2015 – Federal Register Recent Federal Regulation Documents
Results 601 - 650 of 30,167
Pipeline Safety: Random Drug Testing Rate; Contractor Management Information System Reporting; and Obtaining Drug and Alcohol Management Information System Sign-In Information
PHMSA has determined that the minimum random drug testing rate for covered employees will remain at 25 percent during calendar year 2016. Operators are reminded that drug and alcohol testing information must be submitted for contractors performing or ready to perform covered functions. For calendar year 2015 reporting, PHMSA will not attempt to mail the ``user name'' and ``password'' for the Drug and Alcohol Management Information System (DAMIS) to operators, but will make the user name and password available in the PHMSA Portal (https:// portal.phmsa.dot.gov/pipeline).
Potential Benefits and Feasibility of Voluntary Compliance; Public Listening Sessions
The FMCSA announces that it will hold two public listening sessions, on January 12 and 31, 2016, to solicit information on the potential benefits and feasibility of voluntary compliance and ways to credit carriers and drivers who initiate and establish programs that promote safety beyond the standards established in FMCSA regulations. The recently enacted Fixing America's Surface Transportation (FAST) Act mandates that the FMCSA Administrator allow recognition for a motor carrier that installs advanced safety equipment, enhanced driver fitness measures, fleet safety management tools, technologies, and programs and other standards for use by motor carriers to receive recognition, including credit or an improved Safety Measurement System (SMS) percentile. FMCSA is soliciting comment to develop a process for identifying and reviewing these opportunities to provide credit to those carriers and drivers who go above and beyond the regulatory requirements. The listening sessions are intended to provide interested parties with an opportunity to share their views on this topic with Agency representatives, along with any data or analysis they may have. All comments will be transcribed and placed in the docket referenced above for FMCSA's consideration. The entire proceedings of both meetings will be webcast.
Proposed Collection; Comment Request for Form 8844
The Department of the Treasury, as part of its continuing effort to reduce paperwork and respondent burden, invites the general public and other Federal agencies to take this opportunity to comment on proposed and/or continuing information collections, as required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning Form 8844, Empowerment Zone Employment Credit.
Health Center Program
In accordance with the Awarding Agency Grants Administration Manual (AAGAM) Chapter 1.03.103, the Bureau of Primary Health Care (BPHC) has been granted class deviations from the requirements for extensions contained in the AAGAM Chapter 2.04.104B-4A.I.a(5)(b) and the requirements for administrative supplements contained in AAGAM Chapter 2.04.104B-4A.4.b to provide additional grant funds during extended budget periods in excess of the allowed maximum. The deviations prevent interruptions in the provision of critical health care services for a funded service area until a new award can be made to an eligible Service Area Competition (SAC) applicant and to conduct an orderly phase-out of Health Center Program activities by the current award recipient. BPHC has also been granted a deviation that allows it to annually announce via the Federal Register the Health Center Program award recipients that received a low cost extension and/or administrative supplement under the above described deviations.
Submission for OMB Review; Comment Request
The Department of Defense has submitted to OMB for clearance, the following proposal for collection of information under the provisions of the Paperwork Reduction Act.
Deepwater Port License Application: Delfin LNG LLC, Delfin LNG Deepwater Port
The Maritime Administration (MARAD), in cooperation with the U.S. Coast Guard (USCG), announces the receipt and availability of the amended deepwater port license application submitted by Delfin LNG LLC (Delfin LNG) on November 19, 2015 (amended application). The purpose of this Federal Register Notice is to explain the changes between the original application and the amended application and seek public comments regarding the amended application. Please note, MARAD and USCG have determined that this Federal Register Notice is sufficient for satisfying National Environmental Policy Act (NEPA) requirements for public scoping and seeking public comment on an agency action. As such, no public scoping meetings are planned to be held for the Delfin LNG amended application. A Notice of Application that summarized the original Delfin LNG license application was published in the Federal Register on July 16, 2015 (80 FR 42162). A Notice of Intent to Prepare an Environmental Impact Statement and Notice of Public Meetings was published in the Federal Register on Wednesday, July 29, 2015 (80 FR 45270). This Notice incorporates the aforementioned Notices by reference and highlights changes to the proposed Delfin LNG project made since the original application was deemed complete. The proposed Delfin LNG deepwater port incorporates onshore components, which are subject to the jurisdiction of the Federal Energy Regulatory Commission (FERC). These facilities are described in the section of this notice titled ``FERC Application.''
