubs, has
significantly increased the need for cargo industry capacity. Several
cargo carriers have ceased operations, and many others have parked some
aircraft. U.S. carriers compete directly with foreign cargo operators.
A4A stated that any additional costs on U.S. cargo operators that are
not incurred by foreign operators will make U.S. operators less
competitive and will lead to the loss of jobs in the U.S.
We infer that A4A is requesting that we withdraw the proposal to
require corrective action on cargo airplanes because non-U.S. cargo
operators will not be required to make similar modifications, and the
FAA AD action would harm the competitive position of U.S. cargo
operators, resulting in the loss of U.S. jobs.
We do not agree to withdraw the SNPRM for corrective action on
cargo airplanes. As part of the AD development process, the FAA works
with the affected manufacturer to develop a cost estimate for the
corrective actions in a proposed AD. The FAA considers all possible
corrective actions proposed by a manufacturer in an attempt to minimize
the cost burden on operators. In some cases the FAA even makes a
specific suggestion to a manufacturer for a less costly alternative. In
the end, the manufacturer is responsible for development of an
appropriate corrective action.
While the FAA attempts to minimize the costs associated with a
required corrective action for a U.S. product, ultimately the FAA has
the responsibility as the civil aviation authority (CAA) of the state
of design to address unsafe conditions through AD action. Other CAAs
overseeing foreign operators will typically apply the FAA AD or develop
a similar AD for U.S. products operated under each CAA's jurisdiction.
Other CAAs rely heavily on the knowledge and judgment of the CAA of the
state of design to identify unsafe conditions and appropriate
corrective actions for products of that state. The FAA is not aware at
this time of any affected CAAs that do not plan to issue a
corresponding mandate to address the unsafe condition associated with
FQIS identified in the proposed AD. Even if such a situation occurs,
the FAA would not use a foreign CAA's position as a justification for
not addressing an unsafe condition identified by the FAA. While we
acknowledge such a situation could harm the competitive position of a
U.S. operator, we are still obligated by U.S. law and by international
treaties to address the identified unsafe condition. We have determined
that it is necessary to proceed with issuance of this final rule.
Request To Withdraw SNPRM: Costs of Compliance
A4A stated that the proposed modifications are very costly, and
noted that United Parcel Service (UPS) has estimated a total cost of
$16 million for its fleet of four aircraft types that are potentially
affected by the SNPRM and other similar planned ADs. A4A pointed out
that U.S. cargo operators have already spent tens of millions of
dollars on fuel tank safety improvements. UPS alone has spent $35.5
million to comply with 51 SFAR 88 ADs on the four fleet types
potentially affected. A4A noted that cargo operators already have
recurring expenses for Enhanced Airworthiness Program for Airplane
Safety (EAPAS) maintenance program tasks that continue to help ensure
fuel tank safety. A4A added that cargo operators have already invested
in improved and more expensive fuel tank component repair and overhaul
processes.
We infer that A4A is requesting that we withdraw the SNPRM because
the costs of addressing previously identified fuel tank unsafe
conditions has been high, and that the additional cost to address the
FQIS latent-plus-one issue will also be high, with very little safety
benefit.
We do not agree to withdraw the SNPRM. We acknowledge that the
total industry cost to address other fuel tank system unsafe conditions
has been high. The SFAR 88 studies for Boeing airplanes identified
several basic design deficiencies in lightning protection that could
cause an ignition source in a fuel tank in the event of a lightning
strike, and several issues with fuel pump systems and fuel valve
systems where a single failure could result in an ignition source in a
fuel tank. Fuel pump issues are suspected to have caused several fuel
tank ignition events, so these issues were considered to be the highest
priority for the development of corrective actions and related AD
actions. The FAA considers the cost of addressing those issues to be
clearly justified. Deficiencies in maintenance programs and
inappropriate component repair actions that could lead to inadvertent
significant increases in the risk of an ignition source in a fuel tank
were also identified, and the cost of airworthiness limitations to
address those issues is also considered to be justified.
The SFAR 88 studies and the FAA's subsequent decision-making
process identified FQIS vulnerability of Model 707, 727, 737, 747, 757,
767, and 777 airplanes as an unsafe condition requiring corrective
action. While the more recently designed of these airplane models have
significant improvements in FQIS design details, they all have similar
FQIS design architecture with respect to the identified failure
scenario. That architecture is vulnerable to a combination of a latent
in-tank wiring failure and a subsequent wiring failure outside of the
tank that connects a high power source to the FQIS tank circuit
creating an ignition source in a fuel tank. This failure combination
was determined by the National Transportation Safety Board (NTSB) to
have been the most likely cause of the Model 747 fuel tank explosion
accident
[[Page 19475]]
off Long Island in 1996. NTSB Safety Recommendation A-98-038 (https://www.ntsb.gov/about/employment/_layouts/ntsb.recsearch/Recommendation.aspx?Rec=A-98-038) recommended that the FAA require that
FQIS wiring on all airplane models that have similar wiring
installations be separated and shielded to the maximum extent possible.
The FAA issued AD 98-20-40, Amendment 39-10808 (63 FR 52147,
September 30, 1998); and AD 99-03-04, Amendment 39-11018 (64 FR 4959,
February 2, 1999); to address this issue on early Model 747 and Model
737 airplanes, respectively, which used the same FQIS as the accident
airplane. The FAA subsequently (in 2003) determined that this same
architectural vulnerability was an unsafe condition for high
flammability fuel tanks on all Boeing jet transports existing at that
time. This determination was consistent with the published FAA policy
for SFAR 88 corrective actions and with the current FAA TARAM
guidelines for identification of unsafe conditions on transport
airplanes.
The FAA deferred acting on this unsafe condition until after the
FRM rulemaking activity was complete because introduction of FRM had
the potential to change the classification of many of the affected fuel
tanks to low flammability. When the final decision for the FRM rule did
not include a requirement for FRM on all airplanes, the FAA resumed the
planned actions to address the identified FQIS unsafe condition on the
airplanes that were not required to have FRM.
