Notice of Commission Staff Attendance, 12093-12094 [2016-05095]
Download as PDF
Federal Register / Vol. 81, No. 45 / Tuesday, March 8, 2016 / Notices
unless the Commission orders
otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that the licensee, PacifiCorp Energy, is
authorized to continue operation of the
Wallowa Falls Hydroelectric Project,
until such time as the Commission acts
on its application for a subsequent
license.
Dated: March 2, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–05099 Filed 3–7–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6795–019]
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Town of Pownal; Notice of Application
Accepted for Filing, Soliciting
Comments, Motions To Intervene, and
Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Amendment
of Exemption.
b. Project No: 6795–019.
c. Date Filed: February 3, 2016, as
supplemented February 16, 2016.
d. Applicant: Town of Pownal.
e. Name of Project: Pownal
Hydroelectric Project.
f. Location: The project is located on
the Hoosic River, in Bennington County,
Vermont.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: William F.
Scully, Operating Manager, Hoosic
River Hydro, LLC, P.O. Box 338 North
Bennington, VT 05257 (802) 379–2469.
i. FERC Contact: B. Peter Yarrington,
(202) 502–6129 or peter.yarrington@
ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests is 15
days from the issuance date of this
notice by the Commission. The
Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, or comments using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
VerDate Sep<11>2014
17:02 Mar 07, 2016
Jkt 238001
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
Please include the project number (P–
6795–019) on any comments, motions to
intervene, or protests filed.
k. Description of Request: The
applicant proposes to replace the
project’s existing, non-operable
horizontal-double-runner turbine with a
double-regulated Kaplan unit. The
existing unit has a rated generating
capacity of 400 kilowatts (kW) and a
maximum hydraulic capacity of 355
cubic feet per second (cfs). The new unit
would have a rated generating capacity
of 500 kW and would operate with
flows ranging from approximately 100
cfs to 332 cfs.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1 (866) 208- 3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
12093
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the amendment
application. Agencies may obtain copies
of the application directly from the
applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: March 2, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–05096 Filed 3–7–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission’s staff may
attend the following meetings related to
the transmission planning activities of
the PJM Interconnection, L.L.C. (PJM):
PJM Planning Committee
March 10, 2016, 9:30 a.m.–12:00 p.m.
(EST)
E:\FR\FM\08MRN1.SGM
08MRN1
12094
Federal Register / Vol. 81, No. 45 / Tuesday, March 8, 2016 / Notices
asabaliauskas on DSK3SPTVN1PROD with NOTICES
PJM Transmission Expansion Advisory
Committee
March 10, 2016, 11:00 a.m.–3:00 p.m.
(EST)
The above-referenced meetings will
be held at: PJM Conference and Training
Center, PJM Interconnection, 2750
Monroe Boulevard, Audubon, PA
19403.
The above-referenced meetings are
open to stakeholders.
Further information may be found at
www.pjm.com.
The discussions at the meetings
described above may address matters at
issue in the following proceedings:
Docket No. ER16–453, Northeast
Transmission Development, LLC
Docket No. ER16–736, PJM
Interconnection, L.L.C.
Docket No. ER14–972, PJM
Interconnection, L.L.C.
Docket No. ER14–1485, PJM
Interconnection, L.L.C.
Docket Nos. ER13–1944, et al., PJM
Interconnection, L.L.C., et al.
Docket No. ER15–1344, PJM
Interconnection, L.L.C.
Docket No. ER15–1387, PJM
Interconnection, L.L.C. and Potomac
Electric Power Company
Docket No. ER15–2562, PJM
Interconnection, L.L.C.
Docket No. ER15–2563, PJM
Interconnection, L.L.C.
Docket No. EL15–18, Consolidated
Edison Company of New York, Inc. v.
PJM Interconnection, L.L.C.
Docket No. EL15–41, Essential Power
Rock Springs, LLC, et. al. v. PJM
Interconnection, L.L.C.
Docket Nos. ER13–1927, et al., PJM
Interconnection, L.L.C., et al.
Docket No. ER15–2114, PJM
Interconnection, L.L.C. and
Transource West Virginia, LLC
Docket No. EL15–79, TransSource, LLC
v. PJM Interconnection, L.L.C.
Docket No. EL15–95, Delaware Public
Service Commission, et. al., v. PJM
Interconnection, L.L.C., et. al.
Docket No. EL15–67, Linden VFT, LLC
v. PJM Interconnection, L.L.C.
Docket No. EL05–121, PJM
Interconnection, L.L.C.
Docket No. ER13–198, PJM
Interconnection, L.L.C.
Docket No. EC15–157, Pennsylvania
Electric Co., et al.
For more information, contact the
following:
Jonathan Fernandez, Office of Energy
Market Regulation, Federal Energy
Regulatory Commission, (202) 502–
6604, Jonathan.Fernandez@ferc.gov.
