Martha Coakley, Massachusetts Attorney General; Connecticut Public Utilities Regulatory Authority; Massachusetts Department of Public Utilities; New Hampshire Public Utilities Commission; Connecticut Office of Consumer Counsel; Maine Office of the Public Advocate; George Jepsen, Connecticut Attorney General; New Hampshire Office of Consumer Advocate; Rhode Island Division of Public Utilities and Carriers; Vermont Department of Public Service; Massachusetts Municipal Wholesale Electric Company; Associated Industries of Massachusetts; The Energy Consortium; Power Options, Inc.; and the Industrial Energy Consumer Group, v. Bangor Hydro-Electric Company; Central Maine Power Company; New England Power Company d/b/a National Grid; New Hampshire Transmission LLC d/b/a NextEra; NSTAR Electric and Gas Corporation; Northeast Utilities Service Company; The United Illuminating Company; Unitil Energy Systems, Inc. and Fitchburg Gas and Electric Light Company; Vermont Transco, LLC; Notice of Filing, 928 [2016-122]
Download as PDF
928
Federal Register / Vol. 81, No. 5 / Friday, January 8, 2016 / Notices
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an ‘‘eSubscription’’ link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on January 12, 2016.
Dated: December 31, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–98 Filed 1–7–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL11–66–000]
asabaliauskas on DSK5VPTVN1PROD with NOTICES
Martha Coakley, Massachusetts
Attorney General; Connecticut Public
Utilities Regulatory Authority;
Massachusetts Department of Public
Utilities; New Hampshire Public
Utilities Commission; Connecticut
Office of Consumer Counsel; Maine
Office of the Public Advocate; George
Jepsen, Connecticut Attorney General;
New Hampshire Office of Consumer
Advocate; Rhode Island Division of
Public Utilities and Carriers; Vermont
Department of Public Service;
Massachusetts Municipal Wholesale
Electric Company; Associated
Industries of Massachusetts; The
Energy Consortium; Power Options,
Inc.; and the Industrial Energy
Consumer Group, v. Bangor HydroElectric Company; Central Maine
Power Company; New England Power
Company d/b/a National Grid; New
Hampshire Transmission LLC d/b/a
NextEra; NSTAR Electric and Gas
Corporation; Northeast Utilities
Service Company; The United
Illuminating Company; Unitil Energy
Systems, Inc. and Fitchburg Gas and
Electric Light Company; Vermont
Transco, LLC; Notice of Filing
Take notice that December 31, 2015,
NSTAR Electric Company submitted
tariff filing per: Refund Report to be
effective N/A, pursuant to the
Commission’s Opinion No. 531–A,
issued on October 16, 2014.1
1 Martha
Coakley, Mass. Attorney Gen., et al. v.
Bangor Hydro-Elec. Co., et al., Opinion No. 531, 147
VerDate Sep<11>2014
20:40 Jan 07, 2016
Jkt 238001
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible online at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an ‘‘eSubscription’’ link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on January 21, 2016.
Dated: January 4, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–122 Filed 1–7–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2265–010;
ER14–1818–010; ER12–1238–007;
ER10–2338–012; ER10–2340–012;
ER12–1239–007; ER10–2385–008;
FERC ¶ 61,234 (2014) (Opinion No. 531), order on
paper hearing, Opinion No. 531–A, 149 FERC ¶
61,032 (2014) (Opinion No. 531–A).
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
ER11–2062–019; ER11–2508–018;
ER11–4307–019; ER12–261–018; ER10–
2368–007; ER11–2107–010; ER11–2108–
010; ER10–2888–019; ER11–4308–019;
ER11–2805–018; ER10–2382–008;
ER10–2357–008; ER10–2369–007;
ER10–2361–008.
Applicants: NRG Power Marketing
LLC, Boston Energy Trading and
Marketing LLC, Broken Bow Wind, LLC,
CP Power Sales Nineteen, L.L.C., CP
Power Sales Twenty, L.L.C., Crofton
Bluffs Wind, LLC, Elkhorn Ridge Wind,
LLC, Energy Plus Holdings LLC, GenOn
Energy Management, LLC, Green
Mountain Energy Company,
Independence Energy Group LLC,
Laredo Ridge Wind, LLC, North
Community Turbines LLC, North Wind
Turbines LLC, Norwalk Power LLC,
Reliant Energy Northeast LLC, RRI
Energy Services, LLC, San Juan Mesa
Wind Project, LLC, Sleeping Bear, LLC,
Taloga Wind, LLC, Wildorado Wind,
LLC.
