Download as PDF Federal Register / Vol. 81, No. 10 / Friday, January 15, 2016 / Notices Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Dated: January 11, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–00707 Filed 1–14–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission mstockstill on DSK4VPTVN1PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER13–1356–002. Applicants: Duke Energy Florida, LLC. Description: Amendment to December 21, 2015 Compliance filing [including Pro Forma sheets] of Duke Energy Florida, LLC. Filed Date: 1/8/16. Accession Number: 20160108–5264. Comments Due: 5 p.m. ET 1/29/16. Docket Numbers: ER15–1618–003. Applicants: Duke Energy Florida, LLC. Description: Compliance filing: ROE Settlement IA’s Amendment RS 80, 82 & 105 to be effective 5/1/2015. Filed Date: 1/8/16. Accession Number: 20160108–5124. Comments Due: 5 p.m. ET 1/29/16. Docket Numbers: ER16–704–000. Applicants: Southwest Power Pool, Inc. Description: Section 205(d) Rate Filing: Revisions to Identify US/Canada Border as a Point-of-Delivery/Point-ofReceipt to be effective 3/8/2016. Filed Date: 1/8/16. Accession Number: 20160108–5231. Comments Due: 5 p.m. ET 1/29/16. Docket Numbers: ER16–705–000. Applicants: RE Garland LLC. Description: Baseline eTariff Filing: Application and Initial Baseline Tariff Filing to be effective 2/12/2016. Filed Date: 1/8/16. Accession Number: 20160108–5238. Comments Due: 5 p.m. ET 1/29/16. Docket Numbers: ER16–706–000. Applicants: RE Garland A LLC. Description: Baseline eTariff Filing: Application and Initial Baseline Tariff Filing to be effective 2/12/2016. Filed Date: 1/8/16. Accession Number: 20160108–5239. Comments Due: 5 p.m. ET 1/29/16. Docket Numbers: ER16–707–000. VerDate Sep<11>2014 20:01 Jan 14, 2016 Jkt 238001 Applicants: NorthWestern Corporation. Description: Section 205(d) Rate Filing: Ministerial Revisions to Montana OATT to be effective 3/12/2016. Filed Date: 1/11/16. Accession Number: 20160111–5134. Comments Due: 5 p.m. ET 2/1/16. Docket Numbers: ER16–709–000. Applicants: No Applicants listed for this docket/subdocket. Description: Section 205(d) Rate Filing: 607R26 Westar Energy, Inc. NITSA NOA to be effective 1/1/2016. Filed Date: 1/11/16. Accession Number: 20160111–5167. Comments Due: 5 p.m. ET 2/1/16. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 11, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–00708 Filed 1–14–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Staff Attendance at the Midcontinent Independent System Operator, Inc. (MISO) Meetings of the Miso Competitive Retail Solution Task Team (CSRTT) The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of its staff may attend the January meetings of the MISO CSRTT. Their attendance is part of the Commission’s ongoing outreach efforts. The first meeting will be held by conference call on January 15, 2016, from 10:00 a.m. to 12:00 p.m. Eastern. Dial-in and webcast information may be found at https://www.misoenergy.org/ Events/Pages/CSRTT20160115.aspx. PO 00000 Frm 00050 Fmt 4703 Sfmt 4703 2209 The second meeting will be held on January 29, 2016, from 11:00 a.m. to 4:00 p.m. Eastern at the Illinois Commerce Commission Hearing Room, 160 North LaSalle, Suite C–800, Chicago, IL 60601. The discussions may address matters at issue in the following proceedings: Docket No. ER11–4081, Midwest Independent System Operator, Inc. Docket No. EL12–54, Viridity Energy, Inc. v. PJM Interconnection, L.L.C. Docket No. ER13–535, PJM Interconnection, L.L.C. Docket No. ER13–2108, PJM Interconnection, L.L.C. Docket No. ER14–504, PJM Interconnection, L.L.C. Docket No. ER14–822, PJM Interconnection, L.L.C. Docket Nos. ER14–1461 and EL14–48, PJM Interconnection, L.L.C. Docket No. ER14–2940, PJM Interconnection, L.L.C. Docket No. ER15–135, PJM Interconnection, L.L.C. Docket Nos. ER15–623 and EL15–29, PJM Interconnection, L.L.C. Docket No. EL14–20, Independent Market Monitor for PJM v. PJM Interconnection, L.L.C. Docket Nos. EL14–94 and EL14–36, FirstEnergy Solutions Corp. and PJM Interconnection, L.L.C. Docket No. EL14–55, FirstEnergy Service Company v. PJM Interconnection, L.L.C. Docket No. EL15–41, Essential Power Rock Springs, L.L.C. et al. v. PJM Interconnection, L.L.C. Docket No. EL15–46, Champion Energy Marketing L.L.C. v. PJM Interconnection, L.L.C. Docket No. EL15–80, Advanced Energy Management Alliance Coalition v. PJM Interconnection, L.L.C. Docket No. EL15–83, National Resources Defense Council, et al., v. PJM Interconnection, L.L.C. Docket No. EL15–70, Public Citizen, Inc. v. Midcontinent Independent System Operator, Inc. Docket No. EL15–71, People of the State of Illinois v. Midcontinent Independent System Operator, Inc. Docket No. EL15–72, Southwestern Electric Cooperative, Inc. v. Midcontinent Independent System Operator, Inc. Docket No. EL15–82, Illinois Industrial Energy Consumers v. Midcontinent Independent System Operator, Inc. The meeting is open to the public. For more information, contact Patrick Clarey, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (317) 249–5937 or patrick.clarey@ferc.gov. E:\FR\FM\15JAN1.SGM 15JAN1 2210 Federal Register / Vol. 81, No. 10 / Friday, January 15, 2016 / Notices Dated: January 11, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. and sheet pile core wall; (2) a 10,000acre impoundment (Graham Lake) with a useable storage volume of 123.97 million acre-feet at a normal maximum elevation of 104.2 National Geodetic Vertical Datum (NGVD); (3) a 720-footlong, 58-foot-high concrete gravity flood control structure with a 65-footdiameter, 55-foot-high stone-filled sheet pile retaining structure; (4) a 71-footlong, 36.5-foot-high concrete wing wall; and (5) appurtenant facilities. [FR Doc. 2016–00705 Filed 1–14–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2727–092] Black Bear Hydro Partners LLC; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 2727–092. c. Date Filed: December 30, 2015. d. Applicant: Black Bear Hydro Partners LLC (Black Bear Hydro). e. Name of Project: Ellsworth Hydroelectric Project (Ellsworth Project). f. Location: The existing project is located on the Union River in Hancock County, Maine. The project does not occupy federal lands. