Brookfield White Pine Hydro LLC; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 81308 [2015-32696]

Download as PDF 81308 Federal Register / Vol. 80, No. 249 / Tuesday, December 29, 2015 / Notices service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: December 22, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–32691 Filed 12–28–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2531–075] asabaliauskas on DSK5VPTVN1PROD with NOTICES Brookfield White Pine Hydro LLC; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 2531–075. c. Date Filed: December 18, 2015. d. Applicant: Brookfield White Pine Hydro LLC (White Pine Hydro). e. Name of Project: West Buxton Hydroelectric Project. f. Location: The existing project is located on the Saco River in the Towns of Buxton, Hollis, and Standish, within York and Cumberland Counties, Maine. No federal lands are occupied by project works or located within the project boundary. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Frank Dunlap, Licensing Specialist, Brookfield White Pine Hydro LLC, 150 Main Street, Lewiston, ME 04240; Telephone—(207) 755–5603; Email—Frank.Dunlap@ BrookfieldRenewable.com. OR Kelley Maloney, Manager of licensing and Compliance, Brookfield White Pine Hydro LLC, 150 Maine Street, Lewiston, ME 04240; Telephone—(207) 755–5606. i. FERC Contact: Allan Creamer, (202) 502–8365, or allan.creamer@ferc.gov. j. This application is not ready for environmental analysis (EA) at this time. k. Project Description: The West Buxton Project consists of: (1) A 585foot-long by 30-foot-high concrete gravity dam with a crest elevation of 173.8 feet (United States Geological Survey or USGS datum), consisting of (i) two overflow sections topped with three VerDate Sep<11>2014 19:17 Dec 28, 2015 Jkt 238001 inflatable rubber dam sections that have a crest elevation of 178.1 feet (USGS datum) when fully inflated, (ii) a gated section containing a 20-foot-wide by 15foot-high vertical lift gate, (iii) two 40foot-wide by 11-foot-high stanchion sections, (iv) an 11-foot-wide log sluice section, and (v) an intake structure comprised of two vertical lift gates regulating the flow of water to the lower powerhouse and five gate openings (two sealed by stoplogs) controlling water flow to the upper powerhouse; (2) a 118acre impoundment at a normal pool elevation of 177.8 feet (USGS datum); (3) a 105 feet long by 39 feet wide upper powerhouse integral with the dam, containing five horizontal axis Francis turbine generating units that total 3,812 kW; (4) a 241.5-foot-long concrete conduit leading from the intake structure to a 74-foot-long by 30 to 45foot wide surge chamber, and then to the lower powerhouse; (5) a 51.2 feet long by 45.5 feet wide lower powerhouse, containing one 4,000 kW vertical axis Kaplan turbine generating unit; (6) two 38-kV transmission lines, connecting the upper and lower powerhouses to the non-project West Buxton switching station; and (7) appurtenant facilities. White Pine Hydro operates the project in a run-of-river mode, in accordance with the 1997 Saco River Instream Flow Agreement, which provides that outflow approximate inflow from the upstream Bonny Eagle Project No. 2529 and act to minimize impoundment level fluctuations. White Pine Hydro also operates the project with a minimum outflow of 768 cfs, or inflow, whichever is less, in accordance with the project’s current water quality certificate. The project generates an annual average of 34,007 MWh. l. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov, using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866)– 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in item (h) above. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 m. Procedural Schedule: The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate. Notice of Acceptance/ Notice of Ready for Environmental Analysis. Filing of recommendations, preliminary terms and conditions, and fishway prescriptions. Commission issues EA Comments on EA ......... Modified Terms and Conditions. Commission Issues Final EA, if necessary. February 2016. April 2016. August 2016. September 2016. November 2016. February 2017. o. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Dated: December 22, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–32696 Filed 12–28–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL15–44–000] Sage Grouse Energy Project, LLC; Notice Rejecting Request for Extension of Time December 22, 2015. On December 3, 2015, the Commission issued an order denying a complaint filed by Sage Grouse Energy Project, LLC (Sage Grouse) against PacifiCorp under Rule 206(a) of the Commission’s Rules of Practice and Procedure.1 On December 16, 2015, Sage Grouse filed a motion for extension of time and waiver, asking the Commission to grant a 30-day extension of time for Sage Grouse to determine whether to file a request for rehearing of the December 3 Order. Pursuant to section 313(a) of the Federal Power Act,2 an aggrieved party must file an application for rehearing within thirty days after the issuance of the Commission’s order. Moreover, the courts and the Commission have repeatedly recognized that the time period by which a party may file an application for rehearing of a 1 Sage Grouse Energy Project, LLC, 153 FERC ¶ 61,272 (2015) (December 3 Order). 2 16 U.S.C. 825l(a) (2012). E:\FR\FM\29DEN1.SGM 29DEN1

