Download as PDF Federal Register / Vol. 81, No. 10 / Friday, January 15, 2016 / Notices exceed 5 minutes. The Designated Federal Officer is empowered to conduct the meeting in a fashion that will facilitate the orderly conduct of business. This meeting is being published less than 15 days prior to the scheduled meeting to allow the public and Board to hear presentations that are unique to this facility, and for the Board to continue to meet their deadlines and reporting schedules. Scheduling conflicts resulted in a delay in securing the venue. Those not able to attend the meeting or who have insufficient time to address the committee are invited to send a written statement to Karen Gibson, U.S. Department of Energy, 1000 Independence Avenue SW., Washington, DC 20585, email to seab@ hq.doe.gov. Minutes: The minutes of the meeting will be available on the SEAB Web site or by contacting Ms. Gibson. She may be reached at the postal address or email address above, or by visiting SEAB’s Web site at www.energy.gov/seab. On January 5, 2016, Arkansas Electric Cooperative Corporation; Mississippi Delta Energy Agency and its members, Clarksdale Public Utilities Commission of the City of Clarksdale, Mississippi and Public Service Commission of Yazoo City, Mississippi; Hoosier Energy Rural Electric Cooperative, Inc.; and South Mississippi Electric Power Association filed a motion for clarification regarding the submission of briefs on exceptions, in the abovereferenced proceeding (Motion). On January 8, 2016, MISO Transmission Owners filed an answer to the Motion. Notice is hereby given that the deadline for submitting briefs on exceptions is set to and including January 21, 2016. The deadline to file briefs opposing exceptions is set to and including February 10, 2016. Issued in Washington, DC, on January 13, 2016. Amy Bodette, Committee Management Officer. DEPARTMENT OF ENERGY [FR Doc. 2016–00854 Filed 1–14–16; 8:45 am] [Project No. 14439–001] Dated: January 11, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–00704 Filed 1–14–16; 8:45 am] BILLING CODE 6717–01–P Federal Energy Regulatory Commission BILLING CODE 6450–01–P Hawks Nest Hydro, LLC; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL14–12–002] mstockstill on DSK4VPTVN1PROD with NOTICES Notice Setting Deadlines To File Briefs Association of Businesses Advocating Tariff Equity, Coalition of MISO Transmission Customers, Illinois Industrial Energy Consumers, Indiana Industrial Energy Consumers, Inc., Minnesota Large Industrial Group, Wisconsin Industrial Energy Group v. Midcontinent Independent System Operator, Inc., ALLETE, Inc., Ameren Illinois Company, Ameren Missouri, Ameren Transmission Company of Illinois, American Transmission Company LLC, Cleco Power LLC, Duke Energy Business Services, LLC, Entergy Arkansas, Inc., Entergy Gulf States Louisiana, LLC, Entergy Louisiana, LLC, Entergy Mississippi, Inc., Entergy New Orleans, Inc., Entergy Texas, Inc., Indianapolis Power & Light Company, International Transmission Company, ITC Midwest LLC, Michigan Electric Transmission Company, LLC MidAmerican Energy Company, MontanaDakota Utilities Co., Northern Indiana Public Service Company, Northern States Power Company-Minnesota, Northern States Power Company-Wisconsin, Otter Tail Power Company, Southern Indiana Gas & Electric Company VerDate Sep<11>2014 20:01 Jan 14, 2016 Jkt 238001 Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 14439–001. c. Date Filed: December 29, 2015. d. Applicant: Hawks Nest Hydro, LLC (Hawks Nest Hydro). e. Name of Project: Glen Ferris Hydroelectric Project. f. Location: The existing project is located on the Kanawha River, in Fayette County, West Virginia. The project does not occupy any federal lands. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)–825(r). h. Applicant Contact: Steven Murphy, Manager, Licensing, Brookfield Renewable Energy Group, 33 West 1st Street South, Fulton, New York 13069; Telephone (315) 598–6130. i. FERC Contact: Monir Chowdhury, (202) 502–6736 or monir.chowdhury@ ferc.gov. PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 2205 j. This application is not ready for environmental analysis at this time. k. Project Description: The existing Glen Ferris Hydroelectric Project consists of: (1) A low concrete dam with a maximum height of 12 feet above the river bed and a crest elevation of 651.0 feet National Geodetic Vertical Datum of 1929 (NGVD29), consisting of (from left to right—looking downstream) (i) a 590foot-long spillway section that generally curves upstream; (ii) a 128-foot-long five-bay stoplog sluice; (iii) a 2,132-footlong right spillway that runs diagonally in a downstream direction; (iv) a trash sluice section; (v) a 54-foot-long by 38foot-wide east powerhouse with a 62foot-wide intake structure; and (vi) a 64.5-foot-long by 63-foot-wide west powerhouse with a 82.3-foot-wide intake structure, with both powerhouses integral to the dam; (2) a 190-acre reservoir with a gross storage capacity of approximately 1,500 acre-feet at the dam crest elevation of 651.0 feet NGVD29; (3) two turbine-generator units in the east powerhouse, each with a rated capacity of approximately 1.9 megawatts (MW); (4) six turbinegenerator units in the west powerhouse, each with a rated capacity of approximately 0.4 MW; (5) a 4-milelong, 13.8-kilovolt transmission line; and (6) appurtenant facilities. The project is currently operated in a run-of-river mode with no usable storage capacity. Hawks Nest Hydro proposes to continue run-of-river operation. The project generates an annual average of 41,482 megawatthours. l. Locations of the Application: A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ ferc.gov or toll-free at 1–866–208–3676, or for TTY, (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Procedural Schedule: The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate. E:\FR\FM\15JAN1.SGM 15JAN1 2206 Federal Register / Vol. 81, No. 10 / Friday, January 15, 2016 / Notices Milestone Target date Notice of Acceptance/Notice of Ready for Environmental Analysis. Filing of recommendations, preliminary terms and conditions, and fishway prescriptions. Commission issues EA ...... Comments on EA .............. February 2016. Modified Terms and Conditions. Commission Issues Final EA, if necessary. April 2016. August 2016. September 2016. November 2016. Issuance of EA—February 12, 2016 90-day Federal Authorization Decision Deadline—May 12, 2016 If a schedule change becomes necessary, additional notice will be provided so that the relevant agencies are kept informed of the Project’s progress. Project Description February 2017. o. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. [FR Doc. 2016–00710 Filed 1–14–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP15–560–000] mstockstill on DSK4VPTVN1PROD with NOTICES Cameron LNG, LLC; Notice of Schedule for Environmental Review of the Cameron LNG Terminal Expansion Project On September 28, 2015, Cameron LNG, LLC filed an application in Docket No. CP15–560–000 requesting Authorization pursuant to section 3 of the Natural Gas Act to construct and operate certain liquefied natural gas (LNG) facilities at the existing Cameron LNG Terminal. The proposed project is known as the Cameron LNG Terminal Expansion Project (Project), and would increase the terminal’s capability to liquefy natural gas for export by 515 billion cubic feet per year. On October 13, 2015, the Federal Energy Regulatory Commission (Commission or FERC) issued its Notice of Application for the Project. Among other things, that notice alerted agencies issuing federal authorizations of the requirement to complete all necessary reviews and to reach a final decision on a request for a federal authorization within 90 days of the date of issuance of the Commission staff’s Environmental Assessment (EA) for the Project. This instant notice identifies the FERC staff’s planned schedule for the completion of the EA for the Project. 20:01 Jan 14, 2016 Cameron LNG, LLC’s Project would add an additional LNG storage tank (Tank 5) and two new systems to liquefy natural gas (Trains 4 and 5) to its existing LNG Terminal in Cameron and Calcasieu Parishes, Louisiana. No construction would occur outside of the existing terminal and no new shipping is proposed as a result of this Project. site (www.ferc.gov). Using the ‘‘eLibrary’’ link, select ‘‘General Search’’ from the eLibrary menu, enter the selected date range and ‘‘Docket Number’’ excluding the last three digits (i.e., CP15–560), and follow the instructions. For assistance with access to eLibrary, the helpline can be reached at (866) 208–3676, TTY (202) 502–8659, or at FERCOnlineSupport@ferc.gov. The eLibrary link on the FERC Web site also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rule makings. Dated: January 11, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–00703 Filed 1–14–16; 8:45 am] BILLING CODE 6717–01–P Background Dated: January 11, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. VerDate Sep<11>2014 Schedule for Environmental Review Jkt 238001 On June 18, 2015, the Commission issued a Notice of Intent to Prepare an Environmental Assessment for the Planned Cameron LNG Expansion Project and Request for Comments on Environmental Issues (NOI). The NOI was issued during the pre-filing review of the Project in Docket No. PF15–13– 000 and was sent to affected landowners; federal, state, and local government agencies; elected officials; environmental and public interest groups; Native American tribes; other interested parties; and local libraries and newspapers. In response to the NOI, the Commission received comments from the U.S. Environmental Protection Agency (EPA). The primary issues raised by the EPA are alternatives, groundwater and water impacts, wildlife and habitat impacts, air quality, hazardous materials, tribal and state historic preservation office consultation, and environmental justice. The U.S. Department of Transportation and U.S. Department of Energy are cooperating agencies in the preparation of the EA. Additional Information In order to receive notification of the issuance of the EA and to keep track of all formal issuances and submittals in specific dockets, the Commission offers a free service called eSubscription. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/docsfiling/esubscription.asp. Additional information about the Project is available from the Commission’s Office of External Affairs at (866) 208–FERC or on the FERC Web PO 00000 Frm 00047 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #2 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG16–36–000. Applicants: Kingbird Solar A, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of Kingbird Solar A, LLC. Filed Date: 1/11/16. Accession Number: 20160111–5267. Comments Due: 5 p.m. ET 2/1/16. Docket Numbers: EG16–37–000. Applicants: Kingbird Solar B, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of Kingbird Solar B, LLC. Filed Date: 1/11/16. Accession Number: 20160111–5271. Comments Due: 5 p.m. ET 2/1/16. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER16–38–001. Applicants: Kingbird Solar A, LLC. Description: Compliance filing: Application for Initial Market-Based Rate Tariff and Granting Certain Waivers to be effective 1/12/2016. Filed Date: 1/11/16. Accession Number: 20160111–5265. Comments Due: 5 p.m. ET 2/1/16. Docket Numbers: ER16–705–001. Applicants: RE Garland LLC. Description: Tariff Amendment: Amendment to Application and Initial Tariff Filing to be effective 2/12/2016. Filed Date: 1/11/16. E:\FR\FM\15JAN1.SGM 15JAN1

