Actions Taken at March 10, 2016, Meeting, 15398-15399 [2016-06428]
Download as PDF
15398
Federal Register / Vol. 81, No. 55 / Tuesday, March 22, 2016 / Notices
EIDL Loan Application Deadline Date:
12/13/2016.
ADDRESSES: Submit completed loan
applications to: U.S. Small Business
Administration, Processing and
Disbursement Center, 14925 Kingsport
Road, Fort Worth, TX 76155.
FOR FURTHER INFORMATION CONTACT: A.
Escobar, Office of Disaster Assistance,
U.S. Small Business Administration,
409 3rd Street SW., Suite 6050,
Washington, DC 20416.
SUPPLEMENTARY INFORMATION: The notice
of the Presidential disaster declaration
for the State of LOUISIANA, dated 03/
13/2016 is hereby amended to include
the following areas as adversely affected
by the disaster:
Primary Parishes: (Physical Damage and
Economic Injury Loans):
Beauregard, Bienville, Caddo,
Caldwell, De Soto, La Salle,
Livingston, Madison, Natchitoches,
Saint Tammany, Tangipahoa,
Union, Vernon, Washington, West
Carroll, Winn.
Contiguous Parishes/Counties:
(Economic Injury Loans Only):
Louisiana: Allen, Ascension,
Avoyelles, Calcasieu, Catahoula,
East Baton Rouge, Jefferson,
Jefferson Davis, Orleans, Sabine,
Saint Charles, Saint Helena, St John
The Baptist, Tensas.
Mississippi: Amite, Hancock, Marion,
Pearl River, Pike, Walthall, Warren.
Texas: Cass, Harrison, Marion,
Newton, Panola, Shelby.
All other information in the original
declaration remains unchanged.
(Catalog of Federal Domestic Assistance
Numbers 59008)
Lisa Lopez-Suarez,
Acting Associate Administrator for Disaster
Assistance.
[FR Doc. 2016–06386 Filed 3–21–16; 8:45 am]
BILLING CODE 8025–01–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Susquehanna River Basin
Commission.
ACTION: Notice.
asabaliauskas on DSK3SPTVN1PROD with NOTICES
AGENCY:
As part of its regular business
meeting held on March 10, 2016, in
Aberdeen, Maryland, the Commission
took the following actions: (1) Approved
or tabled the applications of certain
water resources projects; (2) accepted
settlements in lieu of penalties from
Aqua Pennsylvania, Inc., Cabot Oil &
VerDate Sep<11>2014
19:06 Mar 21, 2016
Jkt 238001
Compliance Matters
The Commission approved
settlements in lieu of civil penalties for
the following projects:
1. Aqua Pennsylvania, Inc. (Beech
Mountain System), Butler Township,
Luzerne County, PA—$9,000.
2. Cabot Oil & Gas Corporation
(GillinghamR P1 Pad (ABR–201305017;
Forest Lake Township) and DeluciaR P1
Pad (ABR–201211002; Harford
Township)), Susquehanna County, PA—
$11,000.
3. King Valley Golf Course, Kimmel
Township, Bedford County, PA—
$10,000.
Project Applications Approved
Actions Taken at March 10, 2016,
Meeting
SUMMARY:
Gas Corporation, and King Valley Golf
Course; and (3) took additional actions,
as set forth in the SUPPLEMENTARY
INFORMATION below.
DATES: March 10, 2016.
ADDRESSES: Susquehanna River Basin
Commission, 4423 N. Front Street,
Harrisburg, PA 17110–1788.
FOR FURTHER INFORMATION CONTACT:
Jason E. Oyler, General Counsel,
telephone: (717) 238–0423, ext. 1312;
fax: (717) 238–2436; email: joyler@
srbc.net. Regular mail inquiries may be
sent to the above address. See also
Commission Web site at www.srbc.net.
SUPPLEMENTARY INFORMATION: In
addition to the actions taken on projects
identified in the summary above and the
listings below, the following items were
also presented or acted upon at the
business meeting: (1) Adoption of a
budget for the 2017 fiscal year; (2) a
recommendation for engaging an
independent auditor; (3) approval/
ratification of a grant amendment and
an agreement; and (4) a report on
delegated settlements with the following
project sponsors, pursuant to SRBC
Resolution 2014–15: Dauphin County
General Authority—Highlands Golf
Course, in the amount of $2,000;
Talisman Energy USA Inc., in the
amount of $1,000; and Mountain Energy
Services, Inc., in the amount of $1,000.