Alina Halay, Office of Energy Market
Regulation, Federal Energy Regulatory
VerDate Sep<11>2014
17:02 Mar 07, 2016
Jkt 238001
Commission, (202) 502–6474,
Alina.Halay@ferc.gov.
Dated: March 2, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–05095 Filed 3–7–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER16–1051–000]
Graphic Packaging International Inc.;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Graphic
Packaging International Inc.’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is March 22,
2016.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: March 2, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–05094 Filed 3–7–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP16–648–000.
Applicants: ANR Pipeline Company.
Description: § 4(d) Rate Filing:
Vectren Energy Neg Rate Agmts to be
effective 4/1/2016.
Filed Date: 2/29/16.
Accession Number: 20160229–5121.
Comments Due: 5 p.m. ET 3/14/16.
Docket Numbers: RP16–649–000.
Applicants: Equitrans, L.P.
Description: § 4(d) Rate Filing: AVC
Storage Loss Retainage Factor Update2016 to be effective 4/1/2016.
Filed Date: 2/29/16.
Accession Number: 20160229–5175.
Comments Due: 5 p.m. ET 3/14/16.
Docket Numbers: RP16–650–000.
Applicants: ANR Pipeline Company.
Description: § 4(d) Rate Filing: Fuel
Filing 2016 to be effective 4/1/2016.
Filed Date: 2/29/16.
Accession Number: 20160229–5177.
Comments Due: 5 p.m. ET 3/14/16.
Docket Numbers: RP16–651–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Feb2016 Non-conforming and
Negotiated Rate Cleanup to be effective
4/1/2016.
Filed Date: 2/29/16.
Accession Number: 20160229–5194.
Comments Due: 5 p.m. ET 3/14/16.
Docket Numbers: RP16–652–000.
Applicants: Cheniere Creole Trail
Pipeline, L.P.
E:\FR\FM\08MRN1.SGM
08MRN1
Agencies
[Federal Register Volume 81, Number 45 (Tuesday, March 8, 2016)]
[Notices]
[Pages 12093-12094]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-05095]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Commission Staff Attendance
The Federal Energy Regulatory Commission hereby gives notice that
members of the Commission's staff may attend the following meetings
related to the transmission planning activities of the PJM
Interconnection, L.L.C. (PJM):
PJM Planning Committee
March 10, 2016, 9:30 a.m.-12:00 p.m. (EST)
[[Page 12094]]
PJM Transmission Expansion Advisory Committee
March 10, 2016, 11:00 a.m.-3:00 p.m. (EST)
The above-referenced meetings will be held at: PJM Conference and
Training Center, PJM Interconnection, 2750 Monroe Boulevard, Audubon,
PA 19403.
The above-referenced meetings are open to stakeholders.
Further information may be found at www.pjm.com.
The discussions at the meetings described above may address matters
at issue in the following proceedings:
Docket No. ER16-453, Northeast Transmission Development, LLC
Docket No. ER16-736, PJM Interconnection, L.L.C.
Docket No. ER14-972, PJM Interconnection, L.L.C.
Docket No. ER14-1485, PJM Interconnection, L.L.C.
Docket Nos. ER13-1944, et al., PJM Interconnection, L.L.C., et al.
Docket No. ER15-1344, PJM Interconnection, L.L.C.
Docket No. ER15-1387, PJM Interconnection, L.L.C. and Potomac Electric
Power Company
Docket No. ER15-2562, PJM Interconnection, L.L.C.
Docket No. ER15-2563, PJM Interconnection, L.L.C.
Docket No. EL15-18, Consolidated Edison Company of New York, Inc. v.
PJM Interconnection, L.L.C.
Docket No. EL15-41, Essential Power Rock Springs, LLC, et. al. v. PJM
Interconnection, L.L.C.
Docket Nos. ER13-1927, et al., PJM Interconnection, L.L.C., et al.
Docket No. ER15-2114, PJM Interconnection, L.L.C. and Transource West
Virginia, LLC
Docket No. EL15-79, TransSource, LLC v. PJM Interconnection, L.L.C.
Docket No. EL15-95, Delaware Public Service Commission, et. al., v. PJM
Interconnection, L.L.C., et. al.
Docket No. EL15-67, Linden VFT, LLC v. PJM Interconnection, L.L.C.
Docket No. EL05-121, PJM Interconnection, L.L.C.
Docket No. ER13-198, PJM Interconnection, L.L.C.
Docket No. EC15-157, Pennsylvania Electric Co., et al.
For more information, contact the following:
Jonathan Fernandez, Office of Energy Market Regulation, Federal Energy
Regulatory Commission, (202) 502-6604, Jonathan.Fernandez@ferc.gov.
Alina Halay, Office of Energy Market Regulation, Federal Energy
Regulatory Commission, (202) 502-6474, Alina.Halay@ferc.gov.
Dated: March 2, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-05095 Filed 3-7-16; 8:45 am]
BILLING CODE 6717-01-P