Combined Notice of Filings #1, 7335-7336 [2016-02755]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 81, No. 28 / Thursday, February 11, 2016 / Notices
Filed Date: 2/5/16.
Accession Number: 20160205–5172.
Comments Due: 5 p.m. ET 2/26/16.
Docket Numbers: ER16–581–001.
Applicants: ENGIE Portfolio
Management, LLC.
Description: Tariff Amendment:
Supplement to MBR Application &
Request for Shortened Comment Period
to be effective 2/17/2016.
Filed Date: 2/5/16.
Accession Number: 20160205–5202.
Comments Due: 5 p.m. ET 2/26/16.
Docket Numbers: ER16–582–001
Applicants: ENGIE Retail, LLC.
Description: Tariff Amendment:
Supplement to MBR Application &
Request for Shortened Comment Period
to be effective 2/17/2016.
Filed Date: 2/5/16.
Accession Number: 20160205–5204.
Comments Due: 5 p.m. ET 2/26/16.
Docket Numbers: ER16–583–001.
Applicants: GDF SUEZ Energy
Resources NA, Inc.
Description: Tariff Amendment:
Supplement to MBR Application &
Request for Shortened Comment Period
to be effective 2/17/2016.
Filed Date: 2/5/16.
Accession Number: 20160205–5205.
Comments Due: 5 p.m. ET 2/26/16.
Docket Numbers: ER16–901–000.
Applicants: Southwest Power Pool,
Inc.
Description: Section 205(d) Rate
Filing: Revisions to Update Attachment
AF—Frequently Constrained Areas to be
effective 4/5/2016.
Filed Date: 2/5/16.
Accession Number: 20160205–5153.
Comments Due: 5 p.m. ET 2/26/16.
Docket Numbers: ER16–902–000.
Applicants: Voyager Wind I, LLC.
Description: Baseline eTariff Filing:
MBR Application to be effective 4/6/
2016.
Filed Date: 2/5/16.
Accession Number: 20160205–5182.
Comments Due: 5 p.m. ET 2/26/16.
Take notice that the Commission
received the following public utility
holding company filings:
Docket Numbers: PH16–4–000.
Applicants: New Jersey Resources
Corporation.
Description: New Jersey Resources
Corporation submits FERC 65–A
Material Change in Facts of Exemption
Notification.
Filed Date: 2/5/16.
Accession Number: 20160205–5174.
Comments Due: 5 p.m. ET 2/26/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
VerDate Sep<11>2014
16:52 Feb 10, 2016
Jkt 238001
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 5, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–02758 Filed 2–10–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–148–000]
Tennessee Gas Pipeline Company,
L.L.C; Notice of Revised Schedule for
Environmental Review of the
Susquehanna West Project
This notice identifies the Federal
Energy Regulatory Commission staff’s
revised schedule for the completion of
the environmental assessment (EA) for
Tennessee Gas Pipeline Company,
L.L.C.’s (TGP) proposed Susquehanna
West Project. The first notice of
schedule, issued on November 24, 2015,
identified February 23, 2016 as the EA
issuance date. However, TGP has
recently filed supplemental information
that warrants further review. As a result,
staff has revised the schedule for
issuance of the EA.
Schedule for Environmental Review
Issuance of Notice of Availability of
the EA, March 17, 2016.
90-day Federal Authorization
Decision Deadline, June 15, 2016.
If a schedule change becomes
necessary, an additional notice will be
provided so that the relevant agencies
are kept informed of the project’s
progress.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
7335
(https://www.ferc.gov/docs-filing/
esubscription.asp).
Dated: February 5, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–02757 Filed 2–10–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER15–1825–000.
Applicants: California Independent
System Operator Corporation.
Description: Petition for Limited
Waiver to Modify Effective Date and
Request for Shortened Comment Period
of California Independent System
Operator Corporation.
Filed Date: 2/4/16.
Accession Numbers: 20160204–5236,
20160205–5049.
Comments Due: 5 p.m. ET 2/11/16.
Docket Numbers: ER16–898–000.
Applicants: Northern States Power
Company, a Minnesota corporation.