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Ms. Kelly Maloney, Manager of Licensing and Compliance, Brookfield White Pine Hydro LLC, 150 Main Street, Lewiston, ME 04240; Telephone: (207) 755–5606. i. FERC Contact: Dr. Nicholas Palso, (202) 502–8854 or nicholas.palso@ ferc.gov. j.This application is not ready for environmental analysis at this time. k. The Project Description: The existing Ellsworth Project consists of two developments (Graham Lake and Ellsworth) with a total installed capacity of 8.9 megawatts (MW). The project’s average annual generation is 30,511 megawatt-hours. The power generated by the project is sold on the open market through the regional grid. mstockstill on DSK4VPTVN1PROD with NOTICES Graham Lake Development The existing Graham Lake Development consists of: (1) A 750-footlong, 58-foot-high dam that includes: (i) An 80-foot-long, 58-foot-high concrete spillway section with three 20-footwide, 22.5-foot-high spillway gates and one 8-foot-wide sluice gate; and (ii) a 670-foot-long, 45-foot-high west earthen embankment section with a concrete VerDate Sep<11>2014 20:01 Jan 14, 2016 Jkt 238001 Ellsworth Development The existing Ellsworth Development consists of: (1) A 377-foot-long, 62.75foot-high dam that includes: (i) A 102foot-long, 62.75-foot-high west concrete bulkhead section; and (ii) a 275-footlong, 57-foot-high concrete overflow spillway with 1.7-foot-high flashboards; (2) an 85-foot-long, 71-foot-high concrete non-over flow wall at the west end of the bulkhead section; (3) a 26foot-high abutment at the east end of the spillway; (4) a 90-acre impoundment (Lake Leonard) with a gross storage volume of 2.46 million acre-feet at a normal maximum elevation of 66.7 feet NGVD; (5) generating facility No. 1 that includes: (i) A headgate and a trashrack with 2.44-inch clear-bar spacing; (ii) a 10-foot-diameter, 74-foot-long penstock; and (iii) a 30-foot-long, 15-foot-wide concrete and masonry gatehouse that is integral with the dam and contains a single 2.5 MW turbine-generator unit; (6) generating facility No. 2 that includes: (i) An 88.4-foot-wide, 32-foothigh intake structure with three headgates and three trashracks with 1.0to 2.37-inch clear-bar spacing; (ii) an 8foot-diameter, 164-foot-long penstock, an 8-foot-diameter, 195-foot-long penstock, and a 12-foot-diameter, 225foot-long penstock; and (iii) a 52.5-footlong, 68-foot-wide concrete and masonry powerhouse that contains two 2.0–MW and one 2.4–MW turbinegenerator units; (7) downstream fish passage facilities that include three 3foot-wide surface weirs; (8) upstream fish passage facilities that include a 3foot-wide vertical slot fishway and collection station; (9) a 320-foot-long transmission line connecting the turbine-generator units to the regional grid; and (10) appurtenant facilities. The Graham Lake Development operates as a water storage facility where water is stored to reduce downstream flooding during periods of high flow and released during periods of low flow to augment generation at the Ellsworth Development. The Ellsworth Development operates as a peaking facility where Lake Leonard is fluctuated up to one foot on a daily basis to regulate downstream flows and PO 00000 Frm 00051 Fmt 4703 Sfmt 4703 meet peak demands for hydroelectric generation. The existing license requires an instantaneous minimum flow of 250 cubic feet per second (cfs), or inflow (whichever is less), downstream of each development from May 1 to June 30 each year. The minimum flow for each development is reduced to 105 cfs from July 1 to April 30 each year. In addition to the minimum flows, the existing license requires Black Bear Hydro to maintain Graham Lake and Lake Leonard between elevations 93.4 and 104.2 feet NGVD and 65.7 and 66.7 feet NGVD, respectively. Black Bear Hydro proposes to install upstream eel passage facilities at the Graham Lake and Ellsworth developments, construct a canoe portage at the Graham Lake Development, and improve angler access at the Graham Lake Development. l. Locations of the Application: A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in item (h) above. m. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Procedural Schedule: The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate. Milestone Target date 1 Notice of Acceptance/Notice of Ready for Environmental Analysis (REA). Filing of recommendations, preliminary terms and conditions, and fishway prescriptions. Commission issues NonDraft Environmental Assessment (EA). Comments on EA .............. February 2017. E:\FR\FM\15JAN1.SGM 15JAN1 April 2017. October 2017. November 2017.

