Notice Setting Deadlines To File Briefs, 2205 [2016-00704]
Download as PDF
Federal Register / Vol. 81, No. 10 / Friday, January 15, 2016 / Notices
exceed 5 minutes. The Designated
Federal Officer is empowered to
conduct the meeting in a fashion that
will facilitate the orderly conduct of
business.
This meeting is being published less
than 15 days prior to the scheduled
meeting to allow the public and Board
to hear presentations that are unique to
this facility, and for the Board to
continue to meet their deadlines and
reporting schedules. Scheduling
conflicts resulted in a delay in securing
the venue.
Those not able to attend the meeting
or who have insufficient time to address
the committee are invited to send a
written statement to Karen Gibson, U.S.
Department of Energy, 1000
Independence Avenue SW.,
Washington, DC 20585, email to seab@
hq.doe.gov.
Minutes: The minutes of the meeting
will be available on the SEAB Web site
or by contacting Ms. Gibson. She may be
reached at the postal address or email
address above, or by visiting SEAB’s
Web site at www.energy.gov/seab.
On January 5, 2016, Arkansas Electric
Cooperative Corporation; Mississippi
Delta Energy Agency and its members,
Clarksdale Public Utilities Commission
of the City of Clarksdale, Mississippi
and Public Service Commission of
Yazoo City, Mississippi; Hoosier Energy
Rural Electric Cooperative, Inc.; and
South Mississippi Electric Power
Association filed a motion for
clarification regarding the submission of
briefs on exceptions, in the abovereferenced proceeding (Motion). On
January 8, 2016, MISO Transmission
Owners filed an answer to the Motion.
Notice is hereby given that the deadline
for submitting briefs on exceptions is set
to and including January 21, 2016. The
deadline to file briefs opposing
exceptions is set to and including
February 10, 2016.
Issued in Washington, DC, on January 13,
2016.
Amy Bodette,
Committee Management Officer.
DEPARTMENT OF ENERGY
[FR Doc. 2016–00854 Filed 1–14–16; 8:45 am]
[Project No. 14439–001]
Dated: January 11, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–00704 Filed 1–14–16; 8:45 am]
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
BILLING CODE 6450–01–P
Hawks Nest Hydro, LLC; Notice of
Application Tendered for Filing With
the Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL14–12–002]
mstockstill on DSK4VPTVN1PROD with NOTICES
Notice Setting Deadlines To File Briefs
Association of Businesses Advocating
Tariff Equity, Coalition of MISO
Transmission Customers, Illinois Industrial
Energy Consumers, Indiana Industrial Energy
Consumers, Inc., Minnesota Large Industrial
Group, Wisconsin Industrial Energy Group v.
Midcontinent Independent System Operator,
Inc., ALLETE, Inc., Ameren Illinois Company,
Ameren Missouri, Ameren Transmission
Company of Illinois, American Transmission
Company LLC, Cleco Power LLC, Duke
Energy Business Services, LLC, Entergy
Arkansas, Inc., Entergy Gulf States Louisiana,
LLC, Entergy Louisiana, LLC, Entergy
Mississippi, Inc., Entergy New Orleans, Inc.,
Entergy Texas, Inc., Indianapolis Power &
Light Company, International Transmission
Company, ITC Midwest LLC, Michigan
Electric Transmission Company, LLC
MidAmerican Energy Company, MontanaDakota Utilities Co., Northern Indiana Public
Service Company, Northern States Power
Company-Minnesota, Northern States Power
Company-Wisconsin, Otter Tail Power
Company, Southern Indiana Gas & Electric
Company
VerDate Sep<11>2014
20:01 Jan 14, 2016
Jkt 238001
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 14439–001.
c. Date Filed: December 29, 2015.
d. Applicant: Hawks Nest Hydro, LLC
(Hawks Nest Hydro).
e. Name of Project: Glen Ferris
Hydroelectric Project.
f. Location: The existing project is
located on the Kanawha River, in
Fayette County, West Virginia. The
project does not occupy any federal
lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Steven Murphy,
Manager, Licensing, Brookfield
Renewable Energy Group, 33 West 1st
Street South, Fulton, New York 13069;
Telephone (315) 598–6130.
i. FERC Contact: Monir Chowdhury,
(202) 502–6736 or monir.chowdhury@
ferc.gov.