Description: Tariff Cancellation:
20160204_Rate Schedule 601_
Cancellation to be effective 4/30/2015.
Filed Date: 2/4/16.
Accession Number: 20160204–5212.
Comments Due: 5 p.m. ET 2/25/16.
Docket Numbers: ER16–899–000.
Applicants: Orange and Rockland
Utilities, Inc.
Description: Notice of Cancellation of
Power Supply Agreement, Rate
Schedule FERC No. 60, and Request for
Waivers of Orange and Rockland
Utilities, Inc.
Filed Date: 2/4/16.
Accession Number: 20160204–5225.
Comments Due: 5 p.m. ET 2/25/16.
Docket Numbers: ER16–900–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Section 205(d) Rate
Filing: 2016–02–05_SA 2893 Black
Hawk MPFCA (J233, J274, J278, J279) to
be effective 2/6/2016.
Filed Date: 2/5/16.
Accession Number: 20160205–5083.
Comments Due: 5 p.m. ET 2/26/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
E:\FR\FM\11FEN1.SGM
11FEN1
7336
Federal Register / Vol. 81, No. 28 / Thursday, February 11, 2016 / Notices
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 5, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–02755 Filed 2–10–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP14–103–000; CP14–115–
000]
mstockstill on DSK4VPTVN1PROD with NOTICES
Elba Liquefaction Company, LLC,
Southern LNG Company, LLC, Elba
Express Company, LLC; Notice of
Availability of the Environmental
Assessment for the Proposed Elba
Liquefaction Project
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared an
environmental assessment (EA) for the
natural gas facilities proposed by Elba
Liquefaction Company, LLC (ELC),
Southern LNG Company, LLC (SLNG),
and Elba Express Company, LLC (EEC)
(collectively referred to as
‘‘Companies’’) in the above-referenced
dockets. The proposed Elba
Liquefaction Project and EEC
Modification Project are collectively
referred to as the Elba Liquefaction
Project, or Project. The Companies
request authorization to add natural gas
liquefaction and exporting capabilities
to SLNG’s existing Elba Island liquefied
natural gas (LNG) terminal (LNG
Terminal) and abandon SLNG’s existing
LNG truck loading facilities at the LNG
Terminal in Chatham County, Georgia.
In addition, the Companies propose to
construct and operate new and modified
compression and metering facilities in
Hart, Jefferson, and Effingham Counties,
Georgia, and in Jasper County, South
Carolina. The Project would enable
SLNG to export approximately 2.5
million tons per annum of LNG via the
existing LNG Terminal in Chatham
County, Georgia.
VerDate Sep<11>2014
16:52 Feb 10, 2016
Jkt 238001
The EA assesses the potential
environmental effects of the
construction and operation of the
Project in accordance with the
requirements of the National
Environmental Policy Act (NEPA). The
FERC staff concludes that approval of
the proposed Project, with appropriate
mitigating measures, would not
constitute a major federal action
significantly affecting the quality of the
human environment.
The U.S. Department of Energy—
Office of Fossil Energy (DOE–FE), U.S.
Department of Transportation (DOT),
and U.S. Coast Guard (USCG)
participated as cooperating agencies in
the preparation of the EA. Cooperating
agencies have jurisdiction by law or
special expertise with respect to
resources potentially affected by the
proposal and participate in the NEPA
analysis, and will adopt and use the EA
to support their respective approvals for
the Project.
ELC and SLNG propose to construct
and operate liquefaction and export
facilities in two phases at the LNG
Terminal. Phase I of the proposed
facilities associated with the LNG
Terminal includes installation of three
liquefaction system units; installation of
a flare system and a marine flare;
modifications to the LNG Terminal; and
ancillary facilities and support system
modifications. Project facilities
associated with Phase II include
installation of seven additional
liquefaction system units, ancillary
support systems, and potential
additions or upgrades to systems
installed as part of Phase I.
