Airworthiness Directives; The Boeing Company Airplanes, 12041-12044 [2016-04681]
Download as PDF
Federal Register / Vol. 81, No. 45 / Tuesday, March 8, 2016 / Proposed Rules
effective date of this AD, install new engine
fuel spar motor operated valve (MOV)
actuators having part number (P/N)
MA30A1017, in accordance with the
Accomplishment Instructions of Boeing
Service Bulletin 777–28A0034, Revision 3,
dated September 25, 2015.
(2) For airplanes having AIMS 2,
Blockpoint Version 16 or earlier installed:
Within 24 months after the effective date of
this AD, do the actions in paragraph (g)(2)(i)
or (g)(2)(ii) of this AD.
(i) Install new engine fuel spar MOV
actuators having P/N MA30A1017, in
accordance with the Accomplishment
Instructions of Boeing Service Bulletin 777–
28A0034, Revision 3, dated September 25,
2015.
(ii) Install AIMS 2, Blockpoint Version 17
or later, in accordance with the
Accomplishment Instructions of Boeing
Service Bulletin 777–31–0227, Revision 1,
dated August 12, 2015.
asabaliauskas on DSK3SPTVN1PROD with PROPOSALS
(h) Credit for Previous Actions
This paragraph provides credit for actions
required by paragraph (g)(2)(ii) of this AD, if
those actions were performed before the
effective date of this AD using Boeing Special
Attention Service Bulletin 777–31–0227,
dated November 7, 2014, which is not
incorporated by reference in this AD.
(i) Alternative Methods of Compliance
(AMOCs)
(1) The Manager, Seattle Aircraft
Certification Office (ACO) FAA, has the
authority to approve AMOCs for this AD, if
requested using the procedures found in 14
CFR 39.19. In accordance with 14 CFR 39.19,
send your request to your principal inspector
or local Flight Standards District Office, as
appropriate. If sending information directly
to the manager of the ACO, send it to the
attention of the person identified in
paragraph (j)(1) of this AD. Information may
be emailed to: 9-ANM-Seattle-ACO-AMOCRequests@faa.gov.
(2) Before using any approved AMOC,
notify your appropriate principal inspector,
or lacking a principal inspector, the manager
of the local flight standards district office/
certificate holding district office.
(3) An AMOC that provides an acceptable
level of safety may be used for any repair,
modification, or alteration required by this
AD if it is approved by the Boeing
Commercial Airplanes Organization
Designation Authorization (ODA) that has
been authorized by the Manager, Seattle
ACO, to make those findings. To be
approved, the repair method, modification
deviation, or alteration deviation must meet
the certification basis of the airplane, and the
approval must specifically refer to this AD.
(4) For service information that contains
steps that are labeled as Required for
Compliance (RC), the provisions of
paragraphs (i)(4)(i) and (i)(4)(ii) of this AD
apply.
(i) The steps labeled as RC, including
substeps under an RC step and any figures
identified in an RC step, must be done to
comply with the AD. An AMOC is required
for any deviations to RC steps, including
substeps and identified figures.
VerDate Sep<11>2014
16:21 Mar 07, 2016
Jkt 238001
(ii) Steps not labeled as RC may be
deviated from using accepted methods in
accordance with the operator’s maintenance
or inspection program without obtaining
approval of an AMOC, provided the RC steps,
including substeps and identified figures, can
still be done as specified, and the airplane
can be put back in an airworthy condition
(j) Related Information
(1) For more information about this AD,
contact David Lee, Aerospace Engineer,
Propulsion Branch, ANM–140S, FAA, Seattle
Aircraft Certification Office, 1601 Lind
Avenue SW., Renton, WA 98057–3356;
phone: 425–917–6497; fax: 425–917–6590;
email: david.a.lee@faa.gov.
(2) For service information identified in
this AD, contact Boeing Commercial
Airplanes, Attention: Data & Services
Management, P. O. Box 3707, MC 2H–65,
Seattle, WA 98124–2207; telephone 206–
544–5000, extension 1; fax 206–766–5680;
Internet https://www.myboeingfleet.com. You
may view this referenced service information
at the FAA, Transport Airplane Directorate,
1601 Lind Avenue SW., Renton, WA. For
information on the availability of this
material at the FAA, call 425–227–1221.
Issued in Renton, Washington, on February
25, 2016.
Dionne Palermo,
Acting Manager, Transport Airplane
Directorate, Aircraft Certification Service.
[FR Doc. 2016–04682 Filed 3–7–16; 8:45 am]
BILLING CODE 4910–13–P
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA–2015–0935; Directorate
Identifier 2014–NM–243–AD]
RIN 2120–AA64
Airworthiness Directives; The Boeing
Company Airplanes
Federal Aviation
Administration (FAA), DOT.
ACTION: Supplemental notice of
proposed rulemaking (SNPRM);
reopening of comment period.
AGENCY:
We are revising an earlier
proposed airworthiness directive (AD)
for certain The Boeing Company Model
747–100, 747–100B, 747–100B SUD,
747–200B, 747–200C, 747–200F, 747–
300, 747–400, 747–400D, 747–400F,
747SR, and 747SP series airplanes. The
notice of proposed rulemaking (NPRM)
proposed to require replacing the wire
bundles inside the electrical conduit of
the forward and aft boost pumps of the
numbers 1 and 4 main fuel tanks with
new, improved wire bundles inserted
into conduit liners. The NPRM was
prompted by several reports of chafing
SUMMARY:
PO 00000
Frm 00010
Fmt 4702
Sfmt 4702
12041
of the wire bundles inside the electrical
conduit of the forward and aft boost
pumps of the numbers 1 and 4 main fuel
tanks due to high vibration. These wire
bundles can chafe through the wire
sleeving into the insulation, exposing
the wire conductors. This action revises
the NPRM by adding a revision to the
maintenance or inspection program, as
applicable, to include critical design
configuration control limitations
(CDCCL) for the fuel boost pump wiring.
We are proposing this SNPRM to
prevent chafing of the wire bundles and
subsequent arcing between the wiring
and the electrical conduit creating an
ignition source in the fuel tanks, which
could result in a fire and consequent
fuel tank explosion. Since these actions
impose an additional burden over that
proposed in the NPRM, we are
reopening the comment period to allow
the public the chance to comment on
these proposed changes.
