Review of Cost Submittals by Other Federal Agencies for Administering Part I of the Federal Power Act; Notice of Postponing Technical Conference, 19169 [2016-07539]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 81, No. 64 / Monday, April 4, 2016 / Notices
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A control structure
with three 9.5-foot-wide, 25-foot-long
spill gates; (2) one 6-foot-diameter, 98foot-long penstock with a butterfly
valve; (3) a bifurcation structure; (4) two
4-foot-diameter, 32-foot-long penstocks;
(5) a powerhouse containing two
generating units with a total capacity of
1.65 megawatts; (6) a 1000-foot-long,
220-foot-wide tailrace; (7) a substation;
and (8) a 2.5-mile-long, 69 kV
transmission line. The proposed project
would have an estimated average annual
generation of 5,200 megawatt-hours, and
operate as directed by the Corps.
Applicant Contact: Mr. Ander
Gonzalez, Energy Resources USA Inc.,
2655 Le Jeune Road, Suite 804, Coral
Gables, Florida 33134; Phone: (954)
248–8425; Email: agonzalez@energy
resources.es.
FERC Contact: Christiane Casey;
phone: (202) 502–8577.
Deadline for filing comments and
motions to intervene: 60 days from the
issuance of this notice.
The Commission strongly encourages
electronic filing. Please file comments
and motions to intervene using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14750–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14750) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: March 29, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–07531 Filed 4–1–16; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
20:27 Apr 01, 2016
Jkt 238001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No., 14745–000]
Energy Resources USA, Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments and Motions To Intervene
On December 22, 2015, Energy
Resources USA, Inc. (Energy Resources)
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to
study the feasibility of the Rough River
Lake Dam Hydroelectric Project (Rough
River Project or project) to be located at
the U.S. Army Corps of Engineers’
Rough River Lake Dam on the Rough
River in Breckinridge and Grayson
Counties, Kentucky. The sole purpose of
a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A control structure
with three 9.5-foot-wide, 25-foot-long
spill gates; (2) one 9.5-foot-diameter,
130-foot-long penstock with a butterfly
valve; (3) a bifurcation structure; (4) two
6.5-foot-diameter, 32-foot-long
penstocks; (5) a powerhouse containing
two generating units with a total
capacity of 10 megawatts; (6) a 1000foot-long, 220-foot-wide tailrace; (7) a
substation; and (8) a 0.3-mile-long, 69
kV transmission line. The proposed
project would have an estimated average
annual generation of 8,700 megawatthours, and operate as directed by the
Corps.
Applicant Contact: Mr. Ander
Gonzalez, Energy Resources USA Inc.,
2655 Le Jeune Road, Suite 804, Coral
Gables, Florida 33134; Phone: (954)
248–8425; E-mail:
agonzalez@energyresources.es.
FERC Contact: Christiane Casey;
phone: (202) 502–8577.
Deadline for filing comments and
motions to intervene: 60 days from the
issuance of this notice.
The Commission strongly encourages
electronic filing. Please file comments
and motions to intervene using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
PO 00000
Frm 00058
Fmt 4703
Sfmt 4703
19169
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14745–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14745) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: March 29, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–07528 Filed 4–1–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AD16–2–000]
Review of Cost Submittals by Other
Federal Agencies for Administering
Part I of the Federal Power Act; Notice
of Postponing Technical Conference
In a prior notice, the Commission
scheduled a technical conference to
review the submitted Other Federal
Agency costs in the above-captioned
docket. Due to the impact of the Nuclear
Security Summit on March 31, 2016 the
conference is postponed to April 7,
2016.
The technical conference will be held
on April 7, 2016, in Conference Room
3M–1 at the Commission’s headquarters,
888 First Street NE., Washington, DC.
The technical conference will begin at
2:00 p.m. (EST).
Dated: March 29, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–07539 Filed 4–1–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Western Area Power Administration
Boulder Canyon Project
Western Area Power
Administration, DOE.
AGENCY:
E:\FR\FM\04APN1.SGM
04APN1
Agencies
[Federal Register Volume 81, Number 64 (Monday, April 4, 2016)]
[Notices]
[Page 19169]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-07539]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. AD16-2-000]
Review of Cost Submittals by Other Federal Agencies for
Administering Part I of the Federal Power Act; Notice of Postponing
Technical Conference
In a prior notice, the Commission scheduled a technical conference
to review the submitted Other Federal Agency costs in the above-
captioned docket. Due to the impact of the Nuclear Security Summit on
March 31, 2016 the conference is postponed to April 7, 2016.
The technical conference will be held on April 7, 2016, in
Conference Room 3M-1 at the Commission's headquarters, 888 First Street
NE., Washington, DC. The technical conference will begin at 2:00 p.m.
(EST).
Dated: March 29, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-07539 Filed 4-1-16; 8:45 am]
BILLING CODE 6717-01-P