Federal Register / Vol. 81, No. 26 / Tuesday, February 9, 2016 / Notices
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 2, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–02468 Filed 2–8–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission’s staff may
attend the following meetings related to
the transmission planning activities of
the PJM Interconnection, L.L.C. (PJM):
PJM Planning Committee: February
11, 2016, 9:30 a.m.–12:00 p.m. (EST)
PJM Transmission Expansion
Advisory Committee: February 11, 2016,
11:00 a.m.–3:00 p.m. (EST)
The above-referenced meetings will
be held at:
PJM Conference and Training Center,
PJM Interconnection, 2750 Monroe
Boulevard, Audubon, PA 19403.
The above-referenced meetings are
open to stakeholders. Further
information may be found at
www.pjm.com.
The discussions at the meetings
described above may address matters at
issue in the following proceedings:
Docket No. ER16–429, PJM
Interconnection, L.L.C.
Docket No. ER16–736, PJM
Interconnection, L.L.C.
Docket No. ER14–972, PJM
Interconnection, L.L.C.
Docket No. ER14–1485, PJM
Interconnection, L.L.C.
Docket Nos. ER13–1944, et al., PJM
Interconnection, L.L.C., et al.
Docket No. ER15–1344, PJM
Interconnection, L.L.C.
Docket No. ER15–1387, PJM
Interconnection, L.L.C. and Potomac
Electric Power Company
Docket No. ER15–2562, PJM
Interconnection, L.L.C.
Docket No. ER15–2563, PJM
Interconnection, L.L.C.
Docket No. EL15–18, Consolidated
Edison Company of New York, Inc. v.
PJM Interconnection, L.L.C.
Docket No. EL15–41, Essential Power
Rock Springs, LLC, et al. v. PJM
Interconnection, L.L.C.
Docket Nos. ER13–1927, et al., PJM
Interconnection, L.L.C., et al.
Docket No. ER15–2114, PJM
Interconnection, L.L.C. and Transource
West Virginia, LLC
Docket No. EL15–79, TransSource,
LLC v. PJM Interconnection, L.L.C.
Docket No. EL15–95, Delaware Public
Service Commission, et al., v. PJM
Interconnection, L.L.C., et al.
Docket No. EL15–67, Linden VFT, LLC
v. PJM Interconnection, L.L.C.
Docket No. EL05–121, PJM
Interconnection, L.L.C.
For more information, contact the
following: Jonathan Fernandez; Office of
Energy Market Regulation, Federal
Energy Regulatory Commission, (202)
502–6604,
Jonathan.Fernandez@ferc.gov; and
Alina Halay; Office of Energy Market
Regulation, Federal Energy Regulatory
Commission, (202) 502–6474,
Alina.Halay@ferc.gov.
Dated: February 3, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–02505 Filed 2–8–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD16–7–000]
James W. Park; Notice of Preliminary
Determination of a Qualifying Conduit
Hydropower Facility and Soliciting
Comments and Motions To Intervene
On January 27, 2016, James W. Park
filed a notice of intent to construct a
qualifying conduit hydropower facility,
pursuant to section 30 of the Federal
Power Act (FPA), as amended by section
4 of the Hydropower Regulatory
Efficiency Act of 2013 (HREA). The
proposed Park Farm Hydro Project
would have an installed capacity of 15
kilowatts (kW), and would be located
along the Lower Latham Ditch at an
existing 400-foot-long concrete drop
structure. The project would be located
near the Town of Kersey, in Weld
County, Colorado.
Applicant Contact: Tim Olsen, PE,
Advanced Energy Systems, LLC, 1428
South Humboldt Street, Denver, CO
80210, Phone No. (303) 908–2439.
FERC Contact: Christopher Chaney,
Phone No. (202) 502–6778, email:
christopher.chaney@ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) A new
powerhouse, approximately 8 feet by 16
feet, at the downstream end of an
existing 4-foot-wide by 400-foot-long
concrete drop structure; (2) a new 400foot-long, 24-inch-diameter PVC
penstock, with a Coanda screen intake,
paralleling the concrete drop structure;
(3) 10 cross flow turbine/generating
units with an installed capacity of 15
kW; and (4) appurtenant facilities.
The proposed project would have a
total installed capacity of 15 kW.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A), as amended by HREA ..
mstockstill on DSK4VPTVN1PROD with NOTICES
Statutory provision
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is operated for the distribution of water
for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts ..................
Y
FPA 30(a)(3)(C)(i), as amended by HREA
FPA 30(a)(3)(C)(ii),
HREA.
VerDate Sep<11>2014
as
amended
17:54 Feb 08, 2016
by
Jkt 238001
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
E:\FR\FM\09FEN1.SGM
09FEN1
Y
Y
Agencies
[Federal Register Volume 81, Number 26 (Tuesday, February 9, 2016)]
[Notices]
[Page 6846]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-02505]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Commission Staff Attendance
The Federal Energy Regulatory Commission hereby gives notice that
members of the Commission's staff may attend the following meetings
related to the transmission planning activities of the PJM
Interconnection, L.L.C. (PJM):
PJM Planning Committee: February 11, 2016, 9:30 a.m.-12:00 p.m.
(EST)
PJM Transmission Expansion Advisory Committee: February 11, 2016,
11:00 a.m.-3:00 p.m. (EST)
The above-referenced meetings will be held at:
PJM Conference and Training Center, PJM Interconnection, 2750
Monroe Boulevard, Audubon, PA 19403.
The above-referenced meetings are open to stakeholders. Further
information may be found at www.pjm.com.
The discussions at the meetings described above may address matters
at issue in the following proceedings:
Docket No. ER16-429, PJM Interconnection, L.L.C.
Docket No. ER16-736, PJM Interconnection, L.L.C.
Docket No. ER14-972, PJM Interconnection, L.L.C.
Docket No. ER14-1485, PJM Interconnection, L.L.C.
Docket Nos. ER13-1944, et al., PJM Interconnection, L.L.C., et al.
Docket No. ER15-1344, PJM Interconnection, L.L.C.
Docket No. ER15-1387, PJM Interconnection, L.L.C. and Potomac
Electric Power Company
Docket No. ER15-2562, PJM Interconnection, L.L.C.
Docket No. ER15-2563, PJM Interconnection, L.L.C.
Docket No. EL15-18, Consolidated Edison Company of New York, Inc.
v. PJM Interconnection, L.L.C.
Docket No. EL15-41, Essential Power Rock Springs, LLC, et al. v.
PJM Interconnection, L.L.C.
Docket Nos. ER13-1927, et al., PJM Interconnection, L.L.C., et al.
Docket No. ER15-2114, PJM Interconnection, L.L.C. and Transource
West Virginia, LLC
Docket No. EL15-79, TransSource, LLC v. PJM Interconnection, L.L.C.
Docket No. EL15-95, Delaware Public Service Commission, et al., v.
PJM Interconnection, L.L.C., et al.
Docket No. EL15-67, Linden VFT, LLC v. PJM Interconnection, L.L.C.
Docket No. EL05-121, PJM Interconnection, L.L.C.
For more information, contact the following: Jonathan Fernandez;
Office of Energy Market Regulation, Federal Energy Regulatory
Commission, (202) 502-6604, Jonathan.Fernandez@ferc.gov; and Alina
Halay; Office of Energy Market Regulation, Federal Energy Regulatory
Commission, (202) 502-6474, Alina.Halay@ferc.gov.
Dated: February 3, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-02505 Filed 2-8-16; 8:45 am]