PE Hydro Generation, LLC; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 2857-2858 [2016-00819]

Download as PDF Federal Register / Vol. 81, No. 11 / Tuesday, January 19, 2016 / Notices CFR 1501.6, made under 18 CFR 385.2201(e) (1) (v). The following is a list of off-therecord communications recently received by the Secretary of the Commission. The communications listed are grouped by docket numbers in ascending order. These filings are available for electronic review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the eLibrary link. Enter the docket number, excluding the Docket No. 2. 3. 4. 5. 6. CP15–558–000 ........................................................... CP16–21–000 ............................................................. CP16–21–000 ............................................................. CP16–9–000 ............................................................... CP16–21–000 ............................................................. 1 Memo last three digits, in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202)502–8659. File date Prohibited: 1. CP15–554–000 ........................................................... 2. CP–15–554–000 ......................................................... 3. CP15–554–000 ........................................................... 4. CP16–21–000 ............................................................. 5. EL15–623–000, EL15–29–000, EL15–70–000, EL15– 71–000, EL15–72–000, EL15–82–000. 6. CP16–21–000 ............................................................. 7. CP15–520–000 ........................................................... Exempt: 1. CP15–558–000 ........................................................... 12–28–2015 12–28–2015 12–28–2015 1–4–2016 1–5–2016 1–5–2016 1–8–2016 12–28–2015 12–28–2015 1–4–2016 1–4–2016 1–4–2016 1–5–2016 2857 Presenter or requester William Long. Bobby Albrite. James Lee. Peter Stasiowski. FERC Staff.1 Christine Dudley-Marling. FERC Staff.2 Delaware Township, New Jersey Municipal Clerk Judith Allen. Township of Hopewell, New Jersey Mayor Harvey Lester. U.S. House Representative Paul D. Tonko. State of Massachusetts Senate President Stan Rosenberg. U.S. House Representative Stephen F. Lynch. U.S. Senator Kirsten Gillibrand. forwarding post conference notes and transcript for PJM Interconnection, LLM Capacity Performance filing. Summary from January 8, 2016 conference call with Shannon Miller and Jacqueline Rocan of Tennessee Gas Pipeline Company, 2 Meeting LLC. Dated: January 12, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–00817 Filed 1–15–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2343–086] asabaliauskas on DSK5VPTVN1PROD with NOTICES PE Hydro Generation, LLC; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 2343–086. c. Date Filed: December 30, 2015. d. Applicant: PE Hydro Generation, LLC (PE Hydro). e. Name of Project: Millville Hydroelectric Project. f. Location: The existing project is located on the Shenandoah River, near the town of Harpers Ferry in Jefferson County, West Virginia. No federal lands are occupied by project works or located within the project boundary. VerDate Sep<11>2014 18:44 Jan 15, 2016 Jkt 238001 g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r). h. Applicant Contact: Juan Kimble, President, PE Hydro Generation, LLC, 5425 Wisconsin Avenue, 6th Floor, Chevy Chase, MD 20815; Telephone— (301) 718–4496. i. FERC Contact: Michael Spencer, (202) 502–6093, or michael.spencer@ ferc.gov. j. This application is not ready for environmental analysis (EA) at this time. k. Project Description: The Millville project consists of: (1) A 14.0-foot-high concrete and stone dam consisting of three sections: a 36-foot-long nonoverflow abutment on the east bank; an 813-foot long, non-gated spillway section; and a 122-foot-long intake structure, equipped with four vertical lift gates and one canal gate, and extending to the west riverbank; (2) a 100 acre reservoir with gross storage capacity of 900 acre-feet at elevation 324.0 mean sea level; (3) a 1,600-footlong, 30-foot-wide, 12-foot-high masonry and concrete sided headrace canal; (4) a 125-foot-long, 40-foot-wide brick powerhouse containing 3 turbinegenerating units with a combined capacity of 2.84 megawatts; (5) a 550foot-long tailrace, excavated in bedrock and returning flow to the river channel; and (6) a 1,006-foot-long, 2.4 kilovolt (kV) transmission line to a transformer, with a 794-foot-long, 34.5 kV transmission line to the interconnection with the local grid. PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 PE Hydro operates the project in a run-of-river mode, with a minimum flow of 200 cfs, or inflow, whichever is less. Under an agreement with the US Fish and Wildlife Service the licensee shuts down Project nightly from September 15 to December 15 in an effort to reduce entrainment of downstream-migrating American eels. The project generates an annual average of 10,159.431 MWh. l. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov, using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in item (h) above. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. m. Procedural Schedule: The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate. E:\FR\FM\19JAN1.SGM 19JAN1 2858 Federal Register / Vol. 81, No. 11 / Tuesday, January 19, 2016 / Notices Notice of Acceptance/Notice of Ready for Environmental Analysis. Filing of recommendations, preliminary terms and conditions, and fishway prescriptions. Commission issues EA ....................... Comments on EA ................................ Modified Terms and Conditions .......... Commission Issues Final EA, if necessary. February 2016. April 2016. August 2016. September 2016. November 2016. February 2017. o. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Dated: January 12, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–00819 Filed 1–15–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings asabaliauskas on DSK5VPTVN1PROD with NOTICES Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP16–368–000. Applicants: Guardian Pipeline, L.L.C. Description: § 4(d) Rate Filing: Negotiated Rate PAL Agreement— Exelon Generation Comp., LLC to be effective 1/8/2016. Filed Date: 1/7/16. Accession Number: 20160107–5157. Comments Due: 5 p.m. ET 1/19/16. Docket Numbers: RP16–369–000. Applicants: Columbia Gas Transmission, LLC. Description: § 4(d) Rate Filing: Penalty Clean Up Filing to be effective 2/1/2016. Filed Date: 1/7/16. Accession Number: 20160107–5193. Comments Due: 5 p.m. ET 1/19/16. Docket Numbers: RP16–370–000. Applicants: Enable Mississippi River Transmission, L. Description: § 4(d) Rate Filing: Negotiated Rate Filing to Amend LER 5680’s Attachment A_1_7_16 to be effective 1/7/2016. Filed Date: 1/7/16. Accession Number: 20160107–5222. Comments Due: 5 p.m. ET 1/19/16. Docket Numbers: RP16–371–000. Applicants: Millennium Pipeline Company, L.L.C. Description: Penalty Revenue Crediting Report of under RP16–371. VerDate Sep<11>2014 17:50 Jan 15, 2016 Jkt 238001 Filed Date: 1/8/16. Accession Number: 20160108–5149. Comments Due: 5 p.m. ET 1/20/16. Docket Numbers: RP16–372–000. Applicants: Texas Eastern OFO. Description: Compliance filing Report of Refund—S–2 Customer Share of Texas Eastern OFO Penalty Disbursement to be effective N/A. Filed Date: 1/8/16. Accession Number: 20160108–5179. Comments Due: 5 p.m. ET 1/20/16. Docket Numbers: RP16–373–000. Applicants: Southwest Energy, L.P. Description: § 4(d) Rate Filing: Negotiated Rate PAL Agreement— Southwest Energy, L.P. to be effective 1/ 10/2016. Filed Date: 1/8/16. Accession Number: 20160108–5203. Comments Due: 5 p.m. ET 1/20/16. Docket Numbers: RP16–374–000. Applicants: Trailblazer Pipeline Company LLC. Description: § 4(d) Rate Filing: Neg Rate 2016–01–08 Mieco to be effective 1/9/2016. Filed Date: 1/8/16. Accession Number: 20160108–5224. Comments Due: 5 p.m. ET 1/20/16. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and § 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. Filings in Existing Proceedings Docket Numbers: RP16–233–001. Applicants: No Applicants listed for this docket/subdocket. Description: Compliance filing SG Resources Mississippi, L.L.C.— Compliance Filing to be effective 12/31/ 2015. Filed Date: 1/8/16. Accession Number: 20160108–5057. Comments Due: 5 p.m. ET 1/20/16. Any person desiring to protest in any of the above proceedings must file in accordance with Rule 211 of the Commission’s Regulations (18 CFR 385.211) on or before 5:00 p.m. Eastern time on the specified comment date. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 11, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–00809 Filed 1–15–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER16–701–000] CPV Valley, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of CPV Valley, LLC’s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is February 1, 2016. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by E:\FR\FM\19JAN1.SGM 19JAN1

