Notice Setting Deadlines To File Briefs, 2205 [2016-00704]

Download as PDF Federal Register / Vol. 81, No. 10 / Friday, January 15, 2016 / Notices exceed 5 minutes. The Designated Federal Officer is empowered to conduct the meeting in a fashion that will facilitate the orderly conduct of business. This meeting is being published less than 15 days prior to the scheduled meeting to allow the public and Board to hear presentations that are unique to this facility, and for the Board to continue to meet their deadlines and reporting schedules. Scheduling conflicts resulted in a delay in securing the venue. Those not able to attend the meeting or who have insufficient time to address the committee are invited to send a written statement to Karen Gibson, U.S. Department of Energy, 1000 Independence Avenue SW., Washington, DC 20585, email to seab@ hq.doe.gov. Minutes: The minutes of the meeting will be available on the SEAB Web site or by contacting Ms. Gibson. She may be reached at the postal address or email address above, or by visiting SEAB’s Web site at www.energy.gov/seab. On January 5, 2016, Arkansas Electric Cooperative Corporation; Mississippi Delta Energy Agency and its members, Clarksdale Public Utilities Commission of the City of Clarksdale, Mississippi and Public Service Commission of Yazoo City, Mississippi; Hoosier Energy Rural Electric Cooperative, Inc.; and South Mississippi Electric Power Association filed a motion for clarification regarding the submission of briefs on exceptions, in the abovereferenced proceeding (Motion). On January 8, 2016, MISO Transmission Owners filed an answer to the Motion. Notice is hereby given that the deadline for submitting briefs on exceptions is set to and including January 21, 2016. The deadline to file briefs opposing exceptions is set to and including February 10, 2016. Issued in Washington, DC, on January 13, 2016. Amy Bodette, Committee Management Officer. DEPARTMENT OF ENERGY [FR Doc. 2016–00854 Filed 1–14–16; 8:45 am] [Project No. 14439–001] Dated: January 11, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–00704 Filed 1–14–16; 8:45 am] BILLING CODE 6717–01–P Federal Energy Regulatory Commission BILLING CODE 6450–01–P Hawks Nest Hydro, LLC; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL14–12–002] mstockstill on DSK4VPTVN1PROD with NOTICES Notice Setting Deadlines To File Briefs Association of Businesses Advocating Tariff Equity, Coalition of MISO Transmission Customers, Illinois Industrial Energy Consumers, Indiana Industrial Energy Consumers, Inc., Minnesota Large Industrial Group, Wisconsin Industrial Energy Group v. Midcontinent Independent System Operator, Inc., ALLETE, Inc., Ameren Illinois Company, Ameren Missouri, Ameren Transmission Company of Illinois, American Transmission Company LLC, Cleco Power LLC, Duke Energy Business Services, LLC, Entergy Arkansas, Inc., Entergy Gulf States Louisiana, LLC, Entergy Louisiana, LLC, Entergy Mississippi, Inc., Entergy New Orleans, Inc., Entergy Texas, Inc., Indianapolis Power & Light Company, International Transmission Company, ITC Midwest LLC, Michigan Electric Transmission Company, LLC MidAmerican Energy Company, MontanaDakota Utilities Co., Northern Indiana Public Service Company, Northern States Power Company-Minnesota, Northern States Power Company-Wisconsin, Otter Tail Power Company, Southern Indiana Gas & Electric Company VerDate Sep<11>2014 20:01 Jan 14, 2016 Jkt 238001 Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 14439–001. c. Date Filed: December 29, 2015. d. Applicant: Hawks Nest Hydro, LLC (Hawks Nest Hydro). e. Name of Project: Glen Ferris Hydroelectric Project. f. Location: The existing project is located on the Kanawha River, in Fayette County, West Virginia. The project does not occupy any federal lands. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)–825(r). h. Applicant Contact: Steven Murphy, Manager, Licensing, Brookfield Renewable Energy Group, 33 West 1st Street South, Fulton, New York 13069; Telephone (315) 598–6130. i. FERC Contact: Monir Chowdhury, (202) 502–6736 or monir.chowdhury@ ferc.gov. PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 2205 j. This application is not ready for environmental analysis at this time. k. Project Description: The existing Glen Ferris Hydroelectric Project consists of: (1) A low concrete dam with a maximum height of 12 feet above the river bed and a crest elevation of 651.0 feet National Geodetic Vertical Datum of 1929 (NGVD29), consisting of (from left to right—looking downstream) (i) a 590foot-long spillway section that generally curves upstream; (ii) a 128-foot-long five-bay stoplog sluice; (iii) a 2,132-footlong right spillway that runs diagonally in a downstream direction; (iv) a trash sluice section; (v) a 54-foot-long by 38foot-wide east powerhouse with a 62foot-wide intake structure; and (vi) a 64.5-foot-long by 63-foot-wide west powerhouse with a 82.3-foot-wide intake structure, with both powerhouses integral to the dam; (2) a 190-acre reservoir with a gross storage capacity of approximately 1,500 acre-feet at the dam crest elevation of 651.0 feet NGVD29; (3) two turbine-generator units in the east powerhouse, each with a rated capacity of approximately 1.9 megawatts (MW); (4) six turbinegenerator units in the west powerhouse, each with a rated capacity of approximately 0.4 MW; (5) a 4-milelong, 13.8-kilovolt transmission line; and (6) appurtenant facilities. The project is currently operated in a run-of-river mode with no usable storage capacity. Hawks Nest Hydro proposes to continue run-of-river operation. The project generates an annual average of 41,482 megawatthours. l. Locations of the Application: A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ ferc.gov or toll-free at 1–866–208–3676, or for TTY, (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Procedural Schedule: The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate. E:\FR\FM\15JAN1.SGM 15JAN1

