Download as PDF asabaliauskas on DSK9F6TC42PROD with NOTICES Federal Register / Vol. 81, No. 13 / Thursday, January 21, 2016 / Notices for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Western Passage Tidal Energy Project No. 14743 (Western Passage Project) to be located in Western Passage, near the City of Eastport, Washington County, Maine. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of: (1) 15 double TidGen® TGU hydrokinetic tidal devices, each consisting of a 500-kilowatt turbinegenerator unit for a combined capacity of 5,000 kilowatts; (2) an anchoring support structure; (3) a mooring system; (4) a 3,900 to 4,200-foot-long submersible cable connecting the turbine-generator units to a shore station; (5) a 1,900 to 4,600-foot-long, 4.16- to 12.7-kilovolt transmission line connecting the shore station to an existing distribution line; and (6) appurtenant facilities. The estimated average annual generation of the Western Passage Project would be 2.6 to 3.53 gigawatt-hours. There are no federal lands associated with the project. Applicant Contact: Christopher R. Sauer, President and CEO, Ocean Renewable Power Company, LLC, 66 Pearl Street, Suite 301, Portland, Maine 04101; phone: (207) 772–7707. FERC Contact: Michael Watts; phone: (202) 502–6123; email: michael.watts@ ferc.gov. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 VerDate Sep<11>2014 18:26 Jan 20, 2016 Jkt 238001 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–14743–000. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14743) in the docket number field to access the document. For assistance, contact FERC Online Support. 3407 Wind II LLC, Farmers City Wind, LLC, Flat Rock Windpower LLC, Flat Rock Windpower II LLC, Flying Cloud Power Partners, LLC, Groton Wind, LLC, Hardscrabble Wind Power LLC, Hay Canyon Wind LLC, Iberdrola Arizona Renewables, LLC, Iberdrola Renewables, LLC, Juniper Canyon Wind Power LLC, Klamath Energy LLC, Klamath Generation LLC, Klondike Wind Power LLC, Klondike Wind Power II LLC, Klondike Wind Power III LLC, Leaning Juniper Wind Power II LLC, Lempster Wind, LLC, Locust Ridge Wind Farm, LLC, Locust Ridge II, LLC, Manzana Wind LLC, MinnDakota Wind LLC, Dated: January 14, 2016. Moraine Wind LLC, Moraine Wind II Nathaniel J. Davis, Sr., LLC, Mountain View Power Partners III, Deputy Secretary. LLC, New England Wind, LLC, New [FR Doc. 2016–01124 Filed 1–20–16; 8:45 am] Harvest Wind Project LLC, Northern BILLING CODE 6717–01–P Iowa Windpower II LLC, Pebble Springs Wind LLC, Providence Heights Wind, LLC, Rugby Wind LLC, San Luis Solar DEPARTMENT OF ENERGY LLC, Shiloh I Wind Project, LLC, South Chestnut LLC, Star Point Wind Project Federal Energy Regulatory Commission LLC, Streator-Cayuga Ridge Wind Power LLC, Trimont Wind I LLC, Twin Buttes Combined Notice of Filings #2 Wind LLC, Central Maine Power Company, New York State Electric & Take notice that the Commission Gas Corporation, Rochester Gas & received the following electric rate Electric Corporation, The United filings: Illuminating Company, GenConn Devon Docket Numbers: ER10–2822–008; LLC, GenConn Energy LLC, GenConn ER12–2076–005; ER11–2462–006; Middletown LLC. ER11–2463–006; ER11–2112–007; Description: Notice of Change in ER12–2077–005; ER12–2078–005; Status of the AVANGRID MBR Sellers. ER10–2828–003; ER11–2464–006; Filed Date: 1/14/16. ER10–3158–006; ER10–2942–005; Accession Number: 20160114–5314. ER12–2081–005; ER12–2083–005; Comments Due: 5 p.m. ET 2/4/16. ER12–2084–005; ER10–2423–006; Docket Numbers: ER12–1895–000; ER10–2404–006; ER12–2086–005; EL12–110–000; ER11–3657–000; EL11– ER12–2649–003; ER10–1725–003; 64–000. ER11–2465–007; ER14–2676–002; Applicants: Entergy Services, Inc. ER10–2994–013; ER11–2466–006; Description: Entergy Services, Inc. ER11–2467–006; ER11–2468–006; submits tariff filing per 35.19a(b): ER11–2469–006; ER11–2470–006; Refund Report to be effective N/A. ER11–2471–006; ER11–2472–006; Filed Date: 1/14/16. ER10–3001–004; ER10–3002–003; Accession Number: 20160114–5336. ER10–3004–004; ER12–308–006; ER12– Comments Due: 5 p.m. ET 2/4/16. 