Combined Notice of Filings #1, 9180-9181 [2016-03831]
Download as PDF
9180
Federal Register / Vol. 81, No. 36 / Wednesday, February 24, 2016 / Notices
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: February 18, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–03838 Filed 2–23–16; 8:45 am]
BILLING CODE 6717–01–P
DC. There is an ‘‘eSubscription’’ link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on March 10, 2016.
Dated: February 18, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[FR Doc. 2016–03839 Filed 2–23–16; 8:45 am]
BILLING CODE 6717–01–P
Notice of Filing
Docket No.
mstockstill on DSK4VPTVN1PROD with NOTICES
Richardson, Alan C. .............
Chahley, Kris ........................
ID–7484–003
ID–7783–001
Take notice that on February 18, 2016,
Alan C. Richardson and Kris Chahley
submitted for filing, an application for
authority to hold interlocking positions,
pursuant to section 305(b) of the Federal
Power Act (FPA) 1 and Part 45.8 (2015)
of the Federal Energy Regulatory
Commission’s (Commission) 2 Rules of
Practice and Procedure.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
electronic review in the Commission’s
Public Reference Room in Washington,
1 16
2 18
U.S.C. 825d(b) (2015).
CFR part 45 (2015).
VerDate Sep<11>2014
17:59 Feb 23, 2016
Jkt 238001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14749–000]
Energy Resources USA Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On December 22, 2015, the Energy
Resources USA Inc. filed an application
for a preliminary permit under section
4(f) of the Federal Power Act proposing
to study the feasibility of the proposed
Caesar Creek Lake Dam Hydroelectric
Project No. 14749–000, to be located at
the existing Caesar Creek Dam on the
Caesar Creek River, near the City of
Waynesville, in Warren County, Ohio.
The Caesar Creek Lake Dam is owned by
the United States government and
operated by the U.S. Army Corps of
Engineers.
The proposed project would consist
of: (1) A new 12-foot by 7.5-foot by 9foot concrete conduit fitted with a 7-foot
by 8-foot discharge gate; (2) a new 90foot-long, 6-foot-diameter steel penstock
fitted with a butterfly valve; (3) a new
65-foot by 45-foot reinforced concrete
powerhouse containing two 1.4megawatt (MW) horizontal Francis
turbine-generators having a total
combined generating capacity of 2.8
MW; (4) a new 200-foot-long by 60-footwide tailrace; (5) a new 45-foot-long by
30-foot-wide substation; (6) a new 2mile-long, 69-kilovolt transmission line;
and (7) appurtenant facilities. The
project would have an estimated annual
generation of 8.24 gigawatt-hours.
Applicant Contact: Mr. Ander
Gonzalez, 350 Lincoln Road, 2nd Floor,
Miami, FL 33139; telephone (954) 248–
8425.
FERC Contact: Tyrone A. Williams,
(202) 502–6331.
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. The Commission strongly
encourages electronic filing. Please file
comments, motions to intervene, notices
of intent, and competing applications
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14749–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14749) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: February 18, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–03828 Filed 2–23–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER14–153–004;
ER14–154–004; ER10–3143–016; ER10–
2742–007.
Applicants: Gibson City Energy
Center, LLC, Grand Tower Energy
Center, LLC, Lakeswind Power Partners,
LLC, Sabine Cogen, LP, Tilton Energy
LLC.
Description: Amendment to June 26,
2015 Triennial Market-Based Rate
Update Filing for the Central Region of
the Rockland Sellers.
Filed Date: 2/17/16.
E:\FR\FM\24FEN1.SGM
24FEN1
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 81, No. 36 / Wednesday, February 24, 2016 / Notices
Accession Number: 20160217–5219.
Comments Due: 5 p.m. ET 3/9/16.
Docket Numbers: ER16–938–001.
Applicants: Arizona Public Service
Company.
Description: Tariff Amendment:
Energy Imbalance Market OATT
Revisions to be effective 5/1/2016.
Filed Date: 2/17/16.
Accession Number: 20160217–5195.
Comments Due: 5 p.m. ET 3/9/16.
Docket Numbers: ER16–954–001.
Applicants: ISO New England Inc.
Description: Tariff Amendment: Errata
to DARD Pump Parameter Changes to be
effective 3/31/2017.
