Energy Resources USA, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene, 19165 [2016-07530]

Download as PDF Federal Register / Vol. 81, No. 64 / Monday, April 4, 2016 / Notices You may also register online at www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Any comments should be filed within 30 days from the date of this notice. Comments may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail a copy to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–8221–094. For further information, contact Steven Sachs by telephone at 202–502– 8666 or by email at Steven.Sachs@ ferc.gov. Dated: March 29, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–07538 Filed 4–1–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14748–000] mstockstill on DSK4VPTVN1PROD with NOTICES Energy Resources USA, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene On December 22, 2015, Energy Resources USA, Inc. (Energy Resources) filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Cedar Creek Hydroelectric Project (Cedar Creek Project or project) to be located at the U.S. Army Corps of Engineers’ Cedar Creek Dam on the Cedar Creek River in Franklin County, Alabama. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary VerDate Sep<11>2014 19:03 Apr 01, 2016 Jkt 238001 permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A control structure with three 9.5-foot-wide, 25-foot-long spill gates; (2) one 6-foot-diameter, 49foot-long penstock with a butterfly valve; (3) a bifurcation structure; (4) two 4-foot-diameter, 32-foot-long penstocks; (5) a powerhouse containing two generating units with a total capacity of 1.5 megawatts; (6) a 1000-foot-long, 220foot-wide tailrace; (7) a substation; and (8) a 4.5-mile-long, 69 kV transmission line. The proposed project would have an estimated average annual generation of 5,500 megawatt-hours, and operate as directed by the Corps. Applicant Contact: Mr. Ander Gonzalez, Energy Resources USA Inc., 2655 Le Jeune Road, Suite 804, Coral Gables, Florida 33134; Phone: (954) 248–8425; Email: agonzalez@ energyresources.es. FERC Contact: Christiane Casey; phone: (202) 502–8577. Deadline for filing comments and motions to intervene: 60 days from the issuance of this notice. The Commission strongly encourages electronic filing. Please file comments and motions to intervene using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–14748–000. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14748) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: March 29, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–07530 Filed 4–1–16; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00054 Fmt 4703 Sfmt 4703 19165 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14746–000] Energy Resources USA, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene On December 22, 2015, Energy Resources USA, Inc. (Energy Resources) filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Taylorsville Lake Dam Hydroelectric Project (Taylorsville Project or project) to be located at the U.S. Army Corps of Engineers’ Taylorsville Lake Dam on the Salt River in Spencer County, Kentucky. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any landdisturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) A control structure with one spill gate; (2) one 8-footdiameter, 120-foot-long penstock with a butterfly valve; (3) a bifurcation structure; (4) two 5.5-foot-diameter, 32foot-long penstocks; (5) a powerhouse containing two generating units with a total capacity of 3 megawatts; (6) a 90foot-long, 60-foot-wide tailrace; (7) a substation; and (8) a 2.5-mile-long, 69 kV transmission line. The proposed project would have an estimated average annual generation of 9,500 megawatthours, and operate as directed by the Corps. Applicant Contact: Mr. Ander Gonzalez, Energy Resources USA Inc., 2655 Le Jeune Road, Suite 804, Coral Gables, Florida 33134; Phone: (954) 248–8425; Email: agonzalez@ energyresources.es. FERC Contact: Christiane Casey; phone: (202) 502–8577. Deadline for filing comments and motions to intervene: 60 days from the issuance of this notice. The Commission strongly encourages electronic filing. Please file comments and motions to intervene using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end E:\FR\FM\04APN1.SGM 04APN1

Agencies

[Federal Register Volume 81, Number 64 (Monday, April 4, 2016)]
[Notices]
[Page 19165]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-07530]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14748-000]


Energy Resources USA, Inc.; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments and Motions To 
Intervene

    On December 22, 2015, Energy Resources USA, Inc. (Energy Resources) 
filed an application for a preliminary permit, pursuant to section 4(f) 
of the Federal Power Act (FPA), proposing to study the feasibility of 
the Cedar Creek Hydroelectric Project (Cedar Creek Project or project) 
to be located at the U.S. Army Corps of Engineers' Cedar Creek Dam on 
the Cedar Creek River in Franklin County, Alabama. The sole purpose of 
a preliminary permit, if issued, is to grant the permit holder priority 
to file a license application during the permit term. A preliminary 
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by 
others without the owners' express permission.
    The proposed project would consist of the following: (1) A control 
structure with three 9.5-foot-wide, 25-foot-long spill gates; (2) one 
6-foot-diameter, 49-foot-long penstock with a butterfly valve; (3) a 
bifurcation structure; (4) two 4-foot-diameter, 32-foot-long penstocks; 
(5) a powerhouse containing two generating units with a total capacity 
of 1.5 megawatts; (6) a 1000-foot-long, 220-foot-wide tailrace; (7) a 
substation; and (8) a 4.5-mile-long, 69 kV transmission line. The 
proposed project would have an estimated average annual generation of 
5,500 megawatt-hours, and operate as directed by the Corps.
    Applicant Contact: Mr. Ander Gonzalez, Energy Resources USA Inc., 
2655 Le Jeune Road, Suite 804, Coral Gables, Florida 33134; Phone: 
(954) 248-8425; Email: agonzalez@energyresources.es.
    FERC Contact: Christiane Casey; phone: (202) 502-8577.
    Deadline for filing comments and motions to intervene: 60 days from 
the issuance of this notice.
    The Commission strongly encourages electronic filing. Please file 
comments and motions to intervene using the Commission's eFiling system 
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. The first page of any filing should 
include docket number P-14748-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14748) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: March 29, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-07530 Filed 4-1-16; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.