DATES: We must receive comments on
this SNPRM by April 22, 2016.
ADDRESSES: You may send comments,
using the procedures found in 14 CFR
11.43 and 11.45, by any of the following
methods:
• Federal eRulemaking Portal: Go to
https://www.regulations.gov. Follow the
instructions for submitting comments.
• Fax: 202–493–2251.
• Mail: U.S. Department of
Transportation, Docket Operations, M–
30, West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue SE.,
Washington, DC 20590.
• Hand Delivery: U.S. Department of
Transportation, Docket Operations, M–
30, West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
For service information identified in
this SNPRM, contact Boeing
Commercial Airplanes, Attention: Data
& Services Management, P. O. Box 3707,
MC 2H–65, Seattle, WA 98124–2207;
telephone: 206–544–5000, extension 1;
fax: 206–766–5680; Internet: https://
www.myboeingfleet.com. You may view
this referenced service information at
the FAA, Transport Airplane
Directorate, 1601 Lind Avenue SW.,
Renton, WA. For information on the
availability of this material at the FAA,
call 425–227–1221. Boeing Alert Service
Bulletin 747–28A2306, dated October 2,
2014, is also available on the Internet at
https://www.regulations.gov by searching
for and locating Docket No. FAA–2015–
0935.
Examining the AD Docket
You may examine the AD docket on
the Internet at https://
E:\FR\FM\08MRP1.SGM
08MRP1
12042
Federal Register / Vol. 81, No. 45 / Tuesday, March 8, 2016 / Proposed Rules
www.regulations.gov by searching for
and locating Docket No. FAA–2015–
0935; or in person at the Docket
Management Facility between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays. The AD docket
contains this proposed AD, the
regulatory evaluation, any comments
received, and other information. The
street address for the Docket Office
(phone: 800–647–5527) is in the
ADDRESSES section. Comments will be
available in the AD docket shortly after
receipt.
FOR FURTHER INFORMATION CONTACT:
Tung Tran, Aerospace Engineer,
Propulsion Branch, ANM–140S, FAA,
Seattle Aircraft Certification Office,
1601 Lind Avenue SW., Renton, WA
98057–3356; phone: 425–917–6505; fax:
425–917–6590; email: tung.tran@
faa.gov.
SUPPLEMENTARY INFORMATION:
asabaliauskas on DSK3SPTVN1PROD with PROPOSALS
Comments Invited
We invite you to send any written
relevant data, views, or arguments about
this proposed AD. Send your comments
to an address listed under the
ADDRESSES section. Include ‘‘Docket No.
FAA–2015–0935; Directorate Identifier
2014–NM–243–AD’’ at the beginning of
your comments. We specifically invite
comments on the overall regulatory,
economic, environmental, and energy
aspects of this proposed AD. We will
consider all comments received by the
closing date and may amend this
proposed AD because of those
comments.
We will post all comments we
receive, without change, to https://
www.regulations.gov, including any
personal information you provide. We
will also post a report summarizing each
substantive verbal contact we receive
about this proposed AD.
Discussion
We issued an NPRM to amend 14 CFR
part 39 by adding an AD that would
apply to certain The Boeing Company
Model 747–100, 747–100B, 747–100B
SUD, 747–200B, 747–200C, 747–200F,
747–300, 747–400, 747–400D, 747–
400F, 747SR, and 747SP series
airplanes. The NPRM published in the
Federal Register on May 1, 2015 (80 FR
24850) (‘‘the NPRM’’). The NPRM
proposed to require replacing the wire
bundles inside the electrical conduit of
the forward and aft boost pumps of the
numbers 1 and 4 main fuel tanks with
new, improved wire bundles inserted
into conduit liners.
Actions Since the NPRM was Issued
Since we issued the NPRM, we have
determined that it is necessary to revise
VerDate Sep<11>2014
16:21 Mar 07, 2016
Jkt 238001
the NPRM by adding a revision to the
maintenance or inspection program, as
applicable, to include critical design
configuration control limitations
(CDCCL) for the fuel boost pump wiring.
Related AD
AD 2011–15–03, Amendment 39–
16750 (76 FR 41659, July 15, 2011) (‘‘AD
2011–15–03’’), superseded AD 97–26–
07, Amendment 39–10250 (62 FR
65352, December 12, 1997), and requires
repetitive inspections to detect damage
of the sleeving and wire bundles of the
boost pumps of the numbers 1 and 4
main fuel tanks, and of the auxiliary
tank jettison pumps (if installed);
replacement of any damaged sleeving
with new sleeving; and repair or
replacement of any damaged wires with
new wires. For airplanes on which any
burned wires are found, AD 2011–15–03
also requires an inspection to detect
damage of the conduit, and replacement
of any damaged conduit with a
serviceable conduit. AD 2011–15–03
reduced the initial compliance time and
repetitive inspection interval in AD 97–
26–07. AD 2011–15–03 was prompted
by fleet information indicating that the
repetitive inspection interval in AD 97–
26–07 was too long because excessive
chafing of the sleeving continued to
occur much earlier than expected
between scheduled inspections.
Accomplishing the replacement
specified in this proposed AD would
terminate the inspections required by
paragraphs (g), (h), and (n) of AD 2011–
15–03.
Comments
We gave the public the opportunity to
comment on the NPRM. The following
presents the comments received on the
NPRM and the FAA’s response to each
comment.
Support for the NPRM
Boeing concurred with the contents of
the NPRM.
Request To Withdraw the NPRM
UPS recommended that we withdraw
the NPRM so that UPS can continue
doing the inspections required by AD
2011–15–03. UPS stated that it has been
inspecting the forward and aft boost
pump wire bundles and sleeving since
2007 per the requirements in AD 2011–
15–03, and is satisfied with the current
inspection, which detects signs of wear
before major damage occurs. UPS added
that the wire bundle replacement in this
NPRM is a burden to the airlines,
without adding safety to the boost pump
or airplane fuel system.