Filed Date: 2/18/16.
Accession Number: 20160218–5043.
Comments Due: 5 p.m. ET 3/10/16.
Docket Numbers: ER16–959–000.
Applicants: New York Independent
System Operator, Inc.
Description: Compliance filing:
NYISO HTP UDR compliance EL12–98
to be effective 12/31/9998.
Filed Date: 2/17/16.
Accession Number: 20160217–5197.
Comments Due: 5 p.m. ET 3/9/16.
Docket Numbers: ER16–960–000.
Applicants: Big Sandy Peaker Plant,
LLC.
Description: Compliance filing:
Compliance Filing, Informational Filing,
Reactive Tariff Record Doc No ER04–
1103 to be effective 2/17/2016.
Filed Date: 2/17/16.
Accession Number: 20160217–5201.
Comments Due: 5 p.m. ET 3/9/16.
Docket Numbers: ER16–961–000.
Applicants: Wolf Hills Energy, LLC.
Description: Compliance filing:
Compliance Filing, Informational Filing,
Reactive Tariff Record Doc No ER04–
1102 to be effective 2/17/2016.
Filed Date: 2/17/16.
Accession Number: 20160217–5202.
Comments Due: 5 p.m. ET 3/9/16.
Docket Numbers: ER16–962–000.
Applicants: RE Astoria 2 LLC.
Description: Section 205(d) Rate
Filing: Certificate of Concurrence for
LGIA Co-Tenancy Agreement to be
effective 3/27/2016.
Filed Date: 2/18/16.
Accession Number: 20160218–5046.
Comments Due: 5 p.m. ET 3/10/16.
Docket Numbers: ER16–963–000.
Applicants: RE Astoria 2 LLC.
Description: Section 205(d) Rate
Filing: Certificate of Concurrence for
Shared Facilities Agreement to be
effective 3/27/2016.
Filed Date: 2/18/16.
Accession Number: 20160218–5047.
Comments Due: 5 p.m. ET 3/10/16.
Docket Numbers: ER16–964–000.
Applicants: PJM Interconnection,
L.L.C.
VerDate Sep<11>2014
17:59 Feb 23, 2016
Jkt 238001
Description: Section 205(d) Rate
Filing: Original ISA No. 4401, Queue
No. AA1–095 to be effective 1/25/2016.
Filed Date: 2/18/16.
Accession Number: 20160218–5054.
Comments Due: 5 p.m. ET 3/10/16.
Docket Numbers: ER16–965–000.
Applicants: Alabama Power
Company.
Description: Section 205(d) Rate
Filing: Southern Power (Taylor County
Solar Facility II–100MW) LGIA Filing to
be effective 2/4/2016.
Filed Date: 2/18/16.
Accession Number: 20160218–5093.
Comments Due: 5 p.m. ET 3/10/16.
Docket Numbers: ER16–966–000.
Applicants: New York Independent
System Operator, Inc.
Description: Section 205(d) Rate
Filing: Tariff revisions public policy
transmission planning process to be
effective 2/19/2016.
Filed Date: 2/18/16.
Accession Number: 20160218–5113.
Comments Due: 5 p.m. ET 3/10/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 18, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–03831 Filed 2–23–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR16–11–000]
Platte River Midstream, LLC; Notice of
Petition for Declaratory Order
Procedure, 18 CFR 385.207(a)(2) (2015),
Platte River Midstream, LLC, filed a
petition for a declaratory order seeking
an order approving overall tariff and
rate structure for a new crude oil
gathering pipeline system that will
gather crude oil produced from various
points in Weld County, Colorado and
transport it to a central delivery point
near Lucerne, Weld County, Colorado,
all as more fully explained in the
petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on March 18, 2016.
Dated: February 18, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–03825 Filed 2–23–16; 8:45 am]
BILLING CODE 6717–01–P
Take notice that on February 18, 2016,
pursuant to Rule 207(a)(2) of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
PO 00000
Frm 00021
Fmt 4703
Sfmt 9990
9181
E:\FR\FM\24FEN1.SGM
24FEN1
Agencies
[Federal Register Volume 81, Number 36 (Wednesday, February 24, 2016)]
[Notices]
[Pages 9180-9181]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-03831]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER14-153-004; ER14-154-004; ER10-3143-016; ER10-
2742-007.