The FAA considers the safety benefit of the SNPRM to be significant
for both passenger and cargo airplanes. We estimate that the
installation of compliant FRM will provide approximately an order of
magnitude reduction in the risk of a fuel tank explosion on anticipated
flights with a latent failure of an FQIS circuit in the center fuel
tank. We estimate that the periodic BITE checks in the cargo airplane
alternative actions will result in a 75- to 90-percent reduction in the
number of flights that operate with a latent in-tank failure that makes
them vulnerable to a single additional wiring hot short failure
creating an ignition source in the center fuel tank. We estimate that
the proposed wire separation modification in the cargo airplane
alternative actions will reduce the risk of a hot short (and a
resultant ignition source) on flights that have a latent in-tank
failure by 50 to 75 percent. This estimated reduction in the risk on
anticipated flights with a latent in-tank failure is sufficient to
reduce the risk below the FAA's TARAM individual flight risk guideline
level for urgent action. As discussed below in our response to
``Request to Remove Alternative Actions for Cargo Airplanes,'' we
determined that further changes to further reduce the risk below the
TARAM individual flight risk corrective action guideline of 1 in 10
million per flight hour would significantly increase the costs of
compliance and are not necessary to adequately address the unsafe
condition. We have determined that it is necessary to proceed with
issuance of this final rule.
Request To Withdraw SNPRM: Unsafe Condition Addressed by Previous
Requirements
A4A stated that there have been no fuel tank ignition incidents
since the previously issued fuel tank safety ADs were implemented. A4A
stated that this provides direct evidence that FAA projections for
additional incidents were overstated and that SFAR 88 changes have
worked. They further stated that no unsafe condition exists, asserting
that service experience has shown that the fuel tank safety issues have
been sufficiently addressed with significant previous modifications,
recurring maintenance, controlled overhaul processes and repair
processes, and maintenance program tasks.
We infer that A4A is requesting that we withdraw the SNPRM because
previously required actions have adequately addressed the need for
improvements in fuel tank safety.
We do not agree to withdraw the SNPRM. Until recently, fuel tank
ignition incidents on U.S.- and European-manufactured transport
airplanes have occurred roughly once every five to six years, with the
most recent event in May 2006 (a Model 727 airplane in India in 2006, a
Model 737 airplane in Thailand in 2001, a Model 747 airplane near New
York in 1996, and a Model 737 airplane in the Philippines in 1991). It
has now been ten years since the most recent event.
We agree that a significant improvement in fuel tank safety has
occurred due to actions that have reduced the potential for ignition
sources associated with single failures of fuel pumps and fuel pump
power systems. That improvement alone would be expected to increase the
average interval between fuel tank ignition incidents to more than ten
years. However, the fact that no incidents have occurred since 2006 is
not statistically significant, and is not sufficient to predict that
additional events will not occur. In addition, even assuming the
average interval between events is significantly improved to the extent
that the overall fleet risk is considered acceptable, we would still
address unsafe conditions identified based on the published FAA policy
for SFAR 88 corrective actions and the current FAA guidelines for
identification of unsafe conditions on transport airplanes when the
individual flight safety risk exceeds our guidelines, as in this case.
We have determined that it is necessary to proceed with issuance of
this final rule.
Request To Withdraw SNPRM: All Related NTSB Safety Recommendations
Closed
A4A stated that the NTSB previously issued the following safety
recommendations related to flammability, wiring, and wiring
maintenance:
A-96-174--Preclude flammable fuel air mixtures in fuel
tanks. Closed--Acceptable Action: FRM Rulemaking. Safety Recommendation
A-96-174 can be found at https://www.ntsb.gov/_layouts/ntsb.recsearch/Recommendation.aspx?Rec=A-96-174.
A-98-038--Separation of FQIS wires to the max extent
possible. Closed--Acceptable Action: SFAR 88 Rulemaking.
A-98-039--Require surge protection systems for FQIS wires.
Closed--Acceptable Action: SFAR 88 Rulemaking. Safety Recommendation A-
98-039 can be found at https://www.ntsb.gov/about/employment/_layouts/ntsb.recsearch/Recommendation.aspx?Rec=A-98-039.
A-00-106--Assess wiring criticality and separation.
Closed--Acceptable Action: EAPAS/FTS Rulemaking. Safety Recommendation
A-00-106 can be found at (https://www.ntsb.gov/_layouts/ntsb.recsearch/Recommendation.aspx?Rec=A-00-106.
A-00-108--Repair of potentially unsafe wiring conditions.
Closed--Acceptable Action: EAPAS/FTS Rulemaking. Safety Recommendation
A-00-108 can be found at https://www.ntsb.gov/_layouts/ntsb.recsearch/Recommendation.aspx?Rec=A-00-108.
A4A noted that all applicable NTSB safety recommendations are
closed with acceptable actions taken by the FAA. A4A stated that none
of the NTSB safety recommendations called for the FAA to address wire
separation for the FQIS.
We infer that A4A is requesting that we withdraw the SNPRM because
the NTSB considers the overall fuel tank safety issue to be adequately
addressed by previous actions.
We do not agree to withdraw the SNPRM. A4A appears to have
[[Page 19476]]
misunderstood NTSB Safety Recommendation A-98-038 and the NTSB's
acceptance of the FAA's response to that safety recommendation. NTSB
Safety Recommendation A-98-038 specifically called for the FAA to
require, in ``airplanes with fuel quantity indication system (FQIS)
wire installations that are co-routed with wires that may be powered,
the physical separation and electrical shielding of FQIS wires to the
maximum extent possible.'' The NTSB classified that recommendation as
``closed, acceptable action'' after the FAA stated that it would issue
ADs to mandate FQIS protection on the high flammability tanks of
aircraft on which the installation of FRM is not required by the Fuel
Tank Flammability Reduction (FTFR) rule (73 FR 42444, July 21, 2008).
The communications between the NTSB and the FAA on Safety
Recommendation A-98-038 can be viewed at https://www.ntsb.gov/about/employment/_layouts/ntsb.recsearch/Recommendation.aspx?Rec=A-98-038. We
have determined that it is necessary to proceed with issuance of this
final rule.
