13358
Federal Register / Vol. 81, No. 49 / Monday, March 14, 2016 / Notices
Solia 8 Hydroelectric, LLC ...................................................................................................................................
FFP Missouri 13, LLC ...........................................................................................................................................
Solia 5 Hydroelectric, LLC ...................................................................................................................................
Solia 4 Hydroelectric, LLC ...................................................................................................................................
FFP Missouri 12, LLC ...........................................................................................................................................
FFP Missouri 5, LLC .............................................................................................................................................
FFP Missouri 6, LLC .............................................................................................................................................
Solia 6 Hydroelectric, LLC ...................................................................................................................................
On February 3, 2014, February 27,
2014, and March 14, 2014, FFP New
Hydro, LLC and its subsidiary
companies filed a total of ten
applications for the construction and
Applicant
operation of hydropower projects to be
located at the U.S. Army Corps of
Engineers’ (Corps’) existing dams on the
Allegheny River (one project),
Monongahela River (six projects), and
Project No.
FFP Missouri 16, LLC .....................
FFP Missouri 15, LLC .....................
Solia 8 Hydroelectric, LLC ..............
FFP Missouri 13, LLC .....................
Solia 5 Hydroelectric, LLC ..............
Solia 4 Hydroelectric, LLC ..............
FFP Missouri 12, LLC .....................
FFP Missouri 5, LLC .......................
FFP Missouri 6, LLC .......................
Solia 6 Hydroelectric, LLC ..............
P–13753
P–13762
P–13771
P–13763
P–13766
P–13767
P–13755
P–13757
P–13761
P–13768
.......
.......
.......
.......
.......
.......
.......
.......
.......
.......
Project
Project
Project
Project
Project
Project
Project
Project
13771–002
13763–002
13766–002
13767–002
13755–002
13757–002
13761–002
13768–002
Ohio River (three projects), respectively.
The names and locations of the
applicants’ projects are as follows:
Capacity
(MW) *
Projects
No.
No.
No.
No.
No.
No.
No.
No.
Opekiska Lock and Dam ................
Morgantown Lock and Dam ...........
Point Marion Lock and Dam ..........
Grays Landing Lock and Dam .......
Maxwell Locks and Dam ................
Monongahela Locks and Dam 4 ....
Allegheny Lock and Dam 2 ............
Emsworth Locks and Dam .............
Emsworth Back Channel Dam .......
Montgomery Locks and Dam .........
County, State &
river basin
6.0
5.0
5.0
12.0
13.0
12.0
17.0
24.0
12.0
42.0
Monongalia, WV; Monongahela.
Monongalia, WV; Monongahela.
Fayette, PA; Monongahela.
Greene, PA; Monongahela.
Washington, PA; Monongahela.
Washington, PA; Monongahela.
Allegheny, PA; Allegheny.
Allegheny, PA; Ohio.
Allegheny, PA; Ohio.
Beaver, PA; Ohio.
* The combined generator capacity in megawatts.
On December 17, 2015, the
Commission issued a Notice of
Application Ready for Environmental
Analysis, and Soliciting Comments,
Recommendations, Preliminary Terms
and Conditions, and Preliminary
Fishway Prescriptions (REA Notice) and
a Scoping Document 2 for each river
basin, including the Ohio River projects
(P–13757, P–13761, P–13768), the
Allegheny River Project (P–13755), and
the Monongahela River projects (P–
13753, P–13762, P–13771, P–13763, P–
13766, and P–13767). Each Scoping
Document 2 included a procedural
schedule that included preparation of
one multi-project Draft and Final
Environmental Assessment (EA) for all
ten projects.
Based on a review of the comments
received in response to the REA notice,
Commission staff have determined that
the analysis of the proposed licensing
action could be expedited for some of
the projects with the preparation of
three separate EAs; one for the three
Ohio River projects, one for the
Allegheny River Project, and one for the
six Monongahela River projects.
Potential cumulative effects for all
projects will still be evaluated as
described in Scoping Document 2. In
addition, whether Final EAs are issued
or not will depend on the extent and
scope of the comments received on the
EAs. Absent the issuance of final EAs,
comments on the EAs will be addressed
in any license order issued by the
Commission.
The applications will be processed
according to the following revised
procedural schedule. Revisions to the
schedule may be made as appropriate.
Milestone
Target date
Issue Ohio River projects EA ................................................................................................
Comments on Ohio River projects EA due ...........................................................................
Issue Allegheny River project EA .........................................................................................
