Notice of Staff Attendance at the Midcontinent Independent System Operator, Inc. (MISO) Meetings of the Miso Competitive Retail Solution Task Team (CSRTT), 2209-2210 [2016-00705]
Download as PDF
Federal Register / Vol. 81, No. 10 / Friday, January 15, 2016 / Notices
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: January 11, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–00707 Filed 1–14–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
mstockstill on DSK4VPTVN1PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–1356–002.
Applicants: Duke Energy Florida,
LLC.
Description: Amendment to December
21, 2015 Compliance filing [including
Pro Forma sheets] of Duke Energy
Florida, LLC.
Filed Date: 1/8/16.
Accession Number: 20160108–5264.
Comments Due: 5 p.m. ET 1/29/16.
Docket Numbers: ER15–1618–003.
Applicants: Duke Energy Florida,
LLC.
Description: Compliance filing: ROE
Settlement IA’s Amendment RS 80, 82
& 105 to be effective 5/1/2015.
Filed Date: 1/8/16.
Accession Number: 20160108–5124.
Comments Due: 5 p.m. ET 1/29/16.
Docket Numbers: ER16–704–000.
Applicants: Southwest Power Pool,
Inc.
Description: Section 205(d) Rate
Filing: Revisions to Identify US/Canada
Border as a Point-of-Delivery/Point-ofReceipt to be effective 3/8/2016.
Filed Date: 1/8/16.
Accession Number: 20160108–5231.
Comments Due: 5 p.m. ET 1/29/16.
Docket Numbers: ER16–705–000.
Applicants: RE Garland LLC.
Description: Baseline eTariff Filing:
Application and Initial Baseline Tariff
Filing to be effective 2/12/2016.
Filed Date: 1/8/16.
Accession Number: 20160108–5238.
Comments Due: 5 p.m. ET 1/29/16.
Docket Numbers: ER16–706–000.
Applicants: RE Garland A LLC.
Description: Baseline eTariff Filing:
Application and Initial Baseline Tariff
Filing to be effective 2/12/2016.
Filed Date: 1/8/16.
Accession Number: 20160108–5239.
Comments Due: 5 p.m. ET 1/29/16.
Docket Numbers: ER16–707–000.
VerDate Sep<11>2014
20:01 Jan 14, 2016
Jkt 238001
Applicants: NorthWestern
Corporation.
Description: Section 205(d) Rate
Filing: Ministerial Revisions to Montana
OATT to be effective 3/12/2016.
Filed Date: 1/11/16.
Accession Number: 20160111–5134.
Comments Due: 5 p.m. ET 2/1/16.
Docket Numbers: ER16–709–000.
Applicants: No Applicants listed for
this docket/subdocket.
Description: Section 205(d) Rate
Filing: 607R26 Westar Energy, Inc.
NITSA NOA to be effective 1/1/2016.
Filed Date: 1/11/16.
Accession Number: 20160111–5167.
Comments Due: 5 p.m. ET 2/1/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 11, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–00708 Filed 1–14–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Staff Attendance at the
Midcontinent Independent System
Operator, Inc. (MISO) Meetings of the
Miso Competitive Retail Solution Task
Team (CSRTT)
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of its staff may
attend the January meetings of the MISO
CSRTT. Their attendance is part of the
Commission’s ongoing outreach efforts.
The first meeting will be held by
conference call on January 15, 2016,
from 10:00 a.m. to 12:00 p.m. Eastern.
Dial-in and webcast information may be
found at https://www.misoenergy.org/
Events/Pages/CSRTT20160115.aspx.
PO 00000
Frm 00050
Fmt 4703
Sfmt 4703
2209
The second meeting will be held on
January 29, 2016, from 11:00 a.m. to
4:00 p.m. Eastern at the Illinois
Commerce Commission Hearing Room,
160 North LaSalle, Suite C–800,
Chicago, IL 60601.