Request To Withdraw SNPRM: Unjustified by Risk Assessment
A4A stated that the original equipment manufacturers (OEMs) and
other regulatory agencies are having difficulty calculating the true
safety value associated with the proposed FQIS AD. A4A stated that its
position is that all the unsafe conditions have been mitigated,
operationally and across industry, and all previous rules have been
effective. A4A added that, in light of the operators' financial and
technical investment to mitigate the unsafe conditions in all areas,
the SNPRM is difficult to understand technically relative to the amount
of mitigation that would be required, in light of a true risk
assessment. A4A stated that the FAA is alone in believing that a safety
issue still exists.
We infer that A4A is requesting that we withdraw the SNPRM because
it has not been justified by a risk assessment and because previously
required actions have adequately addressed the need for improvements in
fuel tank safety.
We do not agree to withdraw the SNPRM. We provided a detailed
response to similar comments and described the FAA's risk assessment in
the SNPRM in the sections ``Request to Withdraw NPRM (77 FR 12506,
March 1, 2012): Unjustified by Risk,'' ``Request to Withdraw NPRM (77
FR 12506, March 1, 2012): Not Supported by Risk Analysis,'' and
``Request to Withdraw NPRM (77 FR 12506, March 1, 2012): No Unsafe
Condition,'' as well as in earlier paragraphs in this discussion. We
have determined that it is necessary to proceed with issuance of this
final rule.
Request To Remove Requirement for Corrective Actions for Cargo
Airplanes
A4A stated that the alternative wire separation modifications
allowed for cargo airplanes would not meet the ``new design criteria.''
(We assume that A4A is referring to the wire separation requirements
for repairs and modifications that are included in the fuel tank system
airworthiness limitations required by recent ADs for the various Boeing
models.) A4A stated that in the Model 757 service bulletin under
development by Boeing, only about ``5 percent'' of FQIS wires can be
separated from other systems by a distance of 2 inches, and that the
majority of the wire bundle relocation will achieve only up to 0.5-inch
spacing. A4A stated that because the wire separation requirements are
not met, partial exemptions from the requirements of 14 CFR 25.981 are
required to allow approval of these wire separation service bulletins.
Based on the reduced separation distance and the need for exemptions,
A4A considered the proposed wire separation requirements included in
the cargo airplane alternative actions to be a symbolic gesture with no
significant safety benefit, while at the same time being expensive and
intrusive. A4A further stated that operators have reviewed the
associated draft service bulletins and are concerned about the lack of
a design target or adequate rationale for the actions proposed by the
FAA. Finally, A4A stated that Boeing had stated to them that Boeing
does not understand what design changes the FAA wants or why the FAA
considers there to be a safety issue.
We infer that A4A is requesting that we remove the alternative
actions for a wire separation modification on cargo airplanes because
A4A believes the wire separation actions associated with the cargo
airplane alternative actions in the SNPRM would have no significant
safety benefit since inadequate physical wire separation is provided.
We do not agree to withdraw the SNPRM. A4A appears to have
misunderstood the intent of the FQIS wire separation requirements added
to the airworthiness limitations as a critical design configuration
control limitation (CDCCL). The FQIS wire separation CDCCL provides a
set of wire separation requirements that are intended to be used as a
default when modifying or repairing an aircraft to ensure that the
intended level of separation of the FQIS wiring from other wiring is
maintained. The Model 757 CDCCL (28-AWL-05) contains a simple 2-inch
separation requirement as originally proposed by Boeing. While Boeing
has not proposed changes to the Model 757 FQIS wire separation CDCCL,
the corresponding CDCCL (28-AWL-05) for Model 737-700, -800, and -900
airplanes has numerous additional provisions approving other design
approaches (typically combinations of wire sleeving and smaller
separation distances) that Boeing or operators proposed and that the
FAA approved. Each time wire separation configuration options were
approved for Boeing, alternative CDCCL wording was approved as an AMOC
with the AD that required the addition of the CDCCLs to operators'
maintenance programs. A similar AMOC will be granted for the approved
modifications to the FQIS for Model 757 airplanes.
A4A also appears to have misunderstood the reason that exemptions
would be required to allow approval of the cargo airplane wire
separation modification. Lack of a full 2 inches of wire separation in
all of the changed areas is not the reason an exemption is required.
Rather, an exemption is required because the overall FQIS will not
comply with 14 CFR 25.901(c) and 25.981(a)(3) due to the existing
noncompliance of the unchanged areas of the system. Because those rules
require a system-level safety analysis, we cannot find the changes to
the system compliant if a noncompliance exists in the unchanged areas
of the system.
The proposed Boeing design uses sleeving over the wire bundles and
extensive retention features to provide a level of wire protection
similar to the protection that would be provided by a greater
separation distance. The design measures are consistent with those
previously approved by the FAA in the Model 737-700/800/900 CDCCL
mentioned previously.
We consider the safety benefit provided by the proposed cargo
airplane alternative actions to be significant. The unsafe condition
determination and the rationale and estimated safety benefit for the
cargo airplane alternative actions were discussed extensively with
Boeing in several meetings, and we consider that Boeing fully
understands the FAA's position on each of those aspects of the
proposal. The proposed requirement for a periodic check through the
built-in test equipment (BITE) of the FQIS processor is intended to
identify and result in corrective actions for the detectable fault
conditions in the FQIS in-tank wiring. We estimated that this
[[Page 19477]]
proposed requirement will result in a 75- to 90-percent reduction in
the number of flights that operate with a latent in-tank failure that
makes them vulnerable to a single additional wiring hot short failure
creating an ignition source in the center fuel tank. The proposed FQIS
wire separation modification is intended to reduce the risk of a hot
short of power onto center tank FQIS circuits by physically isolating
the portions of those circuits that are outside of the tank in the
areas where those circuits are most vulnerable to damage and most
easily separated. We did not propose to require modifications of the
wiring in the electrical racks or in the cockpit areas because of the
difficulty involved in accessing and achieving additional wire
separation in those areas, and in recognition that the FQIS processor
provides some beneficial circuit isolation to protect against hot
shorts in those areas. We estimated that the proposed wire separation
modification would reduce the risk of a hot short on flights that have
a latent in-tank failure by 50 to 75 percent. Those estimates were
reviewed with Boeing, and Boeing did not disagree with those estimates.
We have determined it is necessary to proceed with issuance of this
final rule.