Applicants: Gibson City Energy Center, LLC, Grand Tower Energy
Center, LLC, Lakeswind Power Partners, LLC, Sabine Cogen, LP, Tilton
Energy LLC.
Description: Amendment to June 26, 2015 Triennial Market-Based Rate
Update Filing for the Central Region of the Rockland Sellers.
Filed Date: 2/17/16.
[[Page 9181]]
Accession Number: 20160217-5219.
Comments Due: 5 p.m. ET 3/9/16.
Docket Numbers: ER16-938-001.
Applicants: Arizona Public Service Company.
Description: Tariff Amendment: Energy Imbalance Market OATT
Revisions to be effective 5/1/2016.
Filed Date: 2/17/16.
Accession Number: 20160217-5195.
Comments Due: 5 p.m. ET 3/9/16.
Docket Numbers: ER16-954-001.
Applicants: ISO New England Inc.
Description: Tariff Amendment: Errata to DARD Pump Parameter
Changes to be effective 3/31/2017.
Filed Date: 2/18/16.
Accession Number: 20160218-5043.
Comments Due: 5 p.m. ET 3/10/16.
Docket Numbers: ER16-959-000.
Applicants: New York Independent System Operator, Inc.
Description: Compliance filing: NYISO HTP UDR compliance EL12-98 to
be effective 12/31/9998.
Filed Date: 2/17/16.
Accession Number: 20160217-5197.
Comments Due: 5 p.m. ET 3/9/16.
Docket Numbers: ER16-960-000.
Applicants: Big Sandy Peaker Plant, LLC.
Description: Compliance filing: Compliance Filing, Informational
Filing, Reactive Tariff Record Doc No ER04-1103 to be effective 2/17/
2016.
Filed Date: 2/17/16.
Accession Number: 20160217-5201.
Comments Due: 5 p.m. ET 3/9/16.
Docket Numbers: ER16-961-000.
Applicants: Wolf Hills Energy, LLC.
Description: Compliance filing: Compliance Filing, Informational
Filing, Reactive Tariff Record Doc No ER04-1102 to be effective 2/17/
2016.
Filed Date: 2/17/16.
Accession Number: 20160217-5202.
Comments Due: 5 p.m. ET 3/9/16.
Docket Numbers: ER16-962-000.
Applicants: RE Astoria 2 LLC.
Description: Section 205(d) Rate Filing: Certificate of Concurrence
for LGIA Co-Tenancy Agreement to be effective 3/27/2016.
Filed Date: 2/18/16.
Accession Number: 20160218-5046.
Comments Due: 5 p.m. ET 3/10/16.
Docket Numbers: ER16-963-000.
Applicants: RE Astoria 2 LLC.
Description: Section 205(d) Rate Filing: Certificate of Concurrence
for Shared Facilities Agreement to be effective 3/27/2016.
Filed Date: 2/18/16.
Accession Number: 20160218-5047.
Comments Due: 5 p.m. ET 3/10/16.
Docket Numbers: ER16-964-000.
Applicants: PJM Interconnection, L.L.C.
Description: Section 205(d) Rate Filing: Original ISA No. 4401,
Queue No. AA1-095 to be effective 1/25/2016.
Filed Date: 2/18/16.
Accession Number: 20160218-5054.
Comments Due: 5 p.m. ET 3/10/16.
Docket Numbers: ER16-965-000.
Applicants: Alabama Power Company.
Description: Section 205(d) Rate Filing: Southern Power (Taylor
County Solar Facility II-100MW) LGIA Filing to be effective 2/4/2016.
Filed Date: 2/18/16.
Accession Number: 20160218-5093.
Comments Due: 5 p.m. ET 3/10/16.
Docket Numbers: ER16-966-000.
Applicants: New York Independent System Operator, Inc.
Description: Section 205(d) Rate Filing: Tariff revisions public
policy transmission planning process to be effective 2/19/2016.
Filed Date: 2/18/16.
Accession Number: 20160218-5113.
Comments Due: 5 p.m. ET 3/10/16.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: February 18, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-03831 Filed 2-23-16; 8:45 am]
BILLING CODE 6717-01-P