Actions Taken at March 10, 2016, Meeting, 15398-15399 [2016-06428]

Download as PDF 15398 Federal Register / Vol. 81, No. 55 / Tuesday, March 22, 2016 / Notices EIDL Loan Application Deadline Date: 12/13/2016. ADDRESSES: Submit completed loan applications to: U.S. Small Business Administration, Processing and Disbursement Center, 14925 Kingsport Road, Fort Worth, TX 76155. FOR FURTHER INFORMATION CONTACT: A. Escobar, Office of Disaster Assistance, U.S. Small Business Administration, 409 3rd Street SW., Suite 6050, Washington, DC 20416. SUPPLEMENTARY INFORMATION: The notice of the Presidential disaster declaration for the State of LOUISIANA, dated 03/ 13/2016 is hereby amended to include the following areas as adversely affected by the disaster: Primary Parishes: (Physical Damage and Economic Injury Loans): Beauregard, Bienville, Caddo, Caldwell, De Soto, La Salle, Livingston, Madison, Natchitoches, Saint Tammany, Tangipahoa, Union, Vernon, Washington, West Carroll, Winn. Contiguous Parishes/Counties: (Economic Injury Loans Only): Louisiana: Allen, Ascension, Avoyelles, Calcasieu, Catahoula, East Baton Rouge, Jefferson, Jefferson Davis, Orleans, Sabine, Saint Charles, Saint Helena, St John The Baptist, Tensas. Mississippi: Amite, Hancock, Marion, Pearl River, Pike, Walthall, Warren. Texas: Cass, Harrison, Marion, Newton, Panola, Shelby. All other information in the original declaration remains unchanged. (Catalog of Federal Domestic Assistance Numbers 59008) Lisa Lopez-Suarez, Acting Associate Administrator for Disaster Assistance. [FR Doc. 2016–06386 Filed 3–21–16; 8:45 am] BILLING CODE 8025–01–P SUSQUEHANNA RIVER BASIN COMMISSION Susquehanna River Basin Commission. ACTION: Notice. asabaliauskas on DSK3SPTVN1PROD with NOTICES AGENCY: As part of its regular business meeting held on March 10, 2016, in Aberdeen, Maryland, the Commission took the following actions: (1) Approved or tabled the applications of certain water resources projects; (2) accepted settlements in lieu of penalties from Aqua Pennsylvania, Inc., Cabot Oil & VerDate Sep<11>2014 19:06 Mar 21, 2016 Jkt 238001 Compliance Matters The Commission approved settlements in lieu of civil penalties for the following projects: 1. Aqua Pennsylvania, Inc. (Beech Mountain System), Butler Township, Luzerne County, PA—$9,000. 2. Cabot Oil & Gas Corporation (GillinghamR P1 Pad (ABR–201305017; Forest Lake Township) and DeluciaR P1 Pad (ABR–201211002; Harford Township)), Susquehanna County, PA— $11,000. 3. King Valley Golf Course, Kimmel Township, Bedford County, PA— $10,000. Project Applications Approved Actions Taken at March 10, 2016, Meeting SUMMARY: Gas Corporation, and King Valley Golf Course; and (3) took additional actions, as set forth in the SUPPLEMENTARY INFORMATION below. DATES: March 10, 2016. ADDRESSES: Susquehanna River Basin Commission, 4423 N. Front Street, Harrisburg, PA 17110–1788. FOR FURTHER INFORMATION CONTACT: Jason E. Oyler, General Counsel, telephone: (717) 238–0423, ext. 1312; fax: (717) 238–2436; email: joyler@ srbc.net. Regular mail inquiries may be sent to the above address. See also Commission Web site at www.srbc.net. SUPPLEMENTARY INFORMATION: In addition to the actions taken on projects identified in the summary above and the listings below, the following items were also presented or acted upon at the business meeting: (1) Adoption of a budget for the 2017 fiscal year; (2) a recommendation for engaging an independent auditor; (3) approval/ ratification of a grant amendment and an agreement; and (4) a report on delegated settlements with the following project sponsors, pursuant to SRBC Resolution 2014–15: Dauphin County General Authority—Highlands Golf Course, in the amount of $2,000; Talisman Energy USA Inc., in the amount of $1,000; and Mountain Energy Services, Inc., in the amount of $1,000. The Commission approved the following project applications: 1. Project Sponsor and Facility: Anadarko E&P Onshore LLC (Lycoming Creek), Lewis Township, Lycoming County, PA. Renewal of surface water withdrawal of up to 1.340 mgd (peak day) (Docket No. 20120301). 2. Project Sponsor: Aqua Pennsylvania, Inc. Project Facility: Midway Manor System, Kingston Township, Luzerne County, PA. Groundwater withdrawal of up to 0.115 mgd (30-day average) from Dug Road Well. PO 00000 Frm 00179 Fmt 4703 Sfmt 4703 3. Project Sponsor: Aqua Pennsylvania, Inc. Project Facility: Midway Manor System, Kingston Township, Luzerne County, PA. Groundwater withdrawal of up to 0.035 mgd (30-day average) from Hilltop Well. 4. Project Sponsor: Aqua Pennsylvania, Inc. Project Facility: Midway Manor System, Kingston Township, Luzerne County, PA. Groundwater withdrawal of up to 0.158 mgd (30-day average) from Midway Well 1. 