Pelzer Hydro Company, LLC; Consolidated Hydro Southeast, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments, 81306-81307 [2015-32698]
Download as PDF
asabaliauskas on DSK5VPTVN1PROD with NOTICES
81306
Federal Register / Vol. 80, No. 249 / Tuesday, December 29, 2015 / Notices
transportation of 152,000 dekatherms
per day of natural gas on the existing
pipeline for an initial term of 10 years.
Pursuant to Section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding, or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule will serve to notify
federal and state agencies of the timing
for the completion of all necessary
reviews, and the subsequent need to
complete all federal authorizations
within 90 days of the date of issuance
of the Commission staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
5 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
VerDate Sep<11>2014
19:17 Dec 28, 2015
Jkt 238001
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
Motions to intervene, protests and
comments may be filed electronically
via the Internet in lieu of paper; see, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings.
Comment Date: 5:00 p.m. Eastern
Time on January 12, 2016. .
Dated: December 22, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–32692 Filed 12–28–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 10254–026]
Pelzer Hydro Company, LLC;
Consolidated Hydro Southeast, LLC;
Notice of Application Tendered for
Filing With the Commission and
Soliciting Additional Study Requests
and Establishing Procedural Schedule
for Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Minor New
License.
b. Project No.: P–10254–026.
c. Date filed: November 30, 2015.
d. Applicant: Pelzer Hydro Company,
LLC and Consolidated Hydro Southeast,
LLC.
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
e. Name of Project: Upper Pelzer
Hydroelectric Project.
f. Location: On the Saluda River, in
Anderson and Greenville Counties,
South Carolina. The project does not
occupy lands of the United States.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Beth E. Harris,
P.E., Regional Operations Manager, Enel
Green Power North America, Inc., 11
Anderson St., Piedmont, SC 29674;
(864) 846–0042; Beth.Harris@Enel.com.
i. FERC Contact: Sean Murphy, (202)
502–6145 or sean.murphy@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: January 29, 2016.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first
page of any filing should include docket
number P–10254–026.
m. The application is not ready for
environmental analysis at this time.
n. The Upper Pelzer Hydroelectric
Project consists of: (a) A granite
masonry dam composed of a 150-footlong non-overflow section, a 280-footlong overflow spillway section
E:\FR\FM\29DEN1.SGM
29DEN1
Federal Register / Vol. 80, No. 249 / Tuesday, December 29, 2015 / Notices
surmounted by 4-foot-high flashboards,
and a 75-foot-long gated intake section;
(b) a reservoir with a surface area of 25
acres and a storage capacity of 200 acrefeet at water surface elevation 718.7 feet
msl; (c) a 260-foot-long by 50-foot-wide
forebay; (d) a concrete powerhouse
containing two generating units rated at
750 kW each for a total of 1,500 kW;
(e) a mill building containing one
generating unit rated at 450 kW; (f) a
tailrace extending from the powerhouse
and a tailrace extending from the mill
building; (g) 3.3-kV generator leads; and
(h) appurtenant facilities.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary Hydro Licensing Schedule.
Revisions to the schedule will be made
as appropriate.
asabaliauskas on DSK5VPTVN1PROD with NOTICES
Issue Notice of Acceptance.
Issue Scoping Document 1 for comments.
Comments on Scoping
Document 1due.
Issue Scoping Document 2.
Issue notice of ready
for environmental
analysis.
Commission issues EA
Comments on EA due ..
Commission issues
final EA.
August 2016.
October 2016.
December 2016.
February 2017.
March 2017.
October 2017.
November 2017.
January 2018.
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: December 22, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–32698 Filed 12–28–15; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
19:17 Dec 28, 2015
Jkt 238001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2331–050;
ER13–1351–023; ER10–2330–048;
ER10–2319–041; ER10–2317–041.
Applicants: J.P. Morgan Ventures
Energy Corporation, BE Alabama LLC,
BE CA LLC, Florida Power Development
LLC, Utility Contract Funding, L.L.C.
Description: Notice of Non-Material
Change in Status of the J.P. Morgan
Sellers.
Filed Date: 12/22/15.
Accession Number: 20151222–5155.
Comments Due: 5 p.m. ET 1/12/16.
Docket Numbers: ER10–2437–003.
Applicants: Arizona Public Service
Company.
Description: Triennial Market Power
Update of Arizona Public Service
Company.
Filed Date: 12/22/15.
Accession Number: 20151222–5183.
Comments Due: 5 p.m. ET 2/22/16.
Docket Numbers: ER16–611–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2015–12–22_NIPSCO–IMPA WDS and
NOTIA to be effective 12/23/2015.
Filed Date: 12/22/15.
Accession Number: 20151222–5046.
Comments Due: 5 p.m. ET 1/12/16.
Docket Numbers: ER16–612–000.
Applicants: Greeley Energy Facility,
LLC.
Description: Baseline eTariff Filing:
Baseline New to be effective 2/20/2016.
Filed Date: 12/22/15.
Accession Number: 20151222–5091.
Comments Due: 5 p.m. ET 1/12/16.
Docket Numbers: ER16–613–000.
Applicants: Tilton Energy, LLC.
