Grand River Dam Authority; Notice of Request To Reduce Comment Period From 60 to 30 Days on Draft Amendment Application and Soliciting Comments, Motions To Intervene, and Protests, 15296-15297 [2016-06370]
Download as PDF
15296
Federal Register / Vol. 81, No. 55 / Tuesday, March 22, 2016 / Notices
and high-level radioactive waste and
requested comments by June 15, 2016.
DOE is extending the comment period
to July 31, 2016.
DATES: DOE is extending the comment
period for the ‘‘Invitation for Public
Comment to Inform the Design of a
Consent-Based Siting Process for
Nuclear Waste Storage and Disposal
Facilities’’ to July 31, 2016.
ADDRESSES: You may submit questions
or comments by any of the following
methods:
Email: Responses may be provided by
email to consentbasedsiting@
hq.doe.gov. Please include ‘‘Response to
IPC’’ in the subject line.
Mail: Responses may be provided by
mail to the following address: U.S.
Department of Energy, Office of Nuclear
Energy, Response to IPC, 1000
Independence Ave. SW., Washington,
DC 20585.
Fax: Responses may be faxed to 202–
586–0544. Please include ‘‘Response to
IPC’’ on the fax cover page.
Online: Responses will be accepted
online at www.regulations.gov.
FOR FURTHER INFORMATION CONTACT:
Requests for further information should
be sent to consentbasedsiting@
hq.doe.gov. Please include ‘‘Question on
IPC’’ in the subject line.
SUPPLEMENTARY INFORMATION:
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Instructions: Submit comments via
any of the mechanisms set forth in the
ADDRESSES section above. Respondents
are requested to provide the following
information at the beginning of their
response to this IPC:
State, tribal, community, organization,
public or individual name;
State, tribal, community, organization,
public or individual point of contact;
and
Point of contact’s address, phone
number, and email address.
If an email or phone number is
included, it will allow the DOE to
contact the commenter if questions or
clarifications arise. No responses will be
provided to commenters in regards to
the disposition of their comments. All
comments will be officially recorded
without change or edit, including any
personal information provided. Personal
information (other than name) will be
protected from public disclosure upon
request.
Please identify your comments as
responding to a specific question posed
in the Invitation for Public Comment, if
possible. Respondents may answer as
many or as few questions as they wish.
Any additional comments that do not
address a particular question should be
17:34 Mar 21, 2016
Issued in Washington, DC, on March 9,
2016.
Andrew Richards,
Chief of Staff, Office of Nuclear Energy,
Department of Energy.
[FR Doc. 2016–05797 Filed 3–21–16; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Submitting Comments
VerDate Sep<11>2014
included at the end of your response to
this IPC as ‘‘Additional Comments.’’
DOE would appreciate early input in
order to identify initial interest and
concerns, as well as any early
opportunities. Amended or revised
inputs from commenters are also
welcome throughout the comment
period to help DOE develop this
process. Comments received after the
closing date will be considered as the
planning process progresses; however,
the DOE is only able to ensure
consideration of comments received on
or before the closing date as the initial
phase of the consent based siting
process is developed. Subsequent
comments and input will also be
welcome as DOE views this as a core
component of a phased and adaptive
consent-based siting process.
Privacy Act: Data collected via the
mechanisms listed above will not be
protected from the public view in any
way.
Jkt 238001
Federal Energy Regulatory
Commission
[Project No. 1494–433]
Grand River Dam Authority; Notice of
Request To Reduce Comment Period
From 60 to 30 Days on Draft
Amendment Application and Soliciting
Comments, Motions To Intervene, and
Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Request to
reduce the comment period from 60 to
30 days for a draft amendment
application to permanently modify the
reservoir elevation rule curve under
Article 401 of the project license.
b. Project No: 1494–433.
c. Date Filed: March 15, 2016.
d. Applicant: Grand River Dam
Authority (GRDA).
e. Name of Project: Pensacola
Hydroelectric Project.
f. Location: The project is located on
the Grand River in Craig, Delaware,
Mayes, and Ottawa Counties, Oklahoma.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
PO 00000
Frm 00077
Fmt 4703
Sfmt 4703
h. Applicant Contact: Tamara Jahnke,
Grand River Dam Authority, 226 West
Dwain Willis Ave, P.O. Box 409, Vinita,
OK 74301; telephone (918) 256–5545.
