Notice of Intent to Prepare Environmental Assessments and Revised Procedural Schedule, 13357-13358 [2016-05653]
Download as PDF
Federal Register / Vol. 81, No. 49 / Monday, March 14, 2016 / Notices
change from the figures currently
approved by the OMB.9
Dated: March 8, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–05654 Filed 3–11–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP16–80–000]
jstallworth on DSK7TPTVN1PROD with NOTICES
ANR Pipeline Company; Notice of
Application
Take notice that on February 29, 2016,
ANR Pipeline Company (ANR), filed an
application pursuant to section 7(b) of
the Natural Gas Act (NGA), and Part 157
of the Commission’s Regulations,
requesting the Commission’s approval
to abandon in place five compressor
units installed in ANR’s Southeast
Mainline segment, located in Louisiana,
Mississippi, Tennessee, and Indiana.
Also, ANR proposes to abandon
associated short haul capacity and
appurtenances. The filing may also be
viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@gerc.gov or call
toll-free, (866) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application should be directed to Linda
Farquhar, Manager, Project
Determinations and Regulatory
Administration, ANR Pipeline
Company, 700 Louisiana Street, Suite
700, Houston, Texas 77002–2700, phone
(832) 320–5685, email: linda_farquhar@
transcanada.com.
ANR states that after the evaluation of
the compressor units needed for
transporting gas under the various flow
and contractual scenarios, ANR
determined to abandon in place one
compressor unit at each of Delhi,
Brownsville, and Shelbyville
compressor stations, and two units at
Sardis compressor station. The total
horsepower (hp) of the abandoned
compressor units is 31,800 hp. ANR also
request to abandon 36 MMcf/day of
short-haul capacity on the segment
northbound from Eunice to the
Celestine compressor station, and
appurtenances. ANR states that this
abandonment of the short-haul capacity
will not affect the available,
unsubscribed capacity remaining along
this segment.
Pursuant to Section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule will serve to notify
federal and state agencies of the timing
for the completion of all necessary
reviews, and the subsequent need to
complete all federal authorizations
within 90 days of the date of
issuance of the Commission staff’s FEIS
or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
5 copies of filings made with the
Commission and must mail a copy
to the applicant and to every other
party in the proceeding. Only parties to
the proceeding can ask for court review
of Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
Motions to intervene, protests and
comments may be filed electronically
via the internet in lieu of paper; see, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings.
Comment Date: 5:00 p.m. Eastern
Time on March 29, 2016.
Dated: March 8, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–05658 Filed 3–11–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Intent to Prepare
Environmental Assessments and
Revised Procedural Schedule
FFP Missouri 16, LLC ...........................................................................................................................................
FFP Missouri 15, LLC ...........................................................................................................................................
9 The current burden inventory for FERC–725L, as
modified by the Final Rule (Order No. 804) in
VerDate Sep<11>2014
14:27 Mar 11, 2016
Jkt 238001
Project No. 13753–002
Project No. 13762–002
Docket No. RM14–12 (80 FR 9596, 2/24/2015), was
approved by the OMB on 4/24/2015.
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
13357
E:\FR\FM\14MRN1.SGM
14MRN1
13358
Federal Register / Vol. 81, No. 49 / Monday, March 14, 2016 / Notices
Solia 8 Hydroelectric, LLC ...................................................................................................................................
FFP Missouri 13, LLC ...........................................................................................................................................
Solia 5 Hydroelectric, LLC ...................................................................................................................................
Solia 4 Hydroelectric, LLC ...................................................................................................................................
FFP Missouri 12, LLC ...........................................................................................................................................
FFP Missouri 5, LLC .............................................................................................................................................
FFP Missouri 6, LLC .............................................................................................................................................
Solia 6 Hydroelectric, LLC ...................................................................................................................................
On February 3, 2014, February 27,
2014, and March 14, 2014, FFP New
Hydro, LLC and its subsidiary
companies filed a total of ten
applications for the construction and
Applicant
operation of hydropower projects to be
located at the U.S. Army Corps of
Engineers’ (Corps’) existing dams on the
Allegheny River (one project),
Monongahela River (six projects), and
Project No.
FFP Missouri 16, LLC .....................
FFP Missouri 15, LLC .....................
Solia 8 Hydroelectric, LLC ..............
FFP Missouri 13, LLC .....................
Solia 5 Hydroelectric, LLC ..............
Solia 4 Hydroelectric, LLC ..............
FFP Missouri 12, LLC .....................
FFP Missouri 5, LLC .......................
FFP Missouri 6, LLC .......................
Solia 6 Hydroelectric, LLC ..............
