CPV Towantic, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 2853-2854 [2016-00812]

Download as PDF Federal Register / Vol. 81, No. 11 / Tuesday, January 19, 2016 / Notices above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 12, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–00810 Filed 1–15–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2428–007] asabaliauskas on DSK5VPTVN1PROD with NOTICES Aquenergy Systems, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Minor New License. b. Project No.: P–2428–007. c. Date filed: December 31, 2015. d. Applicant: Aquenergy Systems, LLC. e. Name of Project: Piedmont Hydroelectric Project. f. Location: On the Saluda River, in Anderson and Greenville Counties, South Carolina. The project does not occupy lands of the United States. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)–825(r). h. Applicant Contact: Beth E. Harris, P.E., Regional Operations Manager, Enel Green Power North America, Inc., 11 Anderson St., Piedmont, SC 29674; (864) 846–0042; Beth.Harris@Enel.com. i. FERC Contact: Sean Murphy, (202) 502–6145 or sean.murphy@ferc.gov. j. Cooperating agencies: Federal, state, local, and tribal agencies with jurisdiction and/or special expertise with respect to environmental issues that wish to cooperate in the preparation of the environmental document should follow the instructions for filing such requests described in item l below. Cooperating agencies should note the Commission’s VerDate Sep<11>2014 17:50 Jan 15, 2016 Jkt 238001 policy that agencies that cooperate in the preparation of the environmental document cannot also intervene. See, 94 FERC ¶ 61,076 (2001). k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission’s regulations, if any resource agency, Indian Tribe, or person believes that an additional scientific study should be conducted in order to form an adequate factual basis for a complete analysis of the application on its merit, the resource agency, Indian Tribe, or person must file a request for a study with the Commission not later than 60 days from the date of filing of the application, and serve a copy of the request on the applicant. l. Deadline for filing additional study requests and requests for cooperating agency status: February 29, 2016 The Commission strongly encourages electronic filing. Please file additional study requests and requests for cooperating agency status using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–2428–007. m. The application is not ready for environmental analysis at this time. n. The Piedmont Hydroelectric Project consists of: (a) A 25-foot-high, 600-footlong stone masonry dam with a 200foot-long overflow spillway section fitted with 16-inch-high flashboards; (b) a reservoir with a surface area of 22 acres at the normal water surface elevation of 774.0 feet mean sea level; (c) an open flume intake canal, about 144 feet long and 81 feet wide; (d) a powerhouse containing a single generating unit with a rated capacity of 1,000 kW; (e) a tailrace, about 180 feet long and 38 feet wide; (f) a 600 volt transmission line, about 263 feet long; and (g) appurtenant facilities. o. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. You may also register online at https:// www.ferc.gov/docs-filing/ PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 2853 esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. p. Procedural schedule and final amendments: The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate. Issue Notice of Acceptance ................ Issue Scoping Document 1 for comments. Comments on Scoping Document 1 due. Issue Scoping Document 2 ................. Issue notice of ready for environmental analysis. Commission issues EA ....................... Comments on EA due ........................ Commission issues final EA ............... August 2016. October 2016. December 2016. February 2017. March 2017. October 2017. November 2017. January 2018. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Dated: January 12, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–00820 Filed 1–15–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER16–700–000] CPV Towantic, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of CPV Towantic, LLC’s application for marketbased rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. E:\FR\FM\19JAN1.SGM 19JAN1 2854 Federal Register / Vol. 81, No. 11 / Tuesday, January 19, 2016 / Notices Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is February 1, 2016. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 12, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–00812 Filed 1–15–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY asabaliauskas on DSK5VPTVN1PROD with NOTICES Federal Energy Regulatory Commission Notice of Staff Attendance at Southwest Power Pool Regional Entity Trustee, Regional State Committee, Members’ and Board of Directors’ Meetings The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of its staff may attend the meetings of the Southwest Power Pool, Inc. (SPP) Regional Entity Trustee (RE), Regional State Committee (RSC), SPP Members Committee and Board of Directors, as noted below. VerDate Sep<11>2014 17:50 Jan 15, 2016 Jkt 238001 Their attendance is part of the Commission’s ongoing outreach efforts. All meetings will be held at the Skirvin Hotel, One Park Ave., Oklahoma City, OK 73102. The phone number is (405) 272–3040. SPP RE January 25, 2016 (8:00 a.m.–3:00 p.m.) SPP RSC January 25, 2016 (1:00 p.m.–5:00 p.m.) SPP Members/Board of Directors January 26, 2016 (8:00 a.m.–3:00 p.m.) The discussions may address matters at issue in the following proceedings: Docket No. EL11–34, Midcontinent Independent System Operator, Inc. Docket No. ER11–1844, Midcontinent Independent System Operator, Inc. Docket No. EL12–60, Southwest Power Pool, Inc., et al. Docket No. ER12–1179, Southwest Power Pool, Inc. Docket No. ER12–1586, Southwest Power Pool, Inc. Docket No. ER13–1864, Southwest Power Pool, Inc. Docket No. ER13–1937, Southwest Power Pool, Inc. Docket No. ER13–1939, Southwest Power Pool, Inc. Docket No. EL14–21, Southwest Power Pool, Inc. Docket No. EL14–30, Midcontinent Independent System Operator, Inc. Docket No. EL15–66, Southern Company Services, et al. v. Midcontinent Independent System Operator Docket No. EL15–77, Morgan Stanley Capital Group Inc. v. Midcontinent Independent System Operator, Inc. Docket No. ER14–67, Southwest Power Pool, Inc. Docket No. ER14–1174, Southwest Power Pool, Inc. Docket No. ER14–2022, Midcontinent Independent System Operator, Inc. Docket No. ER14–2445, Midcontinent Independent System Operator, Inc. Docket No. ER14–2553, Southwest Power Pool, Inc. Docket No. ER15–1499, Southwest Power Pool, Inc. Docket No. ER15–1737, Southwest Power Pool, Inc. Docket No. ER15–2069, Northwestern Corporation Docket No. ER15–2115, Southwest Power Pool, Inc. Docket No. ER15–2265, Southwest Power Pool, Inc. Docket No. ER15–2324, Southwest Power Pool, Inc. Docket No. ER15–2347, Southwest Power Pool, Inc. Docket No. ER15–2351, Southwest Power Pool, Inc. PO 00000 Frm 00018 Fmt 4703 Sfmt 9990 Docket No. ER15–2356, Southwest Power Pool, Inc. Docket No. EL16–20, Grid Assurance LLC Docket No. ER16–13, Southwest Power Pool, Inc. Docket No. ER16–165, Southwest Power Pool, Inc. Docket No. ER16–204, Southwest Power Pool, Inc. Docket No. ER16–209, Southwest Power Pool, Inc. Docket No. ER16–228, Southwest Power Pool, Inc. Docket No. ER16–231, Southwest Power Pool, Inc. Docket No. ER16–232, Southwest Power Pool, Inc. Docket No. ER16–241, Southwest Power Pool, Inc. Docket No. ER16–242, Southwest Power Pool, Inc. Docket No. ER16–244, Southwest Power Pool, Inc. Docket No. ER16–245, Southwest Power Pool, Inc. Docket No. ER16–247, Southwest Power Pool, Inc. Docket No. ER16–383, Midcontinent Independent System Operator, Inc. Docket No. ER16–387, Midcontinent Independent System Operator, Inc. Docket No. ER16–420, Southwest Power Pool, Inc. Docket No. ER16–430, Southwest Power Pool, Inc. Docket No. ER16–460, Southwest Power Pool, Inc. Docket No. ER16–461, Southwest Power Pool, Inc. Docket No. ER16–483, Southwest Power Pool, Inc. Docket No. ER16–511, Southwestern Public Service Company Docket No. ER16–515, Public Service Company of Oklahoma Docket No. ER16–539, Southwest Power Pool, Inc. Docket No. ER16–625, Southwest Power Pool, Inc. Docket No. ER16–626, Southwest Power Pool, Inc. Docket No. ER16–636, Southwest Power Pool, Inc. These meetings are open to the public. For more information, contact Patrick Clarey, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (317) 249–5937 or patrick.clarey@ferc.gov. Dated: January 12, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–00818 Filed 1–15–16; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\19JAN1.SGM 19JAN1