The Commission approved the
following project applications:
1. Project Sponsor and Facility:
Anadarko E&P Onshore LLC (Lycoming
Creek), Lewis Township, Lycoming
County, PA. Renewal of surface water
withdrawal of up to 1.340 mgd (peak
day) (Docket No. 20120301).
2. Project Sponsor: Aqua
Pennsylvania, Inc. Project Facility:
Midway Manor System, Kingston
Township, Luzerne County, PA.
Groundwater withdrawal of up to 0.115
mgd (30-day average) from Dug Road
Well.
PO 00000
Frm 00179
Fmt 4703
Sfmt 4703
3. Project Sponsor: Aqua
Pennsylvania, Inc. Project Facility:
Midway Manor System, Kingston
Township, Luzerne County, PA.
Groundwater withdrawal of up to 0.035
mgd (30-day average) from Hilltop Well.
4. Project Sponsor: Aqua
Pennsylvania, Inc. Project Facility:
Midway Manor System, Kingston
Township, Luzerne County, PA.
Groundwater withdrawal of up to 0.158
mgd (30-day average) from Midway
Well 1.
5. Project Sponsor: Aqua
Pennsylvania, Inc. Project Facility:
Midway Manor System, Kingston
Township, Luzerne County, PA.
Groundwater withdrawal of up to 0.110
mgd (30-day average) from Midway
Well 2.
6. Project Sponsor and Facility: East
Berlin Area Joint Authority, Reading
Township, Adams County, PA.
Groundwater withdrawal of up to 0.044
mgd (30-day average) from Well 1.
7. Project Sponsor and Facility: East
Berlin Area Joint Authority, Reading
Township, Adams County, PA.
Groundwater withdrawal of up to 0.065
mgd (30-day average) from Well 2.
8. Project Sponsor and Facility: East
Berlin Area Joint Authority, East Berlin
Borough, Adams County, PA.
Groundwater withdrawal of up to 0.058
mgd (30-day average) from Well 4.
9. Project Sponsor and Facility: East
Berlin Area Joint Authority, East Berlin
Borough, Adams County, PA. Renewal
with modification to increase
groundwater withdrawal limit, for a
total of up to 0.051 mgd (30-day
average) from Well 5 (Docket No.
19860601).
10. Project Sponsor and Facility: East
Cocalico Township Authority, East
Cocalico Township, Lancaster County,
PA. Groundwater withdrawal of up to
0.059 mgd (30-day average) from Well
3A.
11. Project Sponsor and Facility: East
Cocalico Township Authority, East
Cocalico Township, Lancaster County,
PA. Groundwater withdrawal of up to
0.023 mgd (30-day average) from Well 4.
12. Project Sponsor and Facility: East
Cocalico Township Authority, East
Cocalico Township, Lancaster County,
PA. Groundwater withdrawal of up to
0.056 mgd (30-day average) from Well 5.
13. Project Sponsor and Facility: East
Cocalico Township Authority, East
Cocalico Township, Lancaster County,
PA. Groundwater withdrawal of up to
0.022 mgd (30-day average) from Well 6.
14. Project Sponsor and Facility: East
Cocalico Township Authority, East
Cocalico Township, Lancaster County,
PA. Groundwater withdrawal of up to
0.046 mgd (30-day average) from Well 7.
E:\FR\FM\22MRN1.SGM
22MRN1
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 81, No. 55 / Tuesday, March 22, 2016 / Notices
15. Project Sponsor and Facility: EQT
Production Company (Wilson Creek),
Duncan Township, Tioga County, PA.
Renewal of surface water withdrawal of
up to 0.720 mgd (peak day) (Docket No.
20120307).
16. Project Sponsor and Facility:
Furman Foods, Inc., Point Township,
Northumberland County, PA. Renewal
of groundwater withdrawal to include a
phased implementation of seasonal
groundwater withdrawal limits for Well
1 (Docket No. 19850901).
17. Project Sponsor and Facility:
Furman Foods, Inc., Point Township,
Northumberland County, PA. Renewal
of groundwater withdrawal to include a
phased implementation of seasonal
groundwater withdrawal limits for Well
4 (Docket No. 19850901).
18. Project Sponsor and Facility:
Furman Foods, Inc., Point Township,
Northumberland County, PA. Renewal
of groundwater withdrawal to include a
phased implementation of seasonal
groundwater withdrawal limits for Well
7 (Docket No. 19850901).
