Pine Creek Mine, LLC; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 11554-11555 [2016-04696]
Download as PDF
11554
Federal Register / Vol. 81, No. 43 / Friday, March 4, 2016 / Notices
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an ‘‘eSubscription’’ link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on March 10, 2016.
Dated: February 25, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–04694 Filed 3–3–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14755–000]
jstallworth on DSK7TPTVN1PROD with NOTICES
Ever Better Hydro Power, LLC; Notice
of Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On February 16, 2016, Ever Better
Hydro Power, LLC, filed an application
for a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Pittsfield Mill Dam Hydroelectric
Project (Pittsfield Project or project) to
be located on Suncook River, in the
town of Pittsfield, in Merrimack County,
New Hampshire. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
VerDate Sep<11>2014
15:22 Mar 03, 2016
Jkt 238001
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) An existing 21-foothigh, 470-foot-long concrete and stone
dam with a 150-foot-long ogee spillway,
two 4.5-foot-wide, 7-foot-high stoplog
bays, and two 6.25-foot-wide, 7.66-foothigh outlet gates; (2) an existing 20-acre
impoundment with a normal storage
capacity of 112 acre-feet at spillway
crest elevation of about 474.5 feet
national geodetic vertical datum (NGVD
’29); (3) an existing gated intake
structure and forebay leading to an
existing 200-foot-long, 9-foot-diameter
steel penstock; (4) an existing brick
building housing a 415 kilowatt (kW)
turbine-generator, along with a control
panel and switchgear; (5) a new 75-footlong, 13.8-kilovolt (kV) transmission
line connecting the generator to Public
Service Company of New Hampshire’s
existing distribution system; and (6)
appurtenant facilities. The estimated
annual generation of the proposed
Pittsfield Project would be about 1,400
megawatt-hours. The existing dam is
owned by New Hampshire Department
of Environmental Services.
Applicant Contact: Mr. Douglas Troy,
5 Main Street, Pittsfield, NH 03263;
phone: (603) 435–3598.
FERC Contact: John Ramer; phone:
(202) 502–8969 or email: john.ramer@
ferc.gov.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
The first page of any filing should
include docket number P–14755–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14755) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: February 25, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–04697 Filed 3–3–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12532–006]
Pine Creek Mine, LLC; Notice of
Application Tendered for Filing With
the Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Minor
License.
b. Project No.: 12532–006.
c. Date Filed: February 12, 2016
d. Applicant: Pine Creek Mine, LLC
e. Name of Project: Pine Creek Mine
Tunnel Hydroelectric Project
f. Location: The project is located at
Pine Creek Mine adjacent to Morgan and
Pine Creeks in Inyo County California.
The project’s mine access tunnel, mine
plug, mine water storage cavity,
penstock, generator, and most of its
primary transmission line would be
located under Federal land managed by
the United States Forest Service.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r)
h. Applicant Contacts: Craig N.
Rossell, Member, Pine Creek Mine LLC,
228 West Bonita Avenue Claremont,
California 91711, (909) 482–1000; Lynn
Goodfellow, 9050 Pine Creek Road,
Bishop, California 93514 (760) 387–
2076.
i. FERC Contact: Joseph Hassell, (202)
502–8079 or joseph.hassell@ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. The Project Description: The
proposed Pine Creek Tunnel
Hydroelectric Project would include: (1)
The existing Pine Creek Mine site, mine
E:\FR\FM\04MRN1.SGM
04MRN1
Federal Register / Vol. 81, No. 43 / Friday, March 4, 2016 / Notices
entrance tunnels, mine shafts, and
concrete plug; (2) an existing 30-footlong steel pipe that runs through the
concrete plug, to be used as a proposed
penstock; (3) a proposed Pelton turbine
generating unit located in the mine
tunnel with a total installed capacity of
1.5 megawatts; (4) a proposed
underground power line that would run
approximately 2,500 feet from the
generating unit to the mine portal; and
(5) another proposed 60-foot-long
transmission line from the mine portal
to an existing substation on the mine
site. The proposed project would have
an average annual generation of 5.6
gigawatt-hours.
Pine Creek Mine, LLC would seal the
mine entrance tunnel to store
approximately 200 feet of groundwater
in the existing mine works. The
groundwater would be released at
approximately the same rate at which it
recharges the mine, which is about 10
cubic feet per second.
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural Schedule:
The application will be processed
according to the following preliminary
Hydro Licensing Schedule. Revisions to
the schedule may be made as
appropriate.
Milestone
Target date
Notice of Acceptance/Notice of Ready for Environmental Analysis ................................................................................................
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions ..............................................................
Commission issues Draft EA ............................................................................................................................................................
Comments on Draft Environmental Assessment (EA) .....................................................................................................................
Modified terms and conditions ..........................................................................................................................................................
Commission issues Final EA ............................................................................................................................................................
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: February 25, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–04696 Filed 3–3–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jstallworth on DSK7TPTVN1PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC16–11–000.
Applicants: Greeley Energy Facility,
LLC.
Description: Second Supplement to
October 13, 2015 Application for
Authorization Under Section 203 of the
Federal Power Act and Request for
Expedited Action of Greeley Energy
Facility, LLC.
Filed Date: 2/24/16.
Accession Number: 20160224–5077.
Comments Due: 5 p.m. ET 3/7/16.
Docket Numbers: EC16–80–000.
Applicants: 8point3 Energy Partners
LP, Solar Star Colorado III, LLC.
Description: Application for
Authorization under Section 203 of the
VerDate Sep<11>2014
15:22 Mar 03, 2016
Jkt 238001
Federal Power Act and Request for
Expedited Action of 8point3 Energy
Partners LP and Solar Star Colorado III,
LLC.