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
2205
j. This application is not ready for
environmental analysis at this time.
k. Project Description: The existing
Glen Ferris Hydroelectric Project
consists of: (1) A low concrete dam with
a maximum height of 12 feet above the
river bed and a crest elevation of 651.0
feet National Geodetic Vertical Datum of
1929 (NGVD29), consisting of (from left
to right—looking downstream) (i) a 590foot-long spillway section that generally
curves upstream; (ii) a 128-foot-long
five-bay stoplog sluice; (iii) a 2,132-footlong right spillway that runs diagonally
in a downstream direction; (iv) a trash
sluice section; (v) a 54-foot-long by 38foot-wide east powerhouse with a 62foot-wide intake structure; and (vi) a
64.5-foot-long by 63-foot-wide west
powerhouse with a 82.3-foot-wide
intake structure, with both powerhouses
integral to the dam; (2) a 190-acre
reservoir with a gross storage capacity of
approximately 1,500 acre-feet at the
dam crest elevation of 651.0 feet
NGVD29; (3) two turbine-generator units
in the east powerhouse, each with a
rated capacity of approximately 1.9
megawatts (MW); (4) six turbinegenerator units in the west powerhouse,
each with a rated capacity of
approximately 0.4 MW; (5) a 4-milelong, 13.8-kilovolt transmission line;
and (6) appurtenant facilities.
The project is currently operated in a
run-of-river mode with no usable
storage capacity. Hawks Nest Hydro
proposes to continue run-of-river
operation. The project generates an
annual average of 41,482 megawatthours.
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll-free at 1–866–208–3676,
or for TTY, (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural Schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule may be made as appropriate.
E:\FR\FM\15JAN1.SGM
15JAN1
Agencies
[Federal Register Volume 81, Number 10 (Friday, January 15, 2016)]
[Notices]
[Page 2205]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-00704]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL14-12-002]
Notice Setting Deadlines To File Briefs
Association of Businesses Advocating Tariff Equity, Coalition of
MISO Transmission Customers, Illinois Industrial Energy Consumers,
Indiana Industrial Energy Consumers, Inc., Minnesota Large
Industrial Group, Wisconsin Industrial Energy Group v. Midcontinent
Independent System Operator, Inc., ALLETE, Inc., Ameren Illinois
Company, Ameren Missouri, Ameren Transmission Company of Illinois,
American Transmission Company LLC, Cleco Power LLC, Duke Energy
Business Services, LLC, Entergy Arkansas, Inc., Entergy Gulf States
Louisiana, LLC, Entergy Louisiana, LLC, Entergy Mississippi, Inc.,
Entergy New Orleans, Inc., Entergy Texas, Inc., Indianapolis Power &
Light Company, International Transmission Company, ITC Midwest LLC,
Michigan Electric Transmission Company, LLC MidAmerican Energy
Company, Montana-Dakota Utilities Co., Northern Indiana Public
Service Company, Northern States Power Company-Minnesota, Northern
States Power Company-Wisconsin, Otter Tail Power Company, Southern
Indiana Gas & Electric Company
On January 5, 2016, Arkansas Electric Cooperative Corporation;
Mississippi Delta Energy Agency and its members, Clarksdale Public
Utilities Commission of the City of Clarksdale, Mississippi and Public
Service Commission of Yazoo City, Mississippi; Hoosier Energy Rural
Electric Cooperative, Inc.; and South Mississippi Electric Power
Association filed a motion for clarification regarding the submission
of briefs on exceptions, in the above-referenced proceeding (Motion).
On January 8, 2016, MISO Transmission Owners filed an answer to the
Motion. Notice is hereby given that the deadline for submitting briefs
on exceptions is set to and including January 21, 2016. The deadline to
file briefs opposing exceptions is set to and including February 10,
2016.
Dated: January 11, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-00704 Filed 1-14-16; 8:45 am]
BILLING CODE 6717-01-P