i. FERC Contact: B. Peter Yarrington,
telephone (202) 502–6129 and email
peter.yarrington@ferc.gov; or Linda
Stewart, telephone (202) 502–6680 and
email linda.stewart@ferc.
j. Deadline for filing comments,
motions to intervene, and protests is 15
days from the issuance date of this
notice by the Commission. The
Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include the project number (P–1494–
433).
k. Description of Request: On March
15, 2016, GRDA filed with the
Commission: (1) A draft amendment
application to permanently modify the
reservoir elevation rule curve under
Article 401 of the Pensacola Project for
Grand Lake O’ the Cherokees, (2) a
request for a temporary variance
contained in the draft amendment
application, and (3) a waiver request to
reduce from 60 to 30 days the comment
period for resource agencies, Indian
tribes, and other stakeholders to provide
comments on the draft amendment
application mentioned above. The
Commission’s regulations at 4.38(a)(7)
require GRDA to provide resource
agencies, Indian tribes, and other
stakeholders 60 days to provide
comments on the above draft
amendment application. GRDA requests
Commission approval of a 30-day
comment period instead to expedite the
Commission’s review of any final
application filed with the Commission.
This notice solicits comments,
motions to intervene, and protests on
GRDA’s request to reduce the comment
period from 60 to 30 days as discussed
above. Comments on the draft
application and temporary variance
request contained in the draft
application should be filed directly with
E:\FR\FM\22MRN1.SGM
22MRN1
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 81, No. 55 / Tuesday, March 22, 2016 / Notices
GRDA in accordance with instructions
in the draft application.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS,’’ ‘‘PROTEST,’’ or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the proposed
amendment. Agencies may obtain
copies of the application directly from
VerDate Sep<11>2014
17:34 Mar 21, 2016
Jkt 238001
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: March 16, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–06370 Filed 3–21–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC16–70–000.
Applicants: Portsmouth Genco, LLC,
Virginia Renewable Power—
Portsmouth, LLC.
Description: Supplement to February
12, 2016 Application for Authorization
for Disposition of Jurisdictional
Facilities of Portsmouth Genco, LLC, et
al.
Filed Date: 3/16/16.
Accession Number: 20160316–5133.
Comments Due: 5 p.m. ET 3/28/16.
Docket Numbers: EC16–84–000.
Applicants: Kingbird Solar A, LLC,
Kingbird Solar B, LLC.
Description: Supplement to March 1,
2016 Application for Authorization
Under Section 203 of the Federal Power
Act of Kingbird Solar A, LLC, et al.
Filed Date: 3/16/16.
Accession Number: 20160316–5135.
Comments Due: 5 p.m. ET 3/28/16.
Docket Numbers: EC16–87–000.
Applicants: Judith Gap Energy LLC,
Spring Canyon Energy LLC, Wolverine
Creek Energy LLC, Wolverine Creek
Goshen Interconnection LLC.
Description: Application for
Authorization under Section 203 of the
Federal Power Act and Request for
Waivers and Expedited Action of Judith
Gap Energy LLC, et al.
Filed Date: 3/16/16.
PO 00000
Frm 00078
Fmt 4703
Sfmt 4703
15297
Accession Number: 20160316–5063.
Comments Due: 5 p.m. ET 4/6/16.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG16–74–000.
Applicants: Ninnescah Wind Energy,
LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Ninnescah Wind
Energy, LLC.
Filed Date: 3/15/16.
Accession Number: 20160315–5140.
Comments Due: 5 p.m. ET 4/5/16.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER14–474–006.
Applicants: Sempra Generation, LLC.
Description: Notice of Non-Material
Change in Status of Sempra Generation,
LLC.
Filed Date: 3/15/16.
Accession Number: 20160315–5159.
Comments Due: 5 p.m. ET 4/5/16.
Docket Numbers: ER15–1905–003.
Applicants: Amazon Energy, LLC.
Description: Compliance filing:
Amazon Energy, LLC Tariff Amendment
to be effective 3/16/2016.
