Drawbridge Operation Regulation; Jamaica Bay and Connecting Waterways, Queens, NY, 9770 [2016-04125]
Download as PDF
9770
Federal Register / Vol. 81, No. 38 / Friday, February 26, 2016 / Rules and Regulations
Appeals Panel (ISCAP) established
pursuant to section 5.3 of Executive
Order 13526. Action by that Panel will
be the subject of rules to be promulgated
by the Information Security Oversight
Office.
Dated: February 11, 2016.
Mark W. Ewing,
Chief Management Officer.
[FR Doc. 2016–04172 Filed 2–25–16; 8:45 am]
BILLING CODE 9500–01–P–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2016–0123]
Drawbridge Operation Regulation;
Jamaica Bay and Connecting
Waterways, Queens, NY
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Marine
Parkway Bridge across the Jamaica Bay,
mile 3.0, at Queens, New York. This
deviation is necessary to allow the
bridge owner to replace the auxiliary
clutch shafts at the bridge.
DATES: This deviation is effective from
7 a.m. on March 14, 2016 to 5 p.m. on
March 25, 2016.
ADDRESSES: The docket for this
deviation, [USCG–2016–0123] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH’’.
Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Judy Leung-Yee,
Project Officer, First Coast Guard
District, telephone (212) 514–4330,
email judy.k.leung-yee@uscg.mil.
SUPPLEMENTARY INFORMATION: The
Marine Parkway Bridge, mile 3.0, across
the Jamaica Bay, has a vertical clearance
in the closed position of 55 feet at mean
high water and 59 feet at mean low
water. The existing bridge operating
regulations are found at 33 CFR
117.795(a).
The waterway is transited by
commercial oil barge traffic of various
sizes.
The bridge owner, MTA Bridges and
Tunnels, requested a temporary
deviation from the normal operating
mstockstill on DSK4VPTVN1PROD with RULES
SUMMARY:
VerDate Sep<11>2014
17:33 Feb 25, 2016
Jkt 238001
schedule to facilitate auxiliary clutch
shafts replacement at the bridge.
Under this temporary deviation, the
Marine Parkway Bridge shall remain in
the closed position from 7 a.m. on
March 14, 2016 to 5 p.m. March 25,
2016.
Vessels able to pass under the bridge
in the closed position may do so at
anytime. The bridge will not be able to
open for emergencies and there is no
immediate alternate route for vessels to
pass.
The Coast Guard will inform the users
of the waterways through our Local
Notice and Broadcast to Mariners of the
change in operating schedule for the
bridge so that vessel operations can
arrange their transits to minimize any
impact caused by the temporary
deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: February 22, 2016.
C.J. Bisignano,
Supervisory Bridge Management Specialist,
First Coast Guard District.
[FR Doc. 2016–04125 Filed 2–25–16; 8:45 am]
BILLING CODE 9110–04–P
ENVIRONMENTAL PROTECTION
AGENCY
40 CFR Part 52
[EPA–R07–OAR–2015–0582; FRL–9942–79–
Region 7]
microgram per cubic meter (mg/m3) lead
NAAQS.
This final rule is effective on
March 28, 2016.
DATES:
EPA has established a
docket for this action under Docket ID
No. EPA–R07–OAR–2015–0582. All
documents in the docket are listed on
the https://www.regulations.gov Web
site. Although listed in the index, some
information is not publicly available,
i.e., CBI or other information whose
disclosure is restricted by statute.
Certain other material, such as
copyrighted material, is not placed on
the Internet and will be publicly
available only in hard copy form.
Publicly available docket materials are
available electronically at
www.regulations.gov and at EPA Region
7, 11201 Renner Boulevard, Lenexa,
Kansas 66219. Please schedule an
appointment during normal business
hours with the contact listed in the FOR
FURTHER INFORMATION CONTACT section.
For additional information and general
guidance, please visit https://
www2.epa.gov/dockets/commentingepa-dockets.
ADDRESSES:
FOR FURTHER INFORMATION CONTACT:
Stephanie Doolan, Environmental
Protection Agency, Air Planning and
Development Branch, 11201 Renner
Boulevard, Lenexa, Kansas 66219 at
(913) 551–7719, or by email at
doolan.stephanie@epa.gov.