Request To Remove Alternative Actions for Cargo Airplanes
Colin Edwards and an anonymous commenter made no explicit request
to change the SNPRM, but objected to the proposed addition of
alternative actions for cargo airplanes that would allow a design
change that does not fully comply with the fuel tank system safety
requirements of 14 CFR part 25 (14 CFR 25.981(a)(3)) to be used to
address the unsafe condition. The commenters stated that it should not
be acceptable to allow greater risk to exist on cargo airplanes than
that allowed for passenger airplanes.
We infer that the commenters propose the elimination of the
proposed alternative corrective action for cargo airplanes. We disagree
with this request. We determined that an acceptable level of safety
would be provided for the affected cargo airplanes, and explained our
position in depth in response to similar comments in the SNPRM.
However, we will attempt to address the commenters' concerns by
expanding on the explanation of our safety determination.
When assessing potential unsafe conditions on transport airplanes
to determine if corrective action is necessary, the FAA assesses the
total risk to the affected fleet of airplanes exposed to the condition,
and assesses the level of risk on individual airplanes within the
fleet. The FAA's guidelines for assessing the total fleet risk related
to the unsafe condition are slightly different for cargo and passenger
airplanes due to operational usage differences. In this case, however,
the total risk to the affected fleet is lower than the unsafe condition
risk guidelines for both passenger and cargo airplanes. Total fleet
risk is therefore not the risk assessment element driving the proposed
actions.
When assessing the level of risk on individual airplanes, the FAA
considers the risk on the worst reasonably anticipated flights to
ensure that the level of safety on each flight is acceptable. Our
individual flight risk unsafe condition threshold is 1 x 10E-7 events
(or a 1-in-10-million chance of a catastrophic event) per flight hour.
In addition, the worst reasonably anticipated flights should not be
vulnerable to a single failure that causes a fatal event, regardless of
probability. There is no difference in the individual flight risk
unsafe condition criteria for cargo airplanes and passenger airplanes
because the operational differences are not considered in this risk
calculation.
In this case, we are concerned about a latent failure inside the
fuel tank that, in combination with an electrical short circuit in FQIS
wiring outside of the tank, could result in an electrical spark or arc
in the tank. An electrical arc or spark in the fuel tank combined with
flammable conditions in the fuel tank could result in a fuel tank
explosion. The worst reasonably anticipated flights in this case are
those that have both the latent failure and flammable conditions in the
tank. The manufacturer's analysis indicates that a significant number
of flights would be expected to occur with these conditions in the life
of the affected fleet if no corrective action is taken. For those
flights, one additional failure--a short circuit between FQIS wiring
and power wiring--could cause a fuel tank explosion. Also, the
probability of an explosion is between 1 in a million and 1 in 10
million, per flight hour, which slightly exceeds the numerical unsafe
condition guideline for individual flight risk discussed above.
An issue that violates one or more of the individual flight risk
guidelines would normally require corrective action that reduces the
risk to a level that is below the unsafe condition guidelines. However,
in this case the FAA acknowledged that the cost of corrective action is
high, and that the available corrective action (fuel tank FRM systems)
would reduce, but not eliminate, the number of expected flights with
the condition we are concerned about (a latent failure plus flammable
conditions inside the tank). The alternative actions for cargo
airplanes would also reduce the number of expected flights with the
condition we are concerned about, but to a lesser degree. The FAA has
determined that allowing a moderate number of cargo flights per year
(on average) with this condition provides an acceptable level of
safety. As part of making this determination, we noted that the level
of risk on the worst reasonably anticipated flights is similar to the
level of risk for private and commercial pilots flying normal category
airplanes.
We have not changed the final rule regarding this issue.
Request To Require FQIS Modification in all Fuel Tanks
National Air Traffic Controllers Association (NATCA) requested that
we require changes to the FQIS to address the potential ``latent-plus-
one-failure scenario'' in all fuel tanks, not just in the center fuel
tank.
NATCA stated that the failure condition that is the subject of the
SNPRM should be classified as a ``known'' latent-plus-one-failure
condition when applying the FAA Transport Airplane Directorate Policy
Memorandum 2003-112-15, ``SFAR 88--Mandatory Action Decision
Criteria,'' dated February 25, 2015 (https://rgl.faa.gov/
Regulatory_and_Guidance_Library/rgPolicy.nsf/0/
dc94c3a46396950386256d5e006aed11/$FILE/Feb2503.pdf). NATCA stated that
this would have the effect of classifying the failure condition as an
unsafe condition requiring corrective action in all affected fuel tanks
regardless of flammability level.
NATCA considered the combination of a latent in-tank failure with
electrical energy transmitted into the fuel tank via the FQIS wiring
due to an additional failure outside of the tank to be a ``known''
failure condition because that failure condition was considered to be
the most likely cause of the TWA Flight 800 Model 747 accident. (That
accident occurred on July 17, 1996, shortly after takeoff from John F.
Kennedy International Airport in Jamaica, New York.) NATCA concluded
that because the Model 757 FQIS is similar to that of the Model 747,
both models are vulnerable to the same failure scenario. NATCA cited
the unsafe condition statement for the SNPRM as evidence that the
scenario should be classified as ``known.'' NATCA pointed out that the
FAA issued AD 98-20-40, Amendment 39-10808 (63 FR 52147, September 30,
1998), to address this issue for Model
[[Page 19478]]
747 airplanes, and pointed out that the FAA TARAM Handbook specifically
states that Policy Memorandum 2003-112-15 should be followed in
determining whether corrective action should be required for fuel tank
safety concerns identified through SFAR 88.
We disagree with the request to require modification of the FQIS in
all fuel tanks. We have determined that, under the policy contained in
the policy memorandum, this failure condition for the Model 757 FQIS
should not be classified as ``known.'' The memo defines ``known''
failure conditions as follows:
[T]hose conditions which have occurred in-service and are likely
to occur on other products of the same or similar type design, and
conditions which have been subject to mandatory corrective actions,
following in-service findings, on products with a similar design of
fuel system.