19. Project Sponsor and Facility:
Mount Joy Borough Authority, Mount
Joy Borough, Lancaster County, PA.
Modification to increase withdrawal
limit from Well 2 by 0.105 mgd (30-day
average), for a total Well 2 withdrawal
limit of 1.270 mgd (30-day average), and
to increase the combined withdrawal
limit by an additional 0.199 mgd (30day average), for a total combined
withdrawal limit of 1.799 mgd (30-day
average) from Wells 1 and 2 (Docket No.
20110617).
20. Project Sponsor and Facility:
Muncy Borough Municipal Authority,
Muncy Creek Township, Lycoming
County, PA. Groundwater withdrawal of
up to 0.324 mgd (30-day average) from
Well 5.
21. Project Sponsor and Facility:
Muncy Borough Municipal Authority,
Muncy Creek Township, Lycoming
County, PA. Groundwater withdrawal of
up to 0.352 mgd (30-day average) from
Well 6.
22. Project Sponsor and Facility:
Muncy Borough Municipal Authority,
Muncy Creek Township, Lycoming
County, PA. Groundwater withdrawal of
up to 0.126 mgd (30-day average) from
Well 7.
23. Project Sponsor and Facility:
Muncy Borough Municipal Authority,
Muncy Creek Township, Lycoming
County, PA. Groundwater withdrawal of
up to 0.276 mgd (30-day average) from
Well 8.
24. Project Sponsor: Pennsylvania
Department of Environmental
Protection, Bureau of Conservation and
Restoration. Project Facility: Cresson
Mine Drainage Treatment Plant, Cresson
VerDate Sep<11>2014
17:34 Mar 21, 2016
Jkt 238001
Borough, Cambria County, PA.
Groundwater withdrawal from the
Argyle Stone Bridge Well as part of a
four-well system drawing up to 6.300
mgd (30-day average) from the Gallitzin
Shaft and Cresson Mine Pools.
25. Project Sponsor: Pennsylvania
Department of Environmental
Protection, Bureau of Conservation and
Restoration. Project Facility: Cresson
Mine Drainage Treatment Plant, Cresson
Township, Cambria County, PA.
Groundwater withdrawal from the
Cresson No. 9 Well as part of a four-well
system drawing up to 6.300 mgd (30-day
average) from the Gallitzin Shaft and
Cresson Mine Pools.
26. Project Sponsor: Pennsylvania
Department of Environmental
Protection, Bureau of Conservation and
Restoration. Project Facility: Cresson
Mine Drainage Treatment Plant,
Gallitzin Township, Cambria County,
PA. Groundwater withdrawal from the
Gallitzin Shaft Well 2A (Gallitzin Shaft
#2) as part of a four-well system
drawing up to 6.300 mgd (30-day
average) from the Gallitzin Shaft and
Cresson Mine Pools.
27. Project Sponsor: Pennsylvania
Department of Environmental
Protection, Bureau of Conservation and
Restoration. Project Facility: Cresson
Mine Drainage Treatment Plant,
Gallitzin Township, Cambria County,
PA. Groundwater withdrawal from the
Gallitzin Shaft Well 2B (Gallitzin Shaft
#1) as part of a four-well system
drawing up to 6.300 mgd (30-day
average) from the Gallitzin Shaft and
Cresson Mine Pools.
28. Project Sponsor and Facility: SWN
Production Company, LLC
(Susquehanna River), Mehoopany
Township, Wyoming County, PA.
Surface water withdrawal of up to 1.500
mgd (peak day).
29. Project Sponsor and Facility: SWN
Production Company, LLC
(Susquehanna River), Oakland
Township, Susquehanna County, PA.
Renewal of surface water withdrawal of
up to 3.000 mgd (peak day) (Docket No.
20120311).
30. Project Sponsor and Facility: SWN
Production Company, LLC
(Tunkhannock Creek), Lenox Township,
Susquehanna County, PA. Renewal of
surface water withdrawal of up to 1.218
mgd (peak day) (Docket No. 20120312).
Project Application Tabled
The Commission tabled action on the
following project application:
1. Project Sponsor and Facility: Black
Bear Waters, LLC (Lycoming Creek),
Lewis Township, Lycoming County, PA.
Application for renewal of surface water
PO 00000
Frm 00180
Fmt 4703
Sfmt 4703
15399
withdrawal of up to 0.900 mgd (peak
day) (Docket No. 20120303).