We do not agree with the commenter’s
request to withdraw the NPRM. We
PO 00000
Frm 00011
Fmt 4702
Sfmt 4702
agree that the inspection required by AD
2011–15–03 is likely to detect signs of
wear before major damage occurs, but
the potential for an ignition source
inside the fuel tank due to the single
failure condition still exists. The
manufacturer has now developed an
improved wire bundle installation that
eliminates the single failure condition.
We have determined that installation of
the improved design is required to
eliminate the need for periodic
maintenance and inspections in order to
ensure safety.
Request To Change Paragraph (g) of the
Proposed AD (in the NPRM)
United Airlines (United) asked that
paragraph (g) of the proposed AD (in the
NPRM) be changed to add paragraphs
(g), (h), (i), (j), and (k) of AD 2011–15–
03, to the language which terminates the
repetitive inspections required by
paragraph (n) of AD 2011–15–03. United
stated that those paragraphs are also
terminated after doing the wire bundle
replacement required by paragraph (g)
of the proposed AD (in the NPRM).
We agree to add paragraphs (g) and (h)
of AD 2011–15–03, to the terminating
action language specified in paragraph
(g) of this proposed AD, because the
replacement required by this proposed
AD would terminate the inspections
required by paragraphs (g) and (h) of AD
2011–15–03. However, paragraphs (i),
(j), and (k) of AD 2011–15–03 are oncondition corrective actions, which
must be done depending on the findings
during any inspection required by
paragraph (g) or (h) of AD 2011–15–03.
Therefore, we have not referenced
paragraphs (i), (j), and (k) of AD 2011–
15–03 in paragraph (g) of this proposed
AD.
Request To Add AWL Items
United stated that incorporating
airworthiness limitation (AWL) tasks
28–AWL–24 (747 CL Certification
Maintenance Requirements) and 28–
AWL–35 (747–400 Maintenance
Planning Data) should also be required
by the NPRM.
We agree that this proposed AD
should include revising the
maintenance or inspection program, as
applicable, by incorporating the CDCCL
tasks related to accomplishing Boeing
Alert Service Bulletin 747–28A2306,
dated October 2, 2014; therefore, we
have added new paragraphs (h) and (i)
to this proposed AD to include those
requirements. We have redesignated
subsequent paragraphs accordingly.
E:\FR\FM\08MRP1.SGM
08MRP1
Federal Register / Vol. 81, No. 45 / Tuesday, March 8, 2016 / Proposed Rules
Related Service Information Under 1
CFR Part 51
We reviewed the following service
information:
• Boeing Alert Service Bulletin 747–
28A2306, dated October 2, 2014. The
service information describes
procedures for replacing the wire
bundles of the electrical conduit inside
the electrical conduit of the forward and
aft boost pumps of the numbers 1 and
4 main fuel tanks.
• AWL No. 28–AWL–24, ‘‘Fuel Boost
Pump Wires In Conduit Installation—In
Fuel Tank,’’ of Sub-section C.1, ‘‘Fuel
Tank Ignition Prevention,’’ of Section
C., ‘‘Airworthiness Limitations—
Systems,’’ of the Boeing 747–100/200/
300/SP Airworthiness Limitations
(AWLs) and Certification Maintenance
Requirements (CMRs) Document D6–
13747–CMR, Revision June 2014. The
service information describes a CDCCL
for the fuel boost pump wiring.
• AWL No. 28–AWL–35, ‘‘Fuel Boost
Pump Wires In Conduit Installation—In
Fuel Tank,’’ of Sub-section B.1, ‘‘Fuel
System Ignition Prevention,’’ of Section
B, ‘‘Airworthiness Limitations (AWLs)—
Systems,’’ of Section 9, Airworthiness
Limitations (AWLs) and Certification
Maintenance Requirements (CMRs), of
Boeing 747–400 Maintenance Planning
Data (MPD) Document D621U400–9,
Revision June 2014. The service
information describes a CDCCL for the
fuel boost pump wiring.
This service information is reasonably
available because the interested parties
have access to it through their normal
course of business or by the means
identified in the ADDRESSES section.
FAA’s Determination
We are proposing this SNPRM
because we evaluated all the relevant
information and determined the unsafe
condition described previously is likely
to exist or develop in other products of
the same type design. Certain changes
described above expand the scope of the
NPRM (80 FR 24850, May 1, 2013). As
a result, we have determined that it is
necessary to reopen the comment period
to provide additional opportunity for
the public to comment on this SNPRM.
Proposed Requirements of This SNPRM
This SNPRM would require
accomplishing the actions specified in
Boeing Alert Service Bulletin 747–
28A2306, dated October 2, 2014,
described previously. This SNPRM
would also require revising the
maintenance or inspection program, as
applicable, to include CDCCLs for the
fuel boost pump wiring.
This AD requires revisions to certain
operator maintenance documents to
include new actions (e.g., inspections)
and CDCCLs. Compliance with these
actions and CDCCLs is required by 14
CFR 91.403(c). For airplanes that have
been previously modified, altered, or
12043
repaired in the areas addressed by this
proposed AD, the operator may not be
able to accomplish the actions described
in the revisions. In this situation, to
comply with 14 CFR 91.403(c), the
operator must request approval for an
alternative method of compliance
according to paragraph (j) of this AD.
The request should include a
description of changes to the required
actions that will ensure the continued
damage tolerance of the affected
structure.
Notwithstanding any other
maintenance or operational
requirements, components that have
been identified as airworthy or installed
on the affected airplanes before
accomplishing the revision of the
airplane maintenance or inspection
program specified in this proposed AD
do not need to be reworked in
accordance with the CDCCLs. However,
once the airplane maintenance or
inspection program has been revised as
required by this proposed AD, future
maintenance actions on these
components must be done in
accordance with the CDCCLs.
Costs of Compliance
We estimate that this proposed AD
affects 176 airplanes of U.S. registry.
We estimate the following costs to
comply with this proposed AD:
ESTIMATED COSTS
Action
Labor cost
Replacement .....................
Up to 53 work-hours × $85 per hour =
$4,505.
1 work-hour × $85 per hour = $85 ........
Revise maintenance or inspection program.
asabaliauskas on DSK3SPTVN1PROD with PROPOSALS
Authority for This Rulemaking
Title 49 of the United States Code
specifies the FAA’s authority to issue
rules on aviation safety. Subtitle I,
section 106, describes the authority of
the FAA Administrator. ‘‘Subtitle VII:
Aviation Programs’’ describes in more
detail the scope of the Agency’s
authority.