We agree that the Model 757 FQIS has the same high-level system
architecture and operating principles as those of the Model 747 FQIS,
resulting in vulnerability to the same theoretical latent-plus-one-
failure scenario. There are, however, significant differences in the
details of the Model 757 FQIS design that reduce the likelihood of the
individual contributing failures. Those differences include the
following:
Improved FQIS probe terminal connector block design;
The use of wiring that is not silver plated and therefore
does not create silver sulfide deposits on the terminal blocks;
The use of improved wire types and wiring installation
practices outside of the fuel tanks; and
The use of a system processor that provides significant
isolation of the tank probe circuits from the indication and power
circuits of the FQIS.
We therefore did not consider that the FQIS designs for the Model
747 and Model 757 were so similar that the Model 757 FQIS design should
be considered to have a ``known'' latent-plus-one-failure condition
vulnerability as defined in the policy memorandum. The provisions in
the above definition for classifying a failure condition as ``known''
based on the existence of a similar design were intended to allow the
FAA to evaluate the degree of similarity in the design, and to make
discretionary judgments in determining that a failure condition that is
believed to have occurred (and/or was addressed by AD action) in one
specific design should be classified as ``known'' in a different
specific design. The application of that discretion would be expected
to involve evaluation of design detail differences and the effects of
those differences on failure modes and failure probability. Based on
our determination that sufficient design differences exist between the
Model 757 and Model 747 FQIS designs to not classify the Model 757 FQIS
latent-plus-one-failure condition as ``known,'' under the direction
contained in the policy memorandum, this AD addresses that failure
condition vulnerability only for the center fuel tank, which is the
only high-flammability fuel tank on the Model 757.
NATCA expressed a concern that the FAA did not understand NATCA's
previous comment on this matter, and stated that the FAA had not
considered the requirements of ``Element 2.a)'' from Policy Memorandum
2003-112-15, dated February 25, 2015. In fact, we had addressed the
requirements of ``Element 2.a)'' in the response to the comments under
``Request to Revise Proposed AD Requirements to Apply to All Fuel
Tanks'' of the SNPRM. The FAA understood the earlier comment and
understands the more recent comment, but has reached a different
conclusion about the classification of the failure condition under the
guidance in the policy memorandum. We classified the Model 757 FQIS
latent-plus-one-failure scenario as a theoretical vulnerability rather
than a ``known'' combination of failures. Policy Memorandum 2003-112-
15, dated February 25, 2015, calls for corrective action for
theoretical latent-plus-one-failure conditions only in high-
flammability fuel tanks. Contrary to the assertion in the NATCA
comment, the acknowledgement of the scenario as theoretically possible
and the consequent AD proposal to address the scenario in the high
flammability center fuel tank do not automatically drive classification
of the failure as ``known'' under the policy memorandum. We have not
changed this final rule regarding this issue.
Request To Address Unsafe Condition in All Fuel Tanks, With or Without
FRM
NATCA requested that we require design changes to the FQIS to
address the potential latent-plus-one-failure scenario in all fuel
tanks of all Model 757 airplanes, regardless whether FRM is installed.
NATCA stated that the minimum performance standards for FRM contained
in 14 CFR part 25 allow flights to occur with flammable conditions in
tanks that are required to incorporate FRM due to system performance as
designed and due to system failures. In addition, time-limited dispatch
with an inoperative FRM has been allowed in the master minimum
equipment list (MMEL) for affected airplanes. Flights with flammable
conditions and a pre-existing latent in-tank FQIS failure are
reasonably anticipated to occur in the life of the affected fleet. For
those flights, a fuel tank explosion could occur due to a single
additional failure (hot short of power onto FQIS tank probe circuits).
NATCA notes that four fuel tank explosion events have occurred in fuel
tanks that are classified as low flammability.
We disagree with the request. We have determined that the proposed
corrective actions (either installation of FRM or specific FQIS changes
limited to the center fuel tank) represent a reasonable, cost-effective
method to achieve a meaningful reduction in the risk of an accident due
to potential FQIS fuel tank ignition sources.
The service history of conventional unheated aluminum wing tanks
that contain Jet A fuel indicates that there would be little safety
benefit by further limiting the flammability of these tanks. While
NATCA expressed concern because fuel vapor ignition events have
occurred in wing fuel tanks, NATCA did not differentiate service
experience based on fuel type used (JP-4 versus Jet A fuel).
Our review of the nine wing tank ignition events we know to have
occurred on turbine-engine-powered transport airplanes shows that five
of the nine airplanes were using JP-4 fuel, and this type of fuel is no
longer used except on an emergency basis in the U.S. Use of JP-4 fuel
in other parts of the world is also relatively rare, and is normally
limited to areas with extremely cold airport conditions. Three of the
remaining four events were caused by external heating of the wing by
engine fires, and the remaining event occurred on the ground during
maintenance. To date, there have been no fuel tank explosions in
conventional unheated aluminum wing tanks fueled with Jet A fuel that
have resulted in any fatalities.
The flammability characteristics of JP-4 fuel results in the fuel
tanks being flammable a significant portion of the time when an
airplane is in flight. This is not the case for wing tanks containing
Jet A fuel. Therefore, based on the low fleet average flammability of
the Model 757 wing fuel tanks and on the specific features of the Model
757 FQIS design, we have determined that the latent-plus-one
vulnerability that exists in the Model 757 wing tank FQIS is not an
unsafe condition requiring corrective action on in-service airplanes.
We have not changed this final rule regarding this issue.
[[Page 19479]]
Request To Require Design Changes for Full Compliance with
Airworthiness Regulations
NATCA requested that we require design changes to the FQIS that
would bring that system into full compliance with the applicable
airworthiness regulations. NATCA stated that the failure condition that
is the subject of the SNPRM represents a noncompliance of the type
design with the requirements of 14 CFR 25.901(c) and 25.981(a)(3), even
for low-flammability fuel tanks. NATCA stated that the proposed
corrective actions would not bring the airplane design into compliance
with those regulations ``as required by SFAR 88 and SFAR 88 Policy
published by the FAA as Mandatory Corrective Action criteria in FAA
Policy Statement No. 2003-112-15.'' NATCA added that the proposed
alternative corrective actions for cargo airplanes do not comply with
those regulations because the alternative actions do not fully
eliminate the potential for the failure condition that is addressed by
the SNPRM.
