Combined Notice of Filings #2, 81307-81308 [2015-32691]

Download as PDF Federal Register / Vol. 80, No. 249 / Tuesday, December 29, 2015 / Notices surmounted by 4-foot-high flashboards, and a 75-foot-long gated intake section; (b) a reservoir with a surface area of 25 acres and a storage capacity of 200 acrefeet at water surface elevation 718.7 feet msl; (c) a 260-foot-long by 50-foot-wide forebay; (d) a concrete powerhouse containing two generating units rated at 750 kW each for a total of 1,500 kW; (e) a mill building containing one generating unit rated at 450 kW; (f) a tailrace extending from the powerhouse and a tailrace extending from the mill building; (g) 3.3-kV generator leads; and (h) appurtenant facilities. o. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. p. Procedural schedule and final amendments: The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate. asabaliauskas on DSK5VPTVN1PROD with NOTICES Issue Notice of Acceptance. Issue Scoping Document 1 for comments. Comments on Scoping Document 1due. Issue Scoping Document 2. Issue notice of ready for environmental analysis. Commission issues EA Comments on EA due .. Commission issues final EA. August 2016. October 2016. December 2016. February 2017. March 2017. October 2017. November 2017. January 2018. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Dated: December 22, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–32698 Filed 12–28–15; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 19:17 Dec 28, 2015 Jkt 238001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #2 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2331–050; ER13–1351–023; ER10–2330–048; ER10–2319–041; ER10–2317–041. Applicants: J.P. Morgan Ventures Energy Corporation, BE Alabama LLC, BE CA LLC, Florida Power Development LLC, Utility Contract Funding, L.L.C. Description: Notice of Non-Material Change in Status of the J.P. Morgan Sellers. Filed Date: 12/22/15. Accession Number: 20151222–5155. Comments Due: 5 p.m. ET 1/12/16. Docket Numbers: ER10–2437–003. Applicants: Arizona Public Service Company. Description: Triennial Market Power Update of Arizona Public Service Company. Filed Date: 12/22/15. Accession Number: 20151222–5183. Comments Due: 5 p.m. ET 2/22/16. Docket Numbers: ER16–611–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2015–12–22_NIPSCO–IMPA WDS and NOTIA to be effective 12/23/2015. Filed Date: 12/22/15. Accession Number: 20151222–5046. Comments Due: 5 p.m. ET 1/12/16. Docket Numbers: ER16–612–000. Applicants: Greeley Energy Facility, LLC. Description: Baseline eTariff Filing: Baseline New to be effective 2/20/2016. Filed Date: 12/22/15. Accession Number: 20151222–5091. Comments Due: 5 p.m. ET 1/12/16. Docket Numbers: ER16–613–000. Applicants: Tilton Energy, LLC. Description: § 205(d) Rate Filing: Tilton Energy LLC Revised MBR Tariff per 35.13(a)(2)(iii) to be effective 12/31/9998. Filed Date: 12/22/15. Accession Number: 20151222–5117. Comments Due: 5 p.m. ET 1/12/16. Docket Numbers: ER16–614–000. Applicants: Michigan Power Limited Partnership. Description: § 205(d) Rate Filing: Michigan Power Limited Partnership Revised MBR Tariff per 35.13(a)(2)(iii) to be effective 12/31/9998. Filed Date: 12/22/15. Accession Number: 20151222–5118. Comments Due: 5 p.m. ET 1/12/16. PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 81307 Docket Numbers: ER16–615–000. Applicants: Midcontinent Independent System Operator, Inc. Description: Notice of Termination of Amended and Restated Facilities Construction Agreement designated as SA 1376 of Midcontinent Independent System Operator, Inc. Filed Date: 12/22/15. Accession Number: 20151222–5150. Comments Due: 5 p.m. ET 1/12/16. Docket Numbers: ER16–616–000. Applicants: Orion Solar I, LLC. Description: Baseline eTariff Filing: Filing of Co-Tenancy Agreement to be effective 2/21/2016. Filed Date: 12/22/15. Accession Number: 20151222–5159. Comments Due: 5 p.m. ET 1/12/16. Docket Numbers: ER16–617–000. Applicants: Orion Solar II, LLC. Description: Baseline eTariff Filing: Filing of Co-Tenancy Agreement to be effective 2/21/2016. Filed Date: 12/22/15. Accession Number: 20151222–5160. Comments Due: 5 p.m. ET 1/12/16. Docket Numbers: ER16–618–000. Applicants: GWF Energy LLC. Description: § 205(d) Rate Filing: AltaGas San Joaquin Energy Inc. Notice of Succession to be effective 12/23/2015. Filed Date: 12/22/15. Accession Number: 20151222–5191. Comments Due: 5 p.m. ET 1/12/16. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES16–15–000. Applicants: KCP&L Greater Missouri Operations Company. Description: Application for Authorization of Issuance of Short-Term Debt Securities Under Section 204 of the Federal Power Act of KCP&L Greater Missouri Operations Company. Filed Date: 12/22/15. Accession Number: 20151222–5167. Comments Due: 5 p.m. ET 1/12/16. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and § 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, E:\FR\FM\29DEN1.SGM 29DEN1 81308 Federal Register / Vol. 80, No. 249 / Tuesday, December 29, 2015 / Notices service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: December 22, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–32691 Filed 12–28–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2531–075] asabaliauskas on DSK5VPTVN1PROD with NOTICES Brookfield White Pine Hydro LLC; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 2531–075. c. Date Filed: December 18, 2015. d. Applicant: Brookfield White Pine Hydro LLC (White Pine Hydro). e. Name of Project: West Buxton Hydroelectric Project. f. Location: The existing project is located on the Saco River in the Towns of Buxton, Hollis, and Standish, within York and Cumberland Counties, Maine. No federal lands are occupied by project works or located within the project boundary. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Frank Dunlap, Licensing Specialist, Brookfield White Pine Hydro LLC, 150 Main Street, Lewiston, ME 04240; Telephone—(207) 755–5603; Email—Frank.Dunlap@ BrookfieldRenewable.com. OR Kelley Maloney, Manager of licensing and Compliance, Brookfield White Pine Hydro LLC, 150 Maine Street, Lewiston, ME 04240; Telephone—(207) 755–5606. i. FERC Contact: Allan Creamer, (202) 502–8365, or allan.creamer@ferc.gov. j. This application is not ready for environmental analysis (EA) at this time. k. Project Description: The West Buxton Project consists of: (1) A 585foot-long by 30-foot-high concrete gravity dam with a crest elevation of 173.8 feet (United States Geological Survey or USGS datum), consisting of (i) two overflow sections topped with three VerDate Sep<11>2014 19:17 Dec 28, 2015 Jkt 238001 inflatable rubber dam sections that have a crest elevation of 178.1 feet (USGS datum) when fully inflated, (ii) a gated section containing a 20-foot-wide by 15foot-high vertical lift gate, (iii) two 40foot-wide by 11-foot-high stanchion sections, (iv) an 11-foot-wide log sluice section, and (v) an intake structure comprised of two vertical lift gates regulating the flow of water to the lower powerhouse and five gate openings (two sealed by stoplogs) controlling water flow to the upper powerhouse; (2) a 118acre impoundment at a normal pool elevation of 177.8 feet (USGS datum); (3) a 105 feet long by 39 feet wide upper powerhouse integral with the dam, containing five horizontal axis Francis turbine generating units that total 3,812 kW; (4) a 241.5-foot-long concrete conduit leading from the intake structure to a 74-foot-long by 30 to 45foot wide surge chamber, and then to the lower powerhouse; (5) a 51.2 feet long by 45.5 feet wide lower powerhouse, containing one 4,000 kW vertical axis Kaplan turbine generating unit; (6) two 38-kV transmission lines, connecting the upper and lower powerhouses to the non-project West Buxton switching station; and (7) appurtenant facilities. White Pine Hydro operates the project in a run-of-river mode, in accordance with the 1997 Saco River Instream Flow Agreement, which provides that outflow approximate inflow from the upstream Bonny Eagle Project No. 2529 and act to minimize impoundment level fluctuations. White Pine Hydro also operates the project with a minimum outflow of 768 cfs, or inflow, whichever is less, in accordance with the project’s current water quality certificate. The project generates an annual average of 34,007 MWh. l. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov, using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866)– 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in item (h) above. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 m. Procedural Schedule: The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate. Notice of Acceptance/ Notice of Ready for Environmental Analysis. Filing of recommendations, preliminary terms and conditions, and fishway prescriptions. Commission issues EA Comments on EA ......... Modified Terms and Conditions. Commission Issues Final EA, if necessary. February 2016. April 2016. August 2016. September 2016. November 2016. February 2017. o. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Dated: December 22, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–32696 Filed 12–28–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL15–44–000] Sage Grouse Energy Project, LLC; Notice Rejecting Request for Extension of Time December 22, 2015. On December 3, 2015, the Commission issued an order denying a complaint filed by Sage Grouse Energy Project, LLC (Sage Grouse) against PacifiCorp under Rule 206(a) of the Commission’s Rules of Practice and Procedure.1 On December 16, 2015, Sage Grouse filed a motion for extension of time and waiver, asking the Commission to grant a 30-day extension of time for Sage Grouse to determine whether to file a request for rehearing of the December 3 Order. Pursuant to section 313(a) of the Federal Power Act,2 an aggrieved party must file an application for rehearing within thirty days after the issuance of the Commission’s order. Moreover, the courts and the Commission have repeatedly recognized that the time period by which a party may file an application for rehearing of a 1 Sage Grouse Energy Project, LLC, 153 FERC ¶ 61,272 (2015) (December 3 Order). 2 16 U.S.C. 825l(a) (2012). E:\FR\FM\29DEN1.SGM 29DEN1

