C.P. Crane LLC; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 231 [2015-33124]
Download as PDF
Federal Register / Vol. 81, No. 2 / Tuesday, January 5, 2016 / Notices
231
CHANGES MADE IN RD16–2–000
Number of
respondents
Annual
number of
responses
per
respondent
Total
number of
responses
Average burden
and cost per
response
Total annual
burden (hours)
and cost
Total annual
cost per
respondent
(1)
Reliability standard
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
($)
FERC–725P (Reduction due to Replacement of PRC–005–3) 10 11
One-time review of existing plant and substation sites to determine which ones fall
under PRC–005–3.
One-time review and adjustment of existing
program.
12 937
¥1
¥937
2 hrs.; $146 ..........
¥1,874 hrs.; ¥$136,802 .......
¥146.00
13 288
¥1
¥288
8 hrs.; $584 ..........
¥2,304 hrs.; ¥$168,192 .......
¥584.00
Total Reduction to FERC–725P ................
......................
......................
¥1,225
...............................
¥4,178 hrs.; ¥$304,994.
Replacement of PRC–005–4 14 15—One-time
review of sudden pressure relay maintenance program and adjustment (Burden Reduction).
Implementation of PRC–005–6—One-time review of existing plant and substation sites to
determine which ones fall under PRC–005–6
(Burden Increase).
Implementation of PRC–005–6—One-time review and adjustment of existing program for
reclosing relays and associated equipment
(Burden Increase).
Implementation of PRC–005–6—One-time review and adjustment of existing program for
sudden pressure relays (Burden Increase).
1,287
¥1
¥1,287
8 hrs.; $522.72 .....
¥10,296 hrs.; ¥$672,740.64
16 937
1
937
2 hrs.; $145 ..........
1,874 hrs.; $135,397 ..............
144.50
288
1
288
8.5 hrs.; $614 .......
2,448 hrs.; $176,868 ..............
614.00
1,287
1
1,287
8 hrs.; $531.60 .....
10,296 hrs.; $684,169.20 .......
531.60
Total Net Increase to FERC–725P1 ..........
......................
......................
2,512
...............................
4,332 hrs.; $323,693.56 .........
......................
Total Net Change, due to RD16–2 ............
......................
......................
0
...............................
144 hrs.; $18,699 ...................
......................
FERC–725P1
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Dated: December 29, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[FR Doc. 2015–33125 Filed 1–4–16; 8:45 am]
[Docket No. EL16–21–000]
[Docket No. CP15–490–000, CP15–490–001]
BILLING CODE 6717–01–P
C.P. Crane LLC; Notice of Institution of
Section 206 Proceeding and Refund
Effective Date
asabaliauskas on DSK5VPTVN1PROD with NOTICES
¥522.72
10 The estimates for cost per response are derived
using the following formula: Average Burden Hours
per Response * $73 per Hour = Average Cost per
Response. The hourly cost figure comes from the
average of the salary plus benefits for a manager and
an engineer (rounded to the nearest dollar). The
figures are taken from the Bureau of Labor Statistics
at (https://bls.gov/oes/current/naics3_221000.htm).
11 Implemented in Docket RM14–8.
12 This figure reflects the generator owners and
transmission owners identified in the NERC
Compliance Registry as of May 28, 2014.
13 This figure is a subset of GOs and TOs, as
discussed in Order 803 (Docket No. RM14–8), P 41.
14 Implemented in Docket RM15–9.
15 The estimates for cost per response are derived
using the following formula: Average Burden Hours
per Response * $65.34 per Hour = Average Cost per
Response. The hourly cost figure comes from the
average of the salary plus benefits for an engineer
(rounded to the nearest dollar). The figures are
taken from the Bureau of Labor Statistics at (https://
bls.gov/oes/current/naics3_221000.htm).
16 This figure reflects the generator owners and
transmission owners identified in the NERC
Compliance Registry as of May 28, 2014.
VerDate Sep<11>2014
18:43 Jan 04, 2016
Jkt 238001
On December 29, 2015, the
Commission issued an order in Docket
No. EL16–21–000, pursuant to section
206 of the Federal Power Act (FPA), 16
U.S.C. 824e (2012), instituting an
investigation into the justness and
reasonableness of C.P. Crane LLC’s
reactive power rate schedule. C.P. Crane
LLC, 153 FERC ¶ 61,348 (2015).
The refund effective date in Docket
No. EL16–21–000, established pursuant
to section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register.
Dated: December 29, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–33124 Filed 1–4–16; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
Delfin LNG, LLC; Notice of Scoping for
the Proposed Delfin LNG Project and
Request for Comments on
Environmental Issues
The Federal Energy Regulatory
Commission (FERC or Commission) is
cooperating with the U.S. Coast Guard
(Coast Guard), the lead federal agency
for environmental review of the Delfin
LNG Project. This proposal involves the
construction and operation of an
offshore liquefied natural gas (LNG)
deepwater port (under the jurisdiction
of the Coast Guard and the Maritime
Administration) and associated pipeline
facilities, including about 1.1 mile of
onshore pipeline and aboveground
facilities under the Commission’s
jurisdiction. FERC staff is assisting the
Coast Guard in its preparation of an
environmental impact statement (EIS)
that will discuss the environmental
impacts of the Delfin LNG Project. This
cooperative effort is to comply with the
National Environmental Policy Act of
1969 (NEPA), which requires the
Commission to take into account the
E:\FR\FM\05JAN1.SGM
05JAN1
Agencies
[Federal Register Volume 81, Number 2 (Tuesday, January 5, 2016)]
[Notices]
[Page 231]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-33124]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL16-21-000]
C.P. Crane LLC; Notice of Institution of Section 206 Proceeding
and Refund Effective Date
On December 29, 2015, the Commission issued an order in Docket No.
EL16-21-000, pursuant to section 206 of the Federal Power Act (FPA), 16
U.S.C. 824e (2012), instituting an investigation into the justness and
reasonableness of C.P. Crane LLC's reactive power rate schedule. C.P.
Crane LLC, 153 FERC ] 61,348 (2015).
The refund effective date in Docket No. EL16-21-000, established
pursuant to section 206(b) of the FPA, will be the date of publication
of this notice in the Federal Register.
Dated: December 29, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-33124 Filed 1-4-16; 8:45 am]
BILLING CODE 6717-01-P