Agencies

[Federal Register Volume 81, Number 11 (Tuesday, January 19, 2016)]
[Notices]
[Pages 2853-2854]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-00812]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER16-700-000]


CPV Towantic, LLC; Supplemental Notice That Initial Market-Based 
Rate Filing Includes Request for Blanket Section 204 Authorization

    This is a supplemental notice in the above-referenced proceeding of 
CPV Towantic, LLC's application for market-based rate authority, with 
an accompanying rate tariff, noting that such application includes a 
request for blanket authorization, under 18 CFR part 34, of future 
issuances of securities and assumptions of liability.
    Any person desiring to intervene or to protest should file with the 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426, in accordance with Rules 211 and 214 of the Commission's 
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone 
filing a motion to intervene or protest must serve a copy of that 
document on the Applicant.

[[Page 2854]]

    Notice is hereby given that the deadline for filing protests with 
regard to the applicant's request for blanket authorization, under 18 
CFR part 34, of future issuances of securities and assumptions of 
liability, is February 1, 2016.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
5 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426.
    The filings in the above-referenced proceeding are accessible in 
the Commission's eLibrary system by clicking on the appropriate link in 
the above list. They are also available for electronic review in the 
Commission's Public Reference Room in Washington, DC. There is an 
eSubscription link on the Web site that enables subscribers to receive 
email notification when a document is added to a subscribed docket(s). 
For assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov. or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

    Dated: January 12, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-00812 Filed 1-15-16; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.