Deepwater Port License Application: Liberty Natural Gas LLC, Port Ambrose Deepwater Port; Withdrawal of Application and Termination of Federal Application Review Process
The Maritime Administration (MARAD) announces the termination of the Liberty Natural Gas LLC (Liberty) Port Ambrose Deepwater Port License Application and all related Federal processing activities required by applicable provisions of the Deepwater Port Act of 1974, as amended (Act). On September 28, 2015, Liberty submitted to MARAD and the U.S. Coast Guard (USCG) an application under the Act for a license and all Federal authorizations required to own, construct, and operate a deepwater port for the importation of liquefied natural gas (LNG) into the United States. The deepwater port, known as Port Ambrose, was proposed to be located in the offshore waters of New York and New Jersey, in the New York Bight. On June 14, 2013, MARAD and USCG deemed the application complete, designated New York and New Jersey as adjacent coastal states (ACS) and commenced the Federal application review process required under the Act. This process also included a comprehensive environmental assessment, public meetings and coordination of the application review process with relevant Federal and State agencies. Upon completion of the environmental review process required by the National Environmental Policy Act (NEPA) and the final public licensing hearings, Governor Andrew M. Cuomo of the State of New York, notified the Maritime Administration, by letter dated November 12, 2015, of his disapproval of the Liberty Port Ambrose deepwater port project. Governor Cuomo's disapproval was issued in accordance with the provisions outlined in 33 U.S.C. Section 1508(c)(8) which state, the Secretary (or Maritime Administrator by delegated authority) may issue a deepwater port license only if the Governor of the ACS approves or is presumed to approve, issuance of the license. In light of Governor Cuomo's disapproval of the application, Liberty notified MARAD, by letter dated November 18, 2015, of its withdrawal of the Port Ambrose license application from the Federal review process. As a consequence of Liberty's withdrawal of its application, the Federal application review process and all related Federal processing activities were terminated on November 18, 2015. This Federal Register Notice shall serve as official announcement to the public that the Federal review and processing of the Liberty Port Ambrose deepwater port license application is terminated.
Containment Shell or Liner Moisture Barrier Inspection
The U.S. Nuclear Regulatory Commission (NRC) is seeking public comment on a draft regulatory issue summary (RIS) to reiterate the NRC staff's position in regard to American Society of Mechanical Engineers (ASME) code-required inservice inspection requirements for moisture barriers. The NRC's regulations require, in part, that licensees implement the inservice inspection program for pressure retaining components and their integral attachments of metal containments and metallic liners of concrete containments in accordance with the ASME Code. If a material prevents moisture from contacting inaccessible areas of the containment shell or liner, especially if the material is being relied upon in lieu of augmented examinations of a susceptible location, the material must be inspected as a moisture barrier. The applicable ASME Code sections require licensees to inspect 100 percent of accessible moisture barriers during each inspection period.
Agency Information Collection Activities; Comment Request; Annual Performance Report for the Gaining Early Awareness for Undergraduate Programs
In accordance with the Paperwork Reduction Act of 1995 (44 U.S.C. chapter 3501 et seq.), ED is proposing a revision of an existing information collection.
Agency Information Collection Activities, Comment Request; Solicitation of Nominations for the Iqbal Masih Award for the Elimination of Child Labor
The Department of Labor (DOL) is soliciting comments concerning the proposed extension of Office of Management and Budget (OMB) approval for the Solicitation of Nominations for the Iqbal Masih Award for the Elimination of Child Labor information collection request (ICR), as part of continuing Departmental efforts to reduce paperwork and respondent burden in accordance with the Paperwork Reduction Act of 1995 (PRA) (44 U.S.C. 3501 et seq.).
