CPV Towantic, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 2853-2854 [2016-00812]
Download as PDF
Federal Register / Vol. 81, No. 11 / Tuesday, January 19, 2016 / Notices
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: January 12, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–00810 Filed 1–15–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2428–007]
asabaliauskas on DSK5VPTVN1PROD with NOTICES
Aquenergy Systems, LLC; Notice of
Application Tendered for Filing With
the Commission and Soliciting
Additional Study Requests and
Establishing Procedural Schedule for
Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Minor New
License.
b. Project No.: P–2428–007.
c. Date filed: December 31, 2015.
d. Applicant: Aquenergy Systems,
LLC.
e. Name of Project: Piedmont
Hydroelectric Project.
f. Location: On the Saluda River, in
Anderson and Greenville Counties,
South Carolina. The project does not
occupy lands of the United States.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Beth E. Harris,
P.E., Regional Operations Manager, Enel
Green Power North America, Inc., 11
Anderson St., Piedmont, SC 29674;
(864) 846–0042; Beth.Harris@Enel.com.
i. FERC Contact: Sean Murphy, (202)
502–6145 or sean.murphy@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
VerDate Sep<11>2014
17:50 Jan 15, 2016
Jkt 238001
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: February 29, 2016
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first
page of any filing should include docket
number P–2428–007.
m. The application is not ready for
environmental analysis at this time.
n. The Piedmont Hydroelectric Project
consists of: (a) A 25-foot-high, 600-footlong stone masonry dam with a 200foot-long overflow spillway section
fitted with 16-inch-high flashboards; (b)
a reservoir with a surface area of 22
acres at the normal water surface
elevation of 774.0 feet mean sea level;
(c) an open flume intake canal, about
144 feet long and 81 feet wide; (d) a
powerhouse containing a single
generating unit with a rated capacity of
1,000 kW; (e) a tailrace, about 180 feet
long and 38 feet wide; (f) a 600 volt
transmission line, about 263 feet long;
and (g) appurtenant facilities.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
2853
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary Hydro Licensing Schedule.
Revisions to the schedule will be made
as appropriate.
Issue Notice of Acceptance ................
Issue Scoping Document 1 for comments.
Comments on Scoping Document 1
due.
Issue Scoping Document 2 .................
Issue notice of ready for environmental analysis.
Commission issues EA .......................
Comments on EA due ........................
Commission issues final EA ...............
August
2016.
October
2016.
December
2016.
February
2017.
March 2017.
October
2017.
November
2017.
January
2018.
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: January 12, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–00820 Filed 1–15–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER16–700–000]
CPV Towantic, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of CPV
Towantic, LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
E:\FR\FM\19JAN1.SGM
19JAN1
2854
Federal Register / Vol. 81, No. 11 / Tuesday, January 19, 2016 / Notices
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is February 1,
2016.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: January 12, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–00812 Filed 1–15–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
asabaliauskas on DSK5VPTVN1PROD with NOTICES
Federal Energy Regulatory
Commission
Notice of Staff Attendance at
Southwest Power Pool Regional Entity
Trustee, Regional State Committee,
Members’ and Board of Directors’
Meetings
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of its staff may
attend the meetings of the Southwest
Power Pool, Inc. (SPP) Regional Entity
Trustee (RE), Regional State Committee
(RSC), SPP Members Committee and
Board of Directors, as noted below.
VerDate Sep<11>2014
17:50 Jan 15, 2016
Jkt 238001
Their attendance is part of the
Commission’s ongoing outreach efforts.
All meetings will be held at the
Skirvin Hotel, One Park Ave., Oklahoma
City, OK 73102. The phone number is
(405) 272–3040.
SPP RE
January 25, 2016 (8:00 a.m.–3:00 p.m.)
SPP RSC
January 25, 2016 (1:00 p.m.–5:00
p.m.)
SPP Members/Board of Directors
January 26, 2016 (8:00 a.m.–3:00 p.m.)
The discussions may address matters
at issue in the following proceedings:
Docket No. EL11–34, Midcontinent
Independent System Operator, Inc.
Docket No. ER11–1844, Midcontinent
Independent System Operator, Inc.
Docket No. EL12–60, Southwest Power
Pool, Inc., et al.
Docket No. ER12–1179, Southwest
Power Pool, Inc.
Docket No. ER12–1586, Southwest
Power Pool, Inc.
Docket No. ER13–1864, Southwest
Power Pool, Inc.
Docket No. ER13–1937, Southwest
Power Pool, Inc.
Docket No. ER13–1939, Southwest
Power Pool, Inc.