Agencies

[Federal Register Volume 81, Number 10 (Friday, January 15, 2016)]
[Notices]
[Pages 2209-2210]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-00705]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Staff Attendance at the Midcontinent Independent System 
Operator, Inc. (MISO) Meetings of the Miso Competitive Retail Solution 
Task Team (CSRTT)

    The Federal Energy Regulatory Commission (Commission) hereby gives 
notice that members of its staff may attend the January meetings of the 
MISO CSRTT. Their attendance is part of the Commission's ongoing 
outreach efforts.
    The first meeting will be held by conference call on January 15, 
2016, from 10:00 a.m. to 12:00 p.m. Eastern. Dial-in and webcast 
information may be found at https://www.misoenergy.org/Events/Pages/CSRTT20160115.aspx.
    The second meeting will be held on January 29, 2016, from 11:00 
a.m. to 4:00 p.m. Eastern at the Illinois Commerce Commission Hearing 
Room, 160 North LaSalle, Suite C-800, Chicago, IL 60601.
    The discussions may address matters at issue in the following 
proceedings:

Docket No. ER11-4081, Midwest Independent System Operator, Inc.
Docket No. EL12-54, Viridity Energy, Inc. v. PJM Interconnection, 
L.L.C.
Docket No. ER13-535, PJM Interconnection, L.L.C.
Docket No. ER13-2108, PJM Interconnection, L.L.C.
Docket No. ER14-504, PJM Interconnection, L.L.C.
Docket No. ER14-822, PJM Interconnection, L.L.C.
Docket Nos. ER14-1461 and EL14-48, PJM Interconnection, L.L.C.
Docket No. ER14-2940, PJM Interconnection, L.L.C.
Docket No. ER15-135, PJM Interconnection, L.L.C.
Docket Nos. ER15-623 and EL15-29, PJM Interconnection, L.L.C.
Docket No. EL14-20, Independent Market Monitor for PJM v. PJM 
Interconnection, L.L.C.
Docket Nos. EL14-94 and EL14-36, FirstEnergy Solutions Corp. and PJM 
Interconnection, L.L.C.
Docket No. EL14-55, FirstEnergy Service Company v. PJM Interconnection, 
L.L.C.
Docket No. EL15-41, Essential Power Rock Springs, L.L.C. et al. v. PJM 
Interconnection, L.L.C.
Docket No. EL15-46, Champion Energy Marketing L.L.C. v. PJM 
Interconnection, L.L.C.
Docket No. EL15-80, Advanced Energy Management Alliance Coalition v. 
PJM Interconnection, L.L.C.
Docket No. EL15-83, National Resources Defense Council, et al., v. PJM 
Interconnection, L.L.C.
Docket No. EL15-70, Public Citizen, Inc. v. Midcontinent Independent 
System Operator, Inc.
Docket No. EL15-71, People of the State of Illinois v. Midcontinent 
Independent System Operator, Inc.
Docket No. EL15-72, Southwestern Electric Cooperative, Inc. v. 
Midcontinent Independent System Operator, Inc.
Docket No. EL15-82, Illinois Industrial Energy Consumers v. 
Midcontinent Independent System Operator, Inc.

    The meeting is open to the public.
    For more information, contact Patrick Clarey, Office of Energy 
Market Regulation, Federal Energy Regulatory Commission at (317) 249-
5937 or patrick.clarey@ferc.gov.


[[Page 2210]]


    Dated: January 11, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-00705 Filed 1-14-16; 8:45 am]