Notice of Commission Staff Attendance, 11789-11790 [2016-04960]
Download as PDF
Federal Register / Vol. 81, No. 44 / Monday, March 7, 2016 / Notices
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on March 11, 2016.
Dated: March 1, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–04959 Filed 3–4–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP16–74–000]
asabaliauskas on DSK3SPTVN1PROD with NOTICES
Columbia Gas Transmission, LLC;
Notice of Request Under Blanket
Authorization
Take notice that on February 16, 2016,
Columbia Gas Transmission, LLC
(Columbia), 5151 San Felipe, Suite
2500, Houston, Texas 77056, filed in
Docket No. CP16–74–000 a prior notice
request pursuant to sections 157.205
and 157.208 of the Commission’s
regulations under the Natural Gas Act
(NGA), as amended, requesting
authorization to increase the maximum
allowable operating pressure (MAOP)
on its existing PM–117 pipeline, replace
a segment of Line P–240, and upgrade
appurtenant facilities. Specifically,
Columbia proposes to: (i) Increase the
MAOP of Line PM–117 from 295
VerDate Sep<11>2014
18:37 Mar 04, 2016
Jkt 238001
pounds per square inch gauge (psig) to
360 psig in Johnson and Martin
Counties, Kentucky; (ii) replace an 8inch-diameter bridle setting on Line P–
240 with a 10-inch-diameter bridle and
approximately 200 feet of 8-inchdiameter pipeline with 10-inchdiameter pipeline in Lawrence County,
Kentucky; and (iii) install
appurtenances. Columbia states that the
proposed activities will allow it to
deliver 20,000 dekatherms per day of
firm transportation service to its
shipper. Columbia estimates the cost of
the proposed project to be
approximately $2.7 million, all as more
fully set forth in the application which
is on file with the Commission and open
to public inspection. The filing may also
be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Any questions concerning this
application may be directed to Tyler
Brown, Senior Counsel, Columbia Gas
Transmission, LLC, 5151 San Felipe,
Suite 2500, Houston, Texas 77056, by
telephone at (713) 386–3797.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
11789
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 7 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Dated: February 24, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–04955 Filed 3–4–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of the
Commission’s staff may attend the
following meetings related to the
transmission planning activities of the
New York Independent System
Operator, Inc.
E:\FR\FM\07MRN1.SGM
07MRN1
11790
Federal Register / Vol. 81, No. 44 / Monday, March 7, 2016 / Notices
The New York Independent System
Operator, Inc. Joint Electric System
Planning Working Group and
Transmission Planning Advisory
Subcommittee Meeting
March 7, 2016, 10:00 a.m.–4:00 p.m.
(EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/markets_
operations/services/planning/index.jsp.
The New York Independent System
Operator, Inc. Business Issues
Committee Meeting
March 16, 2016, 10:00 a.m.–4:00 p.m.
(EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/markets_
operations/committees/meeting_
materials/index.jsp?com=bic.
The New York Independent System
Operator, Inc. Electric System Planning
Working Group Meeting
asabaliauskas on DSK3SPTVN1PROD with NOTICES
March 22, 2016, 10:00 a.m.–4:00 p.m.
(EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/markets_
operations/services/planning/index.jsp.
The New York Independent System
Operator, Inc. Management Committee
Meeting
March 30, 2016, 10:00 a.m.–4:00 p.m.
(EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/markets_
Jkt 238001
[FR Doc. 2016–04960 Filed 3–4–16; 8:45 am]
DEPARTMENT OF ENERGY
March 17, 2016, 10:00 a.m.–4:00 p.m.
(EST)
The above-referenced meeting will be
via web conference and teleconference.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
https://www.nyiso.com/public/markets_
operations/committees/meeting_
materials/index.jsp?com=oc.
18:37 Mar 04, 2016
Dated: March 1, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
BILLING CODE 6717–01–P
The New York Independent System
Operator, Inc. Operating Committee
Meeting
VerDate Sep<11>2014
operations/committees/meeting_
materials/index.jsp?com=mc.
The discussions at the meeting
described above may address matters at
issue in the following proceedings:
New York Independent System
Operator, Inc., Docket No. ER13–102.
New York Independent System
Operator, Inc., Docket No. ER15–
2059.
New York Independent System
Operator, Inc., Docket No. ER16–120.
New York Independent System
Operator, Inc., Docket No. ER13–
1942.
New York Transco, LLC, Docket No.
ER15–572.
New York Independent System
Operator, Inc., Docket No. ER16–966.
For more information, contact James
Eason, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission at (202) 502–8622 or
James.Eason@ferc.gov.