Agencies

[Federal Register Volume 80, Number 249 (Tuesday, December 29, 2015)]
[Notices]
[Page 81308]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-32696]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2531-075]


Brookfield White Pine Hydro LLC; Notice of Application Tendered 
for Filing With the Commission and Establishing Procedural Schedule for 
Licensing and Deadline for Submission of Final Amendments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: 2531-075.
    c. Date Filed: December 18, 2015.
    d. Applicant: Brookfield White Pine Hydro LLC (White Pine Hydro).
    e. Name of Project: West Buxton Hydroelectric Project.
    f. Location: The existing project is located on the Saco River in 
the Towns of Buxton, Hollis, and Standish, within York and Cumberland 
Counties, Maine. No federal lands are occupied by project works or 
located within the project boundary.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Frank Dunlap, Licensing Specialist, 
Brookfield White Pine Hydro LLC, 150 Main Street, Lewiston, ME 04240; 
Telephone--(207) 755-5603; Email_Frank.Dunlap@BrookfieldRenewable.com. 
OR Kelley Maloney, Manager of licensing and Compliance, Brookfield 
White Pine Hydro LLC, 150 Maine Street, Lewiston, ME 04240; Telephone--
(207) 755-5606.
    i. FERC Contact: Allan Creamer, (202) 502-8365, or 
allan.creamer@ferc.gov.
    j. This application is not ready for environmental analysis (EA) at 
this time.
    k. Project Description: The West Buxton Project consists of: (1) A 
585-foot-long by 30-foot-high concrete gravity dam with a crest 
elevation of 173.8 feet (United States Geological Survey or USGS 
datum), consisting of (i) two overflow sections topped with three 
inflatable rubber dam sections that have a crest elevation of 178.1 
feet (USGS datum) when fully inflated, (ii) a gated section containing 
a 20-foot-wide by 15-foot-high vertical lift gate, (iii) two 40-foot-
wide by 11-foot-high stanchion sections, (iv) an 11-foot-wide log 
sluice section, and (v) an intake structure comprised of two vertical 
lift gates regulating the flow of water to the lower powerhouse and 
five gate openings (two sealed by stoplogs) controlling water flow to 
the upper powerhouse; (2) a 118-acre impoundment at a normal pool 
elevation of 177.8 feet (USGS datum); (3) a 105 feet long by 39 feet 
wide upper powerhouse integral with the dam, containing five horizontal 
axis Francis turbine generating units that total 3,812 kW; (4) a 241.5-
foot-long concrete conduit leading from the intake structure to a 74-
foot-long by 30 to 45-foot wide surge chamber, and then to the lower 
powerhouse; (5) a 51.2 feet long by 45.5 feet wide lower powerhouse, 
containing one 4,000 kW vertical axis Kaplan turbine generating unit; 
(6) two 38-kV transmission lines, connecting the upper and lower 
powerhouses to the non-project West Buxton switching station; and (7) 
appurtenant facilities.
    White Pine Hydro operates the project in a run-of-river mode, in 
accordance with the 1997 Saco River Instream Flow Agreement, which 
provides that outflow approximate inflow from the upstream Bonny Eagle 
Project No. 2529 and act to minimize impoundment level fluctuations. 
White Pine Hydro also operates the project with a minimum outflow of 
768 cfs, or inflow, whichever is less, in accordance with the project's 
current water quality certificate. The project generates an annual 
average of 34,007 MWh.
    l. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at https://www.ferc.gov, using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support at FERCOnlineSupport@ferc.gov, (866)-208-3676 (toll 
free), or (202) 502-8659 (TTY). A copy is also available for inspection 
and reproduction at the address in item (h) above.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    m. Procedural Schedule: The application will be processed according 
to the following preliminary Hydro Licensing Schedule. Revisions to the 
schedule will be made as appropriate.

Notice of Acceptance/Notice of Ready    February 2016.
 for Environmental Analysis.
Filing of recommendations, preliminary  April 2016.
 terms and conditions, and fishway
 prescriptions.
Commission issues EA..................  August 2016.
Comments on EA........................  September 2016.
Modified Terms and Conditions.........  November 2016.
Commission Issues Final EA, if          February 2017.
 necessary.
 

    o. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

    Dated: December 22, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-32696 Filed 12-28-15; 8:45 am]