Description: § 205(d) Rate Filing:
Tilton Energy LLC Revised MBR Tariff
per 35.13(a)(2)(iii) to be effective
12/31/9998.
Filed Date: 12/22/15.
Accession Number: 20151222–5117.
Comments Due: 5 p.m. ET 1/12/16.
Docket Numbers: ER16–614–000.
Applicants: Michigan Power Limited
Partnership.
Description: § 205(d) Rate Filing:
Michigan Power Limited Partnership
Revised MBR Tariff per 35.13(a)(2)(iii)
to be effective 12/31/9998.
Filed Date: 12/22/15.
Accession Number: 20151222–5118.
Comments Due: 5 p.m. ET 1/12/16.
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
81307
Docket Numbers: ER16–615–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Notice of Termination of
Amended and Restated Facilities
Construction Agreement designated as
SA 1376 of Midcontinent Independent
System Operator, Inc.
Filed Date: 12/22/15.
Accession Number: 20151222–5150.
Comments Due: 5 p.m. ET 1/12/16.
Docket Numbers: ER16–616–000.
Applicants: Orion Solar I, LLC.
Description: Baseline eTariff Filing:
Filing of Co-Tenancy Agreement to be
effective 2/21/2016.
Filed Date: 12/22/15.
Accession Number: 20151222–5159.
Comments Due: 5 p.m. ET 1/12/16.
Docket Numbers: ER16–617–000.
Applicants: Orion Solar II, LLC.
Description: Baseline eTariff Filing:
Filing of Co-Tenancy Agreement to be
effective 2/21/2016.
Filed Date: 12/22/15.
Accession Number: 20151222–5160.
Comments Due: 5 p.m. ET 1/12/16.
Docket Numbers: ER16–618–000.
Applicants: GWF Energy LLC.
Description: § 205(d) Rate Filing:
AltaGas San Joaquin Energy Inc. Notice
of Succession to be effective
12/23/2015.
Filed Date: 12/22/15.
Accession Number: 20151222–5191.
Comments Due: 5 p.m. ET 1/12/16.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES16–15–000.
Applicants: KCP&L Greater Missouri
Operations Company.
Description: Application for
Authorization of Issuance of Short-Term
Debt Securities Under Section 204 of the
Federal Power Act of KCP&L Greater
Missouri Operations Company.
Filed Date: 12/22/15.
Accession Number: 20151222–5167.
Comments Due: 5 p.m. ET 1/12/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
E:\FR\FM\29DEN1.SGM
29DEN1
Agencies
[Federal Register Volume 80, Number 249 (Tuesday, December 29, 2015)]
[Notices]
[Pages 81306-81307]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-32698]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 10254-026]
Pelzer Hydro Company, LLC; Consolidated Hydro Southeast, LLC;
Notice of Application Tendered for Filing With the Commission and
Soliciting Additional Study Requests and Establishing Procedural
Schedule for Relicensing and a Deadline for Submission of Final
Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Minor New License.
b. Project No.: P-10254-026.
c. Date filed: November 30, 2015.
d. Applicant: Pelzer Hydro Company, LLC and Consolidated Hydro
Southeast, LLC.
e. Name of Project: Upper Pelzer Hydroelectric Project.
f. Location: On the Saluda River, in Anderson and Greenville
Counties, South Carolina. The project does not occupy lands of the
United States.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Beth E. Harris, P.E., Regional Operations
Manager, Enel Green Power North America, Inc., 11 Anderson St.,
Piedmont, SC 29674; (864) 846-0042; Beth.Harris@Enel.com.
i. FERC Contact: Sean Murphy, (202) 502-6145 or
sean.murphy@ferc.gov.
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: January 29, 2016.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support
at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202)
502-8659 (TTY). In lieu of electronic filing, please send a paper copy
to: Secretary, Federal Energy Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first page of any filing should include
docket number P-10254-026.
m. The application is not ready for environmental analysis at this
time.
n. The Upper Pelzer Hydroelectric Project consists of: (a) A
granite masonry dam composed of a 150-foot-long non-overflow section, a
280-foot-long overflow spillway section
[[Page 81307]]
surmounted by 4-foot-high flashboards, and a 75-foot-long gated intake
section; (b) a reservoir with a surface area of 25 acres and a storage
capacity of 200 acre-feet at water surface elevation 718.7 feet msl;
(c) a 260-foot-long by 50-foot-wide forebay; (d) a concrete powerhouse
containing two generating units rated at 750 kW each for a total of
1,500 kW; (e) a mill building containing one generating unit rated at
450 kW; (f) a tailrace extending from the powerhouse and a tailrace
extending from the mill building; (g) 3.3-kV generator leads; and (h)
appurtenant facilities.
o. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. Procedural schedule and final amendments: The application will
be processed according to the following preliminary Hydro Licensing
Schedule. Revisions to the schedule will be made as appropriate.
Issue Notice of Acceptance............ August 2016.
Issue Scoping Document 1 for comments. October 2016.
Comments on Scoping Document 1due..... December 2016.
Issue Scoping Document 2.............. February 2017.
Issue notice of ready for March 2017.
environmental analysis.
Commission issues EA.................. October 2017.
Comments on EA due.................... November 2017.
Commission issues final EA............ January 2018.
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: December 22, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.