2108–005; ER12–2097–005; ER12–2101– Docket Numbers: ER15–762–006; 005; ER10–3162–006; ER12–422–005; ER15–760–005; ER15–1579–004; ER 15– ER12–2102–006; ER12–2109–005; 1582–005; ER15–1914–006; ER15–1896– ER11–2473–006; ER10–3010–003; 004. ER12–2106–005; ER11–2196–007; Applicants: Sierra Solar Greenworks ER10–3161–006; ER12–96–005; ER11– 2474–008; ER10–3031–003; ER12–2107– LLC, Western Antelope Blue Sky Ranch A LLC, 67RK 8me LLC, 65HK 8me LLC, 005; ER11–2475–006; ER10–2285–005; 87RL 8me LLC, Eden Solar, LLC. ER10–2301–003; ER10–2306–003; Description: Notice of Non-Material ER10–3160–002; ER10–2812–013; Change in Status of Sierra Solar ER10–1291–020; ER10–2843–012. Greenworks LLC, et. al. Applicants: Atlantic Renewables Filed Date: 1/14/16. Projects II LLC, Barton Windpower LLC, Accession Number: 20160114–5315. Big Horn Wind Project LLC, Big Horn II Comments Due: 5 p.m. ET 2/4/16. Wind Project LLC, Blue Creek Wind Farm LLC, Buffalo Ridge I LLC, Buffalo Docket Numbers: ER16–731–000. Ridge II LLC, Casselman Windpower Applicants: Green Country Energy, LLC, Colorado Green Holdings LLC, LLC. Description: Market-Based Triennial Dillon Wind LLC, Elk River Windfarm, Review Filing: Green Country Energy LLC, Elm Creek Wind, LLC, Elm Creek PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\21JAN1.SGM 21JAN1 3408 Federal Register / Vol. 81, No. 13 / Thursday, January 21, 2016 / Notices Triennial MBR Update in Docket No. ER10–3063 to be effective 3/14/2016. Filed Date: 1/14/16. Accession Number: 20160114–5363. Comments Due: 5 p.m. ET 3/14/16. Docket Numbers: ER16–732–000. Applicants: Consolidated Edison Company of New York, Inc. Description: § 205(d) Rate Filing: Surcharge—Targeted Demand Management Program and Demo Projects to be effective 1/15/2016. Filed Date: 1/14/16. Accession Number: 20160114–5378. Comments Due: 5 p.m. ET 2/4/16. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 14, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–01114 Filed 1–20–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14558–001] asabaliauskas on DSK9F6TC42PROD with NOTICES KC Lake Hydro LLC; Notice of Surrender of Preliminary Permit Take notice that KC Lake Hydro LLC (KC Hydro) filed a letter on January 7, 2016, describing its decision to abandon the preliminary permit for the proposed North Hadley Lake Warner Dam Hydropower Project.1 The permit was issued on June 26, 2014, and would have expired on May 31, 2017.2 The project would have been located at the outlet of Lake Warner, on the Mill River, 1 While not explicitly stated, KC Hydro’s filing constitutes a request to surrender its preliminary permit. 2 147 FERC ¶ 62,236 (2014). VerDate Sep<11>2014 18:26 Jan 20, 2016 Jkt 238001 near the Town of North Hadley, Hampshire County, Massachusetts. The preliminary permit for Project No. 14558 will remain in effect until the close of business, February 13, 2016. But, if the Commission is closed on this day, then the permit remains in effect until the close of business on the next day in which the Commission is open.3 New applications for this site may not be submitted until after the permit surrender is effective. Dated: January 14, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–01122 Filed 1–20–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14702–000] Twain Resources, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On August 25, 2015, Twain Resources, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Scheelite Water Power Project (Scheelite Project or project) to be located along Pine Creek, near the City of Bishop, in Inyo County, California. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any landdisturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) An intake receiving the water discharge from the Tungstar Redux Water Power Project; (2) an18inch-diameter, approximately 6,500foot-long steel penstock, conveying water to; (3) a powerhouse containing a single 810-kilowatt impulse turbine and an 840 kilovolt-ampere generator; (4) a new substation at the powerhouse; (5) an approximately 600-foot-long, 12kilovolt (kV) transmission line connecting the substation to a 12-kV California Edison-owned transmission line; and (6) appurtenant facilities. The estimated annual generation of the 3 18 PO 00000 CFR 385.2007(a)(2) (2015). Frm 00032 Fmt 4703 Sfmt 4703 Scheelite Project would be 4,860 megawatt-hours. Applicant Contact: Mr. Doug Hicks, 280 Floreca Way, Reno, Nevada 89511, phone (775) 997–3429. FERC Contact: Joseph Hassell; phone: (202) 502–8079. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–14702–000. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14702) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: January 14, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–01123 Filed 1–20–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2533–059] City of Brainerd Public Utility Commission; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: E:\FR\FM\21JAN1.SGM 21JAN1