Filed Date: 3/15/16.
Accession Number: 20160315–5000.
Comments Due: 5 p.m. ET 4/5/16.
Docket Numbers: ER16–207–002.
Applicants: Dynegy Oakland, LLC.
Description: Tariff Amendment:
Settlement Agreement and Request for
Expedited Treatment to be effective 1/1/
2016.
Filed Date: 3/14/16.
Accession Number: 20160314–5227.
Comments Due: 5 p.m. ET 4/4/16.
Docket Numbers: ER16–895–001.
Applicants: RDAF Energy Solutions,
LLC.
Description: Tariff Amendment:
Amendment of RDAF Baseline Filing
For MBR Authority and Granting
Waivers to be effective 3/15/2016.
Filed Date: 3/15/16.
Accession Number: 20160315–5073.
Comments Due: 5 p.m. ET 4/5/16.
Docket Numbers: ER16–904–001.
Applicants: Smith Creek Hydro, LLC.
Description: Amendment to February
5, 2016 and March 4, 2016 Smith Creek
Hydro, LLC tariff filings.
Filed Date: 3/16/16.
Accession Number: 20160316–5076.
Comments Due: 5 p.m. ET 3/23/16.
Docket Numbers: ER16–1129–001.
Applicants: VPI Enterprises, Inc.
Description: Tariff Amendment:
Supplement to Application for Order
Accepting Initial Market-Based Rate
Tariff to be effective 3/11/2016.
E:\FR\FM\22MRN1.SGM
22MRN1
Agencies
[Federal Register Volume 81, Number 55 (Tuesday, March 22, 2016)]
[Notices]
[Pages 15296-15297]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-06370]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1494-433]
Grand River Dam Authority; Notice of Request To Reduce Comment
Period From 60 to 30 Days on Draft Amendment Application and Soliciting
Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Request to reduce the comment period from 60
to 30 days for a draft amendment application to permanently modify the
reservoir elevation rule curve under Article 401 of the project
license.
b. Project No: 1494-433.
c. Date Filed: March 15, 2016.
d. Applicant: Grand River Dam Authority (GRDA).
e. Name of Project: Pensacola Hydroelectric Project.
f. Location: The project is located on the Grand River in Craig,
Delaware, Mayes, and Ottawa Counties, Oklahoma.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Tamara Jahnke, Grand River Dam Authority, 226
West Dwain Willis Ave, P.O. Box 409, Vinita, OK 74301; telephone (918)
256-5545.
i. FERC Contact: B. Peter Yarrington, telephone (202) 502-6129 and
email peter.yarrington@ferc.gov; or Linda Stewart, telephone (202) 502-
6680 and email linda.stewart@ferc.
j. Deadline for filing comments, motions to intervene, and protests
is 15 days from the issuance date of this notice by the Commission. The
Commission strongly encourages electronic filing. Please file comments
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include the
project number (P-1494-433).
k. Description of Request: On March 15, 2016, GRDA filed with the
Commission: (1) A draft amendment application to permanently modify the
reservoir elevation rule curve under Article 401 of the Pensacola
Project for Grand Lake O' the Cherokees, (2) a request for a temporary
variance contained in the draft amendment application, and (3) a waiver
request to reduce from 60 to 30 days the comment period for resource
agencies, Indian tribes, and other stakeholders to provide comments on
the draft amendment application mentioned above. The Commission's
regulations at 4.38(a)(7) require GRDA to provide resource agencies,
Indian tribes, and other stakeholders 60 days to provide comments on
the above draft amendment application. GRDA requests Commission
approval of a 30-day comment period instead to expedite the
Commission's review of any final application filed with the Commission.
This notice solicits comments, motions to intervene, and protests
on GRDA's request to reduce the comment period from 60 to 30 days as
discussed above. Comments on the draft application and temporary
variance request contained in the draft application should be filed
directly with
[[Page 15297]]
GRDA in accordance with instructions in the draft application.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits
in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS,'' ``PROTEST,'' or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to project works which are the subject of the proposed amendment.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application. If an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
Dated: March 16, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-06370 Filed 3-21-16; 8:45 am]