Combined Notice of Filings #1, 9846-9847 [2016-04141]

Download as PDF 9846 Federal Register / Vol. 81, No. 38 / Friday, February 26, 2016 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. CP16–76–000] mstockstill on DSK4VPTVN1PROD with NOTICES Cameron Interstate Pipeline LLC; Notice of Application To Amend Take notice that on February 18, 2016, Cameron Interstate Pipeline LLC (Cameron), 488 8th Avenue, San Diego, California 92101, filed in the above referenced docket an application pursuant to section 7(c) of the Natural Gas Act (NGA), and Part 157 of the Commission’s regulations to amend the certificate of public convenience and necessity granted to Cameron on June 19, 2014 in Docket No. CP13–27–000, to decrease the diameter of 3.58 miles of pipeline from 42 to 36 inches, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions concerning this application may be directed to William D. Rapp, Cameron Interstate Pipeline LLC, 488 8th Avenue, San Diego, CA 92101, by telephone at (619) 699–5050. Pursuant to section 157.9 of the Commission’s rules (18 CFR 157.9), within 90 days of this Notice, the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of VerDate Sep<11>2014 20:41 Feb 25, 2016 Jkt 238001 this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit seven copies of filings made in the proceeding with the Commission and must mail a copy to the applicant and to every other party. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE., Washington, DC 20426. Comment Date: 5:00 p.m. Eastern Time on February 29, 2016. Dated: February 19, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–04147 Filed 2–25–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC16–75–000. Applicants: Desert Sunlight 250, LLC, Desert Sunlight 300, LLC, Summit Solar Desert Sunlight, LLC. Description: Joint Application for Authorization under FPA Section 203 of Desert Sunlight 250, LLC, et.al. Filed Date: 2/18/16. Accession Number: 20160218–5214. Comments Due: 5 p.m. ET 3/10/16. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER16–967–000. Applicants: Midcontinent Independent System Operator, Inc., Entergy New Orleans, Inc. Description: § 205(d) Rate Filing: 2016–02–18_ENO Pricing Zone Filing to be effective 9/1/2016. Filed Date: 2/18/16. Accession Number: 20160218–5163. Comments Due: 5 p.m. ET 3/10/16. Docket Numbers: ER16–968–000. Applicants: Pacific Gas and Electric Company. Description: § 205(d) Rate Filing: Silicon Valley Power Work Performance Agreement for Relay Testing to be effective 2/19/2016. Filed Date: 2/18/16. Accession Number: 20160218–5200. Comments Due: 5 p.m. ET 3/10/16. Docket Numbers: ER16–969–000. Applicants: Commonwealth Edison Company, PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: ComEd submits revisions to Attach. H– 13—McHenry wholesale distribution charge to be effective 2/19/2016. Filed Date: 2/19/16. Accession Number: 20160219–5018. Comments Due: 5 p.m. ET 3/11/16. E:\FR\FM\26FEN1.SGM 26FEN1 mstockstill on DSK4VPTVN1PROD with NOTICES Federal Register / Vol. 81, No. 38 / Friday, February 26, 2016 / Notices Docket Numbers: ER16–971–000. Applicants: Public Service Company of New Mexico. Description: Compliance filing: PNM/ Navopache eTariff Compliance Filing— NITSA and NOA to be effective 1/1/ 2016. Filed Date: 2/19/16. Accession Number: 20160219–5047. Comments Due: 5 p.m. ET 3/11/16. Docket Numbers: ER16–972–000. Applicants: Public Service Company of New Mexico. Description: Compliance filing: PNM/ Navopache eTariff Compliance Filing— PSA to be effective 11/1/2015. Filed Date: 2/19/16. Accession Number: 20160219–5048. Comments Due: 5 p.m. ET 3/11/16. Docket Numbers: ER16–973–000. Applicants: Public Service Company of New Mexico. Description: Tariff Cancellation: Notice of Cancellation of Records to be effective 11/1/2015. Filed Date: 2/19/16. Accession Number: 20160219–5049. Comments Due: 5 p.m. ET 3/11/16. Docket Numbers: ER16–974–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2016–02–19_SA 2898 Ameren IllinoisFord County Wind Farm GIA (J375) to be effective 2/20/2016. Filed Date: 2/19/16. Accession Number: 20160219–5079. Comments Due: 5 p.m. ET 3/11/16. Docket Numbers: ER16–975–000. Applicants: New York Independent System Operator, Inc., Niagara Mohawk Power Corporation. Description: Joint Notice of Termination of Small Generator Interconnection Service Agreement No. 1483 Among the New York Independent System Operator, Inc., Niagara Mohawk Power Corporation and Green Power Energy LLC. Filed Date: 2/19/16. Accession Number: 20160219–5081. Comments Due: 5 p.m. ET 3/11/16. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing VerDate Sep<11>2014 20:41 Feb 25, 2016 Jkt 238001 requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: February 19, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–04141 Filed 2–25–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL16–41–000] Morongo Transmission LLC; Notice of Petiton for Declaratory Order Take notice that on February 19, 2016, pursuant to Rule 207 of the Commission’s Rules of Practice and Procedure of the Federal Energy Regulatory Commission’s (Commission), 18 CFR 385.207(a)(2) (2015), Morongo Transmission LLC (Morongo) filed a petition for declaratory order stating that amounts invested by Morongo Transmission in the West of Devers Transmission Upgrade Project in excess of $400 million will receive the same rate treatment that the Commission authorized in its August 25, 2014 order,1 as more fully explained in the petition. Any person desiring to intervene or to protest in this proceeding must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Petitioner. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an 1 Morongo Transmission LLC, 148 FERC 61,139 (2014). PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 9847 eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with an FERC Online service, please email FERCOnlineSupport@ferc.gov.or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern time on March 21, 2016. Dated: February 19, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–04148 Filed 2–25–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP15–504–000] Dominion Carolina Gas Transmission, L.L.C.; Notice of Availability of the Environmental Assessment for the Proposed Columbia to Eastover Project The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared this environmental assessment for the Columbia to Eastover Project (Project) proposed by Dominion Carolina Gas Transmission, L.L.C. in the abovereferenced docket. Dominion Carolina Gas requests authorization to construct, install, own, operate and maintain certain facilities located in Calhoun, Richland, and Lexington Counties, South Carolina. This Project would enable Dominion Carolina Gas to provide 18 million cubic feet per day of firm transportation service to the existing International Paper Plant in Eastover, South Carolina. Specifically, the proposed Project includes the following facilities: • 28 miles of new 8-inch-diameter pipeline; E:\FR\FM\26FEN1.SGM 26FEN1

