Combined Notice of Filings #1, 81309-81310 [2015-32689]
Download as PDF
Federal Register / Vol. 80, No. 249 / Tuesday, December 29, 2015 / Notices
Commission order is statutorily
established at 30 days and that the
Commission has no discretion to extend
that deadline.3 Because the 30-day
rehearing deadline is a statutory
deadline, it cannot be extended, and
Sage Grouse’s request for a 30-day
extension must therefore be rejected.
Dated: December 22, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–32693 Filed 12–28–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM15–11–000]
Reliability Standard for Transmission
System Planned Performance for
Geomagnetic Disturbance Events;
Notice of Technical Conference
Take notice that the Federal Energy
Regulatory Commission (Commission)
will hold a Commission staff-led
technical conference on Reliability
Standard for Transmission System
Planned Performance for Geomagnetic
Disturbance (GMD) Events on issues
identified in the Notice of Proposed
Rulemaking (NOPR) and subsequent
public comments in the abovecaptioned docket on March 1, 2016. The
conference will begin at 9:00 a.m. and
end at approximately 5:00 p.m. (Eastern
Time). The conference will be held at
the Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426.
The technical conference will
facilitate a structured dialogue on GMDrelated topics, including but not limited
to: (1) The benchmark GMD event(s); (2)
vulnerability assessments; and (3)
monitoring of related parameters. The
technical conference will be led by
Commission staff, with prepared
asabaliauskas on DSK5VPTVN1PROD with NOTICES
3 See,
e.g., City of Campbell v. FERC, 770 F.2d
1180, 1183 (D.C. Cir. 1985) (‘‘The 30-day time
requirement of the [FPA] is as much a part of the
jurisdictional threshold as the mandate to file for
a rehearing.’’); Boston Gas Co. v. FERC, 575 F.2d
975, 977–98, 979 (1st Cir. 1978) (describing
identical rehearing provision of Natural Gas Act as
‘‘a tightly structured and formal provision. Neither
the Commission or the courts are given any form
of jurisdictional discretion.’’); see also PJM
Interconnection, L.L.C., 138 FERC ¶ 61,160 (2012)
(rejecting request for clarification as untimely
request for rehearing); La. Energy and Power Auth.,
117 FERC ¶ 61,258 (2006); Midwest Indep.
Transmission Sys. Operator, Inc., 112 FERC
¶ 61,211, at P 10 (2005); Texas-New Mexico Power
Co., 107 FERC ¶ 61,316, at P 22 (2004); Cal. Indep.
Sys. Operator Corp., 105 FERC ¶ 61,322, at P 9
(2003); Am. Elec. Power Serv. Corp., 95 FERC
¶ 61,130, at 61,411–12 (2001).
VerDate Sep<11>2014
19:17 Dec 28, 2015
Jkt 238001
remarks to be presented by invited
panelists, which must be submitted to
the Commission in advance of the
conference. A subsequent notice
providing an agenda and details on the
topics for discussion will be issued in
advance of the conference.
Commissioners may attend and
participate.
There is no fee for attendance.
However, members of the public are
encouraged to preregister online at:
https://www.ferc.gov/whats-new/
registration/03-01-16-form.asp.
Those wishing to participate in panel
discussions should submit nominations
no later than close of business on
Wednesday, January 6, 2016 online at:
https://www.ferc.gov/whats-new/
registration/03-01-16-speaker-form.asp.
This event will be webcast and
transcribed. Transcripts of the
conference will be available for a fee
from Ace-Federal Reporters, Inc. (202–
347–3700).
Commission conferences are
accessible under section 508 of the
Rehabilitation Act of 1973. For
accessibility accommodations please
send an email to accessibility@ferc.gov
or call toll free (866) 208–3372 (voice)
or (202) 502–8659 (TTY), or send a fax
to (202) 208–2106 with the requested
accommodations.
For more information about the
technical conference, please contact:
Sarah McKinley, Office of External
Affairs, 202–502–8368
sarah.mckinley@ferc.gov.
Dated: December 22, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–32699 Filed 12–28–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER13–1356–002.
Applicants: Duke Energy Florida,
LLC.
