Download as PDF Federal Register / Vol. 80, No. 246 / Wednesday, December 23, 2015 / Rules and Regulations notice will mark the beginning of PBGC’s 270-day review period under section 4233(a)(1) of ERISA, and the plan sponsor’s 30-day notice period under 4233(a)(2) of ERISA. * * * * * DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG–2015–1102] 7. In § 4233.12, paragraph (c) is revised to read as follows: ■ § 4233.12 partition. PBGC action on application for * * * * (c) Conditional determination on application. At the request of a plan sponsor, PBGC may, in its discretion, issue an approval of an application conditioned on Treasury issuing a final authorization to suspend under section 305(e)(9)(H)(vi) of ERISA and any other terms and conditions set forth in the conditional approval. The conditional approval will include a written statement of preliminary findings, conclusions, and conditions. The conditional approval is not a final agency action. The proposed partition will only become effective upon satisfaction of the required conditions, and the issuance of an order of partition under section 4233(c) of ERISA. * * * * * 8. In § 4233.13, paragraphs (a)(3) and (4) are revised to read as follows: ■ § 4233.13 Coordinated application process for partition and benefit suspension. (a) * * * (3) If Treasury does not issue the final authorization to suspend, PBGC’s conditional approval under § 4233.12(c) will be null and void. (4) If Treasury issues a final authorization to suspend, PBGC will issue a final partition order under § 4233.14 and section 4233(c) of ERISA. The effective date of a final partition order must satisfy the requirements of section 305(e)(9)(D)(v) of ERISA. * * * * * Issued in Washington, DC, this 18th day of December 2015. W. Thomas Reeder, Director, Pension Benefit Guaranty Corporation. [FR Doc. 2015–32309 Filed 12–22–15; 8:45 am] asabaliauskas on DSK5VPTVN1PROD with RULES Coast Guard, DHS. Notice of deviation from drawbridge regulation. AGENCY: * BILLING CODE 7709–02–P VerDate Sep<11>2014 Drawbridge Operation Regulation; Mill Neck Creek, Oyster Bay, NY 16:43 Dec 22, 2015 Jkt 238001 ACTION: The Coast Guard has issued a temporary deviation from the operating schedule that governs the Bayville Bridge across the Mill Neck Creek, mile 0.1, at Oyster Bay, New York. The deviation is necessary to perform electrical and mechanical upgrades. This deviation allows the bridge to remain in the closed position for approximately 5 days. DATES: This deviation is effective from 7:00 a.m. on January 11, 2016 to 3:30 p.m. on January 15, 2016. ADDRESSES: The docket for this deviation, [USCG–2015–1102] is available at https://www.regulations.gov. Type the docket number in the ‘‘SEARCH’’ box and click ‘‘SEARCH’’. Click on Open Docket Folder on the line associated with this deviation. FOR FURTHER INFORMATION CONTACT: If you have questions on this temporary deviation, call or email Ms. Judy K. Leung-Yee, Project Officer, First Coast Guard District, telephone (212) 514– 4330, email judy.k.leung-yee@uscg.mil. SUPPLEMENTARY INFORMATION: Nassau County Department of Public Works requested this temporary deviation from the normal operating schedule to perform electrical and mechanical upgrades. The Bayville Bridge, mile 0.1, across the Mill Neck Creek has a vertical clearance in the closed position of 9 feet at mean high water and 16 feet at mean low water. The existing bridge operating regulations are found at 33 CFR 117.800. The waterway is transited by one commercial user and recreation vessel traffic. Under this temporary deviation, the Bayville Bridge may remain in the closed position from 7:00 a.m. on January 11, 2016 to 3:30 p.m. on January 15, 2016. Vessels able to pass through the bridge in the closed position may do so at any time. The bridge will not be able to open for emergencies and there is no immediate alternate route for vessels to pass. The Coast Guard will also inform the users of the waterways through our SUMMARY: PO 00000 Frm 00041 Fmt 4700 Sfmt 4700 79695 Local and Broadcast Notices to Mariners of the change in operating schedule for the bridge so that vessels can arrange their transits to minimize any impact caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: December 17, 2015. C.J. Bisignano, Supervisory Bridge Management Specialist, First Coast Guard District. [FR Doc. 2015–32254 Filed 12–22–15; 8:45 am] BILLING CODE 9110–04–P ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA–R08–OAR–2015–0429; FRL–9939–87– Region 8] Air Plan Approval; SD; Update to Materials Incorporated by Reference Environmental Protection Agency (EPA). ACTION: Final rule; administrative change. AGENCY: The Environmental Protection Agency (EPA) is updating the materials that are incorporated by reference (IBR) into the South Dakota State Implementation Plan (SIP). The Regulations affected by this update have been previously submitted by the South Dakota Department of Environment and Natural Resources (SD DENR) and approved by the EPA. In this action, the EPA is also notifying the public of corrections to typographical errors and minor formatting changes to the IBR tables. This update affects the SIP materials that are available for public inspection at the EPA Regional Office. DATES: This action is effective December 23, 2015. ADDRESSES: The EPA has established a docket for this action under Docket Identification Number EPA–R08–OAR– 2015–0429. All documents in the docket are listed on the https:// www.regulations.gov Web site. Although listed in the index, some information may not be publicly available, i.e., Confidential Business Information or other information the disclosure of which is restricted by statute. Certain other material, such as copyrighted material, is not placed on the Internet and will be publicly available only in the hard copy form. Publicly available SUMMARY: E:\FR\FM\23DER1.SGM 23DER1