Spinetoram; Pesticide Tolerances
This regulation establishes tolerances for residues of spinetoram in or on multiple commodities that are identified and discussed later in this document. In addition, this regulation removes a number of existing tolerances for residues of spinetoram that are superseded by this action. Interregional Research Project # 4 (IR-4) requested these tolerances under the Federal Food, Drug, and Cosmetic Act (FFDCA).
Propiconazole on Tea; Pesticide Tolerance
This regulation establishes a tolerance for residues of propiconazole in or on tea. The Tea Association of the U.S.A., Inc. requested these tolerances under the Federal Food, Drug, and Cosmetic Act (FFDCA).
Deviation Reporting for Human Cells, Tissues, and Cellular and Tissue-Based Products; Draft Guidance for Industry; Availability
The Food and Drug Administration (FDA or Agency) is announcing the availability of a draft document entitled ``Deviation Reporting for Human Cells, Tissues, and Cellular and Tissue-Based Products Regulated Solely Under Section 361 of the Public Health Service Act and 21 CFR part 1271; Draft Guidance for Industry.'' The draft guidance document provides certain establishments that manufacture non-reproductive human cells, tissues, and cellular and tissue-based products (HCT/Ps), regulated solely under the Public Health Service Act (PHS Act) and under FDA regulations, with recommendations and relevant examples for complying with the requirements to report HCT/P deviations.
Modernizing the E-rate Program for Schools and Libraries
In this document, the Commission announces that the Office of Management and Budget (OMB) has approved, for a period of three years, the information collection associated with the Commission's Second E- rate Modernization Report and Order and Order on Reconsideration (Second E-rate Modernization Order). This document is consistent with the (Second E-rate Modernization Order, which stated that the Commission would publish a document in the Federal Register announcing the effective date of those rules.
Apprenticeship Programs; Equal Employment Opportunity; Extension of Comment Period
The Department of Labor (Department) issued a proposed rule in the Federal Register of November 6, 2015 [80 FR 68907], concerning proposed updates to the equal opportunity regulations that implement the National Apprenticeship Act of 1937. This document extends the comment period an additional 15 days, from January 5, 2016, to January 20, 2016. The Department received a request for additional time to develop comments on the proposed rulemaking. The Department is therefore extending the comment period in order to give all interested persons the opportunity to comment fully.
Endangered and Threatened Wildlife and Plants; Review of Native Species That Are Candidates for Listing as Endangered or Threatened; Annual Notice of Findings on Resubmitted Petitions; Annual Description of Progress on Listing Actions
In this Candidate Notice of Review (CNOR), we, the U.S. Fish and Wildlife Service (Service), present an updated list of plant and animal species native to the United States that we regard as candidates for or have proposed for addition to the Lists of Endangered and Threatened Wildlife and Plants under the Endangered Species Act of 1973, as amended. Identification of candidate species can assist environmental planning efforts by providing advance notice of potential listings, and by allowing landowners and resource managers to alleviate threats and thereby possibly remove the need to list species as endangered or threatened. Even if we subsequently list a candidate species, the early notice provided here could result in more options for species management and recovery by prompting candidate conservation measures to alleviate threats to the species. This CNOR summarizes the status and threats that we evaluated in order to determine that species qualify as candidates, to assign a listing priority number (LPN) to each species, and to determine whether a species should be removed from candidate status. Additional material that we relied on is available in the Species Assessment and Listing Priority Assignment Forms (species assessment forms) for each candidate species. This CNOR changes the LPN for two candidates and removes two species from candidate status. Combined with other decisions for individual species that were published separately from this CNOR in the past year, the current number of species that are candidates for listing is 60. This document also includes our findings on resubmitted petitions and describes our progress in revising the Lists of Endangered and Threatened Wildlife and Plants (Lists) during the period October 1, 2014, through September 30, 2015. Moreover, we request any additional status information that may be available for the candidate species identified in this CNOR.
