Notice of Technical Conference, 18622 [2016-07232]

Download as PDF 18622 Federal Register / Vol. 81, No. 62 / Thursday, March 31, 2016 / Notices at (866) 208–FERC or on the FERC Web site (www.ferc.gov). Using the ‘‘eLibrary’’ link, select ‘‘General Search’’ from the eLibrary menu, enter the selected date range and ‘‘Docket Number’’ excluding the last three digits (i.e., CP16–9), and follow the instructions. For assistance with access to eLibrary, the helpline can be reached at (866) 208–3676, TTY (202) 502–8659, or at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC Web site also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rule makings. Dated: March 22, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–07232 Filed 3–30–16; 8:45 am] BILLING CODE 6717–01–P mstockstill on DSK4VPTVN1PROD with NOTICES Dated: March 22, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [FR Doc. 2016–07235 Filed 3–30–16; 8:45 am] BILLING CODE 6717–01–P [Docket No. OR16–13–000] Saddlehorn Pipeline Company, LLC; Notice of Petition for Declaratory Order Take notice that on March 22, 2016, pursuant to Rule 207(a)(2) of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.207(a)(2) (2015), [FR Doc. 2016–07261 Filed 3–30–16; 8:45 am] Saddlehorn Pipeline Company, LLC BILLING CODE 6717–01–P (Saddlehorn), filed a petition for a declaratory order concerning the supplemental open season that DEPARTMENT OF ENERGY Saddlehorn conducted from December 2015 to January 2016, to accommodate Federal Energy Regulatory the restructuring of the original Commission Saddlehorn project into an undivided joint interest pipeline with Grand Mesa Notice of Technical Conference Pipeline, LLC, all as more fully Project No. explained in the petition. Any person desiring to intervene or to FFP Missouri 12, LLC .............. 13755–002 protest this filing must file in FFP Missouri 5, LLC ................ 13757–002 accordance with Rules 211 and 214 of FFP Missouri 6, LLC ................ 13761–002 the Commission’s Rules of Practice and Solia 6 Hydroelectric, LLC ........ 13768–002 Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the On Wednesday, April 6, 2016, appropriate action to be taken, but will Commission staff will hold a technical conference to discuss cultural resources not serve to make protestants parties to the proceeding. Any person wishing to related to Rye Development, LLC’s become a party must file a notice of proposed Allegheny Lock and Dam No. intervention or motion to intervene, as 2 Hydroelectric Project No. 13755, Emsworth Locks and Dam Hydroelectric appropriate. Such notices, motions, or protests must be filed on or before the Project No. 13757, Emsworth Back comment date. Anyone filing a motion Channel Dam Hydroelectric Project No. 13761, and Montgomery Locks and Dam to intervene or protest must serve a copy of that document on the Petitioner. Hydroelectric Project No. 13768. The Commission encourages The technical conference will begin at electronic submission of protests and 2:00 p.m. Eastern Standard Time. The interventions in lieu of paper using the conference will be held at the Federal ‘‘eFiling’’ link at https://www.ferc.gov. Energy Regulatory Commission Persons unable to file electronically headquarters building located at 888 1st should submit an original and 5 copies Street NE., Washington, DC, and will of the protest or intervention to the include teleconference capabilities. Federal Energy Regulatory Commission, All local, state, and federal agencies, 888 First Street NE., Washington, DC Indian tribes, and other interested 20426. parties are invited to participate. There This filing is accessible on-line at will be no transcript of the conference, https://www.ferc.gov, using the but a summary of the meeting will be ‘‘eLibrary’’ link and is available for prepared for the project record. If you review in the Commission’s Public are interested in participating in the Reference Room in Washington, DC. meeting you must contact Allyson There is an ‘‘eSubscription’’ link on the Conner at (202) 502–6082 or Web site that enables subscribers to allyson.conner@ferc.gov by April 4, receive email notification when a 2016 to receive specific instructions on document is added to a subscribed how to participate. docket(s). For assistance with any FERC Dated: March 25, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. VerDate Sep<11>2014 19:09 Mar 30, 2016 Jkt 238001 PO 00000 Frm 00059 Fmt 4703 Sfmt 4703 Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern time on April 15, 2016. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC16–91–000. Applicants: Summer Solar LLC. Description: Application for Authorization Under Section 203 of the Federal Power Act, Request for Expedited Consideration and Confidential Treatment of Summer Solar LLC. Filed Date: 3/22/16. Accession Number: 20160322–5204. Comments Due: 5 p.m. ET 4/12/16. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER12–60–011; ER10–1632–011; ER10–1628–009; ER10–1624–005; ER10–1617–009; ER10–1597–005; ER10–1594–009; ER10–1585–009. Applicants: Alabama Electric Marketing, LLC, California Electric Marketing, LLC, Kiowa Power Partners, L.L.C., New Mexico Electric Marketing, LLC, Tenaska Power Management, LLC, Tenaska Power Services Co., Texas Electric Marketing, LLC, Tenaska Gateway Partners, Ltd. Description: Supplement to December 31, 2015 Updated Market Power Analysis in the Southwest Power Pool region of the Tenaska MBR Sellers. Filed Date: 3/23/16. Accession Number: 20160323–5148. Comments Due: 5 p.m. ET 4/13/16. Docket Numbers: ER13–102–009. Applicants: New York Independent System Operator, Inc. Description: Compliance filing: NYISO compliance filing Order No. 1000 RTPP to be effective 4/1/2016. Filed Date: 3/22/16. Accession Number: 20160322–5168. Comments Due: 5 p.m. ET 4/12/16. Docket Numbers: ER15–1047–004. Applicants: R.E. Ginna Nuclear Power Plant, LLC. E:\FR\FM\31MRN1.SGM 31MRN1

Agencies

[Federal Register Volume 81, Number 62 (Thursday, March 31, 2016)]
[Notices]
[Page 18622]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-07232]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Technical Conference

------------------------------------------------------------------------
                                                             Project No.
------------------------------------------------------------------------
FFP Missouri 12, LLC.......................................    13755-002
FFP Missouri 5, LLC........................................    13757-002
FFP Missouri 6, LLC........................................    13761-002
Solia 6 Hydroelectric, LLC.................................    13768-002
------------------------------------------------------------------------

    On Wednesday, April 6, 2016, Commission staff will hold a technical 
conference to discuss cultural resources related to Rye Development, 
LLC's proposed Allegheny Lock and Dam No. 2 Hydroelectric Project No. 
13755, Emsworth Locks and Dam Hydroelectric Project No. 13757, Emsworth 
Back Channel Dam Hydroelectric Project No. 13761, and Montgomery Locks 
and Dam Hydroelectric Project No. 13768.
    The technical conference will begin at 2:00 p.m. Eastern Standard 
Time. The conference will be held at the Federal Energy Regulatory 
Commission headquarters building located at 888 1st Street NE., 
Washington, DC, and will include teleconference capabilities.
    All local, state, and federal agencies, Indian tribes, and other 
interested parties are invited to participate. There will be no 
transcript of the conference, but a summary of the meeting will be 
prepared for the project record. If you are interested in participating 
in the meeting you must contact Allyson Conner at (202) 502-6082 or 
allyson.conner@ferc.gov by April 4, 2016 to receive specific 
instructions on how to participate.

    Dated: March 22, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-07232 Filed 3-30-16; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.