KC Lake Hydro LLC; Notice of Surrender of Preliminary Permit, 3408 [2016-01122]

Download as PDF 3408 Federal Register / Vol. 81, No. 13 / Thursday, January 21, 2016 / Notices Triennial MBR Update in Docket No. ER10–3063 to be effective 3/14/2016. Filed Date: 1/14/16. Accession Number: 20160114–5363. Comments Due: 5 p.m. ET 3/14/16. Docket Numbers: ER16–732–000. Applicants: Consolidated Edison Company of New York, Inc. Description: § 205(d) Rate Filing: Surcharge—Targeted Demand Management Program and Demo Projects to be effective 1/15/2016. Filed Date: 1/14/16. Accession Number: 20160114–5378. Comments Due: 5 p.m. ET 2/4/16. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 14, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–01114 Filed 1–20–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14558–001] asabaliauskas on DSK9F6TC42PROD with NOTICES KC Lake Hydro LLC; Notice of Surrender of Preliminary Permit Take notice that KC Lake Hydro LLC (KC Hydro) filed a letter on January 7, 2016, describing its decision to abandon the preliminary permit for the proposed North Hadley Lake Warner Dam Hydropower Project.1 The permit was issued on June 26, 2014, and would have expired on May 31, 2017.2 The project would have been located at the outlet of Lake Warner, on the Mill River, 1 While not explicitly stated, KC Hydro’s filing constitutes a request to surrender its preliminary permit. 2 147 FERC ¶ 62,236 (2014). VerDate Sep<11>2014 18:26 Jan 20, 2016 Jkt 238001 near the Town of North Hadley, Hampshire County, Massachusetts. The preliminary permit for Project No. 14558 will remain in effect until the close of business, February 13, 2016. But, if the Commission is closed on this day, then the permit remains in effect until the close of business on the next day in which the Commission is open.3 New applications for this site may not be submitted until after the permit surrender is effective. Dated: January 14, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–01122 Filed 1–20–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14702–000] Twain Resources, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On August 25, 2015, Twain Resources, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Scheelite Water Power Project (Scheelite Project or project) to be located along Pine Creek, near the City of Bishop, in Inyo County, California. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any landdisturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) An intake receiving the water discharge from the Tungstar Redux Water Power Project; (2) an18inch-diameter, approximately 6,500foot-long steel penstock, conveying water to; (3) a powerhouse containing a single 810-kilowatt impulse turbine and an 840 kilovolt-ampere generator; (4) a new substation at the powerhouse; (5) an approximately 600-foot-long, 12kilovolt (kV) transmission line connecting the substation to a 12-kV California Edison-owned transmission line; and (6) appurtenant facilities. The estimated annual generation of the 3 18 PO 00000 CFR 385.2007(a)(2) (2015). Frm 00032 Fmt 4703 Sfmt 4703 Scheelite Project would be 4,860 megawatt-hours. Applicant Contact: Mr. Doug Hicks, 280 Floreca Way, Reno, Nevada 89511, phone (775) 997–3429. FERC Contact: Joseph Hassell; phone: (202) 502–8079. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–14702–000. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14702) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: January 14, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–01123 Filed 1–20–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2533–059] City of Brainerd Public Utility Commission; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: E:\FR\FM\21JAN1.SGM 21JAN1

Agencies

[Federal Register Volume 81, Number 13 (Thursday, January 21, 2016)]
[Notices]
[Page 3408]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-01122]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14558-001]


KC Lake Hydro LLC; Notice of Surrender of Preliminary Permit

    Take notice that KC Lake Hydro LLC (KC Hydro) filed a letter on 
January 7, 2016, describing its decision to abandon the preliminary 
permit for the proposed North Hadley Lake Warner Dam Hydropower 
Project.\1\ The permit was issued on June 26, 2014, and would have 
expired on May 31, 2017.\2\ The project would have been located at the 
outlet of Lake Warner, on the Mill River, near the Town of North 
Hadley, Hampshire County, Massachusetts.
---------------------------------------------------------------------------

    \1\ While not explicitly stated, KC Hydro's filing constitutes a 
request to surrender its preliminary permit.
    \2\ 147 FERC ] 62,236 (2014).
---------------------------------------------------------------------------

    The preliminary permit for Project No. 14558 will remain in effect 
until the close of business, February 13, 2016. But, if the Commission 
is closed on this day, then the permit remains in effect until the 
close of business on the next day in which the Commission is open.\3\ 
New applications for this site may not be submitted until after the 
permit surrender is effective.
---------------------------------------------------------------------------

    \3\ 18 CFR 385.2007(a)(2) (2015).

    Dated: January 14, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-01122 Filed 1-20-16; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.