Description: Compliance filing
[including Pro Forma sheets] and
Waiver Request of Duke Energy Florida,
LLC.
Filed Date: 12/21/15.
Accession Number: 20151221–5379.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER14–2022–002.
Applicants: Midcontinent
Independent System Operator, Inc.
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
81309
Description: Request to Terminate
Waiver effective February 1, 2016 of
Midcontinent Independent System
Operator, Inc.
Filed Date: 12/21/15.
Accession Number: 20151221–5389.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16–599–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: First
Revised Service Agreement No. 4184;
Queue No. Z2–106 to be effective
12/9/2015.
Filed Date: 12/21/15.
Accession Number: 20151221–5274.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16–600–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original Service Agreement No.4346;
Queue No. AA2–066 to be effective
11/24/2015.
Filed Date: 12/21/15.
Accession Number: 20151221–5270.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16–601–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2015–12–21_Revisions to Section
19.1.1.2—Pre-Certified TSRs to be
effective 2/1/2016.
Filed Date: 12/21/15.
Accession Number: 20151221–5272.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16–602–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: First
Revised Interconnection Service
Agreement No. 3808, Queue No. AA1–
083 to be effective 5/6/2017.
Filed Date: 12/21/15.
Accession Number: 20151221–5278.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16–603–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: First
Revised WMPA SA No. 4187, Queue
No. Z2–099/AA2–086 to be effective
11/24/2015.
Filed Date: 12/21/15.
Accession Number: 20151221–5298.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16–604–000.
Applicants: Nevada Power Company.
Description: Compliance filing:
Market-Based Rate Tariff, Volume No.
11 Amendments ER15–2281 to be
effective 12/1/2015.
Filed Date: 12/21/15.
Accession Number: 20151221–5299.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16–605–000.
E:\FR\FM\29DEN1.SGM
29DEN1
asabaliauskas on DSK5VPTVN1PROD with NOTICES
81310
Federal Register / Vol. 80, No. 249 / Tuesday, December 29, 2015 / Notices
Applicants: Sierra Pacific Power
Company.
Description: Compliance filing:
Market-Based Rate Tariff Volume No. 7
to be effective 12/1/2015.
Filed Date: 12/21/15.
Accession Number: 20151221–5308.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16–606–000.
Applicants: PacifiCorp.
Description: Compliance filing:
Amendment to Market-Based Rate
Tariff—EIM Compliance Filing to be
effective 12/1/2015.
Filed Date: 12/21/15.
Accession Number: 20151221–5310.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16–607–000.
Applicants: 67RK 8me LLC.
Description: § 205(d) Rate Filing: SFA
to be effective 12/22/2015.
Filed Date: 12/21/15.
Accession Number: 20151221–5311.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16–608–000.
Applicants: 65HK 8me LLC.
Description: § 205(d) Rate Filing:
65HK 8me LLC Hayworth SFA to be
effective 12/22/2015.
Filed Date: 12/21/15.
Accession Number: 20151221–5312.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16–609–000.
Applicants: 87RL 8me LLC.
Description: § 205(d) Rate Filing:
87RL 8me LLC Woodmere SFA to be
effective 12/22/2015.
Filed Date: 12/21/15.
Accession Number: 20151221–5313.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16–610–000.
Applicants: Northern Indiana Public
Service Company.
Description: § 205(d) Rate Filing:
Filing of a CIAC Agreement to be
effective 1/4/2016.
Filed Date: 12/21/15.
Accession Number: 20151221–5314.
Comments Due: 5 p.m. ET 1/11/16.
Take notice that the Commission
received the following electric
reliability filings:
Docket Numbers: RR15–12–001.
Applicants: North American Electric
Reliability Corporation.
Description: Compliance Filing of
North American Electric Reliability
Corporation in Accordance with the
Commission’s November 2, 2015 Order.
Filed Date: 12/18/15.
Accession Number: 20151218–5315.
Comments Due: 5 p.m. ET 1/8/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
VerDate Sep<11>2014
20:53 Dec 28, 2015
Jkt 238001
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 22, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–32689 Filed 12–28–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Western Area Power Administration
Central Arizona Project—Rate Order
No. WAPA–172
Western Area Power
Administration, DOE.