The discussions may address matters
at issue in the following proceedings:
Docket No. ER11–4081, Midwest
Independent System Operator, Inc.
Docket No. EL12–54, Viridity Energy,
Inc. v. PJM Interconnection, L.L.C.
Docket No. ER13–535, PJM
Interconnection, L.L.C.
Docket No. ER13–2108, PJM
Interconnection, L.L.C.
Docket No. ER14–504, PJM
Interconnection, L.L.C.
Docket No. ER14–822, PJM
Interconnection, L.L.C.
Docket Nos. ER14–1461 and EL14–48,
PJM Interconnection, L.L.C.
Docket No. ER14–2940, PJM
Interconnection, L.L.C.
Docket No. ER15–135, PJM
Interconnection, L.L.C.
Docket Nos. ER15–623 and EL15–29,
PJM Interconnection, L.L.C.
Docket No. EL14–20, Independent
Market Monitor for PJM v. PJM
Interconnection, L.L.C.
Docket Nos. EL14–94 and EL14–36,
FirstEnergy Solutions Corp. and PJM
Interconnection, L.L.C.
Docket No. EL14–55, FirstEnergy
Service Company v. PJM
Interconnection, L.L.C.
Docket No. EL15–41, Essential Power
Rock Springs, L.L.C. et al. v. PJM
Interconnection, L.L.C.
Docket No. EL15–46, Champion Energy
Marketing L.L.C. v. PJM
Interconnection, L.L.C.
Docket No. EL15–80, Advanced Energy
Management Alliance Coalition v.
PJM Interconnection, L.L.C.
Docket No. EL15–83, National
Resources Defense Council, et al., v.
PJM Interconnection, L.L.C.
Docket No. EL15–70, Public Citizen, Inc.
v. Midcontinent Independent System
Operator, Inc.
Docket No. EL15–71, People of the State
of Illinois v. Midcontinent
Independent System Operator, Inc.
Docket No. EL15–72, Southwestern
Electric Cooperative, Inc. v.
Midcontinent Independent System
Operator, Inc.
Docket No. EL15–82, Illinois Industrial
Energy Consumers v. Midcontinent
Independent System Operator, Inc.
The meeting is open to the public.
For more information, contact Patrick
Clarey, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission at (317) 249–5937 or
patrick.clarey@ferc.gov.
E:\FR\FM\15JAN1.SGM
15JAN1
2210
Federal Register / Vol. 81, No. 10 / Friday, January 15, 2016 / Notices
Dated: January 11, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
and sheet pile core wall; (2) a 10,000acre impoundment (Graham Lake) with
a useable storage volume of 123.97
million acre-feet at a normal maximum
elevation of 104.2 National Geodetic
Vertical Datum (NGVD); (3) a 720-footlong, 58-foot-high concrete gravity flood
control structure with a 65-footdiameter, 55-foot-high stone-filled sheet
pile retaining structure; (4) a 71-footlong, 36.5-foot-high concrete wing wall;
and (5) appurtenant facilities.
[FR Doc. 2016–00705 Filed 1–14–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2727–092]
Black Bear Hydro Partners LLC; Notice
of Application Tendered for Filing With
the Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2727–092.
c. Date Filed: December 30, 2015.
d. Applicant: Black Bear Hydro
Partners LLC (Black Bear Hydro).
e. Name of Project: Ellsworth
Hydroelectric Project (Ellsworth
Project).
f. Location: The existing project is
located on the Union River in Hancock
County, Maine. The project does not
occupy federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Ms. Kelly
Maloney, Manager of Licensing and
Compliance, Brookfield White Pine
Hydro LLC, 150 Main Street, Lewiston,
ME 04240; Telephone: (207) 755–5606.
i. FERC Contact: Dr. Nicholas Palso,
(202) 502–8854 or nicholas.palso@
ferc.gov.
j.This application is not ready for
environmental analysis at this time.