Comments on Allegheny River project EA due ....................................................................
Issue Monongahela River projects EA ..................................................................................
Comments on Monongahela River projects EA due ............................................................
jstallworth on DSK7TPTVN1PROD with NOTICES
Any questions regarding this notice
may be directed to Nicholas Ettema at
(202) 502–6565, or by email at
nicholas.ettema@ferc.gov.
DEPARTMENT OF ENERGY
Dated: March 8, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
May/June 2016.
June/July 2016.
May/June 2016.
June/July 2016.
September 2016.
October 2016.
Combined Notice of Filings #1
[FR Doc. 2016–05653 Filed 3–11–16; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
14:27 Mar 11, 2016
Jkt 238001
Federal Energy Regulatory
Commission
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC16–60–000.
Applicants: Aspirity Energy MidStates, LLC, Aspirity Energy Northeast,
LLC.
PO 00000
Frm 00049
Fmt 4703
Sfmt 4703
Description: Supplement to January
13, 2016 Application of Aspirity Energy
Northeast, LLC, et. al. for Authorization
under Section 203 of the FPA and
Request for Shortened Comment Period.
Filed Date: 3/4/16.
Accession Number: 20160304–5134.
Comments Due: 5 p.m. ET 3/14/16.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG16–68–000.
E:\FR\FM\14MRN1.SGM
14MRN1
jstallworth on DSK7TPTVN1PROD with NOTICES
Federal Register / Vol. 81, No. 49 / Monday, March 14, 2016 / Notices
Applicants: Alta Windpower
Development, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Alta Windpower
Development, LLC.
Filed Date: 3/8/16.
Accession Number: 20160308–5153.
Comments Due: 5 p.m. ET 3/29/16.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1942–013;
ER10–2042–020; ER14–2931–003;
ER10–1938–015; ER10–1934–014;
ER10–1893–014; ER10–2985–018;
ER10–3049–019; ER10–3051–019;
ER10–1862–014; ER10–3260–005;
ER13–1401–003.
Applicants: Calpine Energy Services,
L.P., Calpine Construction Finance
Company, L.P., Calpine Fore River
Energy Center, LLC, Calpine Power
America—CA, LLC, CES Marketing IX,
LLC, CES Marketing X, LLC, Champion
Energy Marketing LLC, Champion
Energy Services, LLC, Granite Ridge
Energy, LLC, Westbrook Energy Center,
LLC, Champion Energy, LLC, Power
Contract Financing, L.L.C.
Description: Notification of Change in
Status of the Calpine New England MBR
Sellers.
Filed Date: 3/7/16.
Accession Number: 20160307–5257.
Comments Due: 5 p.m. ET 3/28/16.
Docket Numbers: ER15–685–002.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Compliance filing: 2016–
03–07 ELMP Compliance Filing to be
effective 3/1/2015.
Filed Date: 3/7/16.
Accession Number: 20160307–5259.
Comments Due: 5 p.m. ET 3/28/16.
Docket Numbers: ER15–878–001.
Applicants: Occidental Power
Services, Inc.
Description: Compliance filing:
Revision to Rate Schedule No. 1 to be
effective 4/1/2015.
Filed Date: 3/8/16.
Accession Number: 20160308–5133.
Comments Due: 5 p.m. ET 3/29/16.
Docket Numbers: ER15–1451–002.
Applicants: California Independent
System Operator Corporation.
Description: Compliance filing: 2016–
03–07 Filing in Compliance with
February 26, 2016 Letter Order to be
effective 2/26/2016.
Filed Date: 3/7/16.
Accession Number: 20160307–5184.
Comments Due: 5 p.m. ET 3/28/16.
Docket Numbers: ER16–1098–000.
Applicants: Midcontinent
Independent System Operator, Inc.
VerDate Sep<11>2014
14:27 Mar 11, 2016
Jkt 238001
Description: § 205(d) Rate Filing:
2016–03–07 Schedule 26–B Shared
Network Upgrades to be effective 5/6/
2016.
Filed Date: 3/7/16.
Accession Number: 20160307–5203.
Comments Due: 5 p.m. ET 3/28/16.
Docket Numbers: ER16–1099–000.
Applicants: The United Illuminating
Company.
Description: Notice of Cancellation of
The United Illuminating Company of
Service Agreement No. 13, Second
Revised Tariff No. 4.
Filed Date: 3/7/16.
Accession Number: 20160307–5209.