Agencies

[Federal Register Volume 81, Number 10 (Friday, January 15, 2016)]
[Notices]
[Page 2205]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-00704]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL14-12-002]


Notice Setting Deadlines To File Briefs

    Association of Businesses Advocating Tariff Equity, Coalition of 
MISO Transmission Customers, Illinois Industrial Energy Consumers, 
Indiana Industrial Energy Consumers, Inc., Minnesota Large 
Industrial Group, Wisconsin Industrial Energy Group v. Midcontinent 
Independent System Operator, Inc., ALLETE, Inc., Ameren Illinois 
Company, Ameren Missouri, Ameren Transmission Company of Illinois, 
American Transmission Company LLC, Cleco Power LLC, Duke Energy 
Business Services, LLC, Entergy Arkansas, Inc., Entergy Gulf States 
Louisiana, LLC, Entergy Louisiana, LLC, Entergy Mississippi, Inc., 
Entergy New Orleans, Inc., Entergy Texas, Inc., Indianapolis Power & 
Light Company, International Transmission Company, ITC Midwest LLC, 
Michigan Electric Transmission Company, LLC MidAmerican Energy 
Company, Montana-Dakota Utilities Co., Northern Indiana Public 
Service Company, Northern States Power Company-Minnesota, Northern 
States Power Company-Wisconsin, Otter Tail Power Company, Southern 
Indiana Gas & Electric Company

    On January 5, 2016, Arkansas Electric Cooperative Corporation; 
Mississippi Delta Energy Agency and its members, Clarksdale Public 
Utilities Commission of the City of Clarksdale, Mississippi and Public 
Service Commission of Yazoo City, Mississippi; Hoosier Energy Rural 
Electric Cooperative, Inc.; and South Mississippi Electric Power 
Association filed a motion for clarification regarding the submission 
of briefs on exceptions, in the above-referenced proceeding (Motion). 
On January 8, 2016, MISO Transmission Owners filed an answer to the 
Motion. Notice is hereby given that the deadline for submitting briefs 
on exceptions is set to and including January 21, 2016. The deadline to 
file briefs opposing exceptions is set to and including February 10, 
2016.

    Dated: January 11, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
 [FR Doc. 2016-00704 Filed 1-14-16; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.