ECC proposes to construct and
operate facilities on its existing pipeline
system in three phases. The Phase I
would include the addition of
approximately 31,800 horsepower (hp)
of compression and metering
modifications to the existing Hartwell
Compressor Station; construction of a
new 15,900 hp compressor station in
Jefferson County, Georgia; construction
of a new 15,900 hp compressor station
in Effingham County, Georgia;
installation of new metering facilities at
existing sites in Chatham and Effingham
County, Georgia and Jasper County,
South Carolina; and modifications to
segregate the two pipelines that
currently extend from Elba Island to
Port Wentworth, Georgia.
Phase II would include the addition of
approximately 15,900 hp of
compression at the existing Hartwell
Compressor Station. Phase III would
include the addition of approximately
15,900 hp at each of the Hartwell,
Jefferson, and Rincon Compressor
Stations.
PO 00000
Frm 00053
Fmt 4703
Sfmt 4703
The FERC staff mailed copies of the
EA to federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American tribes;
potentially affected landowners and
other interested individuals and groups;
newspapers and libraries in the Project
area; and parties to this proceeding. In
addition, the EA is available for public
viewing on the FERC’s Web site
(www.ferc.gov) using the eLibrary link.
A limited number of copies of the EA
are available for distribution and public
inspection at: Federal Energy Regulatory
Commission, Public Reference Room,
888 First Street NE., Room 2A,
Washington, DC 20426, (202) 502–8371.
Any person wishing to comment on
the EA may do so. Your comments
should focus on the potential
environmental effects, reasonable
alternatives, and measures to avoid or
lessen environmental impacts. The more
specific your comments, the more useful
they will be. To ensure that the
Commission has the opportunity to
consider your comments prior to
making its decision on the proposal, it
is important that we receive your
comments in Washington, DC on or
before March 7, 2016.
For your convenience, there are three
methods you can use to submit your
comments to the Commission. In all
instances, please reference the Project
docket numbers (CP14–103–000 and
CP14–115–000) with your submission.
The Commission encourages electronic
filing of comments and has expert staff
available to assist you at (202) 502–8258
or efiling@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for submitting brief, text-only
comments on a project;
(2) You can also file your comments
electronically using the eFiling feature
on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You must select
the type of filing you are making. If you
are filing a comment on a particular
project, please select ‘‘Comment on a
Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
E:\FR\FM\11FEN1.SGM
11FEN1
Agencies
[Federal Register Volume 81, Number 28 (Thursday, February 11, 2016)]
[Notices]
[Pages 7335-7336]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-02755]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER15-1825-000.
Applicants: California Independent System Operator Corporation.
Description: Petition for Limited Waiver to Modify Effective Date
and Request for Shortened Comment Period of California Independent
System Operator Corporation.
Filed Date: 2/4/16.
Accession Numbers: 20160204-5236, 20160205-5049.
Comments Due: 5 p.m. ET 2/11/16.
Docket Numbers: ER16-898-000.
Applicants: Northern States Power Company, a Minnesota corporation.
Description: Tariff Cancellation: 20160204_Rate Schedule
601_Cancellation to be effective 4/30/2015.
Filed Date: 2/4/16.
Accession Number: 20160204-5212.
Comments Due: 5 p.m. ET 2/25/16.
Docket Numbers: ER16-899-000.
Applicants: Orange and Rockland Utilities, Inc.
Description: Notice of Cancellation of Power Supply Agreement, Rate
Schedule FERC No. 60, and Request for Waivers of Orange and Rockland
Utilities, Inc.
Filed Date: 2/4/16.
Accession Number: 20160204-5225.
Comments Due: 5 p.m. ET 2/25/16.
Docket Numbers: ER16-900-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Section 205(d) Rate Filing: 2016-02-05_SA 2893 Black
Hawk MPFCA (J233, J274, J278, J279) to be effective 2/6/2016.
Filed Date: 2/5/16.
Accession Number: 20160205-5083.
Comments Due: 5 p.m. ET 2/26/16.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211
[[Page 7336]]
and 214 of the Commission's Regulations (18 CFR 385.211 and 385.214) on
or before 5:00 p.m. Eastern time on the specified comment date.
Protests may be considered, but intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: February 5, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-02755 Filed 2-10-16; 8:45 am]
BILLING CODE 6717-01-P