We disagree with the request. SFAR 88, as modified by Amendment 21-
82, and Policy Memorandum 2003-112-15, dated February 25, 2003, do not
specifically require noncompliant designs discovered through SFAR 88 to
be brought into compliance. As originally issued, SFAR 88 required
design approval holders to develop the corrective actions necessary to
bring any noncompliant design fuel system features into compliance.
However, SFAR 88 did not dictate that the FAA require a given
corrective action. In fact, the FAA later published Amendment 21-82,
``Equivalent Safety Provisions for Fuel Tank System Fault Tolerance
Evaluations (SFAR 88),'' to clarify that the FAA would accept SFAR 88
reports that do not provide corrective actions that directly comply
with 14 CFR 25.981(a)(3) provided any aspects that do not comply are
compensated for by factors that provide an equivalent level of safety.
The FAA used the introduction of flammability reduction in place of
corrective action for a specific ignition source as an example of a
potentially acceptable compensating factor.
Also, while the normal certification process requires proposed
design changes to be compliant with the applicable regulations,
applicants are permitted under 14 CFR part 11 to petition for an
exemption from any FAA regulatory requirement. Policy Memorandum 2003-
112-15, dated February 25, 2003, did not state that the FAA would not
consider a petition for exemption from an airworthiness requirement for
a proposed design intended as corrective action for an SFAR 88 issue.
We therefore consider that the applicant may petition for an exemption
and propose a noncompliant design change, and the FAA may approve and
issue an AD to require a noncompliant design change. Boeing's FRM
design change for the Model 757 was approved some time ago. We have
determined that for Model 757 airplanes, installation of FRM, instead
of FQIS design changes, represents a reasonable, cost-effective method
to achieve a meaningful overall reduction in the risk of an accident
due to fuel tank ignition events. We therefore excluded airplanes with
FRM installed from the applicability of this AD.
Request To Mandate Compliance with Airworthiness Regulations for Newly
Produced Airplanes
NATCA requested that we require newly produced airplanes to be in
compliance with 14 CFR 25.901, 25.981(a), and 25.981(b). NATCA
expressed concern that nearly 20 years after the TWA Flight 800
accident, manufacturers have been allowed to continue production of
airplanes without making changes to eliminate the FQIS latent-plus-one-
failure scenario, and that the FAA has granted exemptions to approve
certain design changes without fully addressing the issue.
We disagree with the request. This AD applies only to certain Model
757 series airplanes, and the Model 757 is out of production. The
comment is therefore outside of the scope of this AD. We have not
changed the final rule regarding this issue.
Request To Allow Alternative Procedure for BITE Check
FedEx proposed that we revise paragraph (h)(1) of the SNPRM to
allow use of the FQIS BITE check procedure in its airplane maintenance
manual (AMM) as an alternative to the procedure in Boeing Service
Bulletin 757-28-0136, dated June 5, 2014, which does not apply to
FedEx's fleet. We assume this is because FedEx operates some airplanes
that were converted to a cargo configuration using a non-Boeing
supplemental type certificate.
We disagree with the request. FedEx's comment did not provide
adequate information to show that its AMM procedure is equivalent to
the procedure described in Boeing Service Bulletin 757-28-0136, dated
June 5, 2014. FedEx's comment also did not identify the fault
conditions for which dispatch would be prohibited. We therefore do not
have sufficient information at this time to allow FedEx's proposed
alternative procedure. However, under the provisions of paragraph (i)
of this AD, we will consider requests for approval of alternative
procedures, if sufficient data are submitted to substantiate that the
change would provide an acceptable level of safety. We have not changed
this final rule regarding this request.
Request To Reduce Compliance Time
NATCA requested that we reduce the compliance time to 5 years or
less. NATCA noted that the proposed 72-month compliance time would
result in a corrective action deadline that is approximately 27 years
after the TWA Flight 800 accident. NATCA stated that such a long delay
in action is not in the public interest.
We disagree with the request to reduce the compliance time, which
we have determined is necessary to give operators adequate time to
prepare for and perform the required modifications without excessive
disruption of operations. We had initially proposed 60 months, but
extended that to 72 months in response to operator comments, which
included extension requests of up to 108 months. NATCA made a similar
comment to the NPRM (77 FR 12506, March 1, 2012), requesting a
reduction in the compliance time to 36 months, and the FAA provided its
response in the SNPRM under ``Request to Reduce Compliance Time.'' We
have not changed this final rule regarding this issue.
Statement Regarding Compliance Time for Wire Separation
FedEx stated that without service information for the wire
separation, it cannot effectively determine whether the proposed 72-
month compliance time is acceptable.
We had previously determined, as specified in the SNPRM, that the
work involved for the cargo airplane wire separation modification would
take 230 work-hours, and a compliance time of 72 months would be
adequate for operators to perform the modification on their affected
fleets. Boeing has since provided an updated estimate of 74 work-hours
for the alternative modification for cargo airplanes. We have revised
the cost estimate accordingly in this final rule, but since this change
reduces the work-hour estimate, it is not necessary to adjust the
compliance time to accommodate the workload for this action for cargo
operators.
[[Page 19480]]
Request To Remove Reference to ``Fuel Tank Systems''
Paragraph (g) of the SNPRM would have required modification of
``the FQIS wiring or fuel tank systems.'' Boeing asked that we remove
reference to ``fuel tank systems'' in this proposed requirement because
a fuel tank system modification could be done as an AMOC.
We agree with the commenter's request and rationale. We have
removed the references to ``fuel tank systems'' throughout the preamble
and in paragraph (g) of this AD.
Request To Clarify Condition Requiring Repair
Boeing requested that we revise paragraph (h)(1) of the SNPRM to
specify that repair is required for any ``nondispatchable'' fault code
recorded before or as a result of the BITE check. (The SNPRM would have
required repair for any fault code.) Boeing requested this change to
make the repair requirement consistent with the BITE check service
information referenced in the SNPRM (Boeing Service Bulletin 757-28-
0136, dated June 5, 2014).
We agree with the request. The intent of the SNPRM was to require
correction only of faults identified as ``nondispatchable.'' The SNPRM
used the terminology ``as applicable'' to indicate this intent, but we
agree that further clarification is appropriate. We have revised
paragraph (h)(1) in this AD as requested by the commenter.
