Hawks Nest Hydro, LLC; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 2205-2206 [2016-00710]
Download as PDF
Federal Register / Vol. 81, No. 10 / Friday, January 15, 2016 / Notices
exceed 5 minutes. The Designated
Federal Officer is empowered to
conduct the meeting in a fashion that
will facilitate the orderly conduct of
business.
This meeting is being published less
than 15 days prior to the scheduled
meeting to allow the public and Board
to hear presentations that are unique to
this facility, and for the Board to
continue to meet their deadlines and
reporting schedules. Scheduling
conflicts resulted in a delay in securing
the venue.
Those not able to attend the meeting
or who have insufficient time to address
the committee are invited to send a
written statement to Karen Gibson, U.S.
Department of Energy, 1000
Independence Avenue SW.,
Washington, DC 20585, email to seab@
hq.doe.gov.
Minutes: The minutes of the meeting
will be available on the SEAB Web site
or by contacting Ms. Gibson. She may be
reached at the postal address or email
address above, or by visiting SEAB’s
Web site at www.energy.gov/seab.
On January 5, 2016, Arkansas Electric
Cooperative Corporation; Mississippi
Delta Energy Agency and its members,
Clarksdale Public Utilities Commission
of the City of Clarksdale, Mississippi
and Public Service Commission of
Yazoo City, Mississippi; Hoosier Energy
Rural Electric Cooperative, Inc.; and
South Mississippi Electric Power
Association filed a motion for
clarification regarding the submission of
briefs on exceptions, in the abovereferenced proceeding (Motion). On
January 8, 2016, MISO Transmission
Owners filed an answer to the Motion.
Notice is hereby given that the deadline
for submitting briefs on exceptions is set
to and including January 21, 2016. The
deadline to file briefs opposing
exceptions is set to and including
February 10, 2016.
Issued in Washington, DC, on January 13,
2016.
Amy Bodette,
Committee Management Officer.
DEPARTMENT OF ENERGY
[FR Doc. 2016–00854 Filed 1–14–16; 8:45 am]
[Project No. 14439–001]
Dated: January 11, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–00704 Filed 1–14–16; 8:45 am]
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
BILLING CODE 6450–01–P
Hawks Nest Hydro, LLC; Notice of
Application Tendered for Filing With
the Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL14–12–002]
mstockstill on DSK4VPTVN1PROD with NOTICES
Notice Setting Deadlines To File Briefs
Association of Businesses Advocating
Tariff Equity, Coalition of MISO
Transmission Customers, Illinois Industrial
Energy Consumers, Indiana Industrial Energy
Consumers, Inc., Minnesota Large Industrial
Group, Wisconsin Industrial Energy Group v.
Midcontinent Independent System Operator,
Inc., ALLETE, Inc., Ameren Illinois Company,
Ameren Missouri, Ameren Transmission
Company of Illinois, American Transmission
Company LLC, Cleco Power LLC, Duke
Energy Business Services, LLC, Entergy
Arkansas, Inc., Entergy Gulf States Louisiana,
LLC, Entergy Louisiana, LLC, Entergy
Mississippi, Inc., Entergy New Orleans, Inc.,
Entergy Texas, Inc., Indianapolis Power &
Light Company, International Transmission
Company, ITC Midwest LLC, Michigan
Electric Transmission Company, LLC
MidAmerican Energy Company, MontanaDakota Utilities Co., Northern Indiana Public
Service Company, Northern States Power
Company-Minnesota, Northern States Power
Company-Wisconsin, Otter Tail Power
Company, Southern Indiana Gas & Electric
Company
VerDate Sep<11>2014
20:01 Jan 14, 2016
Jkt 238001
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 14439–001.
c. Date Filed: December 29, 2015.
d. Applicant: Hawks Nest Hydro, LLC
(Hawks Nest Hydro).
e. Name of Project: Glen Ferris
Hydroelectric Project.
f. Location: The existing project is
located on the Kanawha River, in
Fayette County, West Virginia. The
project does not occupy any federal
lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Steven Murphy,
Manager, Licensing, Brookfield
Renewable Energy Group, 33 West 1st
Street South, Fulton, New York 13069;
Telephone (315) 598–6130.
i. FERC Contact: Monir Chowdhury,
(202) 502–6736 or monir.chowdhury@
ferc.gov.
