Combined Notice of Filings #2, 81307-81308 [2015-32691]
Download as PDF
Federal Register / Vol. 80, No. 249 / Tuesday, December 29, 2015 / Notices
surmounted by 4-foot-high flashboards,
and a 75-foot-long gated intake section;
(b) a reservoir with a surface area of 25
acres and a storage capacity of 200 acrefeet at water surface elevation 718.7 feet
msl; (c) a 260-foot-long by 50-foot-wide
forebay; (d) a concrete powerhouse
containing two generating units rated at
750 kW each for a total of 1,500 kW;
(e) a mill building containing one
generating unit rated at 450 kW; (f) a
tailrace extending from the powerhouse
and a tailrace extending from the mill
building; (g) 3.3-kV generator leads; and
(h) appurtenant facilities.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary Hydro Licensing Schedule.
Revisions to the schedule will be made
as appropriate.
asabaliauskas on DSK5VPTVN1PROD with NOTICES
Issue Notice of Acceptance.
Issue Scoping Document 1 for comments.
Comments on Scoping
Document 1due.
Issue Scoping Document 2.
Issue notice of ready
for environmental
analysis.
Commission issues EA
Comments on EA due ..
Commission issues
final EA.
August 2016.
October 2016.
December 2016.
February 2017.
March 2017.
October 2017.
November 2017.
January 2018.
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: December 22, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–32698 Filed 12–28–15; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
19:17 Dec 28, 2015
Jkt 238001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2331–050;
ER13–1351–023; ER10–2330–048;
ER10–2319–041; ER10–2317–041.
Applicants: J.P. Morgan Ventures
Energy Corporation, BE Alabama LLC,
BE CA LLC, Florida Power Development
LLC, Utility Contract Funding, L.L.C.
Description: Notice of Non-Material
Change in Status of the J.P. Morgan
Sellers.
Filed Date: 12/22/15.
Accession Number: 20151222–5155.
Comments Due: 5 p.m. ET 1/12/16.
Docket Numbers: ER10–2437–003.
Applicants: Arizona Public Service
Company.
Description: Triennial Market Power
Update of Arizona Public Service
Company.
Filed Date: 12/22/15.
Accession Number: 20151222–5183.
Comments Due: 5 p.m. ET 2/22/16.
Docket Numbers: ER16–611–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2015–12–22_NIPSCO–IMPA WDS and
NOTIA to be effective 12/23/2015.
Filed Date: 12/22/15.
Accession Number: 20151222–5046.
Comments Due: 5 p.m. ET 1/12/16.
Docket Numbers: ER16–612–000.
Applicants: Greeley Energy Facility,
LLC.
Description: Baseline eTariff Filing:
Baseline New to be effective 2/20/2016.
Filed Date: 12/22/15.
Accession Number: 20151222–5091.
Comments Due: 5 p.m. ET 1/12/16.
Docket Numbers: ER16–613–000.
Applicants: Tilton Energy, LLC.
Description: § 205(d) Rate Filing:
Tilton Energy LLC Revised MBR Tariff
per 35.13(a)(2)(iii) to be effective
12/31/9998.
Filed Date: 12/22/15.
Accession Number: 20151222–5117.
Comments Due: 5 p.m. ET 1/12/16.
Docket Numbers: ER16–614–000.
Applicants: Michigan Power Limited
Partnership.
Description: § 205(d) Rate Filing:
Michigan Power Limited Partnership
Revised MBR Tariff per 35.13(a)(2)(iii)
to be effective 12/31/9998.
Filed Date: 12/22/15.
Accession Number: 20151222–5118.
Comments Due: 5 p.m. ET 1/12/16.
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
81307
Docket Numbers: ER16–615–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Notice of Termination of
Amended and Restated Facilities
Construction Agreement designated as
SA 1376 of Midcontinent Independent
System Operator, Inc.
Filed Date: 12/22/15.
Accession Number: 20151222–5150.
Comments Due: 5 p.m. ET 1/12/16.
Docket Numbers: ER16–616–000.
Applicants: Orion Solar I, LLC.
Description: Baseline eTariff Filing:
Filing of Co-Tenancy Agreement to be
effective 2/21/2016.
Filed Date: 12/22/15.
Accession Number: 20151222–5159.
Comments Due: 5 p.m. ET 1/12/16.
Docket Numbers: ER16–617–000.
Applicants: Orion Solar II, LLC.
Description: Baseline eTariff Filing:
Filing of Co-Tenancy Agreement to be
effective 2/21/2016.
Filed Date: 12/22/15.
Accession Number: 20151222–5160.
Comments Due: 5 p.m. ET 1/12/16.
Docket Numbers: ER16–618–000.
Applicants: GWF Energy LLC.
Description: § 205(d) Rate Filing:
AltaGas San Joaquin Energy Inc. Notice
of Succession to be effective
12/23/2015.
Filed Date: 12/22/15.
Accession Number: 20151222–5191.
Comments Due: 5 p.m. ET 1/12/16.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES16–15–000.
