Energy Resources USA Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 471 [2015-33237]
Download as PDF
Federal Register / Vol. 81, No. 3 / Wednesday, January 6, 2016 / Notices
section 201(a) as of the date it is filed
with the Secretary. 42 U.S.C. 8311.
The following owner of a proposed
new base load electric powerplant has
filed a self-certification of coalcapability with DOE pursuant to FUA
section 201(d) and in accordance with
DOE regulations in 10 CFR 501.60, 61:
OWNER: CPV Towantic, LLC
CAPACITY: 785 megawatts (MW)
PLANT LOCATION: CPV Towantic
Energy Center, 16 Woodruff Hill
Road, Oxford, CT 06478
IN-SERVICE DATE: May 1, 2018
Issued in Washington, DC, on December
30, 2015.
Christopher Lawrence,
Electricity Policy Analyst, Office of Electricity
Delivery and Energy Reliability.
[FR Doc. 2015–33317 Filed 1–5–16; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER16–612–000]
Dated: December 30, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
mstockstill on DSK4VPTVN1PROD with NOTICES
Greeley Energy Facility, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
[FR Doc. 2015–33232 Filed 1–5–16; 8:45 am]
BILLING CODE 6717–01–P
This is a supplemental notice in the
above-referenced proceeding of Greeley
Energy Facility, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is January 19,
2016.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
VerDate Sep<11>2014
17:32 Jan 05, 2016
Jkt 238001
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14739–000]
Energy Resources USA Inc.; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On November 27, 2015, the Energy
Resources USA Inc. filed an application
for a preliminary permit under section
4(f) of the Federal Power Act proposing
to study the feasibility of the proposed
Coralville Dam Hydroelectric Project
No. 14739–000, to be located at the
existing Coralville Dam on the Iowa
River, near the City of Coralville, in
Johnson County, Iowa. The Coralville
Dam is owned by the United States
government and operated by the U.S.
Army Corps of Engineers.
The proposed project would consist
of: (1) A new 90-foot by 13-foot by 18foot concrete conduit; (2) a new 70-foot
by 50-foot reinforced concrete
powerhouse containing two 3.5megawatt Kaplan hydropower turbinegenerators having a total combined
generating capacity of 7.0 megawatts; (3)
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
471
one new 100-foot-long by 65-foot-wide
tailrace; (4) a new 50-foot-long by 45foot-wide substation; (5) a new 2-milelong, 69-kilovolt transmission line; and
(6) appurtenant facilities. The project
would have an estimated annual
generation of 34 gigawatt-hours.
Applicant Contact: Mr. Ander
Gonzalez, 2655 Le Jeune Road, Suite
804, Coral Gables, Florida 33134;
telephone (954) 248–8425.
FERC Contact: Tyrone A. Williams,
(202) 502–6331.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. The Commission strongly
encourages electronic filing. Please file
comments, motions to intervene, notices
of intent, and competing applications
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14739–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14739) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: December 30, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–33237 Filed 1–5–16; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission (Commission) hereby gives
E:\FR\FM\06JAN1.SGM
06JAN1
Agencies
[Federal Register Volume 81, Number 3 (Wednesday, January 6, 2016)]
[Notices]
[Page 471]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-33237]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14739-000]
Energy Resources USA Inc.; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On November 27, 2015, the Energy Resources USA Inc. filed an
application for a preliminary permit under section 4(f) of the Federal
Power Act proposing to study the feasibility of the proposed Coralville
Dam Hydroelectric Project No. 14739-000, to be located at the existing
Coralville Dam on the Iowa River, near the City of Coralville, in
Johnson County, Iowa. The Coralville Dam is owned by the United States
government and operated by the U.S. Army Corps of Engineers.
The proposed project would consist of: (1) A new 90-foot by 13-foot
by 18-foot concrete conduit; (2) a new 70-foot by 50-foot reinforced
concrete powerhouse containing two 3.5-megawatt Kaplan hydropower
turbine-generators having a total combined generating capacity of 7.0
megawatts; (3) one new 100-foot-long by 65-foot-wide tailrace; (4) a
new 50-foot-long by 45-foot-wide substation; (5) a new 2-mile-long, 69-
kilovolt transmission line; and (6) appurtenant facilities. The project
would have an estimated annual generation of 34 gigawatt-hours.
Applicant Contact: Mr. Ander Gonzalez, 2655 Le Jeune Road, Suite
804, Coral Gables, Florida 33134; telephone (954) 248-8425.
FERC Contact: Tyrone A. Williams, (202) 502-6331.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. The Commission strongly encourages electronic filing.
Please file comments, motions to intervene, notices of intent, and
competing applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14739-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14739) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: December 30, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-33237 Filed 1-5-16; 8:45 am]
BILLING CODE 6717-01-P