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
2205
j. This application is not ready for
environmental analysis at this time.
k. Project Description: The existing
Glen Ferris Hydroelectric Project
consists of: (1) A low concrete dam with
a maximum height of 12 feet above the
river bed and a crest elevation of 651.0
feet National Geodetic Vertical Datum of
1929 (NGVD29), consisting of (from left
to right—looking downstream) (i) a 590foot-long spillway section that generally
curves upstream; (ii) a 128-foot-long
five-bay stoplog sluice; (iii) a 2,132-footlong right spillway that runs diagonally
in a downstream direction; (iv) a trash
sluice section; (v) a 54-foot-long by 38foot-wide east powerhouse with a 62foot-wide intake structure; and (vi) a
64.5-foot-long by 63-foot-wide west
powerhouse with a 82.3-foot-wide
intake structure, with both powerhouses
integral to the dam; (2) a 190-acre
reservoir with a gross storage capacity of
approximately 1,500 acre-feet at the
dam crest elevation of 651.0 feet
NGVD29; (3) two turbine-generator units
in the east powerhouse, each with a
rated capacity of approximately 1.9
megawatts (MW); (4) six turbinegenerator units in the west powerhouse,
each with a rated capacity of
approximately 0.4 MW; (5) a 4-milelong, 13.8-kilovolt transmission line;
and (6) appurtenant facilities.
The project is currently operated in a
run-of-river mode with no usable
storage capacity. Hawks Nest Hydro
proposes to continue run-of-river
operation. The project generates an
annual average of 41,482 megawatthours.
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll-free at 1–866–208–3676,
or for TTY, (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural Schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule may be made as appropriate.
E:\FR\FM\15JAN1.SGM
15JAN1
2206
Federal Register / Vol. 81, No. 10 / Friday, January 15, 2016 / Notices
Milestone
Target date
Notice of Acceptance/Notice of Ready for Environmental Analysis.
Filing of recommendations,
preliminary terms and
conditions, and fishway
prescriptions.
Commission issues EA ......
Comments on EA ..............
February 2016.
Modified Terms and Conditions.
Commission Issues Final
EA, if necessary.
April 2016.
August 2016.
September
2016.
November 2016.
Issuance of EA—February 12, 2016
90-day Federal Authorization Decision
Deadline—May 12, 2016
If a schedule change becomes
necessary, additional notice will be
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
February 2017.
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
[FR Doc. 2016–00710 Filed 1–14–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–560–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
Cameron LNG, LLC; Notice of
Schedule for Environmental Review of
the Cameron LNG Terminal Expansion
Project
On September 28, 2015, Cameron
LNG, LLC filed an application in Docket
No. CP15–560–000 requesting
Authorization pursuant to section 3 of
the Natural Gas Act to construct and
operate certain liquefied natural gas
(LNG) facilities at the existing Cameron
LNG Terminal. The proposed project is
known as the Cameron LNG Terminal
Expansion Project (Project), and would
increase the terminal’s capability to
liquefy natural gas for export by 515
billion cubic feet per year.
On October 13, 2015, the Federal
Energy Regulatory Commission
(Commission or FERC) issued its Notice
of Application for the Project. Among
other things, that notice alerted agencies
issuing federal authorizations of the
requirement to complete all necessary
reviews and to reach a final decision on
a request for a federal authorization
within 90 days of the date of issuance
of the Commission staff’s Environmental
Assessment (EA) for the Project. This
instant notice identifies the FERC staff’s
planned schedule for the completion of
the EA for the Project.
20:01 Jan 14, 2016
Cameron LNG, LLC’s Project would
add an additional LNG storage tank
(Tank 5) and two new systems to liquefy
natural gas (Trains 4 and 5) to its
existing LNG Terminal in Cameron and
Calcasieu Parishes, Louisiana. No
construction would occur outside of the
existing terminal and no new shipping
is proposed as a result of this Project.
site (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP15–560), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC Web site also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: January 11, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–00703 Filed 1–14–16; 8:45 am]
BILLING CODE 6717–01–P
Background
Dated: January 11, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
VerDate Sep<11>2014
Schedule for Environmental Review
Jkt 238001
On June 18, 2015, the Commission
issued a Notice of Intent to Prepare an
Environmental Assessment for the
Planned Cameron LNG Expansion
Project and Request for Comments on
Environmental Issues (NOI). The NOI
was issued during the pre-filing review
of the Project in Docket No. PF15–13–
000 and was sent to affected
landowners; federal, state, and local
government agencies; elected officials;
environmental and public interest
groups; Native American tribes; other
interested parties; and local libraries
and newspapers. In response to the NOI,
the Commission received comments
from the U.S. Environmental Protection
Agency (EPA). The primary issues
raised by the EPA are alternatives,
groundwater and water impacts,
wildlife and habitat impacts, air quality,
hazardous materials, tribal and state
historic preservation office consultation,
and environmental justice.