Request To Clarify End Point for FQIS Wire Separation
Paragraph (h)(2) of the SNPRM specified that the FQIS wiring
separation was to be done on the wiring that runs between the FQIS
processor and the center fuel tank. Boeing requested that we change
``the center fuel tank'' to ``the center fuel tank wall penetrations.''
Boeing requested this change to clarify the end point for the FQIS wire
separation.
We agree with the request. Boeing's suggestion is consistent with
the intent of this AD, and improves the clarity of the requirement. We
have revised paragraph (h)(2) in this AD to incorporate Boeing's
request.
Request To Delay Final Rule Pending New Service Information
Boeing requested that we delay issuance of the final rule pending
issuance of new service information that would specifically define an
acceptable wiring configuration that complies with the proposed
requirements.
We disagree with the request because the referenced service
information was not available at the time we were ready to publish the
final rule, and we cannot reliably predict the time that service
information will be issued by Boeing. We do not consider it in the
public interest to further delay this rulemaking. We have determined
that it is necessary to proceed with issuing the final rule as
proposed. Operators may, however, request approval under the provisions
of paragraph (i) of this AD to use a future approved service bulletin,
if developed, as an AMOC with the requirements of this AD, or we may
approve the service bulletin as a global AMOC.
Statement Regarding Unsafe Condition
Boeing stated that it has accepted the FAA's requirement to provide
service information defining an acceptable wire separation
modification, but, based on previously provided analysis, maintained
that the risk level is less than extremely improbable. As asserted in
earlier comments, Boeing considers the design of the affected airplanes
safe and the proposed requirements therefore unnecessary.
We disagree with Boeing's assertions for the reasons discussed
extensively in our response to Boeing's similar comment in the SNPRM.
The FAA's response to Boeing's assertion is covered in the response to
comments in the SNPRM under ``Request to Withdraw NPRM (77 FR 12506,
March 1, 2012): Unjustified by Risk.''
Additional Change Made to This AD
We have revised the introductory text to paragraph (h) of this AD
to clarify that the alternative modification for cargo airplanes must
be accompanied by periodic BITE checks started within 6 months after
the effective date of this AD. And, for airplanes converted to an all-
cargo configuration more than 6 months after the effective date of this
AD, operators must perform the first BITE check before flight after the
conversion. In reviewing the proposed requirements after publication of
the SNPRM, we recognized that operators might interpret the
requirements as allowing a delay in the decision to exercise the cargo
airplane alternative until late in the compliance period. That is not
the literal meaning of the proposed language of the requirement, and
was not the FAA's intent. However, we determined that we should clarify
the language of paragraph (h) of this AD regarding the required timing
for the first BITE check if an operator chooses to exercise the cargo
airplane alternative.
Conclusion
We reviewed the relevant data, considered the comments received,
and determined that air safety and the public interest require adopting
this AD with the changes described previously and minor editorial
changes. We have determined that these minor changes:
Are consistent with the intent that was proposed in the
SNPRM for correcting the unsafe condition; and
Do not add any additional burden upon the public than was
already proposed in the SNPRM.
We also determined that these changes will not increase the
economic burden on any operator or increase the scope of this AD.
Related Service Information Under 1 CFR Part 51
We have reviewed Boeing Service Bulletin 757-28-0136, dated June 5,
2014, which describes procedures for a BITE check (check of built-in
test equipment). This service information is reasonably available
because the interested parties have access to it through their normal
course of business or by the means identified in the ADDRESSES section.
Costs of Compliance
We estimate that this AD affects 167 airplanes of U.S. registry.
This estimate includes 148 cargo airplanes and 19 non-air-carrier
passenger airplanes. We estimate the following costs to comply with
this AD:
Estimated Costs: Basic Requirement for All Airplanes
----------------------------------------------------------------------------------------------------------------
Action Labor cost Parts cost Cost per product
----------------------------------------------------------------------------------------------------------------
Fully correct FQIS vulnerability to 1,200 work-hours x $85 $200,000 $302,000
latent-plus-one-failure conditions. per hour = $102,000.
----------------------------------------------------------------------------------------------------------------
[[Page 19481]]
Estimated Costs: Alternative Actions for All Airplanes
----------------------------------------------------------------------------------------------------------------
Install FRM........................... 720 work-hours x $85 per 323,000 $384,200.
hour = $61,200.
----------------------------------------------------------------------------------------------------------------
Estimated Costs: Alternative Actions for Cargo Airplanes
----------------------------------------------------------------------------------------------------------------
Wire separation....................... 74 work-hours x $85 per 10,000 $16,290.
hour = $6,290.
----------------------------------------------------------------------------------------------------------------
FQIS BITE check (required with wire 1 work-hour x $85 per 0 $85 per check (4 checks
separation alternative actions). hour = $85. per year).
----------------------------------------------------------------------------------------------------------------
Existing regulations already require that air-carrier passenger
airplanes be equipped with FRM by December 26, 2017. We therefore
assume that the FRM installation specified in paragraph (g) of this AD
will be done on only the 19 affected non-air-carrier passenger
airplanes, for an estimated passenger fleet cost of $7,299,800. We also
assume that the operators of the 148 affected cargo airplanes would
choose the less costly actions specified in paragraph (h) of this AD,
at an estimated cost of $2,410,920 for the wire separation
modification, plus $50,320 annually for the BITE checks.
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, section 106, describes the
authority of the FAA Administrator. Subtitle VII: Aviation Programs,
describes in more detail the scope of the Agency's authority.
We are issuing this rulemaking under the authority described in
Subtitle VII, Part A, Subpart III, Section 44701: ``General
requirements.'' Under that section, Congress charges the FAA with
promoting safe flight of civil aircraft in air commerce by prescribing
regulations for practices, methods, and procedures the Administrator
finds necessary for safety in air commerce. This regulation is within
the scope of that authority because it addresses an unsafe condition
that is likely to exist or develop on products identified in this
rulemaking action.
Regulatory Findings
This AD will not have federalism implications under Executive Order
13132. This AD will not have a substantial direct effect on the States,
on the relationship between the national government and the States, or
on the distribution of power and responsibilities among the various
levels of government.