5. Project Sponsor: Aqua Pennsylvania, Inc. Project Facility: Midway Manor System, Kingston Township, Luzerne County, PA. Groundwater withdrawal of up to 0.110 mgd (30-day average) from Midway Well 2. 6. Project Sponsor and Facility: East Berlin Area Joint Authority, Reading Township, Adams County, PA. Groundwater withdrawal of up to 0.044 mgd (30-day average) from Well 1. 7. Project Sponsor and Facility: East Berlin Area Joint Authority, Reading Township, Adams County, PA. Groundwater withdrawal of up to 0.065 mgd (30-day average) from Well 2. 8. Project Sponsor and Facility: East Berlin Area Joint Authority, East Berlin Borough, Adams County, PA. Groundwater withdrawal of up to 0.058 mgd (30-day average) from Well 4. 9. Project Sponsor and Facility: East Berlin Area Joint Authority, East Berlin Borough, Adams County, PA. Renewal with modification to increase groundwater withdrawal limit, for a total of up to 0.051 mgd (30-day average) from Well 5 (Docket No. 19860601). 10. Project Sponsor and Facility: East Cocalico Township Authority, East Cocalico Township, Lancaster County, PA. Groundwater withdrawal of up to 0.059 mgd (30-day average) from Well 3A. 11. Project Sponsor and Facility: East Cocalico Township Authority, East Cocalico Township, Lancaster County, PA. Groundwater withdrawal of up to 0.023 mgd (30-day average) from Well 4. 12. Project Sponsor and Facility: East Cocalico Township Authority, East Cocalico Township, Lancaster County, PA. Groundwater withdrawal of up to 0.056 mgd (30-day average) from Well 5. 13. Project Sponsor and Facility: East Cocalico Township Authority, East Cocalico Township, Lancaster County, PA. Groundwater withdrawal of up to 0.022 mgd (30-day average) from Well 6. 14. Project Sponsor and Facility: East Cocalico Township Authority, East Cocalico Township, Lancaster County, PA. Groundwater withdrawal of up to 0.046 mgd (30-day average) from Well 7. E:\FR\FM\22MRN1.SGM 22MRN1 asabaliauskas on DSK3SPTVN1PROD with NOTICES Federal Register / Vol. 81, No. 55 / Tuesday, March 22, 2016 / Notices 15. Project Sponsor and Facility: EQT Production Company (Wilson Creek), Duncan Township, Tioga County, PA. Renewal of surface water withdrawal of up to 0.720 mgd (peak day) (Docket No. 20120307). 16. Project Sponsor and Facility: Furman Foods, Inc., Point Township, Northumberland County, PA. Renewal of groundwater withdrawal to include a phased implementation of seasonal groundwater withdrawal limits for Well 1 (Docket No. 19850901). 17. Project Sponsor and Facility: Furman Foods, Inc., Point Township, Northumberland County, PA. Renewal of groundwater withdrawal to include a phased implementation of seasonal groundwater withdrawal limits for Well 4 (Docket No. 19850901). 18. Project Sponsor and Facility: Furman Foods, Inc., Point Township, Northumberland County, PA. Renewal of groundwater withdrawal to include a phased implementation of seasonal groundwater withdrawal limits for Well 7 (Docket No. 19850901). 19. Project Sponsor and Facility: Mount Joy Borough Authority, Mount Joy Borough, Lancaster County, PA. Modification to increase withdrawal limit from Well 2 by 0.105 mgd (30-day average), for a total Well 2 withdrawal limit of 1.270 mgd (30-day average), and to increase the combined withdrawal limit by an additional 0.199 mgd (30day average), for a total combined withdrawal limit of 1.799 mgd (30-day average) from Wells 1 and 2 (Docket No. 20110617). 20. Project Sponsor and Facility: Muncy Borough Municipal Authority, Muncy Creek Township, Lycoming County, PA. Groundwater withdrawal of up to 0.324 mgd (30-day average) from Well 5. 21. Project Sponsor and Facility: Muncy Borough Municipal Authority, Muncy Creek Township, Lycoming County, PA. Groundwater withdrawal of up to 0.352 mgd (30-day average) from Well 6. 22. Project Sponsor and Facility: Muncy Borough Municipal Authority, Muncy Creek Township, Lycoming County, PA. Groundwater withdrawal of up to 0.126 mgd (30-day average) from Well 7. 23. Project Sponsor and Facility: Muncy Borough Municipal Authority, Muncy Creek Township, Lycoming County, PA. Groundwater withdrawal of up to 0.276 mgd (30-day average) from Well 8. 