The U.S. Department of
Transportation and U.S. Department of
Energy are cooperating agencies in the
preparation of the EA.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
all formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
can reduce the amount of time you
spend researching proceedings by
automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC Web
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG16–36–000.
Applicants: Kingbird Solar A, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Kingbird Solar A,
LLC.
Filed Date: 1/11/16.
Accession Number: 20160111–5267.
Comments Due: 5 p.m. ET 2/1/16.
Docket Numbers: EG16–37–000.
Applicants: Kingbird Solar B, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Kingbird Solar B,
LLC.
Filed Date: 1/11/16.
Accession Number: 20160111–5271.
Comments Due: 5 p.m. ET 2/1/16.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER16–38–001.
Applicants: Kingbird Solar A, LLC.
Description: Compliance filing:
Application for Initial Market-Based
Rate Tariff and Granting Certain
Waivers to be effective 1/12/2016.
Filed Date: 1/11/16.
Accession Number: 20160111–5265.
Comments Due: 5 p.m. ET 2/1/16.
Docket Numbers: ER16–705–001.
Applicants: RE Garland LLC.
Description: Tariff Amendment:
Amendment to Application and Initial
Tariff Filing to be effective 2/12/2016.
Filed Date: 1/11/16.
E:\FR\FM\15JAN1.SGM
15JAN1
Agencies
[Federal Register Volume 81, Number 10 (Friday, January 15, 2016)]
[Notices]
[Pages 2205-2206]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-00710]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14439-001]
Hawks Nest Hydro, LLC; Notice of Application Tendered for Filing
With the Commission and Establishing Procedural Schedule for Licensing
and Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 14439-001.
c. Date Filed: December 29, 2015.
d. Applicant: Hawks Nest Hydro, LLC (Hawks Nest Hydro).
e. Name of Project: Glen Ferris Hydroelectric Project.
f. Location: The existing project is located on the Kanawha River,
in Fayette County, West Virginia. The project does not occupy any
federal lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Steven Murphy, Manager, Licensing, Brookfield
Renewable Energy Group, 33 West 1st Street South, Fulton, New York
13069; Telephone (315) 598-6130.
i. FERC Contact: Monir Chowdhury, (202) 502-6736 or
monir.chowdhury@ferc.gov.
j. This application is not ready for environmental analysis at this
time.
k. Project Description: The existing Glen Ferris Hydroelectric
Project consists of: (1) A low concrete dam with a maximum height of 12
feet above the river bed and a crest elevation of 651.0 feet National
Geodetic Vertical Datum of 1929 (NGVD29), consisting of (from left to
right--looking downstream) (i) a 590-foot-long spillway section that
generally curves upstream; (ii) a 128-foot-long five-bay stoplog
sluice; (iii) a 2,132-foot-long right spillway that runs diagonally in
a downstream direction; (iv) a trash sluice section; (v) a 54-foot-long
by 38-foot-wide east powerhouse with a 62-foot-wide intake structure;
and (vi) a 64.5-foot-long by 63-foot-wide west powerhouse with a 82.3-
foot-wide intake structure, with both powerhouses integral to the dam;
(2) a 190-acre reservoir with a gross storage capacity of approximately
1,500 acre-feet at the dam crest elevation of 651.0 feet NGVD29; (3)
two turbine-generator units in the east powerhouse, each with a rated
capacity of approximately 1.9 megawatts (MW); (4) six turbine-generator
units in the west powerhouse, each with a rated capacity of
approximately 0.4 MW; (5) a 4-mile-long, 13.8-kilovolt transmission
line; and (6) appurtenant facilities.
The project is currently operated in a run-of-river mode with no
usable storage capacity. Hawks Nest Hydro proposes to continue run-of-
river operation. The project generates an annual average of 41,482
megawatt-hours.
l. Locations of the Application: A copy of the application is
available for review at the Commission in the Public Reference Room or
may be viewed on the Commission's Web site at https://www.ferc.gov using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov
or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Procedural Schedule: The application will be processed according
to the following preliminary Hydro Licensing Schedule. Revisions to the
schedule may be made as appropriate.
[[Page 2206]]
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Notice of Acceptance/Notice of Ready February 2016.
for Environmental Analysis.
Filing of recommendations, preliminary April 2016.
terms and conditions, and fishway
prescriptions.
Commission issues EA................... August 2016.
Comments on EA......................... September 2016.
Modified Terms and Conditions.......... November 2016.
Commission Issues Final EA, if February 2017.
necessary.
------------------------------------------------------------------------
o. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: January 11, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-00710 Filed 1-14-16; 8:45 am]