Agencies

[Federal Register Volume 81, Number 13 (Thursday, January 21, 2016)]
[Notices]
[Pages 3407-3408]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-01114]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #2

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-2822-008; ER12-2076-005; ER11-2462-006; ER11-
2463-006; ER11-2112-007; ER12-2077-005; ER12-2078-005; ER10-2828-003; 
ER11-2464-006; ER10-3158-006; ER10-2942-005; ER12-2081-005; ER12-2083-
005; ER12-2084-005; ER10-2423-006; ER10-2404-006; ER12-2086-005; ER12-
2649-003; ER10-1725-003; ER11-2465-007; ER14-2676-002; ER10-2994-013; 
ER11-2466-006; ER11-2467-006; ER11-2468-006; ER11-2469-006; ER11-2470-
006; ER11-2471-006; ER11-2472-006; ER10-3001-004; ER10-3002-003; ER10-
3004-004; ER12-308-006; ER12-2108-005; ER12-2097-005; ER12-2101-005; 
ER10-3162-006; ER12-422-005; ER12-2102-006; ER12-2109-005; ER11-2473-
006; ER10-3010-003; ER12-2106-005; ER11-2196-007; ER10-3161-006; ER12-
96-005; ER11-2474-008; ER10-3031-003; ER12-2107-005; ER11-2475-006; 
ER10-2285-005; ER10-2301-003; ER10-2306-003; ER10-3160-002; ER10-2812-
013; ER10-1291-020; ER10-2843-012.
    Applicants: Atlantic Renewables Projects II LLC, Barton Windpower 
LLC, Big Horn Wind Project LLC, Big Horn II Wind Project LLC, Blue 
Creek Wind Farm LLC, Buffalo Ridge I LLC, Buffalo Ridge II LLC, 
Casselman Windpower LLC, Colorado Green Holdings LLC, Dillon Wind LLC, 
Elk River Windfarm, LLC, Elm Creek Wind, LLC, Elm Creek Wind II LLC, 
Farmers City Wind, LLC, Flat Rock Windpower LLC, Flat Rock Windpower II 
LLC, Flying Cloud Power Partners, LLC, Groton Wind, LLC, Hardscrabble 
Wind Power LLC, Hay Canyon Wind LLC, Iberdrola Arizona Renewables, LLC, 
Iberdrola Renewables, LLC, Juniper Canyon Wind Power LLC, Klamath 
Energy LLC, Klamath Generation LLC, Klondike Wind Power LLC, Klondike 
Wind Power II LLC, Klondike Wind Power III LLC, Leaning Juniper Wind 
Power II LLC, Lempster Wind, LLC, Locust Ridge Wind Farm, LLC, Locust 
Ridge II, LLC, Manzana Wind LLC, MinnDakota Wind LLC, Moraine Wind LLC, 
Moraine Wind II LLC, Mountain View Power Partners III, LLC, New England 
Wind, LLC, New Harvest Wind Project LLC, Northern Iowa Windpower II 
LLC, Pebble Springs Wind LLC, Providence Heights Wind, LLC, Rugby Wind 
LLC, San Luis Solar LLC, Shiloh I Wind Project, LLC, South Chestnut 
LLC, Star Point Wind Project LLC, Streator-Cayuga Ridge Wind Power LLC, 
Trimont Wind I LLC, Twin Buttes Wind LLC, Central Maine Power Company, 
New York State Electric & Gas Corporation, Rochester Gas & Electric 
Corporation, The United Illuminating Company, GenConn Devon LLC, 
GenConn Energy LLC, GenConn Middletown LLC.
    Description: Notice of Change in Status of the AVANGRID MBR 
Sellers.
    Filed Date: 1/14/16.
    Accession Number: 20160114-5314.
    Comments Due: 5 p.m. ET 2/4/16.

    Docket Numbers: ER12-1895-000; EL12-110-000; ER11-3657-000; EL11-
64-000.
    Applicants: Entergy Services, Inc.
    Description: Entergy Services, Inc. submits tariff filing per 
35.19a(b): Refund Report to be effective N/A.
    Filed Date: 1/14/16.
    Accession Number: 20160114-5336.
    Comments Due: 5 p.m. ET 2/4/16.

    Docket Numbers: ER15-762-006; ER15-760-005; ER15-1579-004; ER 15-
1582-005; ER15-1914-006; ER15-1896-004.
    Applicants: Sierra Solar Greenworks LLC, Western Antelope Blue Sky 
Ranch A LLC, 67RK 8me LLC, 65HK 8me LLC, 87RL 8me LLC, Eden Solar, LLC.
    Description: Notice of Non-Material Change in Status of Sierra 
Solar Greenworks LLC, et. al.
    Filed Date: 1/14/16.
    Accession Number: 20160114-5315.
    Comments Due: 5 p.m. ET 2/4/16.

    Docket Numbers: ER16-731-000.
    Applicants: Green Country Energy, LLC.
    Description: Market-Based Triennial Review Filing: Green Country 
Energy

[[Page 3408]]

Triennial MBR Update in Docket No. ER10-3063 to be effective 3/14/2016.
    Filed Date: 1/14/16.
    Accession Number: 20160114-5363.
    Comments Due: 5 p.m. ET 3/14/16.

    Docket Numbers: ER16-732-000.
    Applicants: Consolidated Edison Company of New York, Inc.
    Description: Sec.  205(d) Rate Filing: Surcharge--Targeted Demand 
Management Program and Demo Projects to be effective 1/15/2016.
    Filed Date: 1/14/16.
    Accession Number: 20160114-5378.
    Comments Due: 5 p.m. ET 2/4/16.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: January 14, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-01114 Filed 1-20-16; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.