For the reasons discussed above, I certify that this AD:
(1) Is not a ``significant regulatory action'' under Executive
Order 12866,
(2) Is not a ``significant rule'' under DOT Regulatory Policies and
Procedures (44 FR 11034, February 26, 1979),
(3) Will not affect intrastate aviation in Alaska, and
(4) Will not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
Adoption of the Amendment
Accordingly, under the authority delegated to me by the
Administrator, the FAA amends 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by adding the following new airworthiness
directive (AD):
2016-07-07 The Boeing Company: Amendment 39-18452; Docket No. FAA-
2012-0187; Directorate Identifier 2011-NM-094-AD.
(a) Effective Date
This AD is effective May 10, 2016.
(b) Affected ADs
None.
(c) Applicability
This AD applies to The Boeing Company Model 757-200, -200PF, -
200CB, and -300 series airplanes; certificated in any category;
except airplanes equipped with a flammability reduction means (FRM)
approved by the FAA as compliant with the Fuel Tank Flammability
Reduction (FTFR) rule (73 FR 42444, July 21, 2008) requirements of
14 CFR 25.981(b) or 14 CFR 26.33(c)(1).
(d) Subject
Joint Aircraft System Component (JASC) Code 7397: Engine fuel
system wiring.
(e) Unsafe Condition
This AD was prompted by fuel system reviews conducted by the
manufacturer. We are issuing this AD to prevent ignition sources
inside the center fuel tank, which, in combination with flammable
fuel vapors, could result in a fuel tank explosion and consequent
loss of the airplane.
(f) Compliance
Comply with this AD within the compliance times specified,
unless already done.
(g) Modification
Within 72 months after the effective date of this AD, modify the
fuel quantity indication system (FQIS) wiring to prevent development
of an ignition source inside the center fuel tank, using a method
approved in accordance with the procedures specified in paragraph
(i) of this AD.
(h) Alternative Actions for Cargo Airplanes
For airplanes used exclusively for cargo operations: As an
alternative to the requirements of paragraph (g) of this AD, do the
actions specified in paragraphs (h)(1) and (h)(2) of this AD, using
methods approved in accordance with the procedures specified in
paragraph (i) of this AD. To exercise this alternative, operators
must perform the first inspection required under paragraph (h)(1) of
this AD within 6 months after the effective date of this AD. To
exercise this alternative for airplanes returned to service after
conversion of the airplane from a passenger configuration to an all-
cargo configuration more than 6 months after the effective date of
this AD, operators must perform the first inspection required under
paragraph (h)(1) of this AD prior to further flight after the
conversion.
(1) Within 6 months after the effective date of this AD, record
the existing fault codes stored in the FQIS processor and then do a
BITE check (check of built-in test equipment) of the FQIS, in
accordance with the
[[Page 19482]]
Accomplishment Instructions of Boeing Service Bulletin 757-28-0136,
dated June 5, 2014. If any nondispatchable fault code is recorded
prior to the BITE check or as a result of the BITE check, before
further flight, do all applicable repairs, and repeat the BITE check
until a successful test is performed with no nondispatchable fault
found, in accordance with the Accomplishment Instructions of Boeing
Service Bulletin 757-28-0136, dated June 5, 2014. Repeat these
actions thereafter at intervals not to exceed 750 flight hours.
(2) Within 72 months after the effective date of this AD, modify
the airplane by separating FQIS wiring that runs between the FQIS
processor and the center fuel tank wall penetrations, including any
circuits that pass through a main fuel tank, from other airplane
wiring that is not intrinsically safe.
(i) Alternative Methods of Compliance (AMOCs)
(1) The Manager, Seattle Aircraft Certification Office (ACO),
FAA, has the authority to approve AMOCs for this AD, if requested
using the procedures found in 14 CFR 39.19. In accordance with 14
CFR 39.19, send your request to your principal inspector or local
Flight Standards District Office, as appropriate. If sending
information directly to the manager of the ACO, send it to the
attention of the person identified in paragraph (j) of this AD.
Information may be emailed to: 9-ANM-Seattle-ACO-AMOC-Requests@faa.gov.
(2) Before using any approved AMOC, notify your appropriate
principal inspector, or lacking a principal inspector, the manager
of the local flight standards district office/certificate holding
district office.
(3) An AMOC that provides an acceptable level of safety may be
used for any repair, modification, or alteration required by this AD
if it is approved by the Boeing Commercial Airplanes Organization
Designation Authorization (ODA) that has been authorized by the
Manager, Seattle ACO, to make those findings. To be approved, the
repair method, modification deviation, or alteration deviation must
meet the certification basis of the airplane, and the approval must
specifically refer to this AD.
(j) Related Information
For more information about this AD, contact Jon Regimbal,
Aerospace Engineer, Propulsion Branch, ANM-140S, FAA, Seattle ACO,
1601 Lind Avenue SW., Renton, WA 98057-3356; phone: 425-917-6506;
fax: 425-917-6590; email: jon.regimbal@faa.gov.
(k) Material Incorporated by Reference
(1) The Director of the Federal Register approved the
incorporation by reference (IBR) of the service information listed
in this paragraph under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) You must use this service information as applicable to do
the actions required by this AD, unless the AD specifies otherwise.
(i) Boeing Service Bulletin 757-28-0136, dated June 5, 2014.
(ii) Reserved.
(3) For service information identified in this AD, contact
Boeing Commercial Airplanes, Attention: Data & Services Management,
P. O. Box 3707, MC 2H-65, Seattle, WA 98124-2207; telephone 206-544-
5000, extension 1; fax 206-766-5680; Internet https://www.myboeingfleet.com.
(4) You may view this service information at FAA, Transport
Airplane Directorate, 1601 Lind Avenue SW., Renton, WA. For
information on the availability of this material at the FAA, call
425-227-1221.
(5) You may view this service information that is incorporated
by reference at the National Archives and Records Administration
(NARA). For information on the availability of this material at
NARA, call 202-741-6030, or go to https://www.archives.gov/federal-register/cfr/ibr-locations.html.
Issued in Renton, Washington, on March 21, 2016.
Michael Kaszycki,
Acting Manager, Transport Airplane Directorate, Aircraft Certification
Service.
[FR Doc. 2016-07150 Filed 4-4-16; 8:45 am]
BILLING CODE 4910-13-P