Description: Updated Market Power
Analysis for the Southwest Power Pool
Region of NRG SPP MBR Sellers.
Filed Date: 12/31/15.
Accession Number: 20151231–5100.
Comments Due: 5 p.m. ET 2/29/16.
Docket Numbers: ER10–2721–006.
Applicants: El Paso Electric Company.
Description: Updated Market Power
Analysis of El Paso Electric Company
(Volume1 of 2).
Filed Date: 12/31/15.
Accession Number: 20151231–5101.
Comments Due: 5 p.m. ET 2/29/16.
Docket Numbers: ER10–2805–005;
ER10–2564–006; ER10–2600–006;
ER10–2289–006.
Applicants: Central Hudson Gas &
Electric Corporation, Tucson Electric
Power Company, UNS Electric, Inc.,
UniSource Energy Development
Company.
Description: Triennial Market Power
Update for the Southwest Region of the
Fortis, Inc. subsidiaries.
Filed Date: 12/31/15.
Accession Number: 20151231–5159.
Comments Due: 5 p.m. ET 2/29/16.
Docket Numbers: ER10–2984–022.
Applicants: Merrill Lynch
Commodities, Inc.
Description: Notice of Non-Material
Change in Status of Merrill Lynch
Commodities, Inc.
Filed Date: 12/31/15.
Accession Number: 20151231–5110.
Comments Due: 5 p.m. ET 1/21/16.
Docket Numbers: ER10–3310–011;
ER15–2013–003; ER14–1439–005;
ER11–2489–008; ER12–2639 –006.
Applicants: New Harquahala
Generating Company, LLC, Talen
Energy Marketing, LLC, TrailStone
E:\FR\FM\08JAN1.SGM
08JAN1
Agencies
[Federal Register Volume 81, Number 5 (Friday, January 8, 2016)]
[Notices]
[Page 928]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2016-122]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL11-66-000]
Martha Coakley, Massachusetts Attorney General; Connecticut
Public Utilities Regulatory Authority; Massachusetts Department of
Public Utilities; New Hampshire Public Utilities Commission;
Connecticut Office of Consumer Counsel; Maine Office of the Public
Advocate; George Jepsen, Connecticut Attorney General; New Hampshire
Office of Consumer Advocate; Rhode Island Division of Public Utilities
and Carriers; Vermont Department of Public Service; Massachusetts
Municipal Wholesale Electric Company; Associated Industries of
Massachusetts; The Energy Consortium; Power Options, Inc.; and the
Industrial Energy Consumer Group, v. Bangor Hydro-Electric Company;
Central Maine Power Company; New England Power Company d/b/a National
Grid; New Hampshire Transmission LLC d/b/a NextEra; NSTAR Electric and
Gas Corporation; Northeast Utilities Service Company; The United
Illuminating Company; Unitil Energy Systems, Inc. and Fitchburg Gas and
Electric Light Company; Vermont Transco, LLC; Notice of Filing
Take notice that December 31, 2015, NSTAR Electric Company
submitted tariff filing per: Refund Report to be effective N/A,
pursuant to the Commission's Opinion No. 531-A, issued on October 16,
2014.\1\
---------------------------------------------------------------------------
\1\ Martha Coakley, Mass. Attorney Gen., et al. v. Bangor Hydro-
Elec. Co., et al., Opinion No. 531, 147 FERC ] 61,234 (2014)
(Opinion No. 531), order on paper hearing, Opinion No. 531-A, 149
FERC ] 61,032 (2014) (Opinion No. 531-A).
---------------------------------------------------------------------------
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Applicant and all the parties in this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426.
This filing is accessible online at https://www.ferc.gov, using the
``eLibrary'' link and is available for electronic review in the
Commission's Public Reference Room in Washington, DC. There is an
``eSubscription'' link on the Web site that enables subscribers to
receive email notification when a document is added to a subscribed
docket(s). For assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on January 21, 2016.
Dated: January 4, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016-122 Filed 1-7-16; 8:45 am]
BILLING CODE 6717-01-P