Pelzer Hydro Company, LLC; Consolidated Hydro Southeast, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments, 81304-81305 [2015-32697]
Download as PDF
81304
Federal Register / Vol. 80, No. 249 / Tuesday, December 29, 2015 / Notices
(7) Annual Estimated Number of
Burden Hours: 14,266; and
(8) Annual Estimated Reporting and
Recordkeeping Cost Burden: There are
no additional costs associated with the
surveys other than the burden hours.
The information is maintained in the
normal course of business. The cost of
burden hours to the respondents is
estimated to be $1,026,724 (14,266
burden hours times $71.97 per hour).
Therefore, other than the cost of burden
hours, FE estimates that there are no
additional costs for generating,
maintaining and providing the
information.
Statutory Authority: Section 13(b) of the
Federal Energy Administration Act of 1974,
Public Law 93–275, codified at 15 U.S.C.
772(b) and Section 3 of the Natural Gas Act
of 1938, codified at 15 U.S.C. 717b.
Issued in Washington, DC, on December
22, 2015.
Nanda Srinivasan,
Director, Office of Survey Development and
Statistical Integration, U.S. Energy
Information Administration.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an ‘‘eSubscription’’ link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on January 11, 2016.
Dated: December 22, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–32721 Filed 12–28–15; 8:45 am]
BILLING CODE 6450–01–P
[FR Doc. 2015–32695 Filed 12–28–15; 8:45 am]
DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
[Docket No. ID–7551–002]
Federal Energy Regulatory
Commission
asabaliauskas on DSK5VPTVN1PROD with NOTICES
Zapalac, Will; Notice of Filing
Take notice that on December 21,
2015, Will Zapalac submitted for filing,
an application for authority to hold
interlocking positions, pursuant to
section 305(b) of the Federal Power Act
(FPA) 1 and Part 45 of the Federal
Energy Regulatory Commission’s
(Commission) 2 Rules of Practice and
Procedure.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
1 16
2 18
U.S.C. 825d(b) (2012).
CFR part 45 (2015).
VerDate Sep<11>2014
19:17 Dec 28, 2015
[Docket No. EL16–22–000]
Lotus Energy Group, LLC v. ISO New
England Inc.; Notice of Complaint
Take notice that on December 22,
2015, pursuant to Rule 206 1 of the
Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice, Lotus Energy Group, LLC
(Complainant) filed a formal complaint
against ISO New England Inc.
(Respondent), alleging that
Respondent’s application of existing
New Resource Offer Floor Price rules to
two merchant combustion turbine
generating facilities currently being
developed by Complainant is unjust and
unreasonable.
Complainant certifies that copies of
the complaint were served on the
contacts for Respondent as listed on the
Commission’s list of Corporate Officials.
In addition, Complainant also served all
parties listed on the service list in
Docket No. ER16–308–000.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
1 18
Jkt 238001
PO 00000
CFR 385.206 (2011).
Frm 00033
Fmt 4703
Sfmt 4703
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC There is an ‘‘eSubscription’’ link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on January 21, 2016.
Dated: December 22, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–32694 Filed 12–28–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 10253–032]
Pelzer Hydro Company, LLC;
Consolidated Hydro Southeast, LLC;
Notice of Application Tendered for
Filing With the Commission and
Soliciting Additional Study Requests
and Establishing Procedural Schedule
for Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Minor New
License.
E:\FR\FM\29DEN1.SGM
29DEN1
asabaliauskas on DSK5VPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 249 / Tuesday, December 29, 2015 / Notices
b. Project No.: P–10253–032.
c. Date filed: November 30, 2015.
d. Applicant: Pelzer Hydro Company,
LLC and Consolidated Hydro Southeast,
LLC.
e. Name of Project: Lower Pelzer
Hydroelectric Project.
f. Location: On the Saluda River, in
Anderson and Greenville Counties,
South Carolina. The project does not
occupy lands of the United States.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)—825(r).
h. Applicant Contact: Beth E. Harris,
P.E., Regional Operations Manager, Enel
Green Power North America, Inc., 11
Anderson St., Piedmont, SC 29674;
(864) 846–0042; Beth.Harris@Enel.com
i. FERC Contact: Sean Murphy, (202)
502–6145 or sean.murphy@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: January 29, 2016
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first
page of any filing should include docket
number P–10253–032.
m. The application is not ready for
environmental analysis at this time.
VerDate Sep<11>2014
19:17 Dec 28, 2015
Jkt 238001
n. The Lower Pelzer Hydroelectric
Project consists of: (a) a granite masonry
dam with 310-foot-long overflow
spillway section surmounted with fourfoot-high flashboards, a 40-foot-long
non-overflow section incorporating two
gates and openings, a 110-foot-long
powerhouse, and a 236-foot-long nonoverflow section; (b) a reservoir with a
surface area of 80 acres and a storage
capacity of 400 acre-feet at an elevation
of 693 feet m.s.l.; (c) a 600 foot-long
tailrace; (d) four 750-kVA synchronous
generators and a 300-kVA synchronous
generator for a total generating capacity
of 3,300 kW; (e) 3.3-kVA generator
leads; (f) a 3-mile-long 3.3-kVA
overhead transmission line; and (g)
appurtenant facilities.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary Hydro Licensing Schedule.
Revisions to the schedule will be made
as appropriate.
Issue Notice of Acceptance.
