Town of Pownal; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 12093 [2016-05096]
Download as PDF
Federal Register / Vol. 81, No. 45 / Tuesday, March 8, 2016 / Notices
unless the Commission orders
otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that the licensee, PacifiCorp Energy, is
authorized to continue operation of the
Wallowa Falls Hydroelectric Project,
until such time as the Commission acts
on its application for a subsequent
license.
Dated: March 2, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–05099 Filed 3–7–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6795–019]
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Town of Pownal; Notice of Application
Accepted for Filing, Soliciting
Comments, Motions To Intervene, and
Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Amendment
of Exemption.
b. Project No: 6795–019.
c. Date Filed: February 3, 2016, as
supplemented February 16, 2016.
d. Applicant: Town of Pownal.
e. Name of Project: Pownal
Hydroelectric Project.
f. Location: The project is located on
the Hoosic River, in Bennington County,
Vermont.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: William F.
Scully, Operating Manager, Hoosic
River Hydro, LLC, P.O. Box 338 North
Bennington, VT 05257 (802) 379–2469.
i. FERC Contact: B. Peter Yarrington,
(202) 502–6129 or peter.yarrington@
ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 15
days from the issuance date of this
notice by the Commission. The
Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, or comments using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
VerDate Sep<11>2014
17:02 Mar 07, 2016
Jkt 238001
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
Please include the project number (P–
6795–019) on any comments, motions to
intervene, or protests filed.
k. Description of Request: The
applicant proposes to replace the
project’s existing, non-operable
horizontal-double-runner turbine with a
double-regulated Kaplan unit. The
existing unit has a rated generating
capacity of 400 kilowatts (kW) and a
maximum hydraulic capacity of 355
cubic feet per second (cfs). The new unit
would have a rated generating capacity
of 500 kW and would operate with
flows ranging from approximately 100
cfs to 332 cfs.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1 (866) 208- 3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
12093
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the amendment
application. Agencies may obtain copies
of the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: March 2, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–05096 Filed 3–7–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission’s staff may
attend the following meetings related to
the transmission planning activities of
the PJM Interconnection, L.L.C. (PJM):
PJM Planning Committee
March 10, 2016, 9:30 a.m.–12:00 p.m.
(EST)
E:\FR\FM\08MRN1.SGM
08MRN1
Agencies
[Federal Register Volume 81, Number 45 (Tuesday, March 8, 2016)]
[Notices]
[Page 12093]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-05096]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 6795-019]
Town of Pownal; Notice of Application Accepted for Filing,
Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Amendment of Exemption.
b. Project No: 6795-019.
c. Date Filed: February 3, 2016, as supplemented February 16, 2016.
d. Applicant: Town of Pownal.
e. Name of Project: Pownal Hydroelectric Project.
f. Location: The project is located on the Hoosic River, in
Bennington County, Vermont.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: William F. Scully, Operating Manager, Hoosic
River Hydro, LLC, P.O. Box 338 North Bennington, VT 05257 (802) 379-
2469.
i. FERC Contact: B. Peter Yarrington, (202) 502-6129 or
peter.yarrington@ferc.gov.
j. Deadline for filing comments, motions to intervene, and protests
is 15 days from the issuance date of this notice by the Commission. The
Commission strongly encourages electronic filing. Please file motions
to intervene, protests, or comments using the Commission's eFiling
system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. Please include the project number
(P-6795-019) on any comments, motions to intervene, or protests filed.
k. Description of Request: The applicant proposes to replace the
project's existing, non-operable horizontal-double-runner turbine with
a double-regulated Kaplan unit. The existing unit has a rated
generating capacity of 400 kilowatts (kW) and a maximum hydraulic
capacity of 355 cubic feet per second (cfs). The new unit would have a
rated generating capacity of 500 kW and would operate with flows
ranging from approximately 100 cfs to 332 cfs.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits
in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1 (866) 208- 3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to project works which are the subject of the amendment application.
Agencies may obtain copies of the application directly from the
applicant. A copy of any protest or motion to intervene must be served
upon each representative of the applicant specified in the particular
application. If an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
Dated: March 2, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-05096 Filed 3-7-16; 8:45 am]