Comments Due: 5 p.m. ET 3/28/16.
Docket Numbers: ER16–1101–000.
Applicants: NorthWestern
Corporation.
Description: § 205(d) Rate Filing: SA
245 6th Rev—NITSA with Ash Grove
Cement to be effective 7/1/2016.
Filed Date: 3/8/16.
Accession Number: 20160308–5085.
Comments Due: 5 p.m. ET 3/29/16.
Docket Numbers: ER16–1102–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellations of Withdrawn
Service Agreements to be effective 3/11/
2011.
Filed Date: 3/8/16.
Accession Number: 20160308–5106.
Comments Due: 5 p.m. ET 3/29/16.
Docket Numbers: ER16–1104–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original Interim ISA No. 4414, Queue
No. AA2–105 to be effective 2/10/2016.
Filed Date: 3/8/16.
Accession Number: 20160308–5152.
Comments Due: 5 p.m. ET 3/29/16.
Docket Numbers: ER16–1105–000.
Applicants: Hafslund Energy Trading
LLC.
Description: Tariff Cancellation:
Hafslund Filing to Cancel Market-Based
rates to be effective 3/9/2016.
Filed Date: 3/8/16.
Accession Number: 20160308–5159.
Comments Due: 5 p.m. ET 3/29/16.
Docket Numbers: ER16–1107–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
ALLETE, Inc., Great River Energy.
Description: § 205(d) Rate Filing:
2016–03–08_ALLETE–GRE Zonal
Agreement Filing to be effective 8/1/
2013.
Filed Date: 3/8/16.
Accession Number: 20160308–5189.
Comments Due: 5 p.m. ET 3/29/16.
Docket Numbers: ER16–1108–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
ALLETE, Inc., Great River Energy.
PO 00000
Frm 00050
Fmt 4703
Sfmt 4703
13359
Description: § 205(d) Rate Filing:
2016–03–08_SA 2905 ALLETE–GRE
Zonal Agreement—WDS Filing to be
effective 8/1/2013.
Filed Date: 3/8/16.
Accession Number: 20160308–5200.
Comments Due: 5 p.m. ET 3/29/16.
Take notice that the Commission
received the following electric
reliability filings:
Docket Numbers: RR16–3–000.
Applicants: North American Electric
Reliability Corporation.
Description: Petition of North
American Electric Reliability
Corporation for approval of
amendments to the Midwest Reliability
Organization (MRO) Regional Reliability
Standards Process Manual.
Filed Date: 3/7/16.
Accession Number: 20160307–5212.
Comments Due: 5 p.m. ET 3/28/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 8, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–05656 Filed 3–11–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP16–716–000.
Applicants: East Tennessee Natural
Gas, LLC.
Description: § 4(d) Rate Filing:
Oglethorpe Release to Sequent to be
effective 3/5/2016.
E:\FR\FM\14MRN1.SGM
14MRN1
Agencies
[Federal Register Volume 81, Number 49 (Monday, March 14, 2016)]
[Notices]
[Pages 13358-13359]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-05656]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC16-60-000.
Applicants: Aspirity Energy Mid-States, LLC, Aspirity Energy
Northeast, LLC.
Description: Supplement to January 13, 2016 Application of Aspirity
Energy Northeast, LLC, et. al. for Authorization under Section 203 of
the FPA and Request for Shortened Comment Period.
Filed Date: 3/4/16.
Accession Number: 20160304-5134.
Comments Due: 5 p.m. ET 3/14/16.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG16-68-000.
[[Page 13359]]
Applicants: Alta Windpower Development, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator Status of Alta Windpower Development, LLC.
Filed Date: 3/8/16.
Accession Number: 20160308-5153.
Comments Due: 5 p.m. ET 3/29/16.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-1942-013; ER10-2042-020; ER14-2931-003; ER10-
1938-015; ER10-1934-014; ER10-1893-014; ER10-2985-018; ER10-3049-019;
ER10-3051-019; ER10-1862-014; ER10-3260-005; ER13-1401-003.
Applicants: Calpine Energy Services, L.P., Calpine Construction
Finance Company, L.P., Calpine Fore River Energy Center, LLC, Calpine
Power America--CA, LLC, CES Marketing IX, LLC, CES Marketing X, LLC,
Champion Energy Marketing LLC, Champion Energy Services, LLC, Granite
Ridge Energy, LLC, Westbrook Energy Center, LLC, Champion Energy, LLC,
Power Contract Financing, L.L.C.