P–13753
P–13762
P–13771
P–13763
P–13766
P–13767
P–13755
P–13757
P–13761
P–13768
.......
.......
.......
.......
.......
.......
.......
.......
.......
.......
Project
Project
Project
Project
Project
Project
Project
Project
13771–002
13763–002
13766–002
13767–002
13755–002
13757–002
13761–002
13768–002
Ohio River (three projects), respectively.
The names and locations of the
applicants’ projects are as follows:
Capacity
(MW) *
Projects
No.
No.
No.
No.
No.
No.
No.
No.
Opekiska Lock and Dam ................
Morgantown Lock and Dam ...........
Point Marion Lock and Dam ..........
Grays Landing Lock and Dam .......
Maxwell Locks and Dam ................
Monongahela Locks and Dam 4 ....
Allegheny Lock and Dam 2 ............
Emsworth Locks and Dam .............
Emsworth Back Channel Dam .......
Montgomery Locks and Dam .........
County, State &
river basin
6.0
5.0
5.0
12.0
13.0
12.0
17.0
24.0
12.0
42.0
Monongalia, WV; Monongahela.
Monongalia, WV; Monongahela.
Fayette, PA; Monongahela.
Greene, PA; Monongahela.
Washington, PA; Monongahela.
Washington, PA; Monongahela.
Allegheny, PA; Allegheny.
Allegheny, PA; Ohio.
Allegheny, PA; Ohio.
Beaver, PA; Ohio.
* The combined generator capacity in megawatts.
On December 17, 2015, the
Commission issued a Notice of
Application Ready for Environmental
Analysis, and Soliciting Comments,
Recommendations, Preliminary Terms
and Conditions, and Preliminary
Fishway Prescriptions (REA Notice) and
a Scoping Document 2 for each river
basin, including the Ohio River projects
(P–13757, P–13761, P–13768), the
Allegheny River Project (P–13755), and
the Monongahela River projects (P–
13753, P–13762, P–13771, P–13763, P–
13766, and P–13767). Each Scoping
Document 2 included a procedural
schedule that included preparation of
one multi-project Draft and Final
Environmental Assessment (EA) for all
ten projects.
Based on a review of the comments
received in response to the REA notice,
Commission staff have determined that
the analysis of the proposed licensing
action could be expedited for some of
the projects with the preparation of
three separate EAs; one for the three
Ohio River projects, one for the
Allegheny River Project, and one for the
six Monongahela River projects.
Potential cumulative effects for all
projects will still be evaluated as
described in Scoping Document 2. In
addition, whether Final EAs are issued
or not will depend on the extent and
scope of the comments received on the
EAs. Absent the issuance of final EAs,
comments on the EAs will be addressed
in any license order issued by the
Commission.
The applications will be processed
according to the following revised
procedural schedule. Revisions to the
schedule may be made as appropriate.
Milestone
Target date
Issue Ohio River projects EA ................................................................................................
Comments on Ohio River projects EA due ...........................................................................
Issue Allegheny River project EA .........................................................................................
Comments on Allegheny River project EA due ....................................................................
Issue Monongahela River projects EA ..................................................................................
Comments on Monongahela River projects EA due ............................................................
jstallworth on DSK7TPTVN1PROD with NOTICES
Any questions regarding this notice
may be directed to Nicholas Ettema at
(202) 502–6565, or by email at
nicholas.ettema@ferc.gov.
DEPARTMENT OF ENERGY
Dated: March 8, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
May/June 2016.
June/July 2016.
May/June 2016.
June/July 2016.
September 2016.
October 2016.
Combined Notice of Filings #1
[FR Doc. 2016–05653 Filed 3–11–16; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
14:27 Mar 11, 2016
Jkt 238001
Federal Energy Regulatory
Commission
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC16–60–000.
Applicants: Aspirity Energy MidStates, LLC, Aspirity Energy Northeast,
LLC.
PO 00000
Frm 00049
Fmt 4703
Sfmt 4703
Description: Supplement to January
13, 2016 Application of Aspirity Energy
Northeast, LLC, et. al. for Authorization
under Section 203 of the FPA and
Request for Shortened Comment Period.
Filed Date: 3/4/16.
Accession Number: 20160304–5134.
Comments Due: 5 p.m. ET 3/14/16.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG16–68–000.