Agencies

[Federal Register Volume 81, Number 10 (Friday, January 15, 2016)]
[Notices]
[Pages 2205-2206]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-00710]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14439-001]


Hawks Nest Hydro, LLC; Notice of Application Tendered for Filing 
With the Commission and Establishing Procedural Schedule for Licensing 
and Deadline for Submission of Final Amendments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: 14439-001.
    c. Date Filed: December 29, 2015.
    d. Applicant: Hawks Nest Hydro, LLC (Hawks Nest Hydro).
    e. Name of Project: Glen Ferris Hydroelectric Project.
    f. Location: The existing project is located on the Kanawha River, 
in Fayette County, West Virginia. The project does not occupy any 
federal lands.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Steven Murphy, Manager, Licensing, Brookfield 
Renewable Energy Group, 33 West 1st Street South, Fulton, New York 
13069; Telephone (315) 598-6130.
    i. FERC Contact: Monir Chowdhury, (202) 502-6736 or 
monir.chowdhury@ferc.gov.
    j. This application is not ready for environmental analysis at this 
time.
    k. Project Description: The existing Glen Ferris Hydroelectric 
Project consists of: (1) A low concrete dam with a maximum height of 12 
feet above the river bed and a crest elevation of 651.0 feet National 
Geodetic Vertical Datum of 1929 (NGVD29), consisting of (from left to 
right--looking downstream) (i) a 590-foot-long spillway section that 
generally curves upstream; (ii) a 128-foot-long five-bay stoplog 
sluice; (iii) a 2,132-foot-long right spillway that runs diagonally in 
a downstream direction; (iv) a trash sluice section; (v) a 54-foot-long 
by 38-foot-wide east powerhouse with a 62-foot-wide intake structure; 
and (vi) a 64.5-foot-long by 63-foot-wide west powerhouse with a 82.3-
foot-wide intake structure, with both powerhouses integral to the dam; 
(2) a 190-acre reservoir with a gross storage capacity of approximately 
1,500 acre-feet at the dam crest elevation of 651.0 feet NGVD29; (3) 
two turbine-generator units in the east powerhouse, each with a rated 
capacity of approximately 1.9 megawatts (MW); (4) six turbine-generator 
units in the west powerhouse, each with a rated capacity of 
approximately 0.4 MW; (5) a 4-mile-long, 13.8-kilovolt transmission 
line; and (6) appurtenant facilities.
    The project is currently operated in a run-of-river mode with no 
usable storage capacity. Hawks Nest Hydro proposes to continue run-of-
river operation. The project generates an annual average of 41,482 
megawatt-hours.
    l. Locations of the Application: A copy of the application is 
available for review at the Commission in the Public Reference Room or 
may be viewed on the Commission's Web site at https://www.ferc.gov using 
the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov 
or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above.
    m. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Procedural Schedule: The application will be processed according 
to the following preliminary Hydro Licensing Schedule. Revisions to the 
schedule may be made as appropriate.

[[Page 2206]]



------------------------------------------------------------------------
               Milestone                           Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready     February 2016.
 for Environmental Analysis.
Filing of recommendations, preliminary   April 2016.
 terms and conditions, and fishway
 prescriptions.
Commission issues EA...................  August 2016.
Comments on EA.........................  September 2016.
Modified Terms and Conditions..........  November 2016.
Commission Issues Final EA, if           February 2017.
 necessary.
------------------------------------------------------------------------

    o. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

    Dated: January 11, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-00710 Filed 1-14-16; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.