Energy Conservation Program: Test Procedures for Ceiling Fan Light Kits
On October 31, 2014, the U.S. Department of Energy (DOE) published a notice of proposed rulemaking (NOPR) to amend the test procedures for ceiling fan light kits (CFLKs). That proposed rulemaking serves as the basis for this final rule. In this final rule, DOE updates the current test procedures by replacing references to ENERGY STAR test procedures with references to DOE lamps test procedures for medium screw base lamps and to industry test procedures for pin-based fluorescent lamps. DOE is also adding test procedures to establish an efficacy-based metric for all lamps packaged with CFLKs and for CFLKs with integrated solid-state lighting circuitry. These additional test procedures also specify that DOE lamp test procedures be used to test lamps packaged with CFLKs, and where such test procedures do not exist, lamps packaged with CFLKs be tested according to current industry test procedures for those lamps. This final rule also replaces references to superseded ENERGY STAR Program requirements with tables that contain the specific performance requirements from the ENERGY STAR documents. This final rule addresses standby and off mode energy usage for CFLKs. DOE also provides updated guidance related to accent lighting in CFLKs and the applicability of the existing energy conservation standards to accent lighting. In this final rule, DOE also reinterprets the definition of a ceiling fan to include hugger fans and clarifies that ceiling fans that produce large volumes of airflow also meet the definition. DOE is also issuing a reinterpretation as it relates to compliance with the 190 W limit requirement for CFLKs with sockets other than medium screw base and pin-based for fluorescent lamps.
Ownership Information in Market-Based Rate Filings
The Federal Energy Regulatory Commission (Commission) proposes to amend its regulations to clarify the scope of ownership information that sellers seeking to obtain or retain market-based rate authority must provide. The Commission proposes to find that the current policy that requires sellers to provide comprehensive ownership information is not necessary for the Commission's assessment of horizontal or vertical market power. The Commission further proposes to amend its regulations to clarify the types of ownership changes that must be reported to the Commission via a notice of change in status.
Rules of Practice in Transportation: Investigative Hearings, Meetings, Reports, and Petitions for Reconsideration
The NTSB amends its regulations which contain the NTSB's procedures for holding investigative hearings, various types of meetings, issuing reports, and responding to petitions for reconsideration. The NTSB introduced a number of substantive and technical changes in its notice of proposed rulemaking (NPRM). In the preamble to this final rule NTSB responds to the five comments the agency received, and explains the adopted changes, including reorganizing the regulation into different subparts to ensure the entire part is easy to follow.
Technical Amendments: FHFA Address and Zip Code Change
The Federal Housing Finance Agency (FHFA) is issuing this final rule as a technical change to correct regulatory references to FHFA's address and postal zip code.
Proposed Establishment of Class E Airspace; Danville, AR
This action proposes to establish Class E airspace at Danville, AR. Controlled airspace is necessary to accommodate new Standard Instrument Approach Procedures developed at Danville Municipal Airport, for the safety and management of Instrument Flight Rules (IFR) operations at the airport.
Commission Information Collection Activities; Consolidated Comment Request; Extension
In compliance with the requirements of the Paperwork Reduction Act of 1995, 44 U.S.C. 3506(c)(2)(A), the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the requirements and burden of the FERC-714 (Annual Electric Balancing Authority Area and Planning Area Report) and FERC-730 (Report of Transmission Investment Activity) information collections.
Airworthiness Directives; Fokker Services B.V. Airplanes
We propose to adopt a new airworthiness directive (AD) for all Fokker Services B.V. Model F.28 Mark 0070 and 0100 airplanes. This proposed AD was prompted by a report of cracking in a certain section of the secondary structure of the wing. This proposed AD would require a one-time inspection of the trailing edge rib, and corrective action if necessary. We are proposing this AD to detect and correct cracking that could lead to failure of the affected rib and consequent reduced control of the airplane.