Project Application Approved
Involving a Diversion
The Commission approved the
following project application involving
a diversion:
1. Project Sponsor: Gas Field
Specialists, Inc. Project Facility: Wayne
Gravel Products Quarry, Ceres
Township, McKean County, PA. Intobasin diversion from the Ohio River
Basin of up to 1.170 mgd (peak day).
Authority: Public Law 91–575, 84 Stat.
1509 et seq., 18 CFR parts 806, 807, and 808.
Dated: March 17, 2016.
Stephanie L. Richardson,
Secretary to the Commission.
[FR Doc. 2016–06428 Filed 3–21–16; 8:45 am]
BILLING CODE 7040–01–P
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
Public Notice For Waiver of
Aeronautical Land-Use Assurance
Mankato Regional Airport, Mankato,
MN
Federal Aviation
Administration, DOT
ACTION: Notice of intent of waiver with
respect to land.
AGENCY:
The Federal Aviation
Administration (FAA) is considering a
proposal to authorize the release of 2.35
acres of the airport property at the
Mankato Regional Airport, Mankato
MN. The City is proposing a land swap
to exchange this 2.35 acre parcel for
another parcel of 2.0 acres.
The acreage being released is not
needed for aeronautical use as currently
identified on the Airport Layout Plan.
The acreage comprising this parcel was
originally acquired in 1982 and funded
with an Airport Improvement Program
(AIP) grant (3–27–0055–05–87). In
exchange for the 2.35 acres the airport
will receive a new parcel of land in the
Runway Protection Zone (RPZ) to
Runway 33. The FAA approved a
Categorical Exclusion for environmental
requirements on May 30, 2014.
Approval does not constitute a
commitment by the FAA to financially
assist in the disposal of the subject
airport property nor a determination of
eligibility for grant-in-aid funding from
the FAA. The disposition of proceeds
from the disposal of the airport property
will be in accordance with FAA’s Policy
and Procedures Concerning the Use of
Airport Revenue, published in the
Federal Register on February 16, 1999.
SUMMARY:
E:\FR\FM\22MRN1.SGM
22MRN1
Agencies
[Federal Register Volume 81, Number 55 (Tuesday, March 22, 2016)]
[Notices]
[Pages 15398-15399]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-06428]
=======================================================================
-----------------------------------------------------------------------
SUSQUEHANNA RIVER BASIN COMMISSION
Actions Taken at March 10, 2016, Meeting
AGENCY: Susquehanna River Basin Commission.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: As part of its regular business meeting held on March 10,
2016, in Aberdeen, Maryland, the Commission took the following actions:
(1) Approved or tabled the applications of certain water resources
projects; (2) accepted settlements in lieu of penalties from Aqua
Pennsylvania, Inc., Cabot Oil & Gas Corporation, and King Valley Golf
Course; and (3) took additional actions, as set forth in the
Supplementary Information below.
DATES: March 10, 2016.
ADDRESSES: Susquehanna River Basin Commission, 4423 N. Front Street,
Harrisburg, PA 17110-1788.
FOR FURTHER INFORMATION CONTACT: Jason E. Oyler, General Counsel,
telephone: (717) 238-0423, ext. 1312; fax: (717) 238-2436; email:
joyler@srbc.net. Regular mail inquiries may be sent to the above
address. See also Commission Web site at www.srbc.net.
SUPPLEMENTARY INFORMATION: In addition to the actions taken on projects
identified in the summary above and the listings below, the following
items were also presented or acted upon at the business meeting: (1)
Adoption of a budget for the 2017 fiscal year; (2) a recommendation for
engaging an independent auditor; (3) approval/ratification of a grant
amendment and an agreement; and (4) a report on delegated settlements
with the following project sponsors, pursuant to SRBC Resolution 2014-
15: Dauphin County General Authority--Highlands Golf Course, in the
amount of $2,000; Talisman Energy USA Inc., in the amount of $1,000;
and Mountain Energy Services, Inc., in the amount of $1,000.
Compliance Matters
The Commission approved settlements in lieu of civil penalties for
the following projects:
1. Aqua Pennsylvania, Inc. (Beech Mountain System), Butler
Township, Luzerne County, PA--$9,000.
2. Cabot Oil & Gas Corporation (GillinghamR P1 Pad (ABR-201305017;
Forest Lake Township) and DeluciaR P1 Pad (ABR-201211002; Harford
Township)), Susquehanna County, PA--$11,000.
3. King Valley Golf Course, Kimmel Township, Bedford County, PA--
$10,000.