SUPPLEMENTARY INFORMATION:
Throughout this document ‘‘we,’’ ‘‘us,’’
or ‘‘our’’ refer to EPA.
Table of Contents
Approval of Iowa’s Air Quality
Implementation Plans; Iowa Plan for
the 2008 Lead Standard
I. What is being addressed in this document?
II. Have the requirements for approval of a
SIP revision been met?
III. EPA’s Response to Comments
IV. What action is EPA taking?
Environmental Protection
Agency (EPA).
ACTION: Final rule.
I. What is being addressed in this
document?
AGENCY:
The Environmental Protection
Agency (EPA) is taking final action to
approve Iowa’s attainment
demonstration State Implementation
Plan (SIP) for the lead National Ambient
Air Quality Standard (NAAQS)
nonattainment area of Council Bluffs,
Pottawattamie County, Iowa, received
by EPA on February 9, 2015. The
applicable standard addressed in this
action is the lead NAAQS promulgated
by EPA in 2008. EPA believes that the
SIP submitted by the state satisfies the
applicable requirements of the Clean Air
Act (CAA), and will bring the
designated portions of Council Bluffs,
Iowa into attainment of the 0.15
SUMMARY:
PO 00000
Frm 00030
Fmt 4700
Sfmt 4700
In this document, EPA is granting
final approval of Iowa’s attainment
demonstration SIP for the lead NAAQS
nonattainment area in portions of
Council Bluffs, Pottawattamie County,
Iowa. The applicable standard
addressed in this action is the lead
NAAQS promulgated by EPA in 2008.
EPA believes that the SIP submitted by
the state satisfies the applicable
requirements of the CAA identified in
EPA’s Final Rule (73 FR 66964, October
15, 2008), and will bring the area into
attainment of the 0.15 microgram per
cubic meter (mg/m3) lead NAAQS. EPA’s
proposal containing the background
information for this action can be found
at 80 FR 59695 (October 2, 2015).
E:\FR\FM\26FER1.SGM
26FER1
Agencies
[Federal Register Volume 81, Number 38 (Friday, February 26, 2016)]
[Rules and Regulations]
[Page 9770]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-04125]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2016-0123]
Drawbridge Operation Regulation; Jamaica Bay and Connecting
Waterways, Queens, NY
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Marine Parkway Bridge across the
Jamaica Bay, mile 3.0, at Queens, New York. This deviation is necessary
to allow the bridge owner to replace the auxiliary clutch shafts at the
bridge.
DATES: This deviation is effective from 7 a.m. on March 14, 2016 to 5
p.m. on March 25, 2016.
ADDRESSES: The docket for this deviation, [USCG-2016-0123] is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH''. Click on Open Docket Folder on the line
associated with this deviation.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Judy Leung-Yee, Project Officer,
First Coast Guard District, telephone (212) 514-4330, email
judy.k.leung-yee@uscg.mil.
SUPPLEMENTARY INFORMATION: The Marine Parkway Bridge, mile 3.0, across
the Jamaica Bay, has a vertical clearance in the closed position of 55
feet at mean high water and 59 feet at mean low water. The existing
bridge operating regulations are found at 33 CFR 117.795(a).
The waterway is transited by commercial oil barge traffic of
various sizes.
The bridge owner, MTA Bridges and Tunnels, requested a temporary
deviation from the normal operating schedule to facilitate auxiliary
clutch shafts replacement at the bridge.
Under this temporary deviation, the Marine Parkway Bridge shall
remain in the closed position from 7 a.m. on March 14, 2016 to 5 p.m.
March 25, 2016.
Vessels able to pass under the bridge in the closed position may do
so at anytime. The bridge will not be able to open for emergencies and
there is no immediate alternate route for vessels to pass.
The Coast Guard will inform the users of the waterways through our
Local Notice and Broadcast to Mariners of the change in operating
schedule for the bridge so that vessel operations can arrange their
transits to minimize any impact caused by the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: February 22, 2016.
C.J. Bisignano,
Supervisory Bridge Management Specialist, First Coast Guard District.
[FR Doc. 2016-04125 Filed 2-25-16; 8:45 am]
BILLING CODE 9110-04-P