Mill and Main Hydroelectric Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 1412 [2016-00401]
Download as PDF
1412
Federal Register / Vol. 81, No. 7 / Tuesday, January 12, 2016 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
tkelley on DSK3SPTVN1PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER16–683–000.
Applicants: Southern California
Edison Company.
Description: Section 205(d) Rate
Filing: LGIA Sunray Energy, LLC SEGS
II Project to be effective 1/1/2016.
Filed Date: 1/6/16.
Accession Number: 20160106–5000.
Comments Due: 5 p.m. ET 1/27/16.
Docket Numbers: ER16–684–000.
Applicants: AlphaGen Power LLC.
Description: Section 205(d) Rate
Filing: Cancellation of MBR tariff to be
effective 3/6/2016.
Filed Date: 1/6/16.
Accession Number: 20160106–5126.
Comments Due: 5 p.m. ET 1/27/16.
Docket Numbers: ER16–685–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Section 205(d) Rate
Filing: Original Service Agreement No.
4327; Queue No. AA1–057 to be
effective 12/9/2015.
Filed Date: 1/6/16.
Accession Number: 20160106–5171.
Comments Due: 5 p.m. ET 1/27/16.
Docket Numbers: ER16–686–000.
Applicants: Southern California
Edison Company.
Description: Section 205(d) Rate
Filing: Revised Non-Trasmission
Depreciation Rates in SCE’s Formula
Transmission Rate to be effective 1/1/
2015.
Filed Date: 1/6/16.
Accession Number: 20160106–5226.
Comments Due: 5 p.m. ET 1/27/16.
Docket Numbers: ER16–687–000.
Applicants: PacifiCorp.
Description: Section 205(d) Rate
Filing: Noble Americas Energy
Solutions NITSA Rev 9 to be effective 1/
1/2016.
Filed Date: 1/6/16.
Accession Number: 20160106–5233.
Comments Due: 5 p.m. ET 1/27/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
VerDate Sep<11>2014
20:14 Jan 11, 2016
Jkt 238001
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 6, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–00398 Filed 1–11–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14722–000]
Mill and Main Hydroelectric Project;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On October 16, 2015, AS Clock Tower
Owner, LLC, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Mill and Main Hydroelectric Project
(Mill and Main Project) to be located on
the Assabet River, near Maynard,
Middlesex County, Massachusetts. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist
of: (1) The existing 9.5-foot-high, 170foot-long granite block Ben Smith dam;
(2) the existing 18.75-acre Ben Smith
dam impoundment with a storage
capacity of 475 acre-feet and a normal
water surface elevation of 177 feet above
mean sea level (msl); (3) an existing
1,600-foot-long power canal leading to
an existing gatehouse at the upstream
end of the existing 18.3-acre Mill Pond
impoundment with a storage capacity of
130 acre-feet and a normal water surface
elevation of 176 feet msl; (4) the existing
masonry Mill Pond dam; (5) an existing
7-foot-diameter, 49-foot-long penstock;
(6) an existing masonry powerhouse
containing one turbine-generator unit
with an installed capacity of 290kilowatts; (7) two 300-foot-long masonry
PO 00000
Frm 00027
Fmt 4703
Sfmt 9990
tailraces; (8) an existing 480-volt
transmission line and a 13.8 kV step-up
transformer to interconnect the project
with the Clock Tower Place; and (9)
appurtenant facilities. The estimated
annual generation of the Mill and Main
Project would be about 1,241 megawatthours. The existing Ben Smith and Mill
dams and appurtenant works are owned
by AS Clock Tower Owner, LLC.
Applicant Contact: Mr. Kurt W.
Saraceno, AS Clock Tower Owner, LLC,
c/o Saracen Properties. 41 Seyon Street,
Suite 200, Waltham, MA 02453; phone:
(781) 250–8000 x2710.
FERC Contact: Patrick Crile; phone:
(202) 502–8042 or email: Patrick.Crile@
ferc.gov.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14722–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14722) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: January 6, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–00401 Filed 1–11–16; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\12JAN1.SGM
12JAN1
Agencies
[Federal Register Volume 81, Number 7 (Tuesday, January 12, 2016)]
[Notices]
[Page 1412]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-00401]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14722-000]
Mill and Main Hydroelectric Project; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On October 16, 2015, AS Clock Tower Owner, LLC, filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of the Mill
and Main Hydroelectric Project (Mill and Main Project) to be located on
the Assabet River, near Maynard, Middlesex County, Massachusetts. The
sole purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The proposed project would consist of: (1) The existing 9.5-foot-
high, 170-foot-long granite block Ben Smith dam; (2) the existing
18.75-acre Ben Smith dam impoundment with a storage capacity of 475
acre-feet and a normal water surface elevation of 177 feet above mean
sea level (msl); (3) an existing 1,600-foot-long power canal leading to
an existing gatehouse at the upstream end of the existing 18.3-acre
Mill Pond impoundment with a storage capacity of 130 acre-feet and a
normal water surface elevation of 176 feet msl; (4) the existing
masonry Mill Pond dam; (5) an existing 7-foot-diameter, 49-foot-long
penstock; (6) an existing masonry powerhouse containing one turbine-
generator unit with an installed capacity of 290-kilowatts; (7) two
300-foot-long masonry tailraces; (8) an existing 480-volt transmission
line and a 13.8 kV step-up transformer to interconnect the project with
the Clock Tower Place; and (9) appurtenant facilities. The estimated
annual generation of the Mill and Main Project would be about 1,241
megawatt-hours. The existing Ben Smith and Mill dams and appurtenant
works are owned by AS Clock Tower Owner, LLC.
Applicant Contact: Mr. Kurt W. Saraceno, AS Clock Tower Owner, LLC,
c/o Saracen Properties. 41 Seyon Street, Suite 200, Waltham, MA 02453;
phone: (781) 250-8000 x2710.
FERC Contact: Patrick Crile; phone: (202) 502-8042 or email:
Patrick.Crile@ferc.gov.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14722-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14722) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: January 6, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-00401 Filed 1-11-16; 8:45 am]
BILLING CODE 6717-01-P