Notice of Availability of Environmental Assessment, 8949 [2016-03614]
Download as PDF
Federal Register / Vol. 81, No. 35 / Tuesday, February 23, 2016 / Notices
personal experience, individual advice,
information, or facts regarding this
topic. It is not the object of this session
to obtain any group position or
consensus from the meeting
participants. To most effectively use the
limited time, please refrain from passing
judgment on another participant’s
recommendations or advice, and
instead, concentrate on your individual
experiences.
Following the meeting, a summary
will be compiled by DOE and posted for
public comment. For those interested in
providing additional public comment,
the summary will be posted at
water.energy.gov.
Issued on February 17, 2016, in
Washington, DC.
´
Jose Zayas,
Director, Wind and Water Power Technologies
Office, Office of Energy Efficiency and
Renewable Energy.
[FR Doc. 2016–03764 Filed 2–22–16; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[FFP Project 92, LLC; Project No. 14276–
002; AD13–9–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
Notice of Availability of Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission (Commission or FERC)
regulations, 18 Code of Federal
Regulations (CFR) Part 380, the Office of
Energy Projects has reviewed the
application for original license for the
Kentucky River Lock and Dam No. 11
Hydroelectric Project (FERC Project No.
14276–002). The proposed project
would be located on the Kentucky River
in Estill and Madison Counties,
Kentucky, at the existing Kentucky
River Lock and Dam No. 11 which is
owned by the Commonwealth of
Kentucky and operated by the Kentucky
River Authority. The project would not
occupy federal land.
Staff prepared an environmental
assessment (EA), which analyzes the
potential environmental effects of
licensing the project, and concludes that
licensing the project, with appropriate
environmental protection measures,
would not constitute a major federal
action that would significantly affect the
quality of the human environment.
A copy of the EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
VerDate Sep<11>2014
17:06 Feb 22, 2016
Jkt 238001
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits, in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll-free at 1–866–208–3676,
or for TTY, (202) 502–8659.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
30 days from the date of this notice. The
Commission strongly encourages
electronic filings. Please file comments
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support. In
lieu of electronic filing, please send a
paper copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first
page of any filing should include
‘‘Kentucky River Lock and Dam No. 11
Hydroelectric Project No. 14276–002.’’
For further information, contact Sarah
Salazar at (202) 502–6863, or by email
at sarah.salazar@ferc.gov.
Dated: February 12, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
8949
Docket Numbers: RP16–602–000.
Applicants: East Cheyenne Gas
Storage, LLC.
Description: Compliance filing ECGS
Order No. 587–W Compliance filing 2–
10–16 to be effective 4/1/2016.
Filed Date: 2/10/16.
Accession Number: 20160210–5113.
Comments Due: 5 p.m. ET 2/22/16.
Docket Numbers: RP16–603–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing: TETLP
Feb2016 Cleanup Filing for Rate
Schedule FT–1 to be effective 3/14/
2016.
Filed Date: 2/11/16.
Accession Number: 20160211–5046.
Comments Due: 5 p.m. ET 2/23/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
[FR Doc. 2016–03614 Filed 2–22–16; 8:45 am]
Dated: February 11, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
BILLING CODE 6717–01–P
[FR Doc. 2016–03618 Filed 2–22–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP16–601–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: § 4(d) Rate Filing: 02/10/
16 Negotiated Rates—Mercuria Energy
Gas Trading LLC (HUB) 7540–89 to be
effective 2/10/2016.
Filed Date: 2/10/16.
Accession Number: 20160210–5110.
Comments Due: 5 p.m. ET 2/22/16.
PO 00000
Frm 00055
Fmt 4703
Sfmt 4703
[Docket No. EL15–79–000]
TransSource, LLC v. PJM
Interconnection, LLC; Notice of
Amended and Restated Complaint
Take notice that on February 10, 2016,
pursuant to Rules 206 and 215 of the
Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure, 18 CFR 385.206
and 385.215, TransSource, LLC
(Complainant), filed an amended and
restated complaint to update its original
complaint filed on June 23, 2015 against
PJM Interconnection, LLC (Respondent),
E:\FR\FM\23FEN1.SGM
23FEN1
Agencies
[Federal Register Volume 81, Number 35 (Tuesday, February 23, 2016)]
[Notices]
[Page 8949]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-03614]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[FFP Project 92, LLC; Project No. 14276-002; AD13-9-000]
Notice of Availability of Environmental Assessment
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission (Commission or FERC)
regulations, 18 Code of Federal Regulations (CFR) Part 380, the Office
of Energy Projects has reviewed the application for original license
for the Kentucky River Lock and Dam No. 11 Hydroelectric Project (FERC
Project No. 14276-002). The proposed project would be located on the
Kentucky River in Estill and Madison Counties, Kentucky, at the
existing Kentucky River Lock and Dam No. 11 which is owned by the
Commonwealth of Kentucky and operated by the Kentucky River Authority.
The project would not occupy federal land.
Staff prepared an environmental assessment (EA), which analyzes the
potential environmental effects of licensing the project, and concludes
that licensing the project, with appropriate environmental protection
measures, would not constitute a major federal action that would
significantly affect the quality of the human environment.
A copy of the EA is available for review at the Commission in the
Public Reference Room or may be viewed on the Commission's Web site at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits, in the docket number field to
access the document. For assistance, contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY,
(202) 502-8659.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Any comments should be filed within 30 days from the date of this
notice. The Commission strongly encourages electronic filings. Please
file comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support. In lieu
of electronic filing, please send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426. The first page of any filing should include ``Kentucky River
Lock and Dam No. 11 Hydroelectric Project No. 14276-002.''
For further information, contact Sarah Salazar at (202) 502-6863,
or by email at sarah.salazar@ferc.gov.
Dated: February 12, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-03614 Filed 2-22-16; 8:45 am]
BILLING CODE 6717-01-P