24. Project Sponsor: Pennsylvania Department of Environmental Protection, Bureau of Conservation and Restoration. Project Facility: Cresson Mine Drainage Treatment Plant, Cresson VerDate Sep<11>2014 17:34 Mar 21, 2016 Jkt 238001 Borough, Cambria County, PA. Groundwater withdrawal from the Argyle Stone Bridge Well as part of a four-well system drawing up to 6.300 mgd (30-day average) from the Gallitzin Shaft and Cresson Mine Pools. 25. Project Sponsor: Pennsylvania Department of Environmental Protection, Bureau of Conservation and Restoration. Project Facility: Cresson Mine Drainage Treatment Plant, Cresson Township, Cambria County, PA. Groundwater withdrawal from the Cresson No. 9 Well as part of a four-well system drawing up to 6.300 mgd (30-day average) from the Gallitzin Shaft and Cresson Mine Pools. 26. Project Sponsor: Pennsylvania Department of Environmental Protection, Bureau of Conservation and Restoration. Project Facility: Cresson Mine Drainage Treatment Plant, Gallitzin Township, Cambria County, PA. Groundwater withdrawal from the Gallitzin Shaft Well 2A (Gallitzin Shaft #2) as part of a four-well system drawing up to 6.300 mgd (30-day average) from the Gallitzin Shaft and Cresson Mine Pools. 27. Project Sponsor: Pennsylvania Department of Environmental Protection, Bureau of Conservation and Restoration. Project Facility: Cresson Mine Drainage Treatment Plant, Gallitzin Township, Cambria County, PA. Groundwater withdrawal from the Gallitzin Shaft Well 2B (Gallitzin Shaft #1) as part of a four-well system drawing up to 6.300 mgd (30-day average) from the Gallitzin Shaft and Cresson Mine Pools. 28. Project Sponsor and Facility: SWN Production Company, LLC (Susquehanna River), Mehoopany Township, Wyoming County, PA. Surface water withdrawal of up to 1.500 mgd (peak day). 29. Project Sponsor and Facility: SWN Production Company, LLC (Susquehanna River), Oakland Township, Susquehanna County, PA. Renewal of surface water withdrawal of up to 3.000 mgd (peak day) (Docket No. 20120311). 30. Project Sponsor and Facility: SWN Production Company, LLC (Tunkhannock Creek), Lenox Township, Susquehanna County, PA. Renewal of surface water withdrawal of up to 1.218 mgd (peak day) (Docket No. 20120312). Project Application Tabled The Commission tabled action on the following project application: 1. Project Sponsor and Facility: Black Bear Waters, LLC (Lycoming Creek), Lewis Township, Lycoming County, PA. Application for renewal of surface water PO 00000 Frm 00180 Fmt 4703 Sfmt 4703 15399 withdrawal of up to 0.900 mgd (peak day) (Docket No. 20120303). Project Application Approved Involving a Diversion The Commission approved the following project application involving a diversion: 1. Project Sponsor: Gas Field Specialists, Inc. Project Facility: Wayne Gravel Products Quarry, Ceres Township, McKean County, PA. Intobasin diversion from the Ohio River Basin of up to 1.170 mgd (peak day). Authority: Public Law 91–575, 84 Stat. 1509 et seq., 18 CFR parts 806, 807, and 808. Dated: March 17, 2016. Stephanie L. Richardson, Secretary to the Commission. [FR Doc. 2016–06428 Filed 3–21–16; 8:45 am] BILLING CODE 7040–01–P DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Public Notice For Waiver of Aeronautical Land-Use Assurance Mankato Regional Airport, Mankato, MN Federal Aviation Administration, DOT ACTION: Notice of intent of waiver with respect to land. AGENCY: The Federal Aviation Administration (FAA) is considering a proposal to authorize the release of 2.35 acres of the airport property at the Mankato Regional Airport, Mankato MN. The City is proposing a land swap to exchange this 2.35 acre parcel for another parcel of 2.0 acres. The acreage being released is not needed for aeronautical use as currently identified on the Airport Layout Plan. The acreage comprising this parcel was originally acquired in 1982 and funded with an Airport Improvement Program (AIP) grant (3–27–0055–05–87). In exchange for the 2.35 acres the airport will receive a new parcel of land in the Runway Protection Zone (RPZ) to Runway 33. The FAA approved a Categorical Exclusion for environmental requirements on May 30, 2014. Approval does not constitute a commitment by the FAA to financially assist in the disposal of the subject airport property nor a determination of eligibility for grant-in-aid funding from the FAA. The disposition of proceeds from the disposal of the airport property will be in accordance with FAA’s Policy and Procedures Concerning the Use of Airport Revenue, published in the Federal Register on February 16, 1999. SUMMARY: E:\FR\FM\22MRN1.SGM 22MRN1