We are issuing this rulemaking under
the authority described in Subtitle VII,
Part A, Subpart III, Section 44701:
‘‘General requirements.’’ Under that
section, Congress charges the FAA with
promoting safe flight of civil aircraft in
air commerce by prescribing regulations
for practices, methods, and procedures
the Administrator finds necessary for
safety in air commerce. This regulation
is within the scope of that authority
VerDate Sep<11>2014
16:21 Mar 07, 2016
Jkt 238001
Parts cost
Cost per product
$4,600
Up to $9,105 .....................
Up to $1,602,480.
0
$85 ....................................
$14,960.
because it addresses an unsafe condition
that is likely to exist or develop on
products identified in this rulemaking
action.
Regulatory Findings
We determined that this proposed AD
would not have federalism implications
under Executive Order 13132. This
proposed AD would not have a
substantial direct effect on the States, on
the relationship between the national
Government and the States, or on the
distribution of power and
responsibilities among the various
levels of government.
For the reasons discussed above, I
certify this proposed regulation:
(1) Is not a ‘‘significant regulatory
action’’ under Executive Order 12866,
PO 00000
Frm 00012
Fmt 4702
Cost on U.S. operators
Sfmt 4702
(2) Is not a ‘‘significant rule’’ under
the DOT Regulatory Policies and
Procedures (44 FR 11034, February 26,
1979),
(3) Will not affect intrastate aviation
in Alaska, and
(4) Will not have a significant
economic impact, positive or negative,
on a substantial number of small entities
under the criteria of the Regulatory
Flexibility Act.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation
safety, Incorporation by reference,
Safety.
The Proposed Amendment
Accordingly, under the authority
delegated to me by the Administrator,
E:\FR\FM\08MRP1.SGM
08MRP1
12044
Federal Register / Vol. 81, No. 45 / Tuesday, March 8, 2016 / Proposed Rules
the FAA proposes to amend 14 CFR part
39 as follows:
PART 39—AIRWORTHINESS
DIRECTIVES
1. The authority citation for part 39
continues to read as follows:
■
Authority: 49 U.S.C. 106(g), 40113, 44701.
§ 39.13
[Amended]
2. The FAA amends § 39.13 by adding
the following new airworthiness
directive (AD):
■
The Boeing Company: Docket No. FAA–
2015–0935; Directorate Identifier 2014–
NM–243–AD.
(a) Comments Due Date
We must receive comments by April 22,
2016.
(b) Affected ADs
This AD affects AD 2011–15–03,
Amendment 39–16750 (76 FR 41659, July 15,
2011).
(c) Applicability
This AD applies to The Boeing Company
Model 747–100, 747–100B, 747–100B SUD,
747–200B, 747–200C, 747–200F, 747–300,
747–400, 747–400D, 747–400F, 747SR, and
747SP series airplanes, certificated in any
category, as identified in Boeing Alert
Service Bulletin 747–28A2306, dated October
2, 2014.
(d) Subject
Air Transport Association (ATA) of
America Code 28, Fuel.
(e) Unsafe Condition
This AD was prompted by several reports
of chafing of the wire bundles inside the
electrical conduit of the forward and aft boost
pumps of the numbers 1 and 4 main fuel
tanks due to high vibration. These wire
bundles can chafe through the wire sleeving
into the insulation, exposing the wire
conductors. We are issuing this AD to
prevent chafing of the wire bundles and
subsequent arcing between the wiring and
the electrical conduit creating an ignition
source in the fuel tanks, which could result
in a fire and consequent fuel tank explosion.
asabaliauskas on DSK3SPTVN1PROD with PROPOSALS
(f) Compliance
Comply with this AD within the
compliance times specified, unless already
done.
(g) Replacement
Within 60 months after the effective date
of this AD: Replace the wire bundles inside
the electrical conduit of the forward and aft
boost pumps of the numbers 1 and 4 main
fuel tanks with new, improved wire bundles
inserted into conduit liners, in accordance
with the Accomplishment Instructions of
Boeing Alert Service Bulletin 747–28A2306,
dated October 2, 2014. Accomplishing the
replacement required by this paragraph
terminates the inspections required by
paragraphs (g), (h), and (n) of AD 2011–15–
03, Amendment 39–16750 (76 FR 41659, July
15, 2011).
VerDate Sep<11>2014
16:21 Mar 07, 2016
Jkt 238001
(h) Maintenance or Inspection Program
Revision
Within 180 days after the effective date of
this AD, revise the maintenance or inspection
program, as applicable, to incorporate critical
design configuration control limitation
(CDCCL) Task AWL No. 28–AWL–24, ‘‘Fuel
Boost Pump Wires In Conduit Installation—
In Fuel Tank,’’ of Sub-section C.1, ‘‘Fuel
Tank Ignition Prevention,’’ of Section C.,
‘‘Airworthiness Limitations—Systems,’’ of
the Boeing 747–100/200/300/SP
Airworthiness Limitations (AWLs) and
Certification Maintenance Requirements
(CMRs) Document D6–13747–CMR, Revision
June 2014; or CDCCL Task No. AWL No. 28–
AWL–35, ‘‘Fuel Boost Pump Wires In
Conduit Installation—In Fuel Tank,’’ of Subsection B.1, ‘‘Fuel System Ignition
Prevention,’’ of Section B, ‘‘Airworthiness
Limitations (AWLs)—Systems,’’ of Section 9,
Airworthiness Limitations (AWLs) and
Certification Maintenance Requirements
(CMRs), of Boeing 747–400 Maintenance
Planning Data (MPD) Document D621U400–
9, Revision June 2014; as applicable.
(i) No Alternative Actions, Intervals, and/or
CDCCLs
After accomplishing the revision required
by paragraph (h) of this AD, no alternative
actions (e.g., inspections), intervals, and/or
CDCCLs may be used unless the actions,
intervals, and/or CDCCLs are approved as an
alternative method of compliance (AMOC) in
accordance with the procedures specified in
paragraph (j) of this AD.