ACTION: Notice of final transmission
service formula rates.
AGENCY:
The Deputy Secretary of
Energy confirmed and approved Rate
Order No. WAPA–172 and Rate
Schedules CAP–FT3, CAP–NFT3, and
CAP–NITS3, placing transmission
service formula rates for the Central
Arizona Project (CAP) of the Western
Area Power Administration (Western)
into effect on an interim basis. The
provisional rates will be in effect until
the Federal Energy Regulatory
Commission (FERC) confirms, approves,
and places them into effect on a final
basis, or until they are replaced by other
rates. The provisional rates will provide
sufficient revenue to pay all annual
costs, including interest expense, and
repay required investment within the
allowable periods.
DATES: Rate Schedules CAP–FT3, CAP–
NFT3, and CAP–NITS3 are effective on
the first day of the first full billing
period beginning on or after January 1,
2016, and will be in effect until FERC
confirms, approves, and places the rate
schedules in effect on a final basis
through December 31, 2020, or until the
rate schedules are superseded.
FOR FURTHER INFORMATION CONTACT: Mr.
Jack Murray, Vice President of Power
Marketing, Desert Southwest Customer
Service Regional Office, Western Area
Power Administration, P.O. Box 6457,
SUMMARY:
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
Phoenix, AZ 85005–6457, (602) 605–
2555, email jmurray@wapa.gov.
SUPPLEMENTARY INFORMATION: An FRN
was published on July 24, 2015 (80 FR
44100) announcing the proposed rates
for transmission service and initiating a
public consultation and comment
period. On July 29, 2015, Western
notified all CAP customers and
interested parties of the rate adjustment
and provided a copy of the published
FRN. On August 27, 2015, Western held
a public information forum in Phoenix,
Arizona, explained the proposed rates
and potential changes to the proposed
rates, answered questions, and provided
handouts. On September 24, 2015,
Western held a public comment forum
in Phoenix, Arizona, to give the public
an opportunity to comment for the
record. No comments were received at
the forum.
Previous Rate Schedules CAP–FT2,
CAP–NFT2, and CAP–NITS2 for Rate
Order No. WAPA–124 1 were approved
by FERC for a 5-year period through
December 31, 2010. These Rate
Schedules were extended through
December 31, 2012, under Rate Order
No. WAPA–153,2 and extended again
through December 31, 2015, under Rate
Order No. WAPA–158.3 Rate Schedules
CAP–FT2, CAP–NFT2, and CAP–NITS2
are being superseded by Rate Schedules
CAP–FT3, CAP–NFT3, and CAP–NITS3.
Under Rate Schedule CAP–FT2, the rate
for firm point-to-point transmission
service is $13.56 per kilowatt year (kWyear). The provisional rate for firm
point-to-point transmission service
under Rate Schedule CAP–FT3 is
$14.88/kW-year, which represents an
increase of 10 percent when compared
with the existing rate. Under Rate
Schedule CAP–NFT2, the rate for nonfirm point-to-point transmission service
is 1.55 mills per kilowatt hour (mills/
kWh). The provisional rate for non-firm
point-to-point transmission service
under Rate Schedule CAP–NFT3 is 1.70
mills/kWh, which represents an
increase of 10 percent when compared
with the existing rate. There will be no
changes to the rate formula under CAP–
NITS3.
By Delegation Order No. 00–037.00A,
effective October 25, 2013, the Secretary
of Energy delegated: (1) The authority to
develop power and transmission rates to
Western’s Administrator, (2) the
authority to confirm, approve, and place
such rates into effect on an interim basis
to the Deputy Secretary of Energy, and
1 Rate Order No. WAPA–124 was approved by
FERC on a final basis on June 29, 2006, in Docket
No. EF06–5111–000 (115 FERC ¶ 62,326).
2 76 FR 548 (January 5, 2011).
3 78 FR 18335 (March 26, 2013).