Project Applications Approved
The Commission approved the following project applications:
1. Project Sponsor and Facility: Anadarko E&P Onshore LLC (Lycoming
Creek), Lewis Township, Lycoming County, PA. Renewal of surface water
withdrawal of up to 1.340 mgd (peak day) (Docket No. 20120301).
2. Project Sponsor: Aqua Pennsylvania, Inc. Project Facility:
Midway Manor System, Kingston Township, Luzerne County, PA. Groundwater
withdrawal of up to 0.115 mgd (30-day average) from Dug Road Well.
3. Project Sponsor: Aqua Pennsylvania, Inc. Project Facility:
Midway Manor System, Kingston Township, Luzerne County, PA. Groundwater
withdrawal of up to 0.035 mgd (30-day average) from Hilltop Well.
4. Project Sponsor: Aqua Pennsylvania, Inc. Project Facility:
Midway Manor System, Kingston Township, Luzerne County, PA. Groundwater
withdrawal of up to 0.158 mgd (30-day average) from Midway Well 1.
5. Project Sponsor: Aqua Pennsylvania, Inc. Project Facility:
Midway Manor System, Kingston Township, Luzerne County, PA. Groundwater
withdrawal of up to 0.110 mgd (30-day average) from Midway Well 2.
6. Project Sponsor and Facility: East Berlin Area Joint Authority,
Reading Township, Adams County, PA. Groundwater withdrawal of up to
0.044 mgd (30-day average) from Well 1.
7. Project Sponsor and Facility: East Berlin Area Joint Authority,
Reading Township, Adams County, PA. Groundwater withdrawal of up to
0.065 mgd (30-day average) from Well 2.
8. Project Sponsor and Facility: East Berlin Area Joint Authority,
East Berlin Borough, Adams County, PA. Groundwater withdrawal of up to
0.058 mgd (30-day average) from Well 4.
9. Project Sponsor and Facility: East Berlin Area Joint Authority,
East Berlin Borough, Adams County, PA. Renewal with modification to
increase groundwater withdrawal limit, for a total of up to 0.051 mgd
(30-day average) from Well 5 (Docket No. 19860601).
10. Project Sponsor and Facility: East Cocalico Township Authority,
East Cocalico Township, Lancaster County, PA. Groundwater withdrawal of
up to 0.059 mgd (30-day average) from Well 3A.
11. Project Sponsor and Facility: East Cocalico Township Authority,
East Cocalico Township, Lancaster County, PA. Groundwater withdrawal of
up to 0.023 mgd (30-day average) from Well 4.
12. Project Sponsor and Facility: East Cocalico Township Authority,
East Cocalico Township, Lancaster County, PA. Groundwater withdrawal of
up to 0.056 mgd (30-day average) from Well 5.
13. Project Sponsor and Facility: East Cocalico Township Authority,
East Cocalico Township, Lancaster County, PA. Groundwater withdrawal of
up to 0.022 mgd (30-day average) from Well 6.
14. Project Sponsor and Facility: East Cocalico Township Authority,
East Cocalico Township, Lancaster County, PA. Groundwater withdrawal of
up to 0.046 mgd (30-day average) from Well 7.
[[Page 15399]]
15. Project Sponsor and Facility: EQT Production Company (Wilson
Creek), Duncan Township, Tioga County, PA. Renewal of surface water
withdrawal of up to 0.720 mgd (peak day) (Docket No. 20120307).
16. Project Sponsor and Facility: Furman Foods, Inc., Point
Township, Northumberland County, PA. Renewal of groundwater withdrawal
to include a phased implementation of seasonal groundwater withdrawal
limits for Well 1 (Docket No. 19850901).
17. Project Sponsor and Facility: Furman Foods, Inc., Point
Township, Northumberland County, PA. Renewal of groundwater withdrawal
to include a phased implementation of seasonal groundwater withdrawal
limits for Well 4 (Docket No. 19850901).
18. Project Sponsor and Facility: Furman Foods, Inc., Point
Township, Northumberland County, PA. Renewal of groundwater withdrawal
to include a phased implementation of seasonal groundwater withdrawal
limits for Well 7 (Docket No. 19850901).
19. Project Sponsor and Facility: Mount Joy Borough Authority,
Mount Joy Borough, Lancaster County, PA. Modification to increase
withdrawal limit from Well 2 by 0.105 mgd (30-day average), for a total
Well 2 withdrawal limit of 1.270 mgd (30-day average), and to increase
the combined withdrawal limit by an additional 0.199 mgd (30-day
average), for a total combined withdrawal limit of 1.799 mgd (30-day
average) from Wells 1 and 2 (Docket No. 20110617).