Issue Scoping Document 1 for comments.
Comments on Scoping
Document 1due.
Issue Scoping Document 2.
Issue notice of ready
for environmental
analysis.
Commission issues EA
Comments on EA due ..
Commission issues
final EA.
August 2016.
October 2016.
December 2016.
February 2017.
March 2017.
October 2017.
November 2017.
January 2018.
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: December 22, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–32697 Filed 12–28–15; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
81305
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP16–35–000]
First ECA Midstream LLC; Notice of
Application
Take notice that on December 18,
2015, First ECA Midstream LLC
(FECAM), filed an application pursuant
to section 7(c) of the Natural Gas Act
(NGA), and Parts 157 and 284 of the
Commission’s Regulations, for a
certificate of public convenience and
necessity to own, operate as an
interstate pipeline, and maintain an
existing approximately 16 mile, 4–16
inch diameter natural gas pipeline
located in Clearfield and Elk Counties,
Pennsylvania. Also, FECAM requests
Blanket Certificates and Waivers of the
tariff requirements, related accounting,
and other regulatory requirements. The
filing may also be viewed on the Web
at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TYY, (202)
502–8659.
Any questions regarding this
application should be directed to
Benjamin M. Sullivan, First ECA
Midstream LLC, 500 Corporate Landing,
Charleston, West Virginia 25311,
telephone (304) 925–6100, fax (304)
925–3285, email: bsullivan@eca.com; or
Randall S. Rich, Pierce Atwood LLP,
900 17th Street NW., Suite 350,
Washington, DC 20006, phone (202)
530–6424, email: rrich@
pierceatwood.com.
The existing pipeline currently is
used solely for the gathering of natural
gas for delivery to the interstate pipeline
system of Dominion Transmission, Inc.
(DTI) and National Fuel Gas Supply
Corporation (NFG). FECAM requests
Commission’s approval of using the
pipeline for the purpose of transporting
natural gas in interstate commerce. The
existing pipeline not only will continue
to deliver natural gas to DTI and NFG,
but also will receive natural gas from
DTI. The existing pipeline will transport
certain of natural gas received from DTI
to a power plant operated by NRG
REMA LLC (REMA), in Shawville,
Pennsylvania. FECAM will construct
measurement and regulating facilities to
receive gas from DTI and a tap for
delivery gas to the power plant’s line
pursuant to the blanket certificate.
FECAM, REMA, and their affiliates have
entered into an agreement for the firm
E:\FR\FM\29DEN1.SGM
29DEN1
Agencies
[Federal Register Volume 80, Number 249 (Tuesday, December 29, 2015)]
[Notices]
[Pages 81304-81305]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-32697]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 10253-032]
Pelzer Hydro Company, LLC; Consolidated Hydro Southeast, LLC;
Notice of Application Tendered for Filing With the Commission and
Soliciting Additional Study Requests and Establishing Procedural
Schedule for Relicensing and a Deadline for Submission of Final
Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Minor New License.
[[Page 81305]]
b. Project No.: P-10253-032.
c. Date filed: November 30, 2015.
d. Applicant: Pelzer Hydro Company, LLC and Consolidated Hydro
Southeast, LLC.
e. Name of Project: Lower Pelzer Hydroelectric Project.
f. Location: On the Saluda River, in Anderson and Greenville
Counties, South Carolina. The project does not occupy lands of the
United States.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)--825(r).
h. Applicant Contact: Beth E. Harris, P.E., Regional Operations
Manager, Enel Green Power North America, Inc., 11 Anderson St.,
Piedmont, SC 29674; (864) 846-0042; Beth.Harris@Enel.com
i. FERC Contact: Sean Murphy, (202) 502-6145 or
sean.murphy@ferc.gov.
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: January 29, 2016
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support
at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202)
502-8659 (TTY). In lieu of electronic filing, please send a paper copy
to: Secretary, Federal Energy Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first page of any filing should include
docket number P-10253-032.
m. The application is not ready for environmental analysis at this
time.
n. The Lower Pelzer Hydroelectric Project consists of: (a) a
granite masonry dam with 310-foot-long overflow spillway section
surmounted with four-foot-high flashboards, a 40-foot-long non-overflow
section incorporating two gates and openings, a 110-foot-long
powerhouse, and a 236-foot-long non-overflow section; (b) a reservoir
with a surface area of 80 acres and a storage capacity of 400 acre-feet
at an elevation of 693 feet m.s.l.; (c) a 600 foot-long tailrace; (d)
four 750-kVA synchronous generators and a 300-kVA synchronous generator
for a total generating capacity of 3,300 kW; (e) 3.3-kVA generator
leads; (f) a 3-mile-long 3.3-kVA overhead transmission line; and (g)
appurtenant facilities.
o. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. Procedural schedule and final amendments: The application will
be processed according to the following preliminary Hydro Licensing
Schedule. Revisions to the schedule will be made as appropriate.
Issue Notice of Acceptance............ August 2016.
Issue Scoping Document 1 for comments. October 2016.
Comments on Scoping Document 1due..... December 2016.
Issue Scoping Document 2.............. February 2017.
Issue notice of ready for March 2017.
environmental analysis.
Commission issues EA.................. October 2017.
Comments on EA due.................... November 2017.
Commission issues final EA............ January 2018.
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: December 22, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-32697 Filed 12-28-15; 8:45 am]
BILLING CODE 6717-01-P