Brookfield White Pine Hydro LLC; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 81308 [2015-32696]
Download as PDF
81308
Federal Register / Vol. 80, No. 249 / Tuesday, December 29, 2015 / Notices
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 22, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–32691 Filed 12–28–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2531–075]
asabaliauskas on DSK5VPTVN1PROD with NOTICES
Brookfield White Pine Hydro LLC;
Notice of Application Tendered for
Filing With the Commission and
Establishing Procedural Schedule for
Licensing and Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2531–075.
c. Date Filed: December 18, 2015.
d. Applicant: Brookfield White Pine
Hydro LLC (White Pine Hydro).
e. Name of Project: West Buxton
Hydroelectric Project.
f. Location: The existing project is
located on the Saco River in the Towns
of Buxton, Hollis, and Standish, within
York and Cumberland Counties, Maine.
No federal lands are occupied by project
works or located within the project
boundary.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Frank Dunlap,
Licensing Specialist, Brookfield White
Pine Hydro LLC, 150 Main Street,
Lewiston, ME 04240; Telephone—(207)
755–5603; Email—Frank.Dunlap@
BrookfieldRenewable.com. OR Kelley
Maloney, Manager of licensing and
Compliance, Brookfield White Pine
Hydro LLC, 150 Maine Street, Lewiston,
ME 04240; Telephone—(207) 755–5606.
i. FERC Contact: Allan Creamer, (202)
502–8365, or allan.creamer@ferc.gov.
j. This application is not ready for
environmental analysis (EA) at this
time.
k. Project Description: The West
Buxton Project consists of: (1) A 585foot-long by 30-foot-high concrete
gravity dam with a crest elevation of
173.8 feet (United States Geological
Survey or USGS datum), consisting of (i)
two overflow sections topped with three
VerDate Sep<11>2014
19:17 Dec 28, 2015
Jkt 238001
inflatable rubber dam sections that have
a crest elevation of 178.1 feet (USGS
datum) when fully inflated, (ii) a gated
section containing a 20-foot-wide by 15foot-high vertical lift gate, (iii) two 40foot-wide by 11-foot-high stanchion
sections, (iv) an 11-foot-wide log sluice
section, and (v) an intake structure
comprised of two vertical lift gates
regulating the flow of water to the lower
powerhouse and five gate openings (two
sealed by stoplogs) controlling water
flow to the upper powerhouse; (2) a 118acre impoundment at a normal pool
elevation of 177.8 feet (USGS datum);
(3) a 105 feet long by 39 feet wide upper
powerhouse integral with the dam,
containing five horizontal axis Francis
turbine generating units that total 3,812
kW; (4) a 241.5-foot-long concrete
conduit leading from the intake
structure to a 74-foot-long by 30 to 45foot wide surge chamber, and then to
the lower powerhouse; (5) a 51.2 feet
long by 45.5 feet wide lower
powerhouse, containing one 4,000 kW
vertical axis Kaplan turbine generating
unit; (6) two 38-kV transmission lines,
connecting the upper and lower
powerhouses to the non-project West
Buxton switching station; and (7)
appurtenant facilities.
White Pine Hydro operates the project
in a run-of-river mode, in accordance
with the 1997 Saco River Instream Flow
Agreement, which provides that outflow
approximate inflow from the upstream
Bonny Eagle Project No. 2529 and act to
minimize impoundment level
fluctuations. White Pine Hydro also
operates the project with a minimum
outflow of 768 cfs, or inflow, whichever
is less, in accordance with the project’s
current water quality certificate. The
project generates an annual average of
34,007 MWh.
l. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov, using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)–
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in item (h) above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
m. Procedural Schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule will be made as appropriate.
Notice of Acceptance/
Notice of Ready for
Environmental Analysis.
Filing of recommendations, preliminary
terms and conditions,
and fishway prescriptions.
Commission issues EA
Comments on EA .........
Modified Terms and
Conditions.
Commission Issues
Final EA, if necessary.
February 2016.
April 2016.
August 2016.
September 2016.
November 2016.
February 2017.
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: December 22, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–32696 Filed 12–28–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL15–44–000]
Sage Grouse Energy Project, LLC;
Notice Rejecting Request for
Extension of Time
December 22, 2015.
On December 3, 2015, the
Commission issued an order denying a
complaint filed by Sage Grouse Energy
Project, LLC (Sage Grouse) against
PacifiCorp under Rule 206(a) of the
Commission’s Rules of Practice and
Procedure.1 On December 16, 2015,
Sage Grouse filed a motion for extension
of time and waiver, asking the
Commission to grant a 30-day extension
of time for Sage Grouse to determine
whether to file a request for rehearing of
the December 3 Order.