Agencies

[Federal Register Volume 81, Number 38 (Friday, February 26, 2016)]
[Notices]
[Pages 9846-9847]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-04141]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
corporate filings:
    Docket Numbers: EC16-75-000.
    Applicants: Desert Sunlight 250, LLC, Desert Sunlight 300, LLC, 
Summit Solar Desert Sunlight, LLC.
    Description: Joint Application for Authorization under FPA Section 
203 of Desert Sunlight 250, LLC, et.al.
    Filed Date: 2/18/16.
    Accession Number: 20160218-5214.
    Comments Due: 5 p.m. ET 3/10/16.

    Take notice that the Commission received the following electric 
rate filings:
    Docket Numbers: ER16-967-000.
    Applicants: Midcontinent Independent System Operator, Inc., Entergy 
New Orleans, Inc.
    Description: Sec.  205(d) Rate Filing: 2016-02-18_ENO Pricing Zone 
Filing to be effective 9/1/2016.
    Filed Date: 2/18/16.
    Accession Number: 20160218-5163.
    Comments Due: 5 p.m. ET 3/10/16.

    Docket Numbers: ER16-968-000.
    Applicants: Pacific Gas and Electric Company.
    Description: Sec.  205(d) Rate Filing: Silicon Valley Power Work 
Performance Agreement for Relay Testing to be effective 2/19/2016.
    Filed Date: 2/18/16.
    Accession Number: 20160218-5200.
    Comments Due: 5 p.m. ET 3/10/16.

    Docket Numbers: ER16-969-000.
    Applicants: Commonwealth Edison Company, PJM Interconnection, 
L.L.C.
    Description: Sec.  205(d) Rate Filing: ComEd submits revisions to 
Attach. H-13--McHenry wholesale distribution charge to be effective 2/
19/2016.
    Filed Date: 2/19/16.
    Accession Number: 20160219-5018.
    Comments Due: 5 p.m. ET 3/11/16.


[[Page 9847]]


    Docket Numbers: ER16-971-000.
    Applicants: Public Service Company of New Mexico.
    Description: Compliance filing: PNM/Navopache eTariff Compliance 
Filing--NITSA and NOA to be effective 1/1/2016.
    Filed Date: 2/19/16.
    Accession Number: 20160219-5047.
    Comments Due: 5 p.m. ET 3/11/16.

    Docket Numbers: ER16-972-000.
    Applicants: Public Service Company of New Mexico.
    Description: Compliance filing: PNM/Navopache eTariff Compliance 
Filing--PSA to be effective 11/1/2015.
    Filed Date: 2/19/16.
    Accession Number: 20160219-5048.
    Comments Due: 5 p.m. ET 3/11/16.

    Docket Numbers: ER16-973-000.
    Applicants: Public Service Company of New Mexico.
    Description: Tariff Cancellation: Notice of Cancellation of Records 
to be effective 11/1/2015.
    Filed Date: 2/19/16.
    Accession Number: 20160219-5049.
    Comments Due: 5 p.m. ET 3/11/16.

    Docket Numbers: ER16-974-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2016-02-19_SA 2898 Ameren 
Illinois-Ford County Wind Farm GIA (J375) to be effective 2/20/2016.
    Filed Date: 2/19/16.
    Accession Number: 20160219-5079.
    Comments Due: 5 p.m. ET 3/11/16.

    Docket Numbers: ER16-975-000.
    Applicants: New York Independent System Operator, Inc., Niagara 
Mohawk Power Corporation.
    Description: Joint Notice of Termination of Small Generator 
Interconnection Service Agreement No. 1483 Among the New York 
Independent System Operator, Inc., Niagara Mohawk Power Corporation and 
Green Power Energy LLC.
    Filed Date: 2/19/16.
    Accession Number: 20160219-5081.
    Comments Due: 5 p.m. ET 3/11/16.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: February 19, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-04141 Filed 2-25-16; 8:45 am]
 BILLING CODE 6717-01-P