Agencies

[Federal Register Volume 81, Number 55 (Tuesday, March 22, 2016)]
[Notices]
[Pages 15398-15399]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-06428]


=======================================================================
-----------------------------------------------------------------------

SUSQUEHANNA RIVER BASIN COMMISSION


Actions Taken at March 10, 2016, Meeting

AGENCY: Susquehanna River Basin Commission.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: As part of its regular business meeting held on March 10, 
2016, in Aberdeen, Maryland, the Commission took the following actions: 
(1) Approved or tabled the applications of certain water resources 
projects; (2) accepted settlements in lieu of penalties from Aqua 
Pennsylvania, Inc., Cabot Oil & Gas Corporation, and King Valley Golf 
Course; and (3) took additional actions, as set forth in the 
Supplementary Information below.

DATES: March 10, 2016.

ADDRESSES: Susquehanna River Basin Commission, 4423 N. Front Street, 
Harrisburg, PA 17110-1788.

FOR FURTHER INFORMATION CONTACT: Jason E. Oyler, General Counsel, 
telephone: (717) 238-0423, ext. 1312; fax: (717) 238-2436; email: 
joyler@srbc.net. Regular mail inquiries may be sent to the above 
address. See also Commission Web site at www.srbc.net.

SUPPLEMENTARY INFORMATION: In addition to the actions taken on projects 
identified in the summary above and the listings below, the following 
items were also presented or acted upon at the business meeting: (1) 
Adoption of a budget for the 2017 fiscal year; (2) a recommendation for 
engaging an independent auditor; (3) approval/ratification of a grant 
amendment and an agreement; and (4) a report on delegated settlements 
with the following project sponsors, pursuant to SRBC Resolution 2014-
15: Dauphin County General Authority--Highlands Golf Course, in the 
amount of $2,000; Talisman Energy USA Inc., in the amount of $1,000; 
and Mountain Energy Services, Inc., in the amount of $1,000.

Compliance Matters

    The Commission approved settlements in lieu of civil penalties for 
the following projects:
    1. Aqua Pennsylvania, Inc. (Beech Mountain System), Butler 
Township, Luzerne County, PA--$9,000.
    2. Cabot Oil & Gas Corporation (GillinghamR P1 Pad (ABR-201305017; 
Forest Lake Township) and DeluciaR P1 Pad (ABR-201211002; Harford 
Township)), Susquehanna County, PA--$11,000.
    3. King Valley Golf Course, Kimmel Township, Bedford County, PA--
$10,000.