Applicants: KCP&L Greater Missouri
Operations Company.
Description: Application for
Authorization of Issuance of Short-Term
Debt Securities Under Section 204 of the
Federal Power Act of KCP&L Greater
Missouri Operations Company.
Filed Date: 12/22/15.
Accession Number: 20151222–5167.
Comments Due: 5 p.m. ET 1/12/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
E:\FR\FM\29DEN1.SGM
29DEN1
81308
Federal Register / Vol. 80, No. 249 / Tuesday, December 29, 2015 / Notices
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 22, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–32691 Filed 12–28–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2531–075]
asabaliauskas on DSK5VPTVN1PROD with NOTICES
Brookfield White Pine Hydro LLC;
Notice of Application Tendered for
Filing With the Commission and
Establishing Procedural Schedule for
Licensing and Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2531–075.
c. Date Filed: December 18, 2015.
d. Applicant: Brookfield White Pine
Hydro LLC (White Pine Hydro).
e. Name of Project: West Buxton
Hydroelectric Project.
f. Location: The existing project is
located on the Saco River in the Towns
of Buxton, Hollis, and Standish, within
York and Cumberland Counties, Maine.
No federal lands are occupied by project
works or located within the project
boundary.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Frank Dunlap,
Licensing Specialist, Brookfield White
Pine Hydro LLC, 150 Main Street,
Lewiston, ME 04240; Telephone—(207)
755–5603; Email—Frank.Dunlap@
BrookfieldRenewable.com. OR Kelley
Maloney, Manager of licensing and
Compliance, Brookfield White Pine
Hydro LLC, 150 Maine Street, Lewiston,
ME 04240; Telephone—(207) 755–5606.
i. FERC Contact: Allan Creamer, (202)
502–8365, or allan.creamer@ferc.gov.
j. This application is not ready for
environmental analysis (EA) at this
time.
k. Project Description: The West
Buxton Project consists of: (1) A 585foot-long by 30-foot-high concrete
gravity dam with a crest elevation of
173.8 feet (United States Geological
Survey or USGS datum), consisting of (i)
two overflow sections topped with three
VerDate Sep<11>2014
19:17 Dec 28, 2015
Jkt 238001
inflatable rubber dam sections that have
a crest elevation of 178.1 feet (USGS
datum) when fully inflated, (ii) a gated
section containing a 20-foot-wide by 15foot-high vertical lift gate, (iii) two 40foot-wide by 11-foot-high stanchion
sections, (iv) an 11-foot-wide log sluice
section, and (v) an intake structure
comprised of two vertical lift gates
regulating the flow of water to the lower
powerhouse and five gate openings (two
sealed by stoplogs) controlling water
flow to the upper powerhouse; (2) a 118acre impoundment at a normal pool
elevation of 177.8 feet (USGS datum);
(3) a 105 feet long by 39 feet wide upper
powerhouse integral with the dam,
containing five horizontal axis Francis
turbine generating units that total 3,812
kW; (4) a 241.5-foot-long concrete
conduit leading from the intake
structure to a 74-foot-long by 30 to 45foot wide surge chamber, and then to
the lower powerhouse; (5) a 51.2 feet
long by 45.5 feet wide lower
powerhouse, containing one 4,000 kW
vertical axis Kaplan turbine generating
unit; (6) two 38-kV transmission lines,
connecting the upper and lower
powerhouses to the non-project West
Buxton switching station; and (7)
appurtenant facilities.
White Pine Hydro operates the project
in a run-of-river mode, in accordance
with the 1997 Saco River Instream Flow
Agreement, which provides that outflow
approximate inflow from the upstream
Bonny Eagle Project No. 2529 and act to
minimize impoundment level
fluctuations. White Pine Hydro also
operates the project with a minimum
outflow of 768 cfs, or inflow, whichever
is less, in accordance with the project’s
current water quality certificate. The
project generates an annual average of
34,007 MWh.
l. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov, using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)–
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in item (h) above.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
m. Procedural Schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. Revisions to the
schedule will be made as appropriate.
Notice of Acceptance/
Notice of Ready for
Environmental Analysis.
Filing of recommendations, preliminary
terms and conditions,
and fishway prescriptions.
Commission issues EA
Comments on EA .........
Modified Terms and
Conditions.
Commission Issues
Final EA, if necessary.
February 2016.
April 2016.
August 2016.
September 2016.
November 2016.
February 2017.
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: December 22, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–32696 Filed 12–28–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL15–44–000]
Sage Grouse Energy Project, LLC;
Notice Rejecting Request for
Extension of Time
December 22, 2015.
On December 3, 2015, the
Commission issued an order denying a
complaint filed by Sage Grouse Energy
Project, LLC (Sage Grouse) against
PacifiCorp under Rule 206(a) of the
Commission’s Rules of Practice and
Procedure.1 On December 16, 2015,
Sage Grouse filed a motion for extension
of time and waiver, asking the
Commission to grant a 30-day extension
of time for Sage Grouse to determine
whether to file a request for rehearing of
the December 3 Order.