Pursuant to section 313(a) of the
Federal Power Act,2 an aggrieved party
must file an application for rehearing
within thirty days after the issuance of
the Commission’s order. Moreover, the
courts and the Commission have
repeatedly recognized that the time
period by which a party may file an
application for rehearing of a
1 Sage Grouse Energy Project, LLC, 153 FERC
¶ 61,272 (2015) (December 3 Order).
2 16 U.S.C. 825l(a) (2012).
E:\FR\FM\29DEN1.SGM
29DEN1
Agencies
[Federal Register Volume 80, Number 249 (Tuesday, December 29, 2015)]
[Notices]
[Page 81308]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-32696]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2531-075]
Brookfield White Pine Hydro LLC; Notice of Application Tendered
for Filing With the Commission and Establishing Procedural Schedule for
Licensing and Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2531-075.
c. Date Filed: December 18, 2015.
d. Applicant: Brookfield White Pine Hydro LLC (White Pine Hydro).
e. Name of Project: West Buxton Hydroelectric Project.
f. Location: The existing project is located on the Saco River in
the Towns of Buxton, Hollis, and Standish, within York and Cumberland
Counties, Maine. No federal lands are occupied by project works or
located within the project boundary.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Frank Dunlap, Licensing Specialist,
Brookfield White Pine Hydro LLC, 150 Main Street, Lewiston, ME 04240;
Telephone--(207) 755-5603; Email_Frank.Dunlap@BrookfieldRenewable.com.
OR Kelley Maloney, Manager of licensing and Compliance, Brookfield
White Pine Hydro LLC, 150 Maine Street, Lewiston, ME 04240; Telephone--
(207) 755-5606.
i. FERC Contact: Allan Creamer, (202) 502-8365, or
allan.creamer@ferc.gov.
j. This application is not ready for environmental analysis (EA) at
this time.
k. Project Description: The West Buxton Project consists of: (1) A
585-foot-long by 30-foot-high concrete gravity dam with a crest
elevation of 173.8 feet (United States Geological Survey or USGS
datum), consisting of (i) two overflow sections topped with three
inflatable rubber dam sections that have a crest elevation of 178.1
feet (USGS datum) when fully inflated, (ii) a gated section containing
a 20-foot-wide by 15-foot-high vertical lift gate, (iii) two 40-foot-
wide by 11-foot-high stanchion sections, (iv) an 11-foot-wide log
sluice section, and (v) an intake structure comprised of two vertical
lift gates regulating the flow of water to the lower powerhouse and
five gate openings (two sealed by stoplogs) controlling water flow to
the upper powerhouse; (2) a 118-acre impoundment at a normal pool
elevation of 177.8 feet (USGS datum); (3) a 105 feet long by 39 feet
wide upper powerhouse integral with the dam, containing five horizontal
axis Francis turbine generating units that total 3,812 kW; (4) a 241.5-
foot-long concrete conduit leading from the intake structure to a 74-
foot-long by 30 to 45-foot wide surge chamber, and then to the lower
powerhouse; (5) a 51.2 feet long by 45.5 feet wide lower powerhouse,
containing one 4,000 kW vertical axis Kaplan turbine generating unit;
(6) two 38-kV transmission lines, connecting the upper and lower
powerhouses to the non-project West Buxton switching station; and (7)
appurtenant facilities.
White Pine Hydro operates the project in a run-of-river mode, in
accordance with the 1997 Saco River Instream Flow Agreement, which
provides that outflow approximate inflow from the upstream Bonny Eagle
Project No. 2529 and act to minimize impoundment level fluctuations.
White Pine Hydro also operates the project with a minimum outflow of
768 cfs, or inflow, whichever is less, in accordance with the project's
current water quality certificate. The project generates an annual
average of 34,007 MWh.
l. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov, using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support at FERCOnlineSupport@ferc.gov, (866)-208-3676 (toll
free), or (202) 502-8659 (TTY). A copy is also available for inspection
and reproduction at the address in item (h) above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
m. Procedural Schedule: The application will be processed according
to the following preliminary Hydro Licensing Schedule. Revisions to the
schedule will be made as appropriate.
Notice of Acceptance/Notice of Ready February 2016.
for Environmental Analysis.
Filing of recommendations, preliminary April 2016.
terms and conditions, and fishway
prescriptions.
Commission issues EA.................. August 2016.
Comments on EA........................ September 2016.
Modified Terms and Conditions......... November 2016.
Commission Issues Final EA, if February 2017.
necessary.
o. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: December 22, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-32696 Filed 12-28-15; 8:45 am]