Combined Notice of Filings #1, 3405-3406 [2016-01119]
Download as PDF
asabaliauskas on DSK9F6TC42PROD with NOTICES
Federal Register / Vol. 81, No. 13 / Thursday, January 21, 2016 / Notices
same address or via phone: (304) 359–
2771 or email: brittanycarns@cpg.com.
On April 16, 2015 the Commission
granted Columbia’s request to utilize the
Pre-Filing Process and assigned Docket
No. PF15–21–000 to staff activities
involved in the WB Xpress Project.
Now, as of the filing of the December 30
application, the Pre-Filing Process for
this Project has ended. From this time
forward, this proceeding will be
conducted in Docket No. CP16–38–000
as noted in the caption of this Notice.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule will serve to notify
federal and state agencies of the timing
for the completion of all necessary
reviews, and the subsequent need to
complete all federal authorizations
within 90 days of the date of issuance
of the Commission staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
5 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
VerDate Sep<11>2014
18:26 Jan 20, 2016
Jkt 238001
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 7 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern time
on February 4, 2016.
Dated: January 14, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–01116 Filed 1–20–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC16–60–000.
Applicants: Aspirity Energy MidStates, LLC, Aspirity Energy Northeast,
LLC.
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
3405
Description: Application of Aspirity
Energy Northeast, LLC, et al. for
Authorization under Section 203 of the
FPA and Requests for Expedited
Consideration and Confidential
Treatment.
Filed Date: 1/13/16.
Accession Number: 20160113–5289.
Comments Due: 5 p.m. ET 2/3/16.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG16–38–000.
Applicants: Innovative Solar 43, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator (EWG) of Innovative Solar 43,
LLC.
Filed Date: 1/13/16.
Accession Number: 20160113–5225.
Comments Due: 5 p.m. ET 2/3/16.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1818–012;
ER10–1819–014; ER10–1820–017;
ER10–1817–013.
Applicants: Public Service Company
of Colorado, Northern States Power
Company, a Minnesota corporation,
Northern States Power Company, a
Wisconsin corporation, Southwestern
Public Service Company.
Description: Triennial Market Power
Analysis and Notice of Change in Status
of Public Service Company of Colorado,
et al.
Filed Date: 1/14/16.
Accession Number: 20160114–5292.
Comments Due: 5 p.m. ET 3/14/16.
Docket Numbers: ER14–1656–007.
Applicants: CSOLAR IV West, LLC.
Description: Notification of Change in
Status of CSOLAR IV West, LLC.
Filed Date: 1/14/16.
Accession Number: 20160114–5268.
Comments Due: 5 p.m. ET 2/4/16.
Docket Numbers: ER15–2679–002.
Applicants: Latigo Wind Park, LLC.
Description: Compliance filing: Latigo
Wind Park, LLC MBR Tariff to be
effective 11/15/2015.
Filed Date: 1/14/16.
Accession Number: 20160114–5273.
Comments Due: 5 p.m. ET 2/4/16.
Docket Numbers: ER15–2680–002.
Applicants: Sandstone Solar LLC.
Description: Compliance filing:
Sandstone Solar LLC MBR Tariff to be
effective 11/1/2015.
Filed Date: 1/14/16.
Accession Number: 20160114–5272.
Comments Due: 5 p.m. ET 2/4/16.
Docket Numbers: ER16–452–003.
Applicants: RE Tranquillity LLC.
Description: Tariff Amendment:
Additional Amendment to Application
E:\FR\FM\21JAN1.SGM
21JAN1
3406
Federal Register / Vol. 81, No. 13 / Thursday, January 21, 2016 / Notices
and Initial Tariff Filing to be effective
12/3/2015.
Filed Date: 1/13/16.
Accession Number: 20160113–5236.
Comments Due: 5 p.m. ET 1/27/16.
Docket Numbers: ER16–730–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing:
Basin Electric NITSA Rev 3 to be
effective 1/1/2016.
Filed Date: 1/14/16.
Accession Number: 20160114–5290.
Comments Due: 5 p.m. ET 2/4/16.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES16–19–000.
Applicants: Union Electric Company.
Description: Application of Union
Electric Company for Section 204
financing authority.
Filed Date: 1/14/16.
Accession Number: 20160114–5303.
Comments Due: 5 p.m. ET 2/4/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 14, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–01119 Filed 1–20–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
asabaliauskas on DSK9F6TC42PROD with NOTICES
Federal Energy Regulatory
Commission
[Project No. P–14721–000]
The City of Springfield; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On October 13, 2015, the City of
Springfield, Massachusetts (Springfield)
VerDate Sep<11>2014
18:26 Jan 20, 2016
Jkt 238001
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to
study the feasibility of the Watershops
Pond Dam Hydroelectric Project
(project) to be located on the Mill River,
near Springfield, Hampden County,
Massachusetts. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist
of: (1) The existing 105-foot-long, 32foot-high, concrete and masonry gravity
Watershops Pond dam; (2) an existing
198-acre impoundment with a normal
maximum water surface elevation of 155
feet above mean sea level; (3) a new 7foot-long, 4-foot-wide steel penstock; (4)
a new 100-foot-long, 30-foot-wide
powerhouse containing a single turbine
generator unit with an installed capacity
of 145 kilowatts; (5) a new 800-footlong, 0.48-kilovolt transmission line;
and (6) appurtenant facilities. The
project would have an estimated average
annual energy generation of 707
megawatt-hours. There are no federal
lands associated with the project.