(j) Alternative Methods of Compliance
(AMOCs)
(1) The Manager, Seattle Aircraft
Certification Office (ACO), FAA, has the
authority to approve AMOCs for this AD, if
requested using the procedures found in 14
CFR 39.19. In accordance with 14 CFR 39.19,
send your request to your principal inspector
or local Flight Standards District Office, as
appropriate. If sending information directly
to the manager of the ACO, send it to the
attention of the person identified in
paragraph (k)(1) of this AD. Information may
be emailed to: 9-ANM-Seattle-ACO-AMOCRequests@faa.gov.
(2) Before using any approved AMOC,
notify your appropriate principal inspector,
or lacking a principal inspector, the manager
of the local flight standards district office/
certificate holding district office.
(3) An AMOC that provides an acceptable
level of safety may be used for any repair,
modification, or alteration required by this
AD if it is approved by the Boeing
Commercial Airplanes Organization
Designation Authorization (ODA) that has
been authorized by the Manager, Seattle
ACO, to make those findings. To be
approved, the repair method, modification
deviation, or alteration deviation must meet
the certification basis of the airplane, and the
approval must specifically refer to this AD.
(k) Related Information
(1) For more information about this AD,
contact Tung Tran, Aerospace Engineer,
Propulsion Branch, ANM–140S, FAA, Seattle
ACO, 1601 Lind Avenue SW., Renton, WA
PO 00000
Frm 00013
Fmt 4702
Sfmt 4702
98057–3356; phone: 425–917–6505; fax: 425–
917–6590; email: tung.tran@faa.gov.
(2) For service information identified in
this AD, contact Boeing Commercial
Airplanes, Attention: Data & Services
Management, P.O. Box 3707, MC 2H–65,
Seattle, WA 98124–2207; phone: 206–544–
5000, extension 1; fax: 206–766–5680;
Internet: https://www.myboeingfleet.com.
You may view this referenced service
information at the FAA, Transport Airplane
Directorate, 1601 Lind Avenue SW., Renton,
WA. For information on the availability of
this material at the FAA, call 425–227–1221.
Issued in Renton, Washington, on February
18, 2016.
Dorr M. Anderson,
Acting Manager, Transport Airplane
Directorate, Aircraft Certification Service.
[FR Doc. 2016–04681 Filed 3–7–16; 8:45 am]
BILLING CODE 4910–13–P
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA–2016–4220; Directorate
Identifier 2015–NM–076–AD]
RIN 2120–AA64
Airworthiness Directives; BAE
Systems (Operations) Limited
Airplanes
Federal Aviation
Administration (FAA), DOT.
ACTION: Notice of proposed rulemaking
(NPRM).
AGENCY:
We propose to supersede
Airworthiness Directive (AD) 2011–24–
06, for all BAE Systems (Operations)
Limited Model Avro 146–RJ series
airplanes. AD 2011–24–06 currently
requires revising the maintenance
program to incorporate life limits for
certain items, adding new and more
restrictive inspections to detect fatigue
cracking in certain structures, and
adding fuel system critical design
configuration control limitations
(CDCCLs) to prevent ignition sources in
the fuel tanks. AD 2011–24–06 also
currently requires modifying the main
fittings of the main landing gear (MLG)
and revising the maintenance program
to incorporate new life limits on MLG
up-locks and door up-locks and other
MLG components. Since we issued AD
2011–24–06, we have determined that
new or revised structural inspection
requirements are necessary. This
proposed AD would require revising the
maintenance or inspection program, as
applicable, to incorporate new or
revised structural inspection
requirements. We are proposing this AD
to detect and correct fatigue cracking of
SUMMARY:
E:\FR\FM\08MRP1.SGM
08MRP1
Agencies
[Federal Register Volume 81, Number 45 (Tuesday, March 8, 2016)]
[Proposed Rules]
[Pages 12041-12044]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-04681]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2015-0935; Directorate Identifier 2014-NM-243-AD]
RIN 2120-AA64
Airworthiness Directives; The Boeing Company Airplanes
AGENCY: Federal Aviation Administration (FAA), DOT.
ACTION: Supplemental notice of proposed rulemaking (SNPRM); reopening
of comment period.
-----------------------------------------------------------------------
SUMMARY: We are revising an earlier proposed airworthiness directive
(AD) for certain The Boeing Company Model 747-100, 747-100B, 747-100B
SUD, 747-200B, 747-200C, 747-200F, 747-300, 747-400, 747-400D, 747-
400F, 747SR, and 747SP series airplanes. The notice of proposed
rulemaking (NPRM) proposed to require replacing the wire bundles inside
the electrical conduit of the forward and aft boost pumps of the
numbers 1 and 4 main fuel tanks with new, improved wire bundles
inserted into conduit liners. The NPRM was prompted by several reports
of chafing of the wire bundles inside the electrical conduit of the
forward and aft boost pumps of the numbers 1 and 4 main fuel tanks due
to high vibration. These wire bundles can chafe through the wire
sleeving into the insulation, exposing the wire conductors. This action
revises the NPRM by adding a revision to the maintenance or inspection
program, as applicable, to include critical design configuration
control limitations (CDCCL) for the fuel boost pump wiring. We are
proposing this SNPRM to prevent chafing of the wire bundles and
subsequent arcing between the wiring and the electrical conduit
creating an ignition source in the fuel tanks, which could result in a
fire and consequent fuel tank explosion. Since these actions impose an
additional burden over that proposed in the NPRM, we are reopening the
comment period to allow the public the chance to comment on these
proposed changes.
DATES: We must receive comments on this SNPRM by April 22, 2016.
ADDRESSES: You may send comments, using the procedures found in 14 CFR
11.43 and 11.45, by any of the following methods:
Federal eRulemaking Portal: Go to https://www.regulations.gov. Follow the instructions for submitting comments.
Fax: 202-493-2251.
Mail: U.S. Department of Transportation, Docket
Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New
Jersey Avenue SE., Washington, DC 20590.
Hand Delivery: U.S. Department of Transportation, Docket
Operations, M-30, West Building Ground Floor, Room W12-140, 1200 New
Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal holidays.