Federal Energy Regulatory
Commission
[Project No. 516–491]
South Carolina Electric & Gas Co.;
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-project use
of project lands and waters.
b. Project No: 516–491.
c. Date Filed: February 8, 2016, as
supplemented February 25, 2016.
d. Applicant: South Carolina Electric
& Gas Co.
e. Name of Project: Saluda
Hydroelectric Project.
f. Location: Saluda River in
Lexington, Newberry, Richland, and
Saluda counties, South Carolina.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Tommy
Boozer, Manager, Lake Management
Programs, SCE&G, 6248 Bush River
Road, Columbia, SC 29212, (803) 217–
9007.
i. FERC Contact: Mr. Kevin Anderson,
(202) 502–6465, kevin.anderson@
ferc.gov.
PO 00000
Frm 00053
Fmt 4703
Sfmt 4703
j. Deadline for filing comments,
motions to intervene, and protests: April
1, 2016.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments,
recommendations, preliminary terms
and conditions, and preliminary
fishway prescriptions using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The first page of any filing should
include docket number P–516–491.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: The
licensee requests authorization to
permit Cherokee Shores Development to
modify their existing marina facility by
replacing sixteen double boat slips with
32 single boat slips, each equipped with
a boat lift. Each new boat slip would be
two feet wider and four feet longer than
the existing slips. The dock would be 64
feet longer and fixed, via pilings, to the
lake bed. No dredging would take place.
The licensee states the modified marina
facility would be consistent with its
shoreline management guidelines for
private marinas.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
E:\FR\FM\07MRN1.SGM
07MRN1
Agencies
[Federal Register Volume 81, Number 44 (Monday, March 7, 2016)]
[Notices]
[Pages 11789-11790]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-04960]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Commission Staff Attendance
The Federal Energy Regulatory Commission (Commission) hereby gives
notice that members of the Commission's staff may attend the following
meetings related to the transmission planning activities of the New
York Independent System Operator, Inc.
[[Page 11790]]
The New York Independent System Operator, Inc. Joint Electric System
Planning Working Group and Transmission Planning Advisory Subcommittee
Meeting
March 7, 2016, 10:00 a.m.-4:00 p.m. (EST)
The above-referenced meeting will be via web conference and
teleconference.
The above-referenced meeting is open to stakeholders.
Further information may be found at: https://www.nyiso.com/public/markets_operations/services/planning/index.jsp.
The New York Independent System Operator, Inc. Business Issues
Committee Meeting
March 16, 2016, 10:00 a.m.-4:00 p.m. (EST)
The above-referenced meeting will be via web conference and
teleconference.
The above-referenced meeting is open to stakeholders.
Further information may be found at: https://www.nyiso.com/public/markets_operations/committees/meeting_materials/index.jsp?com=bic.
The New York Independent System Operator, Inc. Operating Committee
Meeting
March 17, 2016, 10:00 a.m.-4:00 p.m. (EST)
The above-referenced meeting will be via web conference and
teleconference.
The above-referenced meeting is open to stakeholders.
Further information may be found at: https://www.nyiso.com/public/markets_operations/committees/meeting_materials/index.jsp?com=oc.
The New York Independent System Operator, Inc. Electric System Planning
Working Group Meeting
March 22, 2016, 10:00 a.m.-4:00 p.m. (EST)
The above-referenced meeting will be via web conference and
teleconference.
The above-referenced meeting is open to stakeholders.
Further information may be found at: https://www.nyiso.com/public/markets_operations/services/planning/index.jsp.
The New York Independent System Operator, Inc. Management Committee
Meeting
March 30, 2016, 10:00 a.m.-4:00 p.m. (EST)
The above-referenced meeting will be via web conference and
teleconference.
The above-referenced meeting is open to stakeholders.
Further information may be found at: https://www.nyiso.com/public/markets_operations/committees/meeting_materials/index.jsp?com=mc.
The discussions at the meeting described above may address matters
at issue in the following proceedings:
New York Independent System Operator, Inc., Docket No. ER13-102.
New York Independent System Operator, Inc., Docket No. ER15-2059.
New York Independent System Operator, Inc., Docket No. ER16-120.
New York Independent System Operator, Inc., Docket No. ER13-1942.
New York Transco, LLC, Docket No. ER15-572.
New York Independent System Operator, Inc., Docket No. ER16-966.
For more information, contact James Eason, Office of Energy Market
Regulation, Federal Energy Regulatory Commission at (202) 502-8622 or
James.Eason@ferc.gov.
Dated: March 1, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-04960 Filed 3-4-16; 8:45 am]
BILLING CODE 6717-01-P