Pursuant to section 313(a) of the
Federal Power Act,2 an aggrieved party
must file an application for rehearing
within thirty days after the issuance of
the Commission’s order. Moreover, the
courts and the Commission have
repeatedly recognized that the time
period by which a party may file an
application for rehearing of a
1 Sage Grouse Energy Project, LLC, 153 FERC
¶ 61,272 (2015) (December 3 Order).
2 16 U.S.C. 825l(a) (2012).
E:\FR\FM\29DEN1.SGM
29DEN1
Agencies
[Federal Register Volume 80, Number 249 (Tuesday, December 29, 2015)]
[Notices]
[Pages 81307-81308]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-32691]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #2
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER10-2331-050; ER13-1351-023; ER10-2330-048; ER10-
2319-041; ER10-2317-041.
Applicants: J.P. Morgan Ventures Energy Corporation, BE Alabama
LLC, BE CA LLC, Florida Power Development LLC, Utility Contract
Funding, L.L.C.
Description: Notice of Non-Material Change in Status of the J.P.
Morgan Sellers.
Filed Date: 12/22/15.
Accession Number: 20151222-5155.
Comments Due: 5 p.m. ET 1/12/16.
Docket Numbers: ER10-2437-003.
Applicants: Arizona Public Service Company.
Description: Triennial Market Power Update of Arizona Public
Service Company.
Filed Date: 12/22/15.
Accession Number: 20151222-5183.
Comments Due: 5 p.m. ET 2/22/16.
Docket Numbers: ER16-611-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2015-12-22_NIPSCO-IMPA WDS
and NOTIA to be effective 12/23/2015.
Filed Date: 12/22/15.
Accession Number: 20151222-5046.
Comments Due: 5 p.m. ET 1/12/16.
Docket Numbers: ER16-612-000.
Applicants: Greeley Energy Facility, LLC.
Description: Baseline eTariff Filing: Baseline New to be effective
2/20/2016.
Filed Date: 12/22/15.
Accession Number: 20151222-5091.
Comments Due: 5 p.m. ET 1/12/16.
Docket Numbers: ER16-613-000.
Applicants: Tilton Energy, LLC.
Description: Sec. 205(d) Rate Filing: Tilton Energy LLC Revised
MBR Tariff per 35.13(a)(2)(iii) to be effective 12/31/9998.
Filed Date: 12/22/15.
Accession Number: 20151222-5117.
Comments Due: 5 p.m. ET 1/12/16.
Docket Numbers: ER16-614-000.
Applicants: Michigan Power Limited Partnership.
Description: Sec. 205(d) Rate Filing: Michigan Power Limited
Partnership Revised MBR Tariff per 35.13(a)(2)(iii) to be effective 12/
31/9998.
Filed Date: 12/22/15.
Accession Number: 20151222-5118.
Comments Due: 5 p.m. ET 1/12/16.
Docket Numbers: ER16-615-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Notice of Termination of Amended and Restated
Facilities Construction Agreement designated as SA 1376 of Midcontinent
Independent System Operator, Inc.
Filed Date: 12/22/15.
Accession Number: 20151222-5150.
Comments Due: 5 p.m. ET 1/12/16.
Docket Numbers: ER16-616-000.
Applicants: Orion Solar I, LLC.
Description: Baseline eTariff Filing: Filing of Co-Tenancy
Agreement to be effective 2/21/2016.
Filed Date: 12/22/15.
Accession Number: 20151222-5159.
Comments Due: 5 p.m. ET 1/12/16.
Docket Numbers: ER16-617-000.
Applicants: Orion Solar II, LLC.
Description: Baseline eTariff Filing: Filing of Co-Tenancy
Agreement to be effective 2/21/2016.
Filed Date: 12/22/15.
Accession Number: 20151222-5160.
Comments Due: 5 p.m. ET 1/12/16.
Docket Numbers: ER16-618-000.
Applicants: GWF Energy LLC.
Description: Sec. 205(d) Rate Filing: AltaGas San Joaquin Energy
Inc. Notice of Succession to be effective 12/23/2015.
Filed Date: 12/22/15.
Accession Number: 20151222-5191.
Comments Due: 5 p.m. ET 1/12/16.
Take notice that the Commission received the following electric
securities filings:
Docket Numbers: ES16-15-000.
Applicants: KCP&L Greater Missouri Operations Company.
Description: Application for Authorization of Issuance of Short-
Term Debt Securities Under Section 204 of the Federal Power Act of
KCP&L Greater Missouri Operations Company.
Filed Date: 12/22/15.
Accession Number: 20151222-5167.
Comments Due: 5 p.m. ET 1/12/16.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and Sec. 385.214) on or
before 5:00 p.m. Eastern time on the specified comment date. Protests
may be considered, but intervention is necessary to become a party to
the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests,
[[Page 81308]]
service, and qualifying facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information,
call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Dated: December 22, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-32691 Filed 12-28-15; 8:45 am]
BILLING CODE 6717-01-P