For service information identified in this SNPRM, contact Boeing
Commercial Airplanes, Attention: Data & Services Management, P. O. Box
3707, MC 2H-65, Seattle, WA 98124-2207; telephone: 206-544-5000,
extension 1; fax: 206-766-5680; Internet: https://www.myboeingfleet.com. You may view this referenced service information
at the FAA, Transport Airplane Directorate, 1601 Lind Avenue SW.,
Renton, WA. For information on the availability of this material at the
FAA, call 425-227-1221. Boeing Alert Service Bulletin 747-28A2306,
dated October 2, 2014, is also available on the Internet at https://www.regulations.gov by searching for and locating Docket No. FAA-2015-
0935.
Examining the AD Docket
You may examine the AD docket on the Internet at https://
[[Page 12042]]
www.regulations.gov by searching for and locating Docket No. FAA-2015-
0935; or in person at the Docket Management Facility between 9 a.m. and
5 p.m., Monday through Friday, except Federal holidays. The AD docket
contains this proposed AD, the regulatory evaluation, any comments
received, and other information. The street address for the Docket
Office (phone: 800-647-5527) is in the ADDRESSES section. Comments will
be available in the AD docket shortly after receipt.
FOR FURTHER INFORMATION CONTACT: Tung Tran, Aerospace Engineer,
Propulsion Branch, ANM-140S, FAA, Seattle Aircraft Certification
Office, 1601 Lind Avenue SW., Renton, WA 98057-3356; phone: 425-917-
6505; fax: 425-917-6590; email: tung.tran@faa.gov.
SUPPLEMENTARY INFORMATION:
Comments Invited
We invite you to send any written relevant data, views, or
arguments about this proposed AD. Send your comments to an address
listed under the ADDRESSES section. Include ``Docket No. FAA-2015-0935;
Directorate Identifier 2014-NM-243-AD'' at the beginning of your
comments. We specifically invite comments on the overall regulatory,
economic, environmental, and energy aspects of this proposed AD. We
will consider all comments received by the closing date and may amend
this proposed AD because of those comments.
We will post all comments we receive, without change, to https://www.regulations.gov, including any personal information you provide. We
will also post a report summarizing each substantive verbal contact we
receive about this proposed AD.
Discussion
We issued an NPRM to amend 14 CFR part 39 by adding an AD that
would apply to certain The Boeing Company Model 747-100, 747-100B, 747-
100B SUD, 747-200B, 747-200C, 747-200F, 747-300, 747-400, 747-400D,
747-400F, 747SR, and 747SP series airplanes. The NPRM published in the
Federal Register on May 1, 2015 (80 FR 24850) (``the NPRM''). The NPRM
proposed to require replacing the wire bundles inside the electrical
conduit of the forward and aft boost pumps of the numbers 1 and 4 main
fuel tanks with new, improved wire bundles inserted into conduit
liners.
Actions Since the NPRM was Issued
Since we issued the NPRM, we have determined that it is necessary
to revise the NPRM by adding a revision to the maintenance or
inspection program, as applicable, to include critical design
configuration control limitations (CDCCL) for the fuel boost pump
wiring.
Related AD
AD 2011-15-03, Amendment 39-16750 (76 FR 41659, July 15, 2011)
(``AD 2011-15-03''), superseded AD 97-26-07, Amendment 39-10250 (62 FR
65352, December 12, 1997), and requires repetitive inspections to
detect damage of the sleeving and wire bundles of the boost pumps of
the numbers 1 and 4 main fuel tanks, and of the auxiliary tank jettison
pumps (if installed); replacement of any damaged sleeving with new
sleeving; and repair or replacement of any damaged wires with new
wires. For airplanes on which any burned wires are found, AD 2011-15-03
also requires an inspection to detect damage of the conduit, and
replacement of any damaged conduit with a serviceable conduit. AD 2011-
15-03 reduced the initial compliance time and repetitive inspection
interval in AD 97-26-07. AD 2011-15-03 was prompted by fleet
information indicating that the repetitive inspection interval in AD
97-26-07 was too long because excessive chafing of the sleeving
continued to occur much earlier than expected between scheduled
inspections. Accomplishing the replacement specified in this proposed
AD would terminate the inspections required by paragraphs (g), (h), and
(n) of AD 2011-15-03.
Comments
We gave the public the opportunity to comment on the NPRM. The
following presents the comments received on the NPRM and the FAA's
response to each comment.
Support for the NPRM
Boeing concurred with the contents of the NPRM.
Request To Withdraw the NPRM
UPS recommended that we withdraw the NPRM so that UPS can continue
doing the inspections required by AD 2011-15-03. UPS stated that it has
been inspecting the forward and aft boost pump wire bundles and
sleeving since 2007 per the requirements in AD 2011-15-03, and is
satisfied with the current inspection, which detects signs of wear
before major damage occurs. UPS added that the wire bundle replacement
in this NPRM is a burden to the airlines, without adding safety to the
boost pump or airplane fuel system.
We do not agree with the commenter's request to withdraw the NPRM.
We agree that the inspection required by AD 2011-15-03 is likely to
detect signs of wear before major damage occurs, but the potential for
an ignition source inside the fuel tank due to the single failure
condition still exists. The manufacturer has now developed an improved
wire bundle installation that eliminates the single failure condition.
We have determined that installation of the improved design is required
to eliminate the need for periodic maintenance and inspections in order
to ensure safety.
Request To Change Paragraph (g) of the Proposed AD (in the NPRM)
United Airlines (United) asked that paragraph (g) of the proposed
AD (in the NPRM) be changed to add paragraphs (g), (h), (i), (j), and
(k) of AD 2011-15-03, to the language which terminates the repetitive
inspections required by paragraph (n) of AD 2011-15-03. United stated
that those paragraphs are also terminated after doing the wire bundle
replacement required by paragraph (g) of the proposed AD (in the NPRM).
We agree to add paragraphs (g) and (h) of AD 2011-15-03, to the
terminating action language specified in paragraph (g) of this proposed
AD, because the replacement required by this proposed AD would
terminate the inspections required by paragraphs (g) and (h) of AD
2011-15-03. However, paragraphs (i), (j), and (k) of AD 2011-15-03 are
on-condition corrective actions, which must be done depending on the
findings during any inspection required by paragraph (g) or (h) of AD
2011-15-03. Therefore, we have not referenced paragraphs (i), (j), and
(k) of AD 2011-15-03 in paragraph (g) of this proposed AD.
