Notice of Availability of Environmental Assessment, 8949 [2016-03614]

Download as PDF Federal Register / Vol. 81, No. 35 / Tuesday, February 23, 2016 / Notices personal experience, individual advice, information, or facts regarding this topic. It is not the object of this session to obtain any group position or consensus from the meeting participants. To most effectively use the limited time, please refrain from passing judgment on another participant’s recommendations or advice, and instead, concentrate on your individual experiences. Following the meeting, a summary will be compiled by DOE and posted for public comment. For those interested in providing additional public comment, the summary will be posted at water.energy.gov. Issued on February 17, 2016, in Washington, DC. ´ Jose Zayas, Director, Wind and Water Power Technologies Office, Office of Energy Efficiency and Renewable Energy. [FR Doc. 2016–03764 Filed 2–22–16; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [FFP Project 92, LLC; Project No. 14276– 002; AD13–9–000] mstockstill on DSK4VPTVN1PROD with NOTICES Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission (Commission or FERC) regulations, 18 Code of Federal Regulations (CFR) Part 380, the Office of Energy Projects has reviewed the application for original license for the Kentucky River Lock and Dam No. 11 Hydroelectric Project (FERC Project No. 14276–002). The proposed project would be located on the Kentucky River in Estill and Madison Counties, Kentucky, at the existing Kentucky River Lock and Dam No. 11 which is owned by the Commonwealth of Kentucky and operated by the Kentucky River Authority. The project would not occupy federal land. Staff prepared an environmental assessment (EA), which analyzes the potential environmental effects of licensing the project, and concludes that licensing the project, with appropriate environmental protection measures, would not constitute a major federal action that would significantly affect the quality of the human environment. A copy of the EA is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// VerDate Sep<11>2014 17:06 Feb 22, 2016 Jkt 238001 www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits, in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ ferc.gov or toll-free at 1–866–208–3676, or for TTY, (202) 502–8659. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Any comments should be filed within 30 days from the date of this notice. The Commission strongly encourages electronic filings. Please file comments using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include ‘‘Kentucky River Lock and Dam No. 11 Hydroelectric Project No. 14276–002.’’ For further information, contact Sarah Salazar at (202) 502–6863, or by email at sarah.salazar@ferc.gov. Dated: February 12, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. 8949 Docket Numbers: RP16–602–000. Applicants: East Cheyenne Gas Storage, LLC. Description: Compliance filing ECGS Order No. 587–W Compliance filing 2– 10–16 to be effective 4/1/2016. Filed Date: 2/10/16. Accession Number: 20160210–5113. Comments Due: 5 p.m. ET 2/22/16. Docket Numbers: RP16–603–000. Applicants: Texas Eastern Transmission, LP. Description: § 4(d) Rate Filing: TETLP Feb2016 Cleanup Filing for Rate Schedule FT–1 to be effective 3/14/ 2016. Filed Date: 2/11/16. Accession Number: 20160211–5046. Comments Due: 5 p.m. ET 2/23/16. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and § 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. [FR Doc. 2016–03614 Filed 2–22–16; 8:45 am] Dated: February 11, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. BILLING CODE 6717–01–P [FR Doc. 2016–03618 Filed 2–22–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP16–601–000. Applicants: Iroquois Gas Transmission System, L.P. Description: § 4(d) Rate Filing: 02/10/ 16 Negotiated Rates—Mercuria Energy Gas Trading LLC (HUB) 7540–89 to be effective 2/10/2016. Filed Date: 2/10/16. Accession Number: 20160210–5110. Comments Due: 5 p.m. ET 2/22/16. PO 00000 Frm 00055 Fmt 4703 Sfmt 4703 [Docket No. EL15–79–000] TransSource, LLC v. PJM Interconnection, LLC; Notice of Amended and Restated Complaint Take notice that on February 10, 2016, pursuant to Rules 206 and 215 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.206 and 385.215, TransSource, LLC (Complainant), filed an amended and restated complaint to update its original complaint filed on June 23, 2015 against PJM Interconnection, LLC (Respondent), E:\FR\FM\23FEN1.SGM 23FEN1

Agencies

[Federal Register Volume 81, Number 35 (Tuesday, February 23, 2016)]
[Notices]
[Page 8949]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-03614]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[FFP Project 92, LLC; Project No. 14276-002; AD13-9-000]


Notice of Availability of Environmental Assessment

    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory Commission (Commission or FERC) 
regulations, 18 Code of Federal Regulations (CFR) Part 380, the Office 
of Energy Projects has reviewed the application for original license 
for the Kentucky River Lock and Dam No. 11 Hydroelectric Project (FERC 
Project No. 14276-002). The proposed project would be located on the 
Kentucky River in Estill and Madison Counties, Kentucky, at the 
existing Kentucky River Lock and Dam No. 11 which is owned by the 
Commonwealth of Kentucky and operated by the Kentucky River Authority. 
The project would not occupy federal land.
    Staff prepared an environmental assessment (EA), which analyzes the 
potential environmental effects of licensing the project, and concludes 
that licensing the project, with appropriate environmental protection 
measures, would not constitute a major federal action that would 
significantly affect the quality of the human environment.
    A copy of the EA is available for review at the Commission in the 
Public Reference Room or may be viewed on the Commission's Web site at 
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits, in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY, 
(202) 502-8659.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    Any comments should be filed within 30 days from the date of this 
notice. The Commission strongly encourages electronic filings. Please 
file comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support. In lieu 
of electronic filing, please send a paper copy to: Secretary, Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426. The first page of any filing should include ``Kentucky River 
Lock and Dam No. 11 Hydroelectric Project No. 14276-002.''
    For further information, contact Sarah Salazar at (202) 502-6863, 
or by email at sarah.salazar@ferc.gov.

    Dated: February 12, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-03614 Filed 2-22-16; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.