Agencies

[Federal Register Volume 80, Number 246 (Wednesday, December 23, 2015)]
[Rules and Regulations]
[Page 79695]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-32254]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2015-1102]


Drawbridge Operation Regulation; Mill Neck Creek, Oyster Bay, NY

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the Bayville Bridge across the Mill 
Neck Creek, mile 0.1, at Oyster Bay, New York. The deviation is 
necessary to perform electrical and mechanical upgrades. This deviation 
allows the bridge to remain in the closed position for approximately 5 
days.

DATES: This deviation is effective from 7:00 a.m. on January 11, 2016 
to 3:30 p.m. on January 15, 2016.

ADDRESSES: The docket for this deviation, [USCG-2015-1102] is available 
at https://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH''. Click on Open Docket Folder on the line 
associated with this deviation.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Ms. Judy K. Leung-Yee, Project 
Officer, First Coast Guard District, telephone (212) 514-4330, email 
judy.k.leung-yee@uscg.mil.

SUPPLEMENTARY INFORMATION: Nassau County Department of Public Works 
requested this temporary deviation from the normal operating schedule 
to perform electrical and mechanical upgrades.
    The Bayville Bridge, mile 0.1, across the Mill Neck Creek has a 
vertical clearance in the closed position of 9 feet at mean high water 
and 16 feet at mean low water. The existing bridge operating 
regulations are found at 33 CFR 117.800.
    The waterway is transited by one commercial user and recreation 
vessel traffic.
    Under this temporary deviation, the Bayville Bridge may remain in 
the closed position from 7:00 a.m. on January 11, 2016 to 3:30 p.m. on 
January 15, 2016.
    Vessels able to pass through the bridge in the closed position may 
do so at any time. The bridge will not be able to open for emergencies 
and there is no immediate alternate route for vessels to pass.
    The Coast Guard will also inform the users of the waterways through 
our Local and Broadcast Notices to Mariners of the change in operating 
schedule for the bridge so that vessels can arrange their transits to 
minimize any impact caused by the temporary deviation.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.

    Dated: December 17, 2015.
C.J. Bisignano,
Supervisory Bridge Management Specialist, First Coast Guard District.
[FR Doc. 2015-32254 Filed 12-22-15; 8:45 am]
BILLING CODE 9110-04-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.