Applicant Contact: Mr. Peter J.
Garvey, Director, Department of Capital
Asset Construction, 36 Court Street,
Room 312, Springfield, Massachusetts
01103; phone: (413) 787–6445.
FERC Contact: Michael Watts; phone:
(202) 502–6123; email: michael.watts@
ferc.gov.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14721–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14721) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: January 14, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–01118 Filed 1–20–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Termination of Requirement
To FileFourth Quarter 2015 Land
Acquisition Reports
Take notice that sellers with marketbased rate authority need not submit
reports for the fourth quarter of 2015
documenting the acquisition of control
of sites for new generation capacity
development (land acquisition reports).
Order No. 816,1 which will become
effective on January 28, 2016, terminates
the requirement to submit such reports.
Therefore, land acquisition reports for
the fourth quarter of 2015, which would
have been due on January 30, 2016, are
not required.
Dated: January 14, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–01117 Filed 1–20–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. P–14743–000]
ORPC Maine, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On December 4, 2015, ORPC Maine,
LLC (ORPC Maine) filed an application
1 Refinements to Policies and Procedures for
Market-Based Rates for Wholesale Sales of Electric
Energy, Capacity and Ancillary Services by Public
Utilities, Order No. 816, 80 FR 67,056 (Oct. 30,
2015), FERC Stats. & Regs. ¶ 31,374 (2015).
E:\FR\FM\21JAN1.SGM
21JAN1
Agencies
[Federal Register Volume 81, Number 13 (Thursday, January 21, 2016)]
[Notices]
[Pages 3405-3406]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-01119]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
corporate filings:
Docket Numbers: EC16-60-000.
Applicants: Aspirity Energy Mid-States, LLC, Aspirity Energy
Northeast, LLC.
Description: Application of Aspirity Energy Northeast, LLC, et al.
for Authorization under Section 203 of the FPA and Requests for
Expedited Consideration and Confidential Treatment.
Filed Date: 1/13/16.
Accession Number: 20160113-5289.
Comments Due: 5 p.m. ET 2/3/16.
Take notice that the Commission received the following exempt
wholesale generator filings:
Docket Numbers: EG16-38-000.
Applicants: Innovative Solar 43, LLC.
Description: Notice of Self-Certification of Exempt Wholesale
Generator (EWG) of Innovative Solar 43, LLC.
Filed Date: 1/13/16.
Accession Number: 20160113-5225.
Comments Due: 5 p.m. ET 2/3/16.
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-1818-012; ER10-1819-014; ER10-1820-017; ER10-
1817-013.
Applicants: Public Service Company of Colorado, Northern States
Power Company, a Minnesota corporation, Northern States Power Company,
a Wisconsin corporation, Southwestern Public Service Company.
Description: Triennial Market Power Analysis and Notice of Change
in Status of Public Service Company of Colorado, et al.
Filed Date: 1/14/16.
Accession Number: 20160114-5292.
Comments Due: 5 p.m. ET 3/14/16.
Docket Numbers: ER14-1656-007.
Applicants: CSOLAR IV West, LLC.
Description: Notification of Change in Status of CSOLAR IV West,
LLC.
Filed Date: 1/14/16.
Accession Number: 20160114-5268.
Comments Due: 5 p.m. ET 2/4/16.
Docket Numbers: ER15-2679-002.
Applicants: Latigo Wind Park, LLC.
Description: Compliance filing: Latigo Wind Park, LLC MBR Tariff to
be effective 11/15/2015.
Filed Date: 1/14/16.
Accession Number: 20160114-5273.
Comments Due: 5 p.m. ET 2/4/16.
Docket Numbers: ER15-2680-002.
Applicants: Sandstone Solar LLC.
Description: Compliance filing: Sandstone Solar LLC MBR Tariff to
be effective 11/1/2015.
Filed Date: 1/14/16.
Accession Number: 20160114-5272.
Comments Due: 5 p.m. ET 2/4/16.
Docket Numbers: ER16-452-003.
Applicants: RE Tranquillity LLC.
Description: Tariff Amendment: Additional Amendment to Application
[[Page 3406]]
and Initial Tariff Filing to be effective 12/3/2015.
Filed Date: 1/13/16.
Accession Number: 20160113-5236.
Comments Due: 5 p.m. ET 1/27/16.
Docket Numbers: ER16-730-000.
Applicants: PacifiCorp.
Description: Sec. 205(d) Rate Filing: Basin Electric NITSA Rev 3
to be effective 1/1/2016.
Filed Date: 1/14/16.
Accession Number: 20160114-5290.
Comments Due: 5 p.m. ET 2/4/16.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES16-19-000.
Applicants: Union Electric Company.
Description: Application of Union Electric Company for Section 204
financing authority.
Filed Date: 1/14/16.
Accession Number: 20160114-5303.
Comments Due: 5 p.m. ET 2/4/16.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: January 14, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-01119 Filed 1-20-16; 8:45 am]
BILLING CODE 6717-01-P