Columbia Gas Transmission, LLC;, 80760-80761 [2015-32572]
Download as PDF
80760
Federal Register / Vol. 80, No. 248 / Monday, December 28, 2015 / Notices
(5) Annual Estimated Number of
Respondents: 1,004; (6) Annual
Estimated Number of Total Responses:
79,634; (7) Response Obligation:
Required, except for Noncompliance
Tracking System (see Statutory
Authority section below); (8) Annual
Estimated Number of Burden Hours:
41,733; (9) Annual Estimated Reporting
and Recordkeeping Cost Burden: $0
Statutory Authority: Section 641 of the
Department of Energy Organization Act,
codified at 42 U.S.C. 7251, and the following
additional authorities:
Computerized Accident/Incident Reporting
System (CAIRS): DOE Order 231.1B (June 27,
2011).
Occurrence Reporting and Processing
System (ORPS): DOE Order 232.2 (August 30,
2011).
Noncompliance Tracking System (NTS): 10
CFR part 820; 10 CFR part 851.
Radiation Exposure Monitoring System
(REMS): 10 CFR part 835; DOE Order 231.1B
(June 27, 2011).
Annual Fire Protection Summary
Application: DOE Order 231.1B (June 27,
2011).
Safety Basis Information System: 10 CFR
part 830; DOE O 231.1B (June 27, 2011).
Lessons Learned System: DOE Order
210.2A (April 8, 2011).
Issued in Washington, DC, on December
11, 2015.
Stephanie K. Martin,
Acting Director, Office of Resource
Management, Office of Environment, Health,
Safety and Security.
[FR Doc. 2015–32588 Filed 12–24–15; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER16–517–000]
Dated: December 21, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
mstockstill on DSK4VPTVN1PROD with NOTICES
Shelby County Energy Center, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
[FR Doc. 2015–32574 Filed 12–24–15; 8:45 am]
BILLING CODE 6717–01–P
This is a supplemental notice in the
above-referenced proceeding Shelby
County Energy Center, LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
VerDate Sep<11>2014
13:31 Dec 24, 2015
Jkt 238001
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is January 11,
2016.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP16–31–000]
Columbia Gas Transmission, LLC;
Notice of Request Under Blanket
Authorization
Take notice that on December 10,
2015 Columbia Gas Transmission, LLC
(Columbia Gas), 5151 San Felipe, Suite
2500, Houston, Texas 77056 filed a prior
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
notice request pursuant to sections
157.205 and 157.210 of the
Commission’s regulations under the
Natural Gas Act for authorization to
convert existing compressor units from
base load to standby mode at the
Cleveland Compressor Station, located
in Upshur County, WV and the Files
Creek Compressor Station, located in
Randolph County, WV. Columbia Gas
states that there will be no impact on
Columbia’s overall capacity and
certified horsepower, all as more fully
set forth in the application which is on
file with the Commission and open to
public inspection. The filing may also
be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
Application should be directed to Tyler
R. Brown, Senior Counsel, Columbia
Gas Transmission, LLC, 5151 San
Felipe, Suite 2500, Houston, Texas
77056, by calling (713) 386–3797, or by
email at tbrown@cpg.com.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
E:\FR\FM\28DEN1.SGM
28DEN1
Federal Register / Vol. 80, No. 248 / Monday, December 28, 2015 / Notices
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a) (1) (iii)
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link. Persons
unable to file electronically should
submit original and 5 copies of the
protest or intervention to the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Dated: December 21, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–32572 Filed 12–24–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
mstockstill on DSK4VPTVN1PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–1881–007;
ER11–1894–007; ER11–1893–007;
ER11–1892–007; ER11–1890–007;
ER11–1889–007; ER11–1887–007;
ER11–1886–007; ER11–1885–007;
ER11–1883–007; ER11–1882–007.
Applicants: Burley Butte Wind Park,
LLC, Golden Valley Wind Park, LLC,
VerDate Sep<11>2014
13:31 Dec 24, 2015
Jkt 238001
Milner Dam Wind Park, LLC, Oregon
Trail Wind Park, LLC, Pilgrim Stage
Station Wind Park, LLC, Thousand
Springs Wind Park, LLC, Tuana Gulch
Wind Park, LLC, Camp Reed Wind Park,
LLC, Payne’s Ferry Wind Park, LLC,
Salmon Falls Wind Park, LLC, Yahoo
Creek Wind Park, LLC.
Description: Supplement to August 7,
2015 Notice of Non-Material Change in
Status of the IWP Sellers.
Filed Date: 12/21/15.
Accession Number: 20151221–5141.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER15–1883–002;
ER16–91–002; ER16–90–001; ER15–
2477–001; ER15–1418–002; ER15–1375–
002; ER15–1016–002; ER13–2112–004;
ER13–1992–006; ER13–1991–006;
ER12–631–009; ER12–2444–008; ER11–
4678–009; ER11–4677–009; ER11–4462–
014; ER11–2160–008; ER10–1989–008;
ER10–1971–023; ER10–1962–008;
ER10–1890–008 ER10–1856–008; ER10–
1847–008.