E:\FR\FM\29DEN1.SGM
29DEN1
Agencies
[Federal Register Volume 80, Number 249 (Tuesday, December 29, 2015)]
[Notices]
[Pages 81309-81310]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-32689]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER13-1356-002.
Applicants: Duke Energy Florida, LLC.
Description: Compliance filing [including Pro Forma sheets] and
Waiver Request of Duke Energy Florida, LLC.
Filed Date: 12/21/15.
Accession Number: 20151221-5379.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER14-2022-002.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Request to Terminate Waiver effective February 1, 2016
of Midcontinent Independent System Operator, Inc.
Filed Date: 12/21/15.
Accession Number: 20151221-5389.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16-599-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: First Revised Service
Agreement No. 4184; Queue No. Z2-106 to be effective 12/9/2015.
Filed Date: 12/21/15.
Accession Number: 20151221-5274.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16-600-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: Original Service Agreement
No.4346; Queue No. AA2-066 to be effective 11/24/2015.
Filed Date: 12/21/15.
Accession Number: 20151221-5270.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16-601-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) Rate Filing: 2015-12-21_Revisions to
Section 19.1.1.2--Pre-Certified TSRs to be effective 2/1/2016.
Filed Date: 12/21/15.
Accession Number: 20151221-5272.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16-602-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: First Revised
Interconnection Service Agreement No. 3808, Queue No. AA1-083 to be
effective 5/6/2017.
Filed Date: 12/21/15.
Accession Number: 20151221-5278.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16-603-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) Rate Filing: First Revised WMPA SA No.
4187, Queue No. Z2-099/AA2-086 to be effective 11/24/2015.
Filed Date: 12/21/15.
Accession Number: 20151221-5298.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16-604-000.
Applicants: Nevada Power Company.
Description: Compliance filing: Market-Based Rate Tariff, Volume
No. 11 Amendments ER15-2281 to be effective 12/1/2015.
Filed Date: 12/21/15.
Accession Number: 20151221-5299.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16-605-000.
[[Page 81310]]
Applicants: Sierra Pacific Power Company.
Description: Compliance filing: Market-Based Rate Tariff Volume No.
7 to be effective 12/1/2015.
Filed Date: 12/21/15.
Accession Number: 20151221-5308.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16-606-000.
Applicants: PacifiCorp.
Description: Compliance filing: Amendment to Market-Based Rate
Tariff--EIM Compliance Filing to be effective 12/1/2015.
Filed Date: 12/21/15.
Accession Number: 20151221-5310.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16-607-000.
Applicants: 67RK 8me LLC.
Description: Sec. 205(d) Rate Filing: SFA to be effective 12/22/
2015.
Filed Date: 12/21/15.
Accession Number: 20151221-5311.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16-608-000.
Applicants: 65HK 8me LLC.
Description: Sec. 205(d) Rate Filing: 65HK 8me LLC Hayworth SFA to
be effective 12/22/2015.
Filed Date: 12/21/15.
Accession Number: 20151221-5312.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16-609-000.
Applicants: 87RL 8me LLC.
Description: Sec. 205(d) Rate Filing: 87RL 8me LLC Woodmere SFA to
be effective 12/22/2015.
Filed Date: 12/21/15.
Accession Number: 20151221-5313.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16-610-000.
Applicants: Northern Indiana Public Service Company.
Description: Sec. 205(d) Rate Filing: Filing of a CIAC Agreement
to be effective 1/4/2016.
Filed Date: 12/21/15.
Accession Number: 20151221-5314.
Comments Due: 5 p.m. ET 1/11/16.
Take notice that the Commission received the following electric
reliability filings:
Docket Numbers: RR15-12-001.
Applicants: North American Electric Reliability Corporation.
Description: Compliance Filing of North American Electric
Reliability Corporation in Accordance with the Commission's November 2,
2015 Order.
Filed Date: 12/18/15.
Accession Number: 20151218-5315.
Comments Due: 5 p.m. ET 1/8/16.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and Sec. 385.214) on or
before 5:00 p.m. Eastern time on the specified comment date. Protests
may be considered, but intervention is necessary to become a party to
the proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: December 22, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-32689 Filed 12-28-15; 8:45 am]