k. The Project Description: The
existing Ellsworth Project consists of
two developments (Graham Lake and
Ellsworth) with a total installed capacity
of 8.9 megawatts (MW). The project’s
average annual generation is 30,511
megawatt-hours. The power generated
by the project is sold on the open
market through the regional grid.
mstockstill on DSK4VPTVN1PROD with NOTICES
Graham Lake Development
The existing Graham Lake
Development consists of: (1) A 750-footlong, 58-foot-high dam that includes: (i)
An 80-foot-long, 58-foot-high concrete
spillway section with three 20-footwide, 22.5-foot-high spillway gates and
one 8-foot-wide sluice gate; and (ii) a
670-foot-long, 45-foot-high west earthen
embankment section with a concrete
VerDate Sep<11>2014
20:01 Jan 14, 2016
Jkt 238001
Ellsworth Development
The existing Ellsworth Development
consists of: (1) A 377-foot-long, 62.75foot-high dam that includes: (i) A 102foot-long, 62.75-foot-high west concrete
bulkhead section; and (ii) a 275-footlong, 57-foot-high concrete overflow
spillway with 1.7-foot-high flashboards;
(2) an 85-foot-long, 71-foot-high
concrete non-over flow wall at the west
end of the bulkhead section; (3) a 26foot-high abutment at the east end of the
spillway; (4) a 90-acre impoundment
(Lake Leonard) with a gross storage
volume of 2.46 million acre-feet at a
normal maximum elevation of 66.7 feet
NGVD; (5) generating facility No. 1 that
includes: (i) A headgate and a trashrack
with 2.44-inch clear-bar spacing; (ii) a
10-foot-diameter, 74-foot-long penstock;
and (iii) a 30-foot-long, 15-foot-wide
concrete and masonry gatehouse that is
integral with the dam and contains a
single 2.5 MW turbine-generator unit;
(6) generating facility No. 2 that
includes: (i) An 88.4-foot-wide, 32-foothigh intake structure with three
headgates and three trashracks with 1.0to 2.37-inch clear-bar spacing; (ii) an 8foot-diameter, 164-foot-long penstock,
an 8-foot-diameter, 195-foot-long
penstock, and a 12-foot-diameter, 225foot-long penstock; and (iii) a 52.5-footlong, 68-foot-wide concrete and
masonry powerhouse that contains two
2.0–MW and one 2.4–MW turbinegenerator units; (7) downstream fish
passage facilities that include three 3foot-wide surface weirs; (8) upstream
fish passage facilities that include a 3foot-wide vertical slot fishway and
collection station; (9) a 320-foot-long
transmission line connecting the
turbine-generator units to the regional
grid; and (10) appurtenant facilities.
The Graham Lake Development
operates as a water storage facility
where water is stored to reduce
downstream flooding during periods of
high flow and released during periods of
low flow to augment generation at the
Ellsworth Development. The Ellsworth
Development operates as a peaking
facility where Lake Leonard is
fluctuated up to one foot on a daily
basis to regulate downstream flows and
PO 00000
Frm 00051
Fmt 4703
Sfmt 4703
meet peak demands for hydroelectric
generation.
The existing license requires an
instantaneous minimum flow of 250
cubic feet per second (cfs), or inflow
(whichever is less), downstream of each
development from May 1 to June 30
each year. The minimum flow for each
development is reduced to 105 cfs from
July 1 to April 30 each year. In addition
to the minimum flows, the existing
license requires Black Bear Hydro to
maintain Graham Lake and Lake
Leonard between elevations 93.4 and
104.2 feet NGVD and 65.7 and 66.7 feet
NGVD, respectively. Black Bear Hydro
proposes to install upstream eel passage
facilities at the Graham Lake and
Ellsworth developments, construct a
canoe portage at the Graham Lake
Development, and improve angler
access at the Graham Lake
Development.
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural Schedule:
The application will be processed
according to the following preliminary
Hydro Licensing Schedule. Revisions to
the schedule may be made as
appropriate.