Airworthiness Directives; Bombardier, Inc. Airplanes
We propose to supersede Airworthiness Directive (AD) 2014-16- 02, for certain Bombardier, Inc. Model CL-600-1A11 (CL-600) airplanes. AD 2014-16-02 currently requires revising the airplane flight manual to prohibit thrust reverser operation, doing repetitive detailed inspections of both engine thrust reversers for cracks, and modifying the thrust reversers if necessary. The modification of the thrust reversers is also an optional terminating action for the repetitive inspections. Since we issued AD 2014-16-02, we have determined that it is necessary to add a requirement to repair or modify the thrust reversers, which would terminate the requirements of AD 2014-16-02. We are proposing this AD to detect and correct cracks of the translating sleeve at the thrust reverser actuator attachment points, which could result in deployment or dislodgement of an engine thrust reverser in flight and subsequent reduced control of the airplane.
Child Care and Development Fund (CCDF) Program
The Department of Health and Human Services, Administration for Children and Families, proposes to amend the Child Care and Development Fund (CCDF) regulations. This proposed rule makes changes to CCDF regulations to detail provisions of the Child Care and Development Block Grant Act of 2014 in order to protect the health and safety of children in child care; help parents make informed consumer choices and access information to support child development; provide equal access to stable, high quality child care for low-income children; and enhance the overall quality of child care and the early childhood workforce.
Airworthiness Directives; B-N Group Ltd. Airplanes
We propose to adopt a new airworthiness directive (AD) for B-N Group Ltd. Models BN-2, BN-2A, BN-2A-2, BN-2A-3, BN-2A-6, BN-2A-8, BN- 2A-9, BN-2A-20, BN-2A-21, BN-2A-26, BN-2A-27, BN-2B-20, BN-2B-21, BN- 2B-26, BN-2B-27, BN2A MK. III, BN2A MK. III-2, BN2A MK. III-3 BN2A, BN2B, and BN2A MKIII (all models on TCDS A17EU and A29EU) airplanes that would supersede AD 2007-06-06. This proposed AD results from mandatory continuing airworthiness information (MCAI) originated by an aviation authority of another country to identify and correct an unsafe condition on an aviation product. The MCAI describes the unsafe condition as cracks in the inner shell of certain pitot/static pressure heads. We are issuing this proposed AD to require actions to address the unsafe condition on these products.
Airworthiness Directives; The Boeing Company Airplanes
We are adopting a new airworthiness directive (AD) for all The Boeing Company Model 777 airplanes. This AD was prompted by an evaluation by the design approval holder (DAH) indicating that the lap splices of the aft pressure bulkhead webs are subject to widespread fatigue damage (WFD) on aging Model 777 airplanes that have accumulated at least 38,000 total flight cycles. This AD requires repetitive inspections for any crack in the aft webs of the radial lap splices of the aft pressure bulkhead, and, if necessary, corrective actions. We are issuing this AD to detect and correct fatigue cracking in the aft webs of the radial lap splices of the aft pressure bulkhead; such cracking could result in reduced structural integrity of the airplane, decompression of the cabin, and collapse of the floor structure.
Airworthiness Directives; Airbus Airplanes
We are adopting a new airworthiness directive (AD) for certain Airbus Model A330-200, A330-200 Freighter, and A330-300 series airplanes; and all Model A340-200 and A340-300 series airplanes. This AD was prompted by reports that a bracket that attaches the cockpit instrument panel to the airplane structure does not sustain the fatigue loads of the design service goal. This AD requires repetitive inspections of that bracket for cracking and to determine if both lugs are fully broken, an inspection for cracking of an adjacent bracket if necessary, and corrective actions if necessary. This AD also provides an optional modification, which terminates the repetitive inspections. We are issuing this AD to detect and correct cracking on a bracket of the cockpit instrument panel, which, combined with failure of the horizontal beam, could lead to collapse of the cockpit panel, and reduced controllability of the airplane.