E:\FR\FM\14MRN1.SGM
14MRN1
Agencies
[Federal Register Volume 81, Number 49 (Monday, March 14, 2016)]
[Notices]
[Pages 13357-13358]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-05653]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Intent to Prepare Environmental Assessments and Revised
Procedural Schedule
FFP Missouri 16, LLC......... Project No. 13753-002
FFP Missouri 15, LLC......... Project No. 13762-002
[[Page 13358]]
Solia 8 Hydroelectric, LLC... Project No. 13771-002
FFP Missouri 13, LLC......... Project No. 13763-002
Solia 5 Hydroelectric, LLC... Project No. 13766-002
Solia 4 Hydroelectric, LLC... Project No. 13767-002
FFP Missouri 12, LLC......... Project No. 13755-002
FFP Missouri 5, LLC.......... Project No. 13757-002
FFP Missouri 6, LLC.......... Project No. 13761-002
Solia 6 Hydroelectric, LLC... Project No. 13768-002
On February 3, 2014, February 27, 2014, and March 14, 2014, FFP New
Hydro, LLC and its subsidiary companies filed a total of ten
applications for the construction and operation of hydropower projects
to be located at the U.S. Army Corps of Engineers' (Corps') existing
dams on the Allegheny River (one project), Monongahela River (six
projects), and Ohio River (three projects), respectively. The names and
locations of the applicants' projects are as follows:
----------------------------------------------------------------------------------------------------------------
Capacity (MW) County, State &
Applicant Project No. Projects * river basin
----------------------------------------------------------------------------------------------------------------
FFP Missouri 16, LLC............ P-13753............. Opekiska Lock and 6.0 Monongalia, WV;
Dam. Monongahela.
FFP Missouri 15, LLC............ P-13762............. Morgantown Lock and 5.0 Monongalia, WV;
Dam. Monongahela.
Solia 8 Hydroelectric, LLC...... P-13771............. Point Marion Lock 5.0 Fayette, PA;
and Dam. Monongahela.
FFP Missouri 13, LLC............ P-13763............. Grays Landing Lock 12.0 Greene, PA;
and Dam. Monongahela.
Solia 5 Hydroelectric, LLC...... P-13766............. Maxwell Locks and 13.0 Washington, PA;
Dam. Monongahela.
Solia 4 Hydroelectric, LLC...... P-13767............. Monongahela Locks 12.0 Washington, PA;
and Dam 4. Monongahela.
FFP Missouri 12, LLC............ P-13755............. Allegheny Lock and 17.0 Allegheny, PA;
Dam 2. Allegheny.
FFP Missouri 5, LLC............. P-13757............. Emsworth Locks and 24.0 Allegheny, PA;
Dam. Ohio.
FFP Missouri 6, LLC............. P-13761............. Emsworth Back 12.0 Allegheny, PA;
Channel Dam. Ohio.
Solia 6 Hydroelectric, LLC...... P-13768............. Montgomery Locks 42.0 Beaver, PA; Ohio.
and Dam.
----------------------------------------------------------------------------------------------------------------
* The combined generator capacity in megawatts.
On December 17, 2015, the Commission issued a Notice of Application
Ready for Environmental Analysis, and Soliciting Comments,
Recommendations, Preliminary Terms and Conditions, and Preliminary
Fishway Prescriptions (REA Notice) and a Scoping Document 2 for each
river basin, including the Ohio River projects (P-13757, P-13761, P-
13768), the Allegheny River Project (P-13755), and the Monongahela
River projects (P-13753, P-13762, P-13771, P-13763, P-13766, and P-
13767). Each Scoping Document 2 included a procedural schedule that
included preparation of one multi-project Draft and Final Environmental
Assessment (EA) for all ten projects.
Based on a review of the comments received in response to the REA
notice, Commission staff have determined that the analysis of the
proposed licensing action could be expedited for some of the projects
with the preparation of three separate EAs; one for the three Ohio
River projects, one for the Allegheny River Project, and one for the
six Monongahela River projects. Potential cumulative effects for all
projects will still be evaluated as described in Scoping Document 2. In
addition, whether Final EAs are issued or not will depend on the extent
and scope of the comments received on the EAs. Absent the issuance of
final EAs, comments on the EAs will be addressed in any license order
issued by the Commission.
The applications will be processed according to the following
revised procedural schedule. Revisions to the schedule may be made as
appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Issue Ohio River projects EA.............. May/June 2016.
Comments on Ohio River projects EA due.... June/July 2016.
Issue Allegheny River project EA.......... May/June 2016.
Comments on Allegheny River project EA due June/July 2016.
Issue Monongahela River projects EA....... September 2016.
Comments on Monongahela River projects EA October 2016.
due.
------------------------------------------------------------------------
Any questions regarding this notice may be directed to Nicholas
Ettema at (202) 502-6565, or by email at nicholas.ettema@ferc.gov.
Dated: March 8, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-05653 Filed 3-11-16; 8:45 am]
BILLING CODE 6717-01-P