20. Project Sponsor and Facility: Muncy Borough Municipal
Authority, Muncy Creek Township, Lycoming County, PA. Groundwater
withdrawal of up to 0.324 mgd (30-day average) from Well 5.
21. Project Sponsor and Facility: Muncy Borough Municipal
Authority, Muncy Creek Township, Lycoming County, PA. Groundwater
withdrawal of up to 0.352 mgd (30-day average) from Well 6.
22. Project Sponsor and Facility: Muncy Borough Municipal
Authority, Muncy Creek Township, Lycoming County, PA. Groundwater
withdrawal of up to 0.126 mgd (30-day average) from Well 7.
23. Project Sponsor and Facility: Muncy Borough Municipal
Authority, Muncy Creek Township, Lycoming County, PA. Groundwater
withdrawal of up to 0.276 mgd (30-day average) from Well 8.
24. Project Sponsor: Pennsylvania Department of Environmental
Protection, Bureau of Conservation and Restoration. Project Facility:
Cresson Mine Drainage Treatment Plant, Cresson Borough, Cambria County,
PA. Groundwater withdrawal from the Argyle Stone Bridge Well as part of
a four-well system drawing up to 6.300 mgd (30-day average) from the
Gallitzin Shaft and Cresson Mine Pools.
25. Project Sponsor: Pennsylvania Department of Environmental
Protection, Bureau of Conservation and Restoration. Project Facility:
Cresson Mine Drainage Treatment Plant, Cresson Township, Cambria
County, PA. Groundwater withdrawal from the Cresson No. 9 Well as part
of a four-well system drawing up to 6.300 mgd (30-day average) from the
Gallitzin Shaft and Cresson Mine Pools.
26. Project Sponsor: Pennsylvania Department of Environmental
Protection, Bureau of Conservation and Restoration. Project Facility:
Cresson Mine Drainage Treatment Plant, Gallitzin Township, Cambria
County, PA. Groundwater withdrawal from the Gallitzin Shaft Well 2A
(Gallitzin Shaft #2) as part of a four-well system drawing up to 6.300
mgd (30-day average) from the Gallitzin Shaft and Cresson Mine Pools.
27. Project Sponsor: Pennsylvania Department of Environmental
Protection, Bureau of Conservation and Restoration. Project Facility:
Cresson Mine Drainage Treatment Plant, Gallitzin Township, Cambria
County, PA. Groundwater withdrawal from the Gallitzin Shaft Well 2B
(Gallitzin Shaft #1) as part of a four-well system drawing up to 6.300
mgd (30-day average) from the Gallitzin Shaft and Cresson Mine Pools.
28. Project Sponsor and Facility: SWN Production Company, LLC
(Susquehanna River), Mehoopany Township, Wyoming County, PA. Surface
water withdrawal of up to 1.500 mgd (peak day).
29. Project Sponsor and Facility: SWN Production Company, LLC
(Susquehanna River), Oakland Township, Susquehanna County, PA. Renewal
of surface water withdrawal of up to 3.000 mgd (peak day) (Docket No.
20120311).
30. Project Sponsor and Facility: SWN Production Company, LLC
(Tunkhannock Creek), Lenox Township, Susquehanna County, PA. Renewal of
surface water withdrawal of up to 1.218 mgd (peak day) (Docket No.
20120312).
Project Application Tabled
The Commission tabled action on the following project application:
1. Project Sponsor and Facility: Black Bear Waters, LLC (Lycoming
Creek), Lewis Township, Lycoming County, PA. Application for renewal of
surface water withdrawal of up to 0.900 mgd (peak day) (Docket No.
20120303).
Project Application Approved Involving a Diversion
The Commission approved the following project application involving
a diversion:
1. Project Sponsor: Gas Field Specialists, Inc. Project Facility:
Wayne Gravel Products Quarry, Ceres Township, McKean County, PA. Into-
basin diversion from the Ohio River Basin of up to 1.170 mgd (peak
day).
Authority: Public Law 91-575, 84 Stat. 1509 et seq., 18 CFR
parts 806, 807, and 808.
Dated: March 17, 2016.
Stephanie L. Richardson,
Secretary to the Commission.
[FR Doc. 2016-06428 Filed 3-21-16; 8:45 am]
BILLING CODE 7040-01-P