Docket No. EL14–21, Southwest Power
Pool, Inc.
Docket No. EL14–30, Midcontinent
Independent System Operator, Inc.
Docket No. EL15–66, Southern
Company Services, et al. v.
Midcontinent Independent System
Operator
Docket No. EL15–77, Morgan Stanley
Capital Group Inc. v. Midcontinent
Independent System Operator, Inc.
Docket No. ER14–67, Southwest Power
Pool, Inc.
Docket No. ER14–1174, Southwest
Power Pool, Inc.
Docket No. ER14–2022, Midcontinent
Independent System Operator, Inc.
Docket No. ER14–2445, Midcontinent
Independent System Operator, Inc.
Docket No. ER14–2553, Southwest
Power Pool, Inc.
Docket No. ER15–1499, Southwest
Power Pool, Inc.
Docket No. ER15–1737, Southwest
Power Pool, Inc.
Docket No. ER15–2069, Northwestern
Corporation
Docket No. ER15–2115, Southwest
Power Pool, Inc.
Docket No. ER15–2265, Southwest
Power Pool, Inc.
Docket No. ER15–2324, Southwest
Power Pool, Inc.
Docket No. ER15–2347, Southwest
Power Pool, Inc.
Docket No. ER15–2351, Southwest
Power Pool, Inc.
PO 00000
Frm 00018
Fmt 4703
Sfmt 9990
Docket No. ER15–2356, Southwest
Power Pool, Inc.
Docket No. EL16–20, Grid Assurance
LLC
Docket No. ER16–13, Southwest Power
Pool, Inc.
Docket No. ER16–165, Southwest Power
Pool, Inc.
Docket No. ER16–204, Southwest Power
Pool, Inc.
Docket No. ER16–209, Southwest Power
Pool, Inc.
Docket No. ER16–228, Southwest Power
Pool, Inc.
Docket No. ER16–231, Southwest Power
Pool, Inc.
Docket No. ER16–232, Southwest Power
Pool, Inc.
Docket No. ER16–241, Southwest Power
Pool, Inc.
Docket No. ER16–242, Southwest Power
Pool, Inc.
Docket No. ER16–244, Southwest Power
Pool, Inc.
Docket No. ER16–245, Southwest Power
Pool, Inc.
Docket No. ER16–247, Southwest Power
Pool, Inc.
Docket No. ER16–383, Midcontinent
Independent System Operator, Inc.
Docket No. ER16–387, Midcontinent
Independent System Operator, Inc.
Docket No. ER16–420, Southwest Power
Pool, Inc.
Docket No. ER16–430, Southwest Power
Pool, Inc.
Docket No. ER16–460, Southwest Power
Pool, Inc.
Docket No. ER16–461, Southwest Power
Pool, Inc.
Docket No. ER16–483, Southwest Power
Pool, Inc.
Docket No. ER16–511, Southwestern
Public Service Company
Docket No. ER16–515, Public Service
Company of Oklahoma
Docket No. ER16–539, Southwest Power
Pool, Inc.
Docket No. ER16–625, Southwest Power
Pool, Inc.
Docket No. ER16–626, Southwest Power
Pool, Inc.
Docket No. ER16–636, Southwest Power
Pool, Inc.
These meetings are open to the
public.
For more information, contact Patrick
Clarey, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission at (317) 249–5937 or
patrick.clarey@ferc.gov.
Dated: January 12, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–00818 Filed 1–15–16; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\19JAN1.SGM
19JAN1
Agencies
[Federal Register Volume 81, Number 11 (Tuesday, January 19, 2016)]
[Notices]
[Pages 2853-2854]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-00812]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER16-700-000]
CPV Towantic, LLC; Supplemental Notice That Initial Market-Based
Rate Filing Includes Request for Blanket Section 204 Authorization
This is a supplemental notice in the above-referenced proceeding of
CPV Towantic, LLC's application for market-based rate authority, with
an accompanying rate tariff, noting that such application includes a
request for blanket authorization, under 18 CFR part 34, of future
issuances of securities and assumptions of liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
[[Page 2854]]
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability, is February 1, 2016.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
5 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426.
The filings in the above-referenced proceeding are accessible in
the Commission's eLibrary system by clicking on the appropriate link in
the above list. They are also available for electronic review in the
Commission's Public Reference Room in Washington, DC. There is an
eSubscription link on the Web site that enables subscribers to receive
email notification when a document is added to a subscribed docket(s).
For assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov. or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Dated: January 12, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-00812 Filed 1-15-16; 8:45 am]
BILLING CODE 6717-01-P