Request To Add AWL Items
United stated that incorporating airworthiness limitation (AWL)
tasks 28-AWL-24 (747 CL Certification Maintenance Requirements) and 28-
AWL-35 (747-400 Maintenance Planning Data) should also be required by
the NPRM.
We agree that this proposed AD should include revising the
maintenance or inspection program, as applicable, by incorporating the
CDCCL tasks related to accomplishing Boeing Alert Service Bulletin 747-
28A2306, dated October 2, 2014; therefore, we have added new paragraphs
(h) and (i) to this proposed AD to include those requirements. We have
redesignated subsequent paragraphs accordingly.
[[Page 12043]]
Related Service Information Under 1 CFR Part 51
We reviewed the following service information:
Boeing Alert Service Bulletin 747-28A2306, dated October
2, 2014. The service information describes procedures for replacing the
wire bundles of the electrical conduit inside the electrical conduit of
the forward and aft boost pumps of the numbers 1 and 4 main fuel tanks.
AWL No. 28-AWL-24, ``Fuel Boost Pump Wires In Conduit
Installation--In Fuel Tank,'' of Sub-section C.1, ``Fuel Tank Ignition
Prevention,'' of Section C., ``Airworthiness Limitations--Systems,'' of
the Boeing 747-100/200/300/SP Airworthiness Limitations (AWLs) and
Certification Maintenance Requirements (CMRs) Document D6-13747-CMR,
Revision June 2014. The service information describes a CDCCL for the
fuel boost pump wiring.
AWL No. 28-AWL-35, ``Fuel Boost Pump Wires In Conduit
Installation--In Fuel Tank,'' of Sub-section B.1, ``Fuel System
Ignition Prevention,'' of Section B, ``Airworthiness Limitations
(AWLs)--Systems,'' of Section 9, Airworthiness Limitations (AWLs) and
Certification Maintenance Requirements (CMRs), of Boeing 747-400
Maintenance Planning Data (MPD) Document D621U400-9, Revision June
2014. The service information describes a CDCCL for the fuel boost pump
wiring.
This service information is reasonably available because the
interested parties have access to it through their normal course of
business or by the means identified in the ADDRESSES section.
FAA's Determination
We are proposing this SNPRM because we evaluated all the relevant
information and determined the unsafe condition described previously is
likely to exist or develop in other products of the same type design.
Certain changes described above expand the scope of the NPRM (80 FR
24850, May 1, 2013). As a result, we have determined that it is
necessary to reopen the comment period to provide additional
opportunity for the public to comment on this SNPRM.
Proposed Requirements of This SNPRM
This SNPRM would require accomplishing the actions specified in
Boeing Alert Service Bulletin 747-28A2306, dated October 2, 2014,
described previously. This SNPRM would also require revising the
maintenance or inspection program, as applicable, to include CDCCLs for
the fuel boost pump wiring.
This AD requires revisions to certain operator maintenance
documents to include new actions (e.g., inspections) and CDCCLs.
Compliance with these actions and CDCCLs is required by 14 CFR
91.403(c). For airplanes that have been previously modified, altered,
or repaired in the areas addressed by this proposed AD, the operator
may not be able to accomplish the actions described in the revisions.
In this situation, to comply with 14 CFR 91.403(c), the operator must
request approval for an alternative method of compliance according to
paragraph (j) of this AD. The request should include a description of
changes to the required actions that will ensure the continued damage
tolerance of the affected structure.
Notwithstanding any other maintenance or operational requirements,
components that have been identified as airworthy or installed on the
affected airplanes before accomplishing the revision of the airplane
maintenance or inspection program specified in this proposed AD do not
need to be reworked in accordance with the CDCCLs. However, once the
airplane maintenance or inspection program has been revised as required
by this proposed AD, future maintenance actions on these components
must be done in accordance with the CDCCLs.
Costs of Compliance
We estimate that this proposed AD affects 176 airplanes of U.S.
registry.
We estimate the following costs to comply with this proposed AD:
Estimated Costs
----------------------------------------------------------------------------------------------------------------
Cost on U.S.
Action Labor cost Parts cost Cost per product operators
----------------------------------------------------------------------------------------------------------------
Replacement...................... Up to 53 $4,600 Up to $9,105....... Up to $1,602,480.
work[dash]hours x
$85 per hour =
$4,505.
Revise maintenance or inspection 1 work-hour x $85 0 $85................ $14,960.
program. per hour = $85.
----------------------------------------------------------------------------------------------------------------
Authority for This Rulemaking
Title 49 of the United States Code specifies the FAA's authority to
issue rules on aviation safety. Subtitle I, section 106, describes the
authority of the FAA Administrator. ``Subtitle VII: Aviation Programs''
describes in more detail the scope of the Agency's authority.
We are issuing this rulemaking under the authority described in
Subtitle VII, Part A, Subpart III, Section 44701: ``General
requirements.'' Under that section, Congress charges the FAA with
promoting safe flight of civil aircraft in air commerce by prescribing
regulations for practices, methods, and procedures the Administrator
finds necessary for safety in air commerce. This regulation is within
the scope of that authority because it addresses an unsafe condition
that is likely to exist or develop on products identified in this
rulemaking action.
Regulatory Findings
We determined that this proposed AD would not have federalism
implications under Executive Order 13132. This proposed AD would not
have a substantial direct effect on the States, on the relationship
between the national Government and the States, or on the distribution
of power and responsibilities among the various levels of government.
For the reasons discussed above, I certify this proposed
regulation:
(1) Is not a ``significant regulatory action'' under Executive
Order 12866,
(2) Is not a ``significant rule'' under the DOT Regulatory Policies
and Procedures (44 FR 11034, February 26, 1979),
(3) Will not affect intrastate aviation in Alaska, and
(4) Will not have a significant economic impact, positive or
negative, on a substantial number of small entities under the criteria
of the Regulatory Flexibility Act.
List of Subjects in 14 CFR Part 39
Air transportation, Aircraft, Aviation safety, Incorporation by
reference, Safety.