Project Applications Approved

    The Commission approved the following project applications:
    1. Project Sponsor and Facility: Anadarko E&P Onshore LLC (Lycoming 
Creek), Lewis Township, Lycoming County, PA. Renewal of surface water 
withdrawal of up to 1.340 mgd (peak day) (Docket No. 20120301).
    2. Project Sponsor: Aqua Pennsylvania, Inc. Project Facility: 
Midway Manor System, Kingston Township, Luzerne County, PA. Groundwater 
withdrawal of up to 0.115 mgd (30-day average) from Dug Road Well.
    3. Project Sponsor: Aqua Pennsylvania, Inc. Project Facility: 
Midway Manor System, Kingston Township, Luzerne County, PA. Groundwater 
withdrawal of up to 0.035 mgd (30-day average) from Hilltop Well.
    4. Project Sponsor: Aqua Pennsylvania, Inc. Project Facility: 
Midway Manor System, Kingston Township, Luzerne County, PA. Groundwater 
withdrawal of up to 0.158 mgd (30-day average) from Midway Well 1.
    5. Project Sponsor: Aqua Pennsylvania, Inc. Project Facility: 
Midway Manor System, Kingston Township, Luzerne County, PA. Groundwater 
withdrawal of up to 0.110 mgd (30-day average) from Midway Well 2.
    6. Project Sponsor and Facility: East Berlin Area Joint Authority, 
Reading Township, Adams County, PA. Groundwater withdrawal of up to 
0.044 mgd (30-day average) from Well 1.
    7. Project Sponsor and Facility: East Berlin Area Joint Authority, 
Reading Township, Adams County, PA. Groundwater withdrawal of up to 
0.065 mgd (30-day average) from Well 2.
    8. Project Sponsor and Facility: East Berlin Area Joint Authority, 
East Berlin Borough, Adams County, PA. Groundwater withdrawal of up to 
0.058 mgd (30-day average) from Well 4.
    9. Project Sponsor and Facility: East Berlin Area Joint Authority, 
East Berlin Borough, Adams County, PA. Renewal with modification to 
increase groundwater withdrawal limit, for a total of up to 0.051 mgd 
(30-day average) from Well 5 (Docket No. 19860601).
    10. Project Sponsor and Facility: East Cocalico Township Authority, 
East Cocalico Township, Lancaster County, PA. Groundwater withdrawal of 
up to 0.059 mgd (30-day average) from Well 3A.
    11. Project Sponsor and Facility: East Cocalico Township Authority, 
East Cocalico Township, Lancaster County, PA. Groundwater withdrawal of 
up to 0.023 mgd (30-day average) from Well 4.
    12. Project Sponsor and Facility: East Cocalico Township Authority, 
East Cocalico Township, Lancaster County, PA. Groundwater withdrawal of 
up to 0.056 mgd (30-day average) from Well 5.
    13. Project Sponsor and Facility: East Cocalico Township Authority, 
East Cocalico Township, Lancaster County, PA. Groundwater withdrawal of 
up to 0.022 mgd (30-day average) from Well 6.
    14. Project Sponsor and Facility: East Cocalico Township Authority, 
East Cocalico Township, Lancaster County, PA. Groundwater withdrawal of 
up to 0.046 mgd (30-day average) from Well 7.

[[Page 15399]]