Airworthiness Directives; Bombardier, Inc. Airplanes
We are adopting a new airworthiness directive (AD) for certain Bombardier, Inc. Model CL-600-2A12 (CL-601) and CL-600-2B16 (CL-601-3A, CL-601-3R, and CL-604 Variants) airplanes. This AD was prompted by a report of an aft equipment bay fire due to chafing and subsequent arcing of the integrated drive generator (IDG) power cables. Additionally, we have received several reports of broken support brackets of the hydraulic line. This AD requires a one-time inspection of the IDG power cables for chafing, and for any cracked or broken support bracket of the hydraulic line; and corrective actions if necessary. We are issuing this AD to detect and correct broken support brackets of the hydraulic lines, which could result in inadequate clearance between the IDG power cables and hydraulic lines and chafing of the IDG power cables, and consequent high energy arcing and an uncontrolled fire in the aft equipment bay.
Airworthiness Directives; The Boeing Company Airplanes
We are superseding Airworthiness Directive (AD) 2013-23-03, which applies to certain The Boeing Company Model 747-100, 747-100B, 747-100B SUD, 747-200B, 747-200C, 747-200F, 747-300, 747-400, 747-400D, 747-400F, and 747SR series airplanes. AD 2013-23-03 required a detailed inspection of certain attach fittings for a cylindrical defect, and replacement if necessary. For certain airplanes, this new AD requires new inspections of the inboard actuator attach fittings for machining defects, and overhaul or replacement if necessary. This new AD also limits the compliance time for doing the replacement for certain other airplanes. This AD was prompted by a report that a machining defect was also found on some of the actuator assemblies inspected during manufacture. This defect could lead to fatigue cracking and subsequent fracture. We are issuing this AD to detect and correct defective inboard actuator attach fittings which, combined with loss of the outboard actuator load path, could result in uncontrolled retraction of the outboard flap, damage to flight control systems, and consequent reduced controllability of the airplane.
Airworthiness Directives; Gulfstream Aerospace Corporation Airplanes
We are revising an earlier proposed airworthiness directive (AD) for all Gulfstream Aerospace Corporation Model GV and GV-SP airplanes. The NPRM proposed to supersede Airworthiness Directive (AD) 2013-22-19, which requires inspecting to determine if fuel boost pumps having a certain part number are installed, replacing the fuel boost pumps having a certain part number, and revising the airplane maintenance or inspection program to include revised instructions for continued airworthiness. The NPRM also proposed to require revising the airplane maintenance program to include a fuel leak check of the fuel boost pumps, using new service information. The NPRM was prompted by reports of two independent types of failure of the fuel boost pump: overheat damage on the internal components and external housing, and fuel leakage. This action revises the NPRM by reducing the compliance time for revising the airplane maintenance program. We are proposing this supplemental NPRM (SNPRM) to prevent fuel leakage in combination with a capacitor clearance issue, which could result in an uncontrolled fire in the wheel well. Since these actions impose an additional burden over that proposed in the NPRM, we are reopening the comment period to allow the public the chance to comment on these proposed changes.
Pesticides; Certification of Pesticide Applicators; Second Extension of the Comment Period
EPA issued a proposed rule in the Federal Register of August 24, 2015, concerning certification of applicators of restricted use pesticides. This document extends the comment period to January 22, 2016. The comment period is being extended to provide additional time for commenters to prepare their responses.
Notice of Availability of Draft Guidance Documents for Subsequent License Renewal
The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft NUREG, NUREG-2191, ``Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report, Volume 1 and Volume 2,'' and draft NUREG-2192, ``Standard Review Plan for Review of Subsequent License Renewal Applications for Nuclear Power Plants'' (SRP-SLR). These draft documents describe methods acceptable to the NRC staff for granting a subsequent license renewal in accordance with license renewal regulations, as well as techniques used by the NRC staff in evaluating applications for subsequent license renewal. Public meetings related to the issuance of these NUREGs are planned to be held on January 27 and 28, 2016, and February 23, 2016, at NRC's headquarters. Information about the public meetings will be posted on the NRC's Web site at https://meetings.nrc.gov/pmns/mtg.