Filed Date: 2/25/16.
Accession Number: 20160225–5047.
Comments Due: 5 p.m. ET 3/17/16.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG16–58–000.
Applicants: Middlesex Energy Center,
LLC.
Description: Middlesex Energy
Center, LLC submits the Notice of SelfCertification of Exempt Wholesale
Generator Status.
Filed Date: 2/24/16.
Accession Number: 20160224–0001.
Comments Due: 5 p.m. ET 3/16/16.
Docket Numbers: EG16–59–000.
Applicants: San Roman Wind I, LLC.
Description: San Roman Wind I, LLC
Notice of Self-Certification of Exempt
Wholesale Generator Status.
Filed Date: 2/25/16.
Accession Number: 20160225–5164.
Comments Due: 5 p.m. ET 3/17/16.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER16–996–000.
Applicants: Pacific Gas and Electric
Company.
Description: Notice of Termination of
Pacific Gas and Electric Company for
Transmission Service for San Luis Unit,
Rate Schedule No. 227.
Filed Date: 2/24/16.
PO 00000
Frm 00048
Fmt 4703
11555
Sfmt 4703
May 2016.
July 2016.
January 2017.
March 2017.
May 2017.
August 2017.
Accession Number: 20160224–5028.
Comments Due: 5 p.m. ET 3/16/16.
Docket Numbers: ER16–1000–000.
Applicants: Madison Gas and Electric
Company.
Description: Compliance filing:
Certificate of Concurrence to be effective
2/22/2016.
Filed Date: 2/24/16.
Accession Number: 20160224–5139.
Comments Due: 5 p.m. ET 3/16/16.
Docket Numbers: ER16–1001–000.
Applicants: Commonwealth Edison
Company, PJM Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
ComEd submits Transmission Upgrade
Agreement No. 4417 to be effective 2/
25/2016.
Filed Date: 2/25/16.
Accession Number: 20160225–5061.
Comments Due: 5 p.m. ET 3/17/16.
Docket Numbers: ER16–1002–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2016–02–25_SA 2791 Notice of
Termination Ameren-FutureGen GIA
(J239) to be effective 4/5/2016.
Filed Date: 2/25/16.
Accession Number: 20160225–5114.
Comments Due: 5 p.m. ET 3/17/16.
Docket Numbers: ER16–1003–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Ameren Illinois Company.
Description: § 205(d) Rate Filing:
2016–02–25_SA 2901 Ameren IllinoisComEd Kewanee CA to be effective
2/4/2016.
E:\FR\FM\04MRN1.SGM
04MRN1
Agencies
[Federal Register Volume 81, Number 43 (Friday, March 4, 2016)]
[Notices]
[Pages 11554-11555]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-04696]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12532-006]
Pine Creek Mine, LLC; Notice of Application Tendered for Filing
With the Commission and Establishing Procedural Schedule for Licensing
and Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Minor License.
b. Project No.: 12532-006.
c. Date Filed: February 12, 2016
d. Applicant: Pine Creek Mine, LLC
e. Name of Project: Pine Creek Mine Tunnel Hydroelectric Project
f. Location: The project is located at Pine Creek Mine adjacent to
Morgan and Pine Creeks in Inyo County California. The project's mine
access tunnel, mine plug, mine water storage cavity, penstock,
generator, and most of its primary transmission line would be located
under Federal land managed by the United States Forest Service.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r)
h. Applicant Contacts: Craig N. Rossell, Member, Pine Creek Mine
LLC, 228 West Bonita Avenue Claremont, California 91711, (909) 482-
1000; Lynn Goodfellow, 9050 Pine Creek Road, Bishop, California 93514
(760) 387-2076.
i. FERC Contact: Joseph Hassell, (202) 502-8079 or
joseph.hassell@ferc.gov.
j. This application is not ready for environmental analysis at this
time.
k. The Project Description: The proposed Pine Creek Tunnel
Hydroelectric Project would include: (1) The existing Pine Creek Mine
site, mine
[[Page 11555]]
entrance tunnels, mine shafts, and concrete plug; (2) an existing 30-
foot-long steel pipe that runs through the concrete plug, to be used as
a proposed penstock; (3) a proposed Pelton turbine generating unit
located in the mine tunnel with a total installed capacity of 1.5
megawatts; (4) a proposed underground power line that would run
approximately 2,500 feet from the generating unit to the mine portal;
and (5) another proposed 60-foot-long transmission line from the mine
portal to an existing substation on the mine site. The proposed project
would have an average annual generation of 5.6 gigawatt-hours.
Pine Creek Mine, LLC would seal the mine entrance tunnel to store
approximately 200 feet of groundwater in the existing mine works. The
groundwater would be released at approximately the same rate at which
it recharges the mine, which is about 10 cubic feet per second.
l. Locations of the Application: A copy of the application is
available for review at the Commission in the Public Reference Room or
may be viewed on the Commission's Web site at https://www.ferc.gov using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at
the address in item (h) above.
m. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Procedural Schedule:
The application will be processed according to the following
preliminary Hydro Licensing Schedule. Revisions to the schedule may be
made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready for May 2016.
Environmental Analysis.
Filing of recommendations, preliminary terms July 2016.
and conditions, and fishway prescriptions.
Commission issues Draft EA................... January 2017.
Comments on Draft Environmental Assessment March 2017.
(EA).
Modified terms and conditions................ May 2017.
Commission issues Final EA................... August 2017.
------------------------------------------------------------------------
o. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: February 25, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-04696 Filed 3-3-16; 8:45 am]