Agencies

[Federal Register Volume 80, Number 249 (Tuesday, December 29, 2015)]
[Notices]
[Pages 81307-81308]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-32691]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings #2

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER10-2331-050; ER13-1351-023; ER10-2330-048; ER10-
2319-041; ER10-2317-041.
    Applicants: J.P. Morgan Ventures Energy Corporation, BE Alabama 
LLC, BE CA LLC, Florida Power Development LLC, Utility Contract 
Funding, L.L.C.
    Description: Notice of Non-Material Change in Status of the J.P. 
Morgan Sellers.
    Filed Date: 12/22/15.
    Accession Number: 20151222-5155.
    Comments Due: 5 p.m. ET 1/12/16.

    Docket Numbers: ER10-2437-003.
    Applicants: Arizona Public Service Company.
    Description: Triennial Market Power Update of Arizona Public 
Service Company.
    Filed Date: 12/22/15.
    Accession Number: 20151222-5183.
    Comments Due: 5 p.m. ET 2/22/16.

    Docket Numbers: ER16-611-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Sec.  205(d) Rate Filing: 2015-12-22_NIPSCO-IMPA WDS 
and NOTIA to be effective 12/23/2015.
    Filed Date: 12/22/15.
    Accession Number: 20151222-5046.
    Comments Due: 5 p.m. ET 1/12/16.

    Docket Numbers: ER16-612-000.
    Applicants: Greeley Energy Facility, LLC.
    Description: Baseline eTariff Filing: Baseline New to be effective 
2/20/2016.
    Filed Date: 12/22/15.
    Accession Number: 20151222-5091.
    Comments Due: 5 p.m. ET 1/12/16.

    Docket Numbers: ER16-613-000.
    Applicants: Tilton Energy, LLC.
    Description: Sec.  205(d) Rate Filing: Tilton Energy LLC Revised 
MBR Tariff per 35.13(a)(2)(iii) to be effective 12/31/9998.
    Filed Date: 12/22/15.
    Accession Number: 20151222-5117.
    Comments Due: 5 p.m. ET 1/12/16.

    Docket Numbers: ER16-614-000.
    Applicants: Michigan Power Limited Partnership.
    Description: Sec.  205(d) Rate Filing: Michigan Power Limited 
Partnership Revised MBR Tariff per 35.13(a)(2)(iii) to be effective 12/
31/9998.
    Filed Date: 12/22/15.
    Accession Number: 20151222-5118.
    Comments Due: 5 p.m. ET 1/12/16.

    Docket Numbers: ER16-615-000.
    Applicants: Midcontinent Independent System Operator, Inc.
    Description: Notice of Termination of Amended and Restated 
Facilities Construction Agreement designated as SA 1376 of Midcontinent 
Independent System Operator, Inc.
    Filed Date: 12/22/15.
    Accession Number: 20151222-5150.
    Comments Due: 5 p.m. ET 1/12/16.

    Docket Numbers: ER16-616-000.
    Applicants: Orion Solar I, LLC.
    Description: Baseline eTariff Filing: Filing of Co-Tenancy 
Agreement to be effective 2/21/2016.
    Filed Date: 12/22/15.
    Accession Number: 20151222-5159.
    Comments Due: 5 p.m. ET 1/12/16.

    Docket Numbers: ER16-617-000.
    Applicants: Orion Solar II, LLC.
    Description: Baseline eTariff Filing: Filing of Co-Tenancy 
Agreement to be effective 2/21/2016.
    Filed Date: 12/22/15.
    Accession Number: 20151222-5160.
    Comments Due: 5 p.m. ET 1/12/16.

    Docket Numbers: ER16-618-000.
    Applicants: GWF Energy LLC.
    Description: Sec.  205(d) Rate Filing: AltaGas San Joaquin Energy 
Inc. Notice of Succession to be effective 12/23/2015.
    Filed Date: 12/22/15.
    Accession Number: 20151222-5191.
    Comments Due: 5 p.m. ET 1/12/16.

    Take notice that the Commission received the following electric 
securities filings:

    Docket Numbers: ES16-15-000.
    Applicants: KCP&L Greater Missouri Operations Company.
    Description: Application for Authorization of Issuance of Short-
Term Debt Securities Under Section 204 of the Federal Power Act of 
KCP&L Greater Missouri Operations Company.
    Filed Date: 12/22/15.
    Accession Number: 20151222-5167.
    Comments Due: 5 p.m. ET 1/12/16.

    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and Sec.  385.214) on or 
before 5:00 p.m. Eastern time on the specified comment date. Protests 
may be considered, but intervention is necessary to become a party to 
the proceeding.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests,

[[Page 81308]]

service, and qualifying facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, 
call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.

    Dated: December 22, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-32691 Filed 12-28-15; 8:45 am]
 BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.