Sam Rayburn Dam Project Power Rate
Pursuant to Delegation Order Nos. 00-037.00A, effective October 25, 2013, and 00-001.00F, effective November 17, 2014, the Deputy Secretary has approved and placed into effect on an interim basis Rate Order No. SWPA-69, which increases the power rate for the Sam Rayburn Dam Project (Rayburn) pursuant to the Rayburn Rate Schedule (SRD-15) to supersede the existing rate schedule.
Robert D. Willis Hydropower Project Power Rate
Pursuant to Delegation Order Nos. 00-037.00A, effective October 25, 2013, and 00-001.00F, effective November 17, 2014, the Deputy Secretary has approved and placed into effect on an interim basis Rate Order No. SWPA-70, which increases the power rate for the Robert D. Willis Hydropower Project (Willis) pursuant to the Willis Rate Schedule (RDW-15) which supersedes the existing rate schedule.
Privacy Act of 1974; New System of Records
BBG proposes to add a new time and attendance system to its inventory of records systems subject to the Privacy Act of 1974 (5 U.S.C. 522a), as amended. The primary purpose of this system is to track time worked and leave for pay administration, leave administration, reporting, and compliance functions. This action is necessary to meet the requirement of the Privacy Act to publish in the Federal Register notice of the existence and character of records maintained by the Agency (5 U.S.C. 522a(e)(4)).
Indian Gaming; Three Tribal-State Class III Gaming Compacts Taking Effect in the State of California
The State of California entered into Tribal-State compacts governing Class III gaming with: (1) The Santa Ynez Band of Chumash Mission Indians of the Santa Ynez Reservation, California; (2) the Sycuan Band of the Kumeyaay Nation; and (3) the United Auburn Indian Community of the Auburn Rancheria of California. This notice announces that the compacts are taking effect.
Invitation for Public Comment To Inform the Design of a Consent-Based Siting Process for Nuclear Waste Storage and Disposal Facilities
The U.S Department of Energy (DOE) is implementing a consent- based siting process to establish an integrated waste management system to transport, store, and dispose of commercial spent nuclear fuel and high level defense radioactive waste. In a consent-based siting approach, DOE will work with communities, tribal governments and states across the country that express interest in hosting any of the facilities identified as part of an integrated waste management system. As part of this process, the Department wants public input on implementing this system. In order to solicit public feedback, DOE is submitting this Invitation for Public Comment (IPC). Through this IPC, we are requesting feedback from communities, states, Tribes, and other interested stakeholders on how to design a consent-based siting process. In addition, the Department intends to host a series of public meetings to engage communities and discuss the development of a consent-based approach to managing our nation's nuclear waste.
Riverside Chrome Plating Superfund Site; Notice of Proposed CERCLA Administrative Cost Recovery Settlement
The United States Environmental Protection Agency (EPA) is hereby providing notice of a proposed administrative settlement with two parties for recovery of response costs concerning the Riverside Chrome Plating Superfund Site in Riverside County, California (the Site). The proposed settlement requires Settling Parties Cleon Benson and SP Group, who own the Site property, to pay $86,388.99 to reimburse EPA for funds expended in performing and overseeing response actions at the Site. For thirty (30) days following the date of publication of this Notice in the Federal Register, EPA will receive written comments relating to the proposed settlement. EPA will consider all comments received and may modify or withdraw its consent to the settlement if comments received disclose facts or considerations which indicate the proposed settlement is inappropriate, improper, or inadequate. EPA's response to any comments received will be available for public inspection at 75 Hawthorne Street, San Francisco, CA 94105.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.