Agencies

[Federal Register Volume 81, Number 11 (Tuesday, January 19, 2016)]
[Notices]
[Pages 2857-2858]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-00819]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2343-086]


PE Hydro Generation, LLC; Notice of Application Tendered for 
Filing With the Commission and Establishing Procedural Schedule for 
Licensing and Deadline for Submission of Final Amendments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: 2343-086.
    c. Date Filed: December 30, 2015.
    d. Applicant: PE Hydro Generation, LLC (PE Hydro).
    e. Name of Project: Millville Hydroelectric Project.
    f. Location: The existing project is located on the Shenandoah 
River, near the town of Harpers Ferry in Jefferson County, West 
Virginia. No federal lands are occupied by project works or located 
within the project boundary.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Juan Kimble, President, PE Hydro Generation, 
LLC, 5425 Wisconsin Avenue, 6th Floor, Chevy Chase, MD 20815; 
Telephone--(301) 718-4496.
    i. FERC Contact: Michael Spencer, (202) 502-6093, or 
michael.spencer@ferc.gov.
    j. This application is not ready for environmental analysis (EA) at 
this time.
    k. Project Description: The Millville project consists of: (1) A 
14.0-foot-high concrete and stone dam consisting of three sections: a 
36-foot-long non-overflow abutment on the east bank; an 813-foot long, 
non-gated spillway section; and a 122-foot-long intake structure, 
equipped with four vertical lift gates and one canal gate, and 
extending to the west riverbank; (2) a 100 acre reservoir with gross 
storage capacity of 900 acre-feet at elevation 324.0 mean sea level; 
(3) a 1,600-foot-long, 30-foot-wide, 12-foot-high masonry and concrete 
sided headrace canal; (4) a 125-foot-long, 40-foot-wide brick 
powerhouse containing 3 turbine-generating units with a combined 
capacity of 2.84 megawatts; (5) a 550-foot-long tailrace, excavated in 
bedrock and returning flow to the river channel; and (6) a 1,006-foot-
long, 2.4 kilovolt (kV) transmission line to a transformer, with a 794-
foot-long, 34.5 kV transmission line to the interconnection with the 
local grid.
    PE Hydro operates the project in a run-of-river mode, with a 
minimum flow of 200 cfs, or inflow, whichever is less. Under an 
agreement with the US Fish and Wildlife Service the licensee shuts down 
Project nightly from September 15 to December 15 in an effort to reduce 
entrainment of downstream-migrating American eels. The project 
generates an annual average of 10,159.431 MWh.
    l. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at https://www.ferc.gov, using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). A copy is also available for inspection 
and reproduction at the address in item (h) above.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    m. Procedural Schedule: The application will be processed according 
to the following preliminary Hydro Licensing Schedule. Revisions to the 
schedule will be made as appropriate.

[[Page 2858]]



------------------------------------------------------------------------
 
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready for    February 2016.
 Environmental Analysis.
Filing of recommendations, preliminary      April 2016.
 terms and conditions, and fishway
 prescriptions.
Commission issues EA......................  August 2016.
Comments on EA............................  September 2016.
Modified Terms and Conditions.............  November 2016.
Commission Issues Final EA, if necessary..  February 2017.
------------------------------------------------------------------------

    o. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

    Dated: January 12, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.