Description: Notification of Change in Status of the Calpine New
England MBR Sellers.
Filed Date: 3/7/16.
Accession Number: 20160307-5257.
Comments Due: 5 p.m. ET 3/28/16.
Docket Numbers: ER15-685-002.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Compliance filing: 2016-03-07 ELMP Compliance Filing
to be effective 3/1/2015.
Filed Date: 3/7/16.
Accession Number: 20160307-5259.
Comments Due: 5 p.m. ET 3/28/16.
Docket Numbers: ER15-878-001.
Applicants: Occidental Power Services, Inc.
Description: Compliance filing: Revision to Rate Schedule No. 1 to
be effective 4/1/2015.
Filed Date: 3/8/16.
Accession Number: 20160308-5133.
Comments Due: 5 p.m. ET 3/29/16.
Docket Numbers: ER15-1451-002.
Applicants: California Independent System Operator Corporation.
Description: Compliance filing: 2016-03-07 Filing in Compliance
with February 26, 2016 Letter Order to be effective 2/26/2016.
Filed Date: 3/7/16.
Accession Number: 20160307-5184.
Comments Due: 5 p.m. ET 3/28/16.
Docket Numbers: ER16-1098-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2016-03-07 Schedule 26-B
Shared Network Upgrades to be effective 5/6/2016.
Filed Date: 3/7/16.
Accession Number: 20160307-5203.
Comments Due: 5 p.m. ET 3/28/16.
Docket Numbers: ER16-1099-000.
Applicants: The United Illuminating Company.
Description: Notice of Cancellation of The United Illuminating
Company of Service Agreement No. 13, Second Revised Tariff No. 4.
Filed Date: 3/7/16.
Accession Number: 20160307-5209.
Comments Due: 5 p.m. ET 3/28/16.
Docket Numbers: ER16-1101-000.
Applicants: NorthWestern Corporation.
Description: Sec. 205(d) Rate Filing: SA 245 6th Rev--NITSA with
Ash Grove Cement to be effective 7/1/2016.
Filed Date: 3/8/16.
Accession Number: 20160308-5085.
Comments Due: 5 p.m. ET 3/29/16.
Docket Numbers: ER16-1102-000.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Cancellation: Notice of Cancellations of
Withdrawn Service Agreements to be effective 3/11/2011.
Filed Date: 3/8/16.
Accession Number: 20160308-5106.
Comments Due: 5 p.m. ET 3/29/16.
Docket Numbers: ER16-1104-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original Interim ISA No.
4414, Queue No. AA2-105 to be effective 2/10/2016.
Filed Date: 3/8/16.
Accession Number: 20160308-5152.
Comments Due: 5 p.m. ET 3/29/16.
Docket Numbers: ER16-1105-000.
Applicants: Hafslund Energy Trading LLC.
Description: Tariff Cancellation: Hafslund Filing to Cancel Market-
Based rates to be effective 3/9/2016.
Filed Date: 3/8/16.
Accession Number: 20160308-5159.
Comments Due: 5 p.m. ET 3/29/16.
Docket Numbers: ER16-1107-000.
Applicants: Midcontinent Independent System Operator, Inc., ALLETE,
Inc., Great River Energy.
Description: Sec. 205(d) Rate Filing: 2016-03-08_ALLETE-GRE Zonal
Agreement Filing to be effective 8/1/2013.
Filed Date: 3/8/16.
Accession Number: 20160308-5189.
Comments Due: 5 p.m. ET 3/29/16.
Docket Numbers: ER16-1108-000.
Applicants: Midcontinent Independent System Operator, Inc., ALLETE,
Inc., Great River Energy.
Description: Sec. 205(d) Rate Filing: 2016-03-08_SA 2905 ALLETE-
GRE Zonal Agreement--WDS Filing to be effective 8/1/2013.
Filed Date: 3/8/16.
Accession Number: 20160308-5200.
Comments Due: 5 p.m. ET 3/29/16.
Take notice that the Commission received the following electric
reliability filings:
Docket Numbers: RR16-3-000.
Applicants: North American Electric Reliability Corporation.
Description: Petition of North American Electric Reliability
Corporation for approval of amendments to the Midwest Reliability
Organization (MRO) Regional Reliability Standards Process Manual.
Filed Date: 3/7/16.
Accession Number: 20160307-5212.
Comments Due: 5 p.m. ET 3/28/16.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: March 8, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-05656 Filed 3-11-16; 8:45 am]