Combined Notice of Filings #1, 1412 [2016-00398]

Download as PDF 1412 Federal Register / Vol. 81, No. 7 / Tuesday, January 12, 2016 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission tkelley on DSK3SPTVN1PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER16–683–000. Applicants: Southern California Edison Company. Description: Section 205(d) Rate Filing: LGIA Sunray Energy, LLC SEGS II Project to be effective 1/1/2016. Filed Date: 1/6/16. Accession Number: 20160106–5000. Comments Due: 5 p.m. ET 1/27/16. Docket Numbers: ER16–684–000. Applicants: AlphaGen Power LLC. Description: Section 205(d) Rate Filing: Cancellation of MBR tariff to be effective 3/6/2016. Filed Date: 1/6/16. Accession Number: 20160106–5126. Comments Due: 5 p.m. ET 1/27/16. Docket Numbers: ER16–685–000. Applicants: PJM Interconnection, L.L.C. Description: Section 205(d) Rate Filing: Original Service Agreement No. 4327; Queue No. AA1–057 to be effective 12/9/2015. Filed Date: 1/6/16. Accession Number: 20160106–5171. Comments Due: 5 p.m. ET 1/27/16. Docket Numbers: ER16–686–000. Applicants: Southern California Edison Company. Description: Section 205(d) Rate Filing: Revised Non-Trasmission Depreciation Rates in SCE’s Formula Transmission Rate to be effective 1/1/ 2015. Filed Date: 1/6/16. Accession Number: 20160106–5226. Comments Due: 5 p.m. ET 1/27/16. Docket Numbers: ER16–687–000. Applicants: PacifiCorp. Description: Section 205(d) Rate Filing: Noble Americas Energy Solutions NITSA Rev 9 to be effective 1/ 1/2016. Filed Date: 1/6/16. Accession Number: 20160106–5233. Comments Due: 5 p.m. ET 1/27/16. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. VerDate Sep<11>2014 20:14 Jan 11, 2016 Jkt 238001 Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 6, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–00398 Filed 1–11–16; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14722–000] Mill and Main Hydroelectric Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On October 16, 2015, AS Clock Tower Owner, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Mill and Main Hydroelectric Project (Mill and Main Project) to be located on the Assabet River, near Maynard, Middlesex County, Massachusetts. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of: (1) The existing 9.5-foot-high, 170foot-long granite block Ben Smith dam; (2) the existing 18.75-acre Ben Smith dam impoundment with a storage capacity of 475 acre-feet and a normal water surface elevation of 177 feet above mean sea level (msl); (3) an existing 1,600-foot-long power canal leading to an existing gatehouse at the upstream end of the existing 18.3-acre Mill Pond impoundment with a storage capacity of 130 acre-feet and a normal water surface elevation of 176 feet msl; (4) the existing masonry Mill Pond dam; (5) an existing 7-foot-diameter, 49-foot-long penstock; (6) an existing masonry powerhouse containing one turbine-generator unit with an installed capacity of 290kilowatts; (7) two 300-foot-long masonry PO 00000 Frm 00027 Fmt 4703 Sfmt 9990 tailraces; (8) an existing 480-volt transmission line and a 13.8 kV step-up transformer to interconnect the project with the Clock Tower Place; and (9) appurtenant facilities. The estimated annual generation of the Mill and Main Project would be about 1,241 megawatthours. The existing Ben Smith and Mill dams and appurtenant works are owned by AS Clock Tower Owner, LLC. Applicant Contact: Mr. Kurt W. Saraceno, AS Clock Tower Owner, LLC, c/o Saracen Properties. 41 Seyon Street, Suite 200, Waltham, MA 02453; phone: (781) 250–8000 x2710. FERC Contact: Patrick Crile; phone: (202) 502–8042 or email: Patrick.Crile@ ferc.gov. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–14722–000. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https:// www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P–14722) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: January 6, 2016. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2016–00401 Filed 1–11–16; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\12JAN1.SGM 12JAN1

Agencies

[Federal Register Volume 81, Number 7 (Tuesday, January 12, 2016)]
[Notices]
[Page 1412]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-00398]



[[Page 1412]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #1

    Take notice that the Commission received the following electric 
rate filings:
    Docket Numbers: ER16-683-000.
    Applicants: Southern California Edison Company.
    Description: Section 205(d) Rate Filing: LGIA Sunray Energy, LLC 
SEGS II Project to be effective 1/1/2016.
    Filed Date: 1/6/16.
    Accession Number: 20160106-5000.
    Comments Due: 5 p.m. ET 1/27/16.

    Docket Numbers: ER16-684-000.
    Applicants: AlphaGen Power LLC.
    Description: Section 205(d) Rate Filing: Cancellation of MBR tariff 
to be effective 3/6/2016.
    Filed Date: 1/6/16.
    Accession Number: 20160106-5126.
    Comments Due: 5 p.m. ET 1/27/16.

    Docket Numbers: ER16-685-000.
    Applicants: PJM Interconnection, L.L.C.
    Description: Section 205(d) Rate Filing: Original Service Agreement 
No. 4327; Queue No. AA1-057 to be effective 12/9/2015.
    Filed Date: 1/6/16.
    Accession Number: 20160106-5171.
    Comments Due: 5 p.m. ET 1/27/16.

    Docket Numbers: ER16-686-000.
    Applicants: Southern California Edison Company.
    Description: Section 205(d) Rate Filing: Revised Non-Trasmission 
Depreciation Rates in SCE's Formula Transmission Rate to be effective 
1/1/2015.
    Filed Date: 1/6/16.
    Accession Number: 20160106-5226.
    Comments Due: 5 p.m. ET 1/27/16.

    Docket Numbers: ER16-687-000.
    Applicants: PacifiCorp.
    Description: Section 205(d) Rate Filing: Noble Americas Energy 
Solutions NITSA Rev 9 to be effective 1/1/2016.
    Filed Date: 1/6/16.
    Accession Number: 20160106-5233.
    Comments Due: 5 p.m. ET 1/27/16.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 
(toll free). For TTY, call (202) 502-8659.

    Dated: January 6, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-00398 Filed 1-11-16; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.