    15. Project Sponsor and Facility: EQT Production Company (Wilson 
Creek), Duncan Township, Tioga County, PA. Renewal of surface water 
withdrawal of up to 0.720 mgd (peak day) (Docket No. 20120307).
    16. Project Sponsor and Facility: Furman Foods, Inc., Point 
Township, Northumberland County, PA. Renewal of groundwater withdrawal 
to include a phased implementation of seasonal groundwater withdrawal 
limits for Well 1 (Docket No. 19850901).
    17. Project Sponsor and Facility: Furman Foods, Inc., Point 
Township, Northumberland County, PA. Renewal of groundwater withdrawal 
to include a phased implementation of seasonal groundwater withdrawal 
limits for Well 4 (Docket No. 19850901).
    18. Project Sponsor and Facility: Furman Foods, Inc., Point 
Township, Northumberland County, PA. Renewal of groundwater withdrawal 
to include a phased implementation of seasonal groundwater withdrawal 
limits for Well 7 (Docket No. 19850901).
    19. Project Sponsor and Facility: Mount Joy Borough Authority, 
Mount Joy Borough, Lancaster County, PA. Modification to increase 
withdrawal limit from Well 2 by 0.105 mgd (30-day average), for a total 
Well 2 withdrawal limit of 1.270 mgd (30-day average), and to increase 
the combined withdrawal limit by an additional 0.199 mgd (30-day 
average), for a total combined withdrawal limit of 1.799 mgd (30-day 
average) from Wells 1 and 2 (Docket No. 20110617).
    20. Project Sponsor and Facility: Muncy Borough Municipal 
Authority, Muncy Creek Township, Lycoming County, PA. Groundwater 
withdrawal of up to 0.324 mgd (30-day average) from Well 5.
    21. Project Sponsor and Facility: Muncy Borough Municipal 
Authority, Muncy Creek Township, Lycoming County, PA. Groundwater 
withdrawal of up to 0.352 mgd (30-day average) from Well 6.
    22. Project Sponsor and Facility: Muncy Borough Municipal 
Authority, Muncy Creek Township, Lycoming County, PA. Groundwater 
withdrawal of up to 0.126 mgd (30-day average) from Well 7.
    23. Project Sponsor and Facility: Muncy Borough Municipal 
Authority, Muncy Creek Township, Lycoming County, PA. Groundwater 
withdrawal of up to 0.276 mgd (30-day average) from Well 8.
    24. Project Sponsor: Pennsylvania Department of Environmental 
Protection, Bureau of Conservation and Restoration. Project Facility: 
Cresson Mine Drainage Treatment Plant, Cresson Borough, Cambria County, 
PA. Groundwater withdrawal from the Argyle Stone Bridge Well as part of 
a four-well system drawing up to 6.300 mgd (30-day average) from the 
Gallitzin Shaft and Cresson Mine Pools.
    25. Project Sponsor: Pennsylvania Department of Environmental 
Protection, Bureau of Conservation and Restoration. Project Facility: 
Cresson Mine Drainage Treatment Plant, Cresson Township, Cambria 
County, PA. Groundwater withdrawal from the Cresson No. 9 Well as part 
of a four-well system drawing up to 6.300 mgd (30-day average) from the 
Gallitzin Shaft and Cresson Mine Pools.
    26. Project Sponsor: Pennsylvania Department of Environmental 
Protection, Bureau of Conservation and Restoration. Project Facility: 
Cresson Mine Drainage Treatment Plant, Gallitzin Township, Cambria 
County, PA. Groundwater withdrawal from the Gallitzin Shaft Well 2A 
(Gallitzin Shaft #2) as part of a four-well system drawing up to 6.300 
mgd (30-day average) from the Gallitzin Shaft and Cresson Mine Pools.
    27. Project Sponsor: Pennsylvania Department of Environmental 
Protection, Bureau of Conservation and Restoration. Project Facility: 
Cresson Mine Drainage Treatment Plant, Gallitzin Township, Cambria 
County, PA. Groundwater withdrawal from the Gallitzin Shaft Well 2B 
(Gallitzin Shaft #1) as part of a four-well system drawing up to 6.300 
mgd (30-day average) from the Gallitzin Shaft and Cresson Mine Pools.
    28. Project Sponsor and Facility: SWN Production Company, LLC 
(Susquehanna River), Mehoopany Township, Wyoming County, PA. Surface 
water withdrawal of up to 1.500 mgd (peak day).
    29. Project Sponsor and Facility: SWN Production Company, LLC 
(Susquehanna River), Oakland Township, Susquehanna County, PA. Renewal 
of surface water withdrawal of up to 3.000 mgd (peak day) (Docket No. 
20120311).
    30. Project Sponsor and Facility: SWN Production Company, LLC 
(Tunkhannock Creek), Lenox Township, Susquehanna County, PA. Renewal of 
surface water withdrawal of up to 1.218 mgd (peak day) (Docket No. 
20120312).

Project Application Tabled

    The Commission tabled action on the following project application:
    1. Project Sponsor and Facility: Black Bear Waters, LLC (Lycoming 
Creek), Lewis Township, Lycoming County, PA. Application for renewal of 
surface water withdrawal of up to 0.900 mgd (peak day) (Docket No. 
20120303).

Project Application Approved Involving a Diversion

    The Commission approved the following project application involving 
a diversion:
    1. Project Sponsor: Gas Field Specialists, Inc. Project Facility: 
Wayne Gravel Products Quarry, Ceres Township, McKean County, PA. Into-
basin diversion from the Ohio River Basin of up to 1.170 mgd (peak 
day).

    Authority: Public Law 91-575, 84 Stat. 1509 et seq., 18 CFR 
parts 806, 807, and 808.

    Dated: March 17, 2016.
Stephanie L. Richardson,
Secretary to the Commission.
[FR Doc. 2016-06428 Filed 3-21-16; 8:45 am]
BILLING CODE 7040-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.