The Proposed Amendment
Accordingly, under the authority delegated to me by the
Administrator,
[[Page 12044]]
the FAA proposes to amend 14 CFR part 39 as follows:
PART 39--AIRWORTHINESS DIRECTIVES
0
1. The authority citation for part 39 continues to read as follows:
Authority: 49 U.S.C. 106(g), 40113, 44701.
Sec. 39.13 [Amended]
0
2. The FAA amends Sec. 39.13 by adding the following new airworthiness
directive (AD):
The Boeing Company: Docket No. FAA-2015-0935; Directorate Identifier
2014-NM-243-AD.
(a) Comments Due Date
We must receive comments by April 22, 2016.
(b) Affected ADs
This AD affects AD 2011-15-03, Amendment 39-16750 (76 FR 41659,
July 15, 2011).
(c) Applicability
This AD applies to The Boeing Company Model 747-100, 747-100B,
747-100B SUD, 747-200B, 747-200C, 747-200F, 747-300, 747-400, 747-
400D, 747-400F, 747SR, and 747SP series airplanes, certificated in
any category, as identified in Boeing Alert Service Bulletin 747-
28A2306, dated October 2, 2014.
(d) Subject
Air Transport Association (ATA) of America Code 28, Fuel.
(e) Unsafe Condition
This AD was prompted by several reports of chafing of the wire
bundles inside the electrical conduit of the forward and aft boost
pumps of the numbers 1 and 4 main fuel tanks due to high vibration.
These wire bundles can chafe through the wire sleeving into the
insulation, exposing the wire conductors. We are issuing this AD to
prevent chafing of the wire bundles and subsequent arcing between
the wiring and the electrical conduit creating an ignition source in
the fuel tanks, which could result in a fire and consequent fuel
tank explosion.
(f) Compliance
Comply with this AD within the compliance times specified,
unless already done.
(g) Replacement
Within 60 months after the effective date of this AD: Replace
the wire bundles inside the electrical conduit of the forward and
aft boost pumps of the numbers 1 and 4 main fuel tanks with new,
improved wire bundles inserted into conduit liners, in accordance
with the Accomplishment Instructions of Boeing Alert Service
Bulletin 747-28A2306, dated October 2, 2014. Accomplishing the
replacement required by this paragraph terminates the inspections
required by paragraphs (g), (h), and (n) of AD 2011-15-03, Amendment
39-16750 (76 FR 41659, July 15, 2011).
(h) Maintenance or Inspection Program Revision
Within 180 days after the effective date of this AD, revise the
maintenance or inspection program, as applicable, to incorporate
critical design configuration control limitation (CDCCL) Task AWL
No. 28-AWL-24, ``Fuel Boost Pump Wires In Conduit Installation--In
Fuel Tank,'' of Sub-section C.1, ``Fuel Tank Ignition Prevention,''
of Section C., ``Airworthiness Limitations--Systems,'' of the Boeing
747-100/200/300/SP Airworthiness Limitations (AWLs) and
Certification Maintenance Requirements (CMRs) Document D6-13747-CMR,
Revision June 2014; or CDCCL Task No. AWL No. 28-AWL-35, ``Fuel
Boost Pump Wires In Conduit Installation--In Fuel Tank,'' of Sub-
section B.1, ``Fuel System Ignition Prevention,'' of Section B,
``Airworthiness Limitations (AWLs)--Systems,'' of Section 9,
Airworthiness Limitations (AWLs) and Certification Maintenance
Requirements (CMRs), of Boeing 747-400 Maintenance Planning Data
(MPD) Document D621U400-9, Revision June 2014; as applicable.
(i) No Alternative Actions, Intervals, and/or CDCCLs
After accomplishing the revision required by paragraph (h) of
this AD, no alternative actions (e.g., inspections), intervals, and/
or CDCCLs may be used unless the actions, intervals, and/or CDCCLs
are approved as an alternative method of compliance (AMOC) in
accordance with the procedures specified in paragraph (j) of this
AD.
(j) Alternative Methods of Compliance (AMOCs)
(1) The Manager, Seattle Aircraft Certification Office (ACO),
FAA, has the authority to approve AMOCs for this AD, if requested
using the procedures found in 14 CFR 39.19. In accordance with 14
CFR 39.19, send your request to your principal inspector or local
Flight Standards District Office, as appropriate. If sending
information directly to the manager of the ACO, send it to the
attention of the person identified in paragraph (k)(1) of this AD.
Information may be emailed to: 9-ANM-Seattle-ACO-AMOC-Requests@faa.gov.
(2) Before using any approved AMOC, notify your appropriate
principal inspector, or lacking a principal inspector, the manager
of the local flight standards district office/certificate holding
district office.
(3) An AMOC that provides an acceptable level of safety may be
used for any repair, modification, or alteration required by this AD
if it is approved by the Boeing Commercial Airplanes Organization
Designation Authorization (ODA) that has been authorized by the
Manager, Seattle ACO, to make those findings. To be approved, the
repair method, modification deviation, or alteration deviation must
meet the certification basis of the airplane, and the approval must
specifically refer to this AD.
(k) Related Information
(1) For more information about this AD, contact Tung Tran,
Aerospace Engineer, Propulsion Branch, ANM-140S, FAA, Seattle ACO,
1601 Lind Avenue SW., Renton, WA 98057-3356; phone: 425-917-6505;
fax: 425-917-6590; email: tung.tran@faa.gov.
(2) For service information identified in this AD, contact
Boeing Commercial Airplanes, Attention: Data & Services Management,
P.O. Box 3707, MC 2H-65, Seattle, WA 98124-2207; phone: 206-544-
5000, extension 1; fax: 206-766-5680; Internet: https://www.myboeingfleet.com. You may view this referenced service
information at the FAA, Transport Airplane Directorate, 1601 Lind
Avenue SW., Renton, WA. For information on the availability of this
material at the FAA, call 425-227-1221.
Issued in Renton, Washington, on February 18, 2016.
Dorr M. Anderson,
Acting Manager, Transport Airplane Directorate, Aircraft Certification
Service.
[FR Doc. 2016-04681 Filed 3-7-16; 8:45 am]
BILLING CODE 4910-13-P