Applicants: Adelanto Solar, LLC,
Adelanto Solar II, LLC, Blythe Solar
110, LLC, Desert Sunlight 250, LLC,
Desert Sunlight 300, LLC, Diablo Winds,
LLC, FPL Energy Cabazon Wind, LLC,
FPL Energy Green Power Wind, LLC,
FPL Energy Montezuma Wind, LLC,
Genesis Solar, LLC, Golden Hills Wind,
LLC, Golden Hills Interconnection, LLC,
High Winds, LLC, McCoy Solar, LLC,
NEPM II, LLC, NextEra Energy
Montezuma II Wind, LLC, NextEra
Energy Power Marketing, LLC, North
Sky River Energy, LLC, Shafter Solar,
LLC, Sky River LLC, Vasco Winds, LLC,
Windpower Partners 1993, LLC
Description: Notification of Change in
Status of the NextEra Resources Entities.
Filed Date: 12/18/15.
Accession Number: 20151218–5311.
Comments Due: 5 p.m. ET 1/8/16.
Docket Numbers: ER16–149–001.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Tariff Amendment:
2015–12–21_SA 2854 MDU–MDU
Amended FCA (F109) to be effective 10/
28/2015.
Filed Date: 12/21/15.
Accession Number: 20151221–5162.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16–587–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA SA No. 4324, Queue
No. Z2–115 to be effective 12/8/2015.
Filed Date: 12/21/15.
Accession Number: 20151221–5091.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16–588–000.
Applicants: PJM Interconnection,
L.L.C.
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
80761
Description: § 205(d) Rate Filing:
Service Agreement No. 2975; Queue No.
W1–082 to be effective 12/2/2015.
Filed Date: 12/21/15.
Accession Number: 20151221–5092.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16–589–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to Florence Solar WMPA
SA No. 3482, Queue No. W3–080 to be
effective 5/8/2014.
Filed Date: 12/21/15.
Accession Number: 20151221–5104.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16–590–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of WMPA SA No.
3248, Queue No. W2–083 to be effective
2/5/2016.
Filed Date: 12/21/15.
Accession Number: 20151221–5110.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16–591–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of WMPA SA No.
3249, Queue No. W2–088 to be effective
2/5/2016.
Filed Date: 12/21/15.
Accession Number: 20151221–5133.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16–592–000.
Applicants: Wisconsin Electric Power
Company.
Description: Application of Wisconsin
Electric Power Company of Depreciation
Study and Change in Depreciation
Rates.
Filed Date: 12/18/15.
Accession Number: 20151218–5300.
Comments Due: 5 p.m. ET 1/8/16.
Docket Numbers: ER16–593–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Cancellation:
Notice of Cancellation of WMPA SA No.
4159, Queue No. AA1–131 to be
effective 2/8/2016.
Filed Date: 12/21/15.
Accession Number: 20151221–5135.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16–594–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Assignment of WMPA SA No. 3859,
Queue No. Z1–082 to HD Project One,
LLC to be effective 5/19/2014.
Filed Date: 12/21/15.
Accession Number: 20151221–5138.
Comments Due: 5 p.m. ET 1/11/16.
Docket Numbers: ER16–595–000.
E:\FR\FM\28DEN1.SGM
28DEN1
Agencies
[Federal Register Volume 80, Number 248 (Monday, December 28, 2015)]
[Notices]
[Pages 80760-80761]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-32572]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP16-31-000]
Columbia Gas Transmission, LLC;
Notice of Request Under Blanket Authorization
Take notice that on December 10, 2015 Columbia Gas Transmission,
LLC (Columbia Gas), 5151 San Felipe, Suite 2500, Houston, Texas 77056
filed a prior notice request pursuant to sections 157.205 and 157.210
of the Commission's regulations under the Natural Gas Act for
authorization to convert existing compressor units from base load to
standby mode at the Cleveland Compressor Station, located in Upshur
County, WV and the Files Creek Compressor Station, located in Randolph
County, WV. Columbia Gas states that there will be no impact on
Columbia's overall capacity and certified horsepower, all as more fully
set forth in the application which is on file with the Commission and
open to public inspection. The filing may also be viewed on the web at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TTY,
(202) 502-8659.
Any questions regarding this Application should be directed to
Tyler R. Brown, Senior Counsel, Columbia Gas Transmission, LLC, 5151
San Felipe, Suite 2500, Houston, Texas 77056, by calling (713) 386-
3797, or by email at tbrown@cpg.com.
Any person may, within 60 days after the issuance of the instant
notice by the Commission, file pursuant to Rule 214 of the Commission's
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of
intervention. Any person filing to intervene or the Commission's staff
may, pursuant to section 157.205 of the Commission's Regulations under
the NGA (18 CFR 157.205) file a protest to the request. If no protest
is filed within the time allowed therefore, the proposed activity shall
be deemed to be authorized effective the day after the time allowed for
protest. If a protest is filed and not withdrawn within 30 days after
the time allowed for filing a protest, the instant request shall be
treated as an application for authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record
[[Page 80761]]
for this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenter's will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commenter's will not be required to serve copies of filed
documents on all other parties. However, the non-party commentary, will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests, and interventions via the internet in lieu of paper. See 18
CFR 385.2001(a) (1) (iii) and the instructions on the Commission's Web
site (www.ferc.gov) under the ``e-Filing'' link. Persons unable to file
electronically should submit original and 5 copies of the protest or
intervention to the Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426.
Dated: December 21, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-32572 Filed 12-24-15; 8:45 am]
BILLING CODE 6717-01-P