Milestone
Target date 1
Notice of Acceptance/Notice of Ready for Environmental Analysis
(REA).
Filing of recommendations,
preliminary terms and
conditions, and fishway
prescriptions.
Commission issues NonDraft Environmental Assessment (EA).
Comments on EA ..............
February 2017.
E:\FR\FM\15JAN1.SGM
15JAN1
April 2017.
October 2017.
November 2017.
Agencies
[Federal Register Volume 81, Number 10 (Friday, January 15, 2016)]
[Notices]
[Pages 2209-2210]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-00705]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Staff Attendance at the Midcontinent Independent System
Operator, Inc. (MISO) Meetings of the Miso Competitive Retail Solution
Task Team (CSRTT)
The Federal Energy Regulatory Commission (Commission) hereby gives
notice that members of its staff may attend the January meetings of the
MISO CSRTT. Their attendance is part of the Commission's ongoing
outreach efforts.
The first meeting will be held by conference call on January 15,
2016, from 10:00 a.m. to 12:00 p.m. Eastern. Dial-in and webcast
information may be found at https://www.misoenergy.org/Events/Pages/CSRTT20160115.aspx.
The second meeting will be held on January 29, 2016, from 11:00
a.m. to 4:00 p.m. Eastern at the Illinois Commerce Commission Hearing
Room, 160 North LaSalle, Suite C-800, Chicago, IL 60601.
The discussions may address matters at issue in the following
proceedings:
Docket No. ER11-4081, Midwest Independent System Operator, Inc.
Docket No. EL12-54, Viridity Energy, Inc. v. PJM Interconnection,
L.L.C.
Docket No. ER13-535, PJM Interconnection, L.L.C.
Docket No. ER13-2108, PJM Interconnection, L.L.C.
Docket No. ER14-504, PJM Interconnection, L.L.C.
Docket No. ER14-822, PJM Interconnection, L.L.C.
Docket Nos. ER14-1461 and EL14-48, PJM Interconnection, L.L.C.
Docket No. ER14-2940, PJM Interconnection, L.L.C.
Docket No. ER15-135, PJM Interconnection, L.L.C.
Docket Nos. ER15-623 and EL15-29, PJM Interconnection, L.L.C.
Docket No. EL14-20, Independent Market Monitor for PJM v. PJM
Interconnection, L.L.C.
Docket Nos. EL14-94 and EL14-36, FirstEnergy Solutions Corp. and PJM
Interconnection, L.L.C.
Docket No. EL14-55, FirstEnergy Service Company v. PJM Interconnection,
L.L.C.
Docket No. EL15-41, Essential Power Rock Springs, L.L.C. et al. v. PJM
Interconnection, L.L.C.
Docket No. EL15-46, Champion Energy Marketing L.L.C. v. PJM
Interconnection, L.L.C.
Docket No. EL15-80, Advanced Energy Management Alliance Coalition v.
PJM Interconnection, L.L.C.
Docket No. EL15-83, National Resources Defense Council, et al., v. PJM
Interconnection, L.L.C.
Docket No. EL15-70, Public Citizen, Inc. v. Midcontinent Independent
System Operator, Inc.
Docket No. EL15-71, People of the State of Illinois v. Midcontinent
Independent System Operator, Inc.
Docket No. EL15-72, Southwestern Electric Cooperative, Inc. v.
Midcontinent Independent System Operator, Inc.
Docket No. EL15-82, Illinois Industrial Energy Consumers v.
Midcontinent Independent System Operator, Inc.
The meeting is open to the public.
For more information, contact Patrick Clarey, Office of Energy
Market Regulation, Federal Energy Regulatory Commission at (317) 249-
5937 or patrick.clarey@ferc.gov.
[[Page 2210]]
Dated: January 11, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-00